NITOL INSURANCE COMPANY LIMITED

Similar documents
FIRE & ALLIED PERILS PROPOSAL FORM (TEXTILE) 1. Name of Proposer. 2. Address. 3. Name of Bankers, if involved. 4. Contact Person Telephone No. Fax No.

FIRE PROTECTION PROGRAM

Highly Protected Risks in Power Generation Stewart Kidd outlines the issues to consider when installing active fire suppression in power stations THE

Technical write-up on Fire safety services

Fire Safety Plan (FSP) Review Checklist 1

Fire Safety Plan (FSP) Review Checklist 1

EXHIBIT D ATTACHMENT G - UNIT PRICING DMS-14/15-039B - SIMPLEXGRINNELL, LP FIRE SPRINKLER SYSTEM INSPECTIONS YEARS 1-5

Fire. IMO fire control signs - according to IMO Resolution A.654 (16) (mm) 150x x200

DISASTER MANAGEMENT PLAN 3.0 IDENTIFICATION OF MAJOR HAZARD POTENTIAL

NIPSCO Michigan City Generating Station

Fire Protection. A Health and Safety Guideline for Your Workplace. Introduction. Fire Prevention and Control. Workplace Assessment

RULES 1978 UNDERGROUND COAL MINES FIRE PRECAUTIONS

FIRE SAFETY MAINTENANCE INFORMATION for Agricultural Livestock Structures

Hot Work Permit. Can this job be avoided? Is there a safer alternative? Permit No.:

Property Protect Risk Questionnaire (To be completed for all risks containing high hazard activities / processes)

Fire protection on chemical manufacturing sites

School EMERGENCY PLAN

HOT WORK PERMIT PROCEDURES

The Social Accountability International (SAI) Fire Safety Checklist

contents iii Drilling Tools 27 Adjustable Choke 27 Automatic Drillers 29 MWD and LWD Tools 30 How They Work 30 Uses 30

Storage Questionnaire

RAMBLER PARK FIRE SAFETY INFORMATION

Enclosure 4- RISK ASSESSMENT

NFPA CODE TESTING & INSPECTION. Requirements & Recommendations for. Licensed Florida Hospitals, Ambulatory Surgery Centers,

Fire Safety. Presenter, Kevin V Coleman September 14 th 2016

The following checklists are to be used during an aerodrome RFFS inspection/ audit.

El Reno Fire Department Fire Alarm Plan Review Worksheet

INITIAL FIRE ASSESSMENT REPORT (FAR)

Slight Harm Moderate Harm Extreme Harm Low Trivial Risk Tolerable Risk Moderate Risk Medium Tolerable Risk Moderate Risk Substantial Risk

St. Vincent s Health System Page 1 of 6

Osceola County Department of Fire Rescue and Emergency Medical Services

UNCONTROLLED IF PRINTED. Issued with the authority of the Chief Commissioner and General Manager of Scouts Australia NSW

What are the Contents of an Effective Fire Safety Plan? Name: Date: Address of Project: Building Permit Number:

Fire fighting Questions

7.0 SAMPLE PERMITS, FORMS AND CHECKLISTS SELF INSPECTION CHECKLIST

a) Establishment of emergency procedures to be followed at the time of an emergency;

BP U.S. Pipelines and Logistics (USPL) Safety Manual Page 1 of 6

GENERAL PROCEDURES TO FOLLOW IN CASE OF EMERGENCY SAFETY RULES TO PREVENT FIRES

Fire. This policy applies to all members of our school community, including those within the EYFS setting.

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

WORKPLACE AND SAFETY SIGNS

Chapter 5. Energy Conservation & Fire Safety

POSITION PAPER ON WATER MIST FOR FIRE FIGHTING APPLICATIONS


HOT WORK SAFETY PROGRAM:

To: All SAAS Accredited Certification Bodies Subject: Clarification to Emergency and Health & Safety Requirements in the SA8000 Standard

Loss Prevention Standards

FIRE SAFETY INSPECTIONS

Well managed building mean risk is normal. Fire action notices should be displayed by all alarm break glass call points.

TEN STEP PROCESS PREPARING FIRE SAFETY PLANS

Title: Fire Protection Effective Date: 7/1/2013 Control Number: THG_0039 Revision Number: 1 Date: 10/23/2015 Annual Review Completed: 5/13/2015

Fire Safety & Evacuation Procedures

SYLLABUS. Departmental Syllabus. Fire Protection Equipment Alarm Systems. Departmental Syllabus. Departmental Syllabus. Departmental Syllabus

Water mist fire suppression systems. Minifog ProCon Low-pressure water mist system

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT

Practical guide to rural fire. Put fire safety into your plan

AM Retail Group, Inc.

Fire Prevention Plan

(2) Various fire sections enclosed by various classes of fire divisions; (3) Arrangement of fire detectors and manual fire alarm stations;

Following are the systems proposed as per NBC & Local Fire Authority:

First Aspen Federal Regulation Set: K LSC 2000 Health Existing

International Safety Guide Chapter 30 for Inland Navigation Tank-barges and Terminals. Chapter 30 FIRE-FIGHTING

Guidelines for Fire Safety Plans at Construction or Demolition Sites

Appendix 29. Mount Emerald Wind Farm Fire Management Plan Prepared by RATCH Australia Corporation Limited

American Society of Safety Engineers Professional Development Conference June 9-12, Fire Protection. Stephen J.

Fire Safety. Version 1.0

Contractor Worksheet Underground Fires Major Hazard Standard

SACRAMENTO FIRE DEPARTMENT FIRE PREVENTION DIVISION FIRE DEPARTMENT DEVELOPMENT SERVICES UNIT CONTRATOR INFORMATION PACKET

Making sense of risk Risk engineering. Metalworking operations

Maintenance of Fire Systems

Emergency shutdown systems. Procedures for bypassing ESD s

Official Journal of the European Union

DEPARTMENT OF FIRE & EMERGENCY SERVICES DNH.

MINOOKA FIRE PROTECTION DISTRICT Fire Prevention Bureau Fire Inspector Rodney Bradberry Plan Review

GUILFORD COUNTY SCHOOLS

Fire Risk Assessment

Fire protection documentation. CFPA-E Guideline No 13:2015 F

REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE RISK ASSESSMENT

HAZARDOUS MATERIALS/WASTE EMERGENCY CONTINGENCY PLAN University of Southern Maine Portland Campus

A GUIDE FOR CONDUCTING FACILITY PRE-FIRE PLANS

KRISHNAMURTI FOUNDATION TRUST FIRE SAFETY POLICY. Last Review Date 30 June Next review date 30 August Health and Safety Officer

Residential Bed & Breakfast

FIRE SAFETY & EMERGENCY EVACUATION STRATEGY AND POLICY

ChurchSafety InfoSheet: Fire Risk Assessment

Stillwater Area Community Services Center Inc.

Explosion Protection Engineering Principles

FIRE RISK ASSESSMENT Self Assessment

Safety And Fire Prevention. A guide to help Community Living Support Staff prepare for, respond to and prevent emergencies in a residential setting.

C. None (No sprinkler system) K3 E. NUMBER OF BEDS CERTIFIED FOR MEDICAID

RISK ASSESSMENT & EMERGENCY PREPAREDNESS PLAN

HAZARDOUS MATERIALS/WASTE EMERGENCY CONTINGENCY PLAN University of Southern Maine Portland Campus

FIRE SAFETY AWARENESS

MAINTENANCE AND SERVICE OF AUTOMATIC FIRE EXTINGUISHING SYSTEMS

WATER SPRAY EXTINGUISHING SYSTEMS

Sprinkler systems. A presentation for fire brigade staff

Branch Solution Wood based panel plants. Fire protection solutions for wood based panel plants

40 TAC Tex. Admin. Code tit. 40, What safety precautions must I follow when children in my care use a swimming pool?

FIRE SAFETY PRACTICES AND PROCEDURES

Guidance Document on Caravan and Camping Sites Fire Safety Equipment Requirements

IMO. Resolution A.952(23) Adopted on 5 December 2003 (Agenda item 17) GRAPHICAL SYMBOLS FOR SHIPBOARD FIRE CONTROL PLANS

Transcription:

NITOL INSURANCE COMPANY LIMITED 1. Name and Address of the Insured : PROPOSAL FORM 2. Nature of Risk : 3. Location : 4. Period of Insurance : From: To: 5. Sum Insured : (Section-wise) (a) Section-I (Property All Risks cover) Description of the Property (i) Building (ii) Machinery (iii) Equipment (Others) (iv) Stock-In-Process (v) Stock of Raw Materials (vi) Stock of Finished Goods Godown (vii) Other Stocks (please separate sheet if necessary) (B) Section-II - Business Interruption cover (BI) (Indemnity period for 6 months) (i) Gross Profit (6 months) (ii) Wages (6 months) (iii) Standing charges (6 months) (C) Section-III Third Party Liability (i) Bodily injury &/or death (ii) Property damage Total Sum Insured/Limit of Indemnity Amount 6. Limit of Indemnity : (i) Material Damage including Machinery Breakdown (MD + MBD) for 1 year (ii) Business Interruption (BI) for 6 months (iii) Third Party & Property Damage Liability for 1 year 7. General Information : 7.1 When the civil construction started and completed? 7.2 When was the plant put into operation? 7.3 Who constructed and what is the experience of the contactor? Several Contractor 7.4 Who Erected the Machinery? GE 7.5 Which are the finished products? Electricity 7.6 What Developments/Modifications have been carried out? 7.7 How many persons are employed? Skilled nskilled Expatriate Proposal Form for Power Plant-1 Page 1 of 5

7.8 Operating period? Shifts 1 2 3 8. Construction : 8.1 Nature of Construction : Wall Roof 8.2 Type : Fire Resistant : (Describe briefly ) n- Combustible 8.3 Are there automatic/manual smoke/heat vents / detectors: 8.4 State of maintenance Good Acceptable Fair Poor 8.5 Are Buildings separated specially or divided by Fire wall and doors? (Describe briefly) 8.6 Are there lightning protection systems? Type: 8.7 Can the risk be sub-divided into several Fire areas? Number : 9. (Utilities Common Hazards) : 9.1 What is the source of Power? 9.2 What is the source of Water? 9.3 Are the Transformers protected? Fixed fire fighting systems:- Type : Fire wall separated:- Type : Others:- 9.4 Are the cable penetrations sealed? Fire Proof Partially 9.5 Are there steam production facilities? (Describe briefly) 9.6 What fuels are used for firing boilers, furnaces, heaters etc? Natural Gas Coal Oil 9.7 Are there air compressor? 9.8 From which sources is water supplied? Public Wells River (s) Lake Reservoir Others Quantity M 3 /h 9.9 Internal transport by? Fork lift trucks Conveyor Belts Others 10. Tankage / Storage : N/A Proposal Form for Power Plant-1 Page 2 of 5

11. Processes: 11.1 What are the manufacturing processing involved? (describe briefly) Natural Gas = Engine = Alternator Electricity = Interconnection National Grid 11.2 What are the resultant intermediate and final products? (Flow chart be given) 12. Special Hazards: Electricity 12.1 Process Are there specific hazardous process? (describe briefly) 12.2 Are flammable gases used? : 12.3 Are flammable liquid used? 12.4 Are there explosive dusts? Type : 13. Electronic Data Processing Unit : Is there separation by Fire walls from adjacent areas? 14. Management: Is the location secured from external Fire, Explosion, Water Damage Is smoking controlled? 15. Maintenance / Inspection: 15.1 Are the Machinery/Electrical installation well maintained 15.2 Is the alarm and Fire Fighting Equipment inspected regularly? 16. Fire/Explosion Protection: 16.1 Fire Alarms: Are there manual alarm systems such as push buttons throughout the plant What other means of alerting fire brigades are available? Proposal Form for Power Plant-1 Page 3 of 5

Telephones Walkie Talkie Radio Communication Are manual alarm systems connected to the nearest fire station? What types of automatic detection systems are present? Heat Smoke Gas Flame - detectors Number:- Is there a central alarm station? Fire Station Gate House Control Room(s) 17. Fire Water Supplies: Is the risk connected to the public water supply? Own water supply? Tank(s) Reservoir(s) Pond Walls Elevated Tanks Others What is the minimum amount of fire water available? <500m3 Between 500m3 and 1000 m3 >1000m3 Are there fire pumps which draw from the above mentioned water sources? Number : Manually Operated Automatic Electric Drive Diesel or turbine driven Capacities / Pressures What is the diameter of the fire mains? Maximum Minimum Are there dry or wet risers in high structures? Number, type and distribution of hydrants and fixed monitors? 07 s. Are there hose connections with hoses and nozzles in building 18. Fire Extinguishers: What types, sizes and number of extinguishers are available? Dry Power Number:- Size: Water Number:- Size: CO2 Number:- Size: Halon Number:- Size: Others Maintained regularly by:- 19. Fixed installed, automatic Fire Fighting Systems: Are automatic sprinkler systems installed? Type: Wet Dry Proposal Form for Power Plant-1 Page 4 of 5

Areas Protected: Are Water deluge systems installed with open sprinkler heads? Areas /Units Protected: Are dry powder, CO2 and/or Halon Systems installed? Dry Powder CO2 Halon Are foam extinguishing systems installed? Areas Protected: 20. Fire Brigade: Whole Plant Is there a private fire brigade? Full Time:- Minimum staff per shift: Can the full time fire brigade be supported by trained plant personnel? Number of volunteer firemen per shift? Are there regular fire drills and instructions? Weekly Monthly ne Is there a private fire station? Fire Trucks Number: Is there a stock of fire fighting agents? Powder Quantity:. Kg Foam Concentrate:- Quantity: Litres: Others: Where is the nearest public fire brigade? Full Time Part Time Full Time Part Time Distance: 05 Km Response Time: Min. 10 Equipment: Good Fair Poor Is the public fire brigade familiar with the plant? Is there a mutual aid agreement with neighboring works fire brigades? 21. experience of the last five years. Sl.# Year Name of the previous Insurer/Insurers 1. Premium Income Intimated Paid Repudiated Outstanding 2. 3. 4. 5. Insured Dated: Seal & Signature of the Proposal Form for Power Plant-1 Page 5 of 5