PINE CURVE REZONING. Property does not meet criteria for open space preservation and is not a candidate for a park

Similar documents
PINE CURVE REZONING. BACKGROUND Purchased as two parcels in 2001 and 2002

Staff Report to the North Ogden City Planning Commission

Lehigh Acres Land Development Regulations Community Planning Project

Parker Pine Curve Master Plan January 28th, 2009, Public Workshop Comments

Prosperity Hucks Area Plan. Transportation and Planning Committee May 11, 2015

Town Center (part of the Comprehensive Plan)

Draft Cary Community Plan Review Part 3: Shop, Engage, Serve, Special Area Plans, Other Updates. October 27, 2015 Police Department Training Room

Tonight s Agenda. Summary Presentation Open House. Group Discussion Next Steps: online community wide survey

Metro. Activity Center Design Guidelines. Recommendations For Developing Focused, Mixed-Use Commercial/Residential Centers

Policies and Code Intent Sections Related to Town Center

Presentation of the Staff Draft. July 17, 2014 SSRVP Team, Area 3

Aloha Tomorrow Study (2017)

City of Woodinville Planning Commission Study Session. Development Regulations 101: An Overview of Specific Regulatory Items To Help You in 2012

Sheridan Boulevard S TAT I O N A R E A P L A N S H E R I D A N B O U L E VA R D S TAT I O N A R E A P L A N

3.1 community vision. 3.3 required plan elements

Citizen Comment Staff Response Staff Recommended Revision Planning Committee

Lower Merion Commercial Districts Issues and Characteristics Handbook November 2013

Pine Island Road Corridor Master Plan

The Village. Chapter 3. Mixed Use Development Plan SPECIFIC PLAN

TEAM INPUT SUMMARY. Postcard Image?

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004

Review of Opportunity Area C Draft Comprehensive Plan and Draft BOS Follow-On Motions. Special Working Group Meeting March 4, 2015

appendix and street interface guidelines

FUTURE LAND USE ELEMENT

Rezoning Petition Pre-Hearing Staff Analysis September 17, 2018

Broadway District Specific Plan. Community Workshop #2 February 23,2016

INDEPENDENCE BOULEVARD AREA PLAN

Sewanee Village + Request for Builder/Developer Proposals

4- PA - LD - LIVELY DOWNTOWN. LD - Background

2.0 THE PLATINUM TRIANGLE VISION

Table of Contents. Elm Avenue Improvement Plan City of Waco, Texas. Introduction 1. Existing Context 1 Figure 1 2.

EXISTING COMPREHENSIVE PLAN

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN

TOWN COUNCIL / PLANNING COMMISSION

Small Area Plan. South Gateway

Public may provide comments on the GDP within the next two weeks (December 24)

A P P E N D I X B - O P P O R T U N I T Y S I T E S

C. Westerly Creek Village & The Montview Corridor

COMPREHENSIVE PLAN & UNIFIED DEVELOPMENT ORDINANCE

Mix of Uses Guide for Transit-Oriented Development MIX OF USES

Bethesda Downtown Plan

Vision Statement for the Town of Flower Mound Master Plan The Town of Flower Mound Master Plan furthers the established community based vision to:

APPENDICES DESIGNING PUBLIC SPACES - ENERGIZED PUBLIC SPACES DESIGN GUIDELINES WORKING DRAFT DECEMBER 2018 A1

North Downtown Specific Plan MEMORANDUM

MIXED-USE VILLAGE OVERLAY FLOATING DISTRICT

4. Shape Transitions. 4. Shape Transitions

LOW DENSITY RESIDENTIAL

THE NEIGHBORHOOD TODAY

Request Alternative Compliance to the prescribed criteria of the Oceanfront Resort District Form- Based Code. Staff Recommendation Approval

PLAN ELEMENTS WORKSHOP. April 5, 2016

14 October 10, 2012 Public Hearing APPLICANT: MPB, INC

SUBJECT: PREDEVELOPMENT PLAN REVIEW OF PROJECT LOCATED AT E. COLORADO BOULEVARD (PASEO COLORADO)

Zoning Technical Review Presented by Camiros. November 10, 2015

Old Town Neighborhoods Plan. Choices Event Wednesday, December 9, 2015

East Bench Master Plan Update

Corridor Planning Area


PLANNING COMMISSION REPORT

Description of Preferred Alternative

CHAPTER 2: FUTURE LAND USE CONCEPTS

Anatomy of A Vibrant Downtown. Anatomy of a Vibrant Downtown

Wadsworth Boulevard S TAT I O N A R E A P L A N

Town of Liberty, NY COMPREHENSIVE PLAN & ZONING UPDATES

CHAPTER 4 COMMUNITY DEVELOPMENT AND DESIGN

CITY OF PUYALLUP. Background. Development Services

4.1.3 LAND USE CATEGORIES

Leonard s Beach Secondary Plan (Alcona North) Official Plan Amendment

Schedule B to Report PLS

Welcome! to Keller Town Hall

SECTION TWO: Urban Design Concepts

HISTORIC TOWN CENTER MASTER PLAN CITY COUNCIL PRESENTATION APRIL 3, 2012

WHEREAS, after consideration of the evidence presented at the public hearing on January 14, 2010, the Prince George's County Planning Board finds:

MEMORANDUM. DATE: March 15, Chairman and Members Community Redevelopment Agency. Leif J. Ahnell, C.P.A., C.G.F.O. Executive Director

Staff Report and Recommendation

CITY OF MERCER ISLAND DESIGN COMMISSION STAFF REPORT

Town Center. Block 5 Existing multifamily residential units are expected to remain.

A. Background Summary of Existing Challenges and Potential Possibilities. 1. Summary of Existing Assets and Potential Opportunities

Obey Creek July 17, Vicinity Map. Concept Plan Submittal. No

Welcome. Walk Around. Talk to Us. Write Down Your Comments

Request Alternative Compliance to the prescribed criteria of the Oceanfront Resort District Form-Based Code. Staff Planner Kristine Gay

REDLANDS TRANSIT VILLAGES SPECIFIC PLAN

The Floyds Fork Area Plan

ARTICLE 6: Special and Planned Development Districts

Welcome & Introductions

Narcoossee Roadway Corridor

Town of Chapel Hill. Prepared By: A Division of Pennoni. Chapel Hill, NC (919) Firm License: F-1267.

City Center Specific Plan Amendments And Background Report City of Richmond. PLANNING COMMISION FINAL DRAFT January, 2001

Information Session July 25, 2018

Cobb County Design Guidelines Mableton Parkway & Veterans Memorial Highway Community Design Workshop January 12, 2017

Osceola County Board of County Commissioners 1 Courthouse Square, Suite 1100 Kissimmee, FL

Land Use. Hardware Street Vendor Mixed-Use

The City of Poway Creating a Town Center. Patti Brindle, AICP City Planner, City of Poway APA Luncheon September 28, 2006

SLIDE TITLE TRANSIT-ORIENTED DEVELOPMENT PLAN RED-PURPLE BYPASS STUDY AREA PUBLIC MEETING #2 RED AND PURPLE MODERNIZATION. RPM TOD Plan Update

Beatties Ford Road & Mt. Holly-Huntersville Road Small Area Plan

Silver Line CPAM UPDATE. Transportation and Land Use Committee October 14, 2016

City Council Special Meeting AGENDA ITEM NO. C.

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

REQUEST Current Zoning: O-15(CD) (office) Proposed Zoning: TOD-M(CD) (transit oriented development mixed-use, conditional)

2016 Comprehensive Plan

Wheaton CBD & Vicinity Sector Plan D E S I G N G U I D E L I N E S

Transcription:

PINE CURVE REZONING BACKGROUND Purchased as two parcels in 2001 and 2002 Annexed and Zoned Greater Downtown District Historic Center September 25, 2002 and October 7, 2002 WHAT THE PROJECT IS AND IS NOT A Rezoning establishes the land use standards for development which includes: Originally intended to be Police Department and Fire Department headquarters. These facilities were located elsewhere. Property does not meet criteria for open space preservation and is not a candidate for a park Pine Curve Master Plan process conducted in 2009 which developed framework and conceptual illustrations RFQ for development partners released in 2010, received two submittals. The Town has continued conversations with one respondent but no agreement is in place The Parker 2035 Master Plan (2012) shows property as part of East Downtown Gateway Character Area Permitted land uses Setback requirements Height limits Architectural standards A Rezoning is not: A development proposal A site or a landscape plan An engineering document Does not subdivide property Does not transfer property Does not determine the final end user A regional detention pond was constructed in 2014. This detention pond can be redesigned, but will remain on site The Town is proposing to rezone the property from Greater Downtown District Historic Center to Planned Development (PD)

PINE CURVE REZONING - CONSIDERATIONS REZONING CONSIDERATIONS The rezoning process is guided by a number of factors: Parker 2035 Master Plan (www.parkeronline.org/parker2035) Mainstreet Master Plan (www.parkeronline.org/mainstreetplan ) Transportation Master Plan (www.parkeronline.org/tmp) Community input Town Council direction Other guiding factors PARKER 2035 MASTER PLAN (2012) The Parker 2035 Master Plan depicts the Pine Curve property in the East Downtown Gateway Character Area which is described as: A transition from the unique mixed use Downtown Core to the suburban residential uses. Development should focus on framing the gateway to the Downtown Core at the intersection of Pine Drive and Mainstreet. Buildings adjacent to residential shall be compatible in scale and massing. A mixed use neighborhood that includes uses such as higher density residential, office, restaurants, retail, with parks, open space and other public gathering places incorporated. East Downtown Gateway should be compact and walkable. Any auto oriented uses should respect pedestrian safety and movement. The visible impact of drive-throughs, garage doors and gas canopies should be mitigated. MAINSTREET MASTER PLAN (2015) Highlights of the Mainstreet Master Plan as they relate to this site: Pine Curve Site Land uses in this area to be mixed use including retail, office, commercial, civic, educational, institutional, entertainment and residential. 2-5 story height and massing adjacent to Pine Drive and framing the Pine Drive and Mainstreet intersection 1 story maximum height adjacent to Parker Vista residential area. Architecture that creates a sense of place with excellence in design to produce a high quality, visually interesting environment Emphasize a pedestrian and bicycle friendly environment with connectivity to downtown development.

PINE CURVE REZONING WHAT WE HAVE HEARD COMMUNITY INPUT (2015-2016) The downtown character for residents and visitors should extend into the site creating a sense of place that reflects the charming Colorado style and includes a mix of uses Response: Proposed Planning Area 2 as an extension of the downtown Create a safe and comfortable pedestrian and bicycle crossing and connection from downtown across Pine Drive and Mainstreet intersection Response: Retained a transportation planner to evaluate the intersection for pedestrian and bicycle safety and movement Preserve views and create a buffer from Parker Vista Response: Proposes a 55 buffer/no build zone and a transitional planning area that restricts building size, heights and uses No typical big box or typical strip mall development Response: Enhanced architectural standards to mitigate the building scale and impacts. Limit the location of larger buildings, drive throughs and gas stations to the west away from existing neighborhoods and the Pine Drive/Mainstreet intersection. Propose standards for more appropriate downtown development. P A2 extends the downtown Mainstreet feel. Concerned about traffic impacts Response: Retained a traffic engineering firm to conduct a traffic study that will analyze the traffic movement, circulation and impacts Attract independent businesses such as cafés, small shops, offices and residential. Also focus on family and medical needs Response: Proposed zoning will allow for a mix of uses including these uses Attract grocers such as Trader Joes and Whole Foods Preference to not develop the property and dedicate it as open space Response: In 2009 Town Council decided that this site was not to be retained by the Town as a park or open space and would be privately developed Include recreational uses such as a park, plaza, open air markets or indoor ice skating rink Response: Proposed zoning includes meaningful active outdoor space or gathering areas such as small plazas and active sidewalks with patios. Proposed zoning also allows for indoor entertainment. The Town will be constructing a Park next to the new library in 2016. Concerned about the impacts of commercial development such as 24 hour lights noise, activity, crime and reduced quality of life Response: Town code has lighting standards/limits. 24 hour uses (drive through, gas station) only permitted to the west. Zoning includes buffer adjacent to Parker Vista Concerned about over development Response: Since 1985, the Town's Master Plan has designated this area for development. Why now? Response: Town Council directed staff to begin this process in 2009 with the public Pine Curve planning process - after proposed civic uses were built elsewhere. The current strength of the economy has increased development activity and interest in the Town including this site. Response: Proposed zoning will allow for a mix of uses including these uses No typical apartments and consider age restricted housing Response: Proposed zoning to allow age restricted multifamily housing for more downtown life cycle housing options

PINE CURVE REZONING CURRENT ZONING Property is currently zoned Greater Downtown District Historic Center which allows for: REZONING PROCESS The rezoning process is depicted below. Green text is public participation and blue is staff work internal to the Town. Land Use Summary Multifamily residential Hotels, motels and bed and breakfast Office Retail including grocery, convenience and specialty goods Convenience services (dry cleaners, nail salons, barbers, etc ) Restaurants Parks and playgrounds Indoor recreation (special review) Gas station pumps and drive-throughs are not permitted Building Height Four (4 ) stories or 60 Setback Requirements Front maximum 0 Side and rear minimum of 0 Other Requirements: Pedestrian and bicycle friendly 10% requirement for landscaping/plazas/pocket parks/ open space Architectural standards require traditional western commercial forms and materials (an example is the Vines building) No minimum parking requirement Limited requirements for buffers REVIEW EXISTING PLANNING DOCUMENTS & PREVIOUS PINE CURVE PLANNING PUBLIC OPEN HOUSE - INFORMATIONAL DEVELOP DRAFT PD GUIDE & MAP PUBLIC OPEN HOUSE DRAFT PD GUIDE & MAP REVISIONS TO DRAFT PD GUIDE & MAP REZONING APPLICATION SUBMITTED REFERRAL TO OUTSIDE AGENCIES AND HOA s FOR REVIEW & COMMENT PUBLIC OPEN HOUSE DRAFT PD GUIDE & MAP FINAL REVISIONS TO DRAFT PD GUIDE AND MAP PUBLIC HEARINGS TO CONSIDER ADOPTION OF PD ZONING FOR THE SITE JUNE 2016 You Are Here

PINE CURVE REZONING PLANNED DEVELOPMENT PLAN Planned Development (PD) Plan Planned Development (PD) is the proposed zoning. The PD Plan shows multiple planning areas which each have different zoning standards. Associated with the PD Plan is the PD Guide which describes the permitted land uses and standards for each of the Planning Areas. Planning Area 1 (PA-1) Commercial Retail, office and service including drive throughs and gas stations. Planning Area 2 (PA-2) Mainstreet Extension Retail, office and service facing an internal drive with a Mainstreet feel, no drive throughs or gas stations. Corner buildings to frame intersection of Pine Drive & Mainstreet. Planning Area 3 (PA-3) Commercial East Retail, office, service and age restricted housing; no drive throughs or gas stations. Planning Area 4 (PA-4) Limited Mix of Uses, Transition & Buffer One single family home, office and limited use for events. Structure size limits including a maximum building size of 2,900 s.f. and an accessory gazebo with a maximum of 400 s.f. Maximum height of 1 story or 15. Planning Area 5 (PA-5) Limited Commercial Transition & Buffer Events center, office and restaurant including structure size limits and a buffer. Proposed zoning will accommodate the existing use on the site. Additional Proposed Plan Components Height limits will consider views (not to exceed elevation of 5,950) Enhanced architectural standards Bicycle & pedestrian connectivity Landscaping buffer

PINE CURVE REZONING PLANNING OBJECTIVES Develop and adopt appropriate Planned Development (PD) zoning for the Pine Curve property that supports community goals and the Town vision Build upon the 2009 planning process and 2010 request for proposals for the site Ensure that PD rezoning is consistent with the intent of the Parker 2035 Master Plan East Downtown Gateway Character Area that supports: Neighborhood serving uses including retail A transition between existing neighborhoods and the downtown core Ensure that PD zoning is consistent with the intent of the Mainstreet Master Plan (2015) recommendations strengthening the eastern gateway to Downtown GIVENS The Planned Development (PD) rezoning is an open, public process The final rezoning will allow for commercial uses and future private development The rezoning does not obligate the Town to take any future actions. The implementation of the rezoning will be determined at a future date. Primary access points to the site will be from the intersection of Mainstreet and Pine Drive and from the intersection of Pine Drive and Summerset Lane Town Council will make the final decision regarding the rezoning of this site based on: Land use and development policy Goals & objectives of the Parker 2035 Master Plan Goals & objectives of the Mainstreet Master Plan (2015) Public comment, input Staff recommendations and other pertinent information Future development will incorporate a buffer between the development site and the Parker Vista neighborhood PD zoning will incorporate standards for appropriate access, site plan and urban design A grocery anchored commercial shopping center will be a permitted land use Stormwater detention will be located on the site ISSUES/OPPORTUNITIES The following issues and opportunities are important to be considered through the rezoning of this site: Access and Circulation How do automobiles, pedestrians and bicycles access the site and move around within it? How do access points interact with and impact the traveling public on Pine Drive? Integrate into Downtown: Urban Design and Architecture How can development on this site function as a gateway and become part of downtown? The character, look and feel of this site matters. Land Use What are the most appropriate uses that make the site part of downtown. How does this site transition from the more intense land uses near Pine Drive to the existing neighborhoods to the east including the design of a buffer. NEXT STEPS Application and Referral Process February 2016 Public Open House Spring 2016 Public Hearings June 2016 CONTACT INFORMATION Mary Munekata - mmunekata@parkeronline.org Bryce Matthews - bmatthews@parkeronline.org Phone Number - 303.841.2332. Project Website www.parkeronline.org/pinecurve