PUTTING THE HEART INTO BATTERSEA. A vision

Similar documents
97 Lea Bridge Road, Leyton, E10 7QL London Borough of Waltham Forest December 2015

Welcome to our public exhibition on London Square s plans to redevelop the B&Q site on Smugglers Way. from Monday 10th October 2016.

REPORT BACK BROADSHEET 3 May 2016

East Grove Public Realm

WEST BLACKHALL STREET PUBLIC REALM + TOWN CENTRE CONNECTIONS Public Exhibition 28 th June 2018

Ringsend & Irishtown Local Environmental Improvement Plan

THE CIVIC DISTRICT DEVELOPMENT OPPORTUNITIES

Colchester Northern Gateway Master Plan Vision Review Draft. July 2016

4- PA - LD - LIVELY DOWNTOWN. LD - Background

Calderdale the Next Chapter

Streets for All East of England

FRUITVALE TRANSIT VILLAGE (Phase 2) Residential Project

8. Urban Villages. Other Relevant Policies & Bylaws Official Community Plan Development Permit Area Designations and Guidelines

heuston gateway: sections heuston gateway: regeneration strategy and development framework plan

West Blackhall Street Public Realm Public Exhibition

Village Enhancement Scheme Barton under Needwood

3.1 Streetscape Overview

Chapter 5 Urban Design and Public Realm

PHASE III: Reserved Matters Submission

Figure 3-1: Public Realm Plan

REDEFINING QUEENSWAY CONCEPT DESIGN DESIGN RATIONALE

4.0 URBAN DESIGN FRAMEWORK. The vision for the future development of the plan area is to:

ANCHOR TO ANCHOR. Rescale the street to create an iconic boulevard.

Workshop 3. City of Burlington Waterfront Hotel Planning Study. September 14, The Planning Partnership

A Vibrant Downtown. Chapter 5 Cary Public Art Opportunities 31

2.0 Strategic Context 4

10 Proposed Redevelopment, Tewkesbury Road, Cheltenham SCHEME EVOLUTION STARBUCKS

open house 3 CITY OF SALEM Downtown Streetscape Plan

Dyersville Downtown Plan. Open House October 24, 2017

The Vision. Photo provided by The Minervini Group. 46 Vision, Objectives & Strategies

East Bayshore Road Neighbourhood

Welcome. Community Consultation Meeting November 28, Review and discuss the Bathurst Quay Neighbourhood Plan Framework

PROPOSED URBAN STRUCTURE

Hamilton Road Corridor Streetscape Master Plan. Open House October 4 th, 2017

THE STORY SO FAR... THE STORY SO FAR...

16E. 24 th Street Corridor. A. Background

Town Center. Block 5 Existing multifamily residential units are expected to remain.

Public realm strategy

4.0 Open Space and Laneways

Stratford Neighbourhood Plan Questionnaire

Artists impression of the Park Promenade and plot H4 with café and restaurant uses that is still subject to change

Vision for Irvine: a self-confident town where people aspire to live and work and which they are proud to call home

TRANSPORTATION & STREET DESIGN

GREATER CAMBRIDGE CITY DEAL. Urban Design Guidance for Transport Infrastructure Projects

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004

The Master Plan also identified a number of issues and these issues remain and if anything have become more acute since 1997.

Alma Road Rain Gardens, London

Making the case for Sustainable Transport Project Potential

Figure 12: St Andrews, Bow 14 TOWNSHEND LANDSCAPE ARCHITECTS

Market Place Bythell Place Queen Street Park Riverside Park. Public Spaces. Blenheim CBD Streetscape Final Report 36

PUBLIC REALM STUDY AREA

Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS. A New Garden Neighbourhood Matford Barton 17

HS2 Interchange Station Design

John M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference

11.5 Kipling Avenue Corridor Secondary Plan

Welcome to the Public Consultation Exhibition

Regency Developments. Urban Design Brief. Holyrood DC2 Rezoning

Bayswater Town Centre Structure Plan. Visioning Workshop. October 2016

Horwood Map of London, Westminster & Southwark First edition

New Bolton Woods Cricket Club

8.0 Design and Form of Development 43/

Rotherhithe Rotherhithe Area Vision Map

ILLUSTRATIVE MASTERPLAN

A VISION FOR ST DAVIDS. Agreed by the community at the SDRBA meeting on Monday 22 nd March 2004 at Exeter Community Centre

0 9 Areas of Change 59

EXISTING COMPREHENSIVE PLAN

6 Site Framework Strategies

Review of Opportunity Area C Draft Comprehensive Plan and Draft BOS Follow-On Motions. Special Working Group Meeting March 4, 2015

appendix and street interface guidelines

1. Creating a liveable, vibrant, safe and inclusive city centre for the benefit of people of all ages to live, work, learn and enjoy.

Downtown Lead Revitalization Project Final Recommendations. Three Proposed Options for the Revitalization of Downtown Lead

York Road Arial View

Quality Public Realm & Streetscapes

III - design standards

GREENING THE BOULEVARD Master Plan Concepts for Venice Boulevard between Lincoln and Sawtelle

TURN TO THE RIVER CITY PLAZA LANDSCAPE DESIGN CONCEPT May 25, 2016

QUESTION 8: What are your Public Realm priorities for implementation? What would you like to see happen first? TELL US WHAT YOU THINK

Tauranga City Centre Spatial Framework

GUIDELINES WESTON LOCATION: URBAN DESIGN GUIDELINES

PLANNING STATEMENT. Market House Market Place Kingston upon Thames KT1 1JS

Appendix H: Easement cross sections

Figure Example of out door dining in the public right-of-way.

Next Steps / Development Process. Structure Plan. June submitted to City of Fremantle. Structure Plan. July supported for advertising

W&OD PARK MASTER PLAN. The City s Greenest Street. DRAFT W&OD Trail Master Plan v4.docx Page 1

3.1 community vision. 3.3 required plan elements

3.1 Existing Land Use

WATERFORD Plan of Preservation, Conservation and Development Supplement Part 1 - Policy Element

Johnson Street Bridge Public Realm Update

CHAPTER 5: GUIDING PRINCIPLES

Community Design Plan

Vision for Mayfair and Belgravia

7Page 91 CLEMMONS COMMUNITY COMPASS 7 COMMUNITY CHARACTER

Anston House, Brighton

WELCOME and introduction

Huddersfield Urban Design Framework. 3. Framework

3.0 Area-Wide Strategies 30

UNIVERSITY TOWN NEIGHBOURHOODS 5.5 HOUSING MELBOURNE CAMPUS MASTER PLAN 2014

project background relationship to the spit Guiding Principles Mooloolaba Spit Futures Plan (2009) Vision one

Former North Works, Lickey Road, Longbridge, Birmingham

PIKE PINE RENAISSANCE: ACT ONE. October 19, 2017

Transcription:

PUTTING THE HEART INTO BATTERSEA A vision

INTRODUCTION This document is a vision for creating a Battersea that its community can be proud of and it is about putting Battersea on the map. It is being proposed by a local architectural practice, Goldstein Ween Architects; several of whom are also local residents. LACK OF IDENTITY Battersea has little sense of place or neighbourhood. Its centre is Clapham Junction, but it does not have a heart. The urban realm is primarily focussed on catering for high levels of through-traffic at the expense of access for local people with three major East-West trunk road intersections (A3 York Road, Lavender Hill/St John s Hill and Battersea Rise). By creating a route that crosses these roads with safe people-oriented crossings, it will be possible to create calmer and more people-friendly streetscapes. The driving force of these proposals is to create a new heart for Battersea by creating a coherent and continuous route from the Southern end of Northcote Road to St Mary s Church, Battersea, on the River. URBAN REALM INTERVENTIONS This Vision proposes a number of urban realm, sustainability and landscape interventions along the route, that could evoke the history of the Falcon Brook and local history. It proposes urban realm improvments that have positive impacts on the environment, that create healthy streets that encourage healthy active travel as well as prviding places to dwell and repose. This document sets out suggestions, rather than specific proposals, for how the area could be enhanced. CREATE A VIBRANT BATTERSEA The intention is to inspire Wandsworth Council, local stakeholders and community groups to invest energy and money into creating a local neighbourhood that will help local residents and businesses to thrive and enjoy being part of Battersea. POOR STREETSCAPE Battersea has long suffered from poor streetscape and drab public space. There is no legible connection from the Thames in the North to the end of Northcote Road in the South, yet there is a continuous street network (albeit interrupted by highway junctions and barriers). Much of this route is, in fact, the course of the Falcon Brook that has been laid into an underground drainage channel since Victorian times. Lost rivers of London

OBJECTIVES Key objectives are: CREATE A SENSE OF PLACE and put a heart back into Battersea, so we know where it is IMPROVE URBAN REALM Green, clean, attractive PROMOTE SUSTAINABLE URBAN LIVING Encourage active travel Promote recycling and re-use HISTORICAL CONNECTIONS Evoke the memory of Falcon Brook Connect to The Thames Celebrate Battersea s history STRATEGY The key features proposed are: - Green the entire route with a continuous tree planting strategy that ties all the streets together - Introduce a continuous lighting strategy that unites the various sections and makes it feel safe at night - Create a continuous protected cycle route - Create people-friendly crossings at major junctions - Radical make-over of the Clapham Junction rail-underpass - Encourage street life, street cafes and activity through public realm enhancements and providing public seating - Reduce plastic water bottle waste by introducing public water fountains where passers-by can drink and fill water bottles - Promote recycling with the introduction of a bottle recycling scheme - Evoke the memory of Falcon Brook with water features and fountains. The proposed route

THE KEY PROPOSALS ALONG THE WHOLE LENGTH - Continuous tree planting strategy, that creates the visual cue of connectivity - A lighting strategy for the whole route, using low energy and solar powered lights, inset pavement lights etc. - Protected cycle lane - People-friendly crossings at major junctions and natural crossing points - Iconic drinking fountains installed at regular intervals to encourage use of reuseable water bottles (and reduce single-use plastic). These could be a new Battersea Fountain. - Water features - Benches for meeting frineds and resting Trees benches Lighting Fountains Cycling

THE KEY PROPOSALS AT SPECIFIC LOCATIONS CONNECT ST. MARY S CHURCH Widen the pavement on Battersea Church Road to create a proper link from St Mary s Church to Battersea Square. BATTERSEA HIGH STREET (Market) Transform Battersea High Street into a pedestrian priority street with access-only one-way traffic and a two-way cycle route, so that cafes and businesses can open onto the street. This will require removing parking spaces (but allowing loading bays). Move the market Northwards, away from the junction with York Road, to allow for a new public space at the southern end, which will act as gateway and focal point. The area to the North at the junction with Simpson and Gwynne Roads should be landscaped to form a pocket park, with the removal of the fire barrier. FALCON ROAD/ YORK ROAD JUNCTION Create a more people friendly crossing point that gives clear crossings on desire lines. FALCON ROAD Widen the Eastern (shop side) pavement to allow activity on the street and to accommodate the higher footfall on this side of the street. Include a protected cycle route. Landscape the Western pavement and create a new safe crossing at the bus stop near Grant Road. CLAPHAM JUNCTION RAIL UNDERPASS A major overhaul of the streetscape under the Clapham Junction rail bridge, including slightly widening the pavements and reducing the carriageway widths. Art works evoking the history of Battersea and the Falcon Brook could be included in the wall treatment. NORTHCOTE ROAD LIBRARY Create a new public space on Northcote Road outside the Northcote Library, to act as a community focus and meeting point. JUNCTIONS Remodel the major junctions (Falcon Road & York Road / Lavender Hill & St John s Road / Battersea Rise & Northcote Road) to be more attractive and people and cycle friendly. RECYCLE STATION Introduce a plastic bottle refund scheme (possibly at Clapham Junction crossing) that will scan bottles and issue credit notes that can be spent in nearby shops. Junction improvements

THE KEY PROPOSALS TREES LIGHTING CYCLE LANE BENCHES

THE KEY PROPOSALS DRINKING FOUNTAINS RECYCLE WATER FEATURES

ST. MARY S CHURCH to BATTERSEA SQUARE THE PROBLEM Currently the pedestrian access from Battersea Square to St Mary s Church is horribly narrow and dangerous, effectively cutting off the Thames Route from the neighbourhood. THE PROPOSAL The proposal is to reduce the carriageway width and allow only one-way traffic (through traffic in the opposite direction would follow the existing 170 bus route), widen the pavements, introduce tree planting and a cycleway. The pedestrian crossing would have a raised platform and simplified signalling. Existing Proposal

BATTERSEA HIGH STREET (MARKET) THE PROBLEM Battersea High Street feels drab and dead. THE PROPOSAL The idea is to create a vibrant local street that encourages activity, meeting and dwelling. Market stalls would be of a consistent design and follow a tidier layout. The market location will be pushed a little North of the current area, to allow for the creation of the Battersea Triangle, which will act as the new gateway to Battersea High Street. The street will be treated as a shared space, with only occasional access vehicle traffic. Car parking would be relocated to adjacent streets, allowing only loading bays. A two-way cycle lane will pass through the shared space. Existing Proposal

BATTERSEA TRIAGLE YORK ROAD JUNCTION THE PROBLEM This junction is engineered to favour vehicle traffic and implies that there is no entry to Battersea High Street. THE PROPOSAL The junction should be de-cluttered and re-designed to create pedestrian crossings on the desire lines and clear access to Battersea High Street for cycles. Proposal Concept scheme Existing De-cluttering needed

FALCON ROAD THE PROBLEM The street is drab and does not respond to the activity along it. The Eastern side, where the majority of the shops are located, has an inadequate, narrow pavement whereas the West side is generous, though poorly landscaped. The street has attractive curves and bends, but the street furniture and tree planting has not capitalised on this feature. THE PROPOSAL The pavement on the East side should be widened to encourage activity on the street and street cafes. The West side could be narrower, but with enhanced landscaping so that is becomes an attractive commuter walk route. A consistent tree planting scheme would reinforce the street along its length and a lighting scheme could make this an attractive place at night. Water fountains and water features would evoke the Falcon Brook (in a pipe under the street) memory. The overall theme would be clean, green and attractive, aiming at supporting local business as well as encouraging community gathering. Existing Proposal

CLAPHAM JUNCTION RAIL UNDERPASS THE PROBLEM The under-passage feels dark, dirty and noisy and the pavements are very narrow. THE PROPOSAL The carriageway width would be slightly reduced to allow for pavement widening. The walls and ceiling would be dressed and lit, to brighten the atmosphere. Tiled wall or light panels could evoke scenes from Battersea s history and the Falcon Brook. Existing Proposal

CLAPHAM JUNCTION CROSSING THE PROBLEM Though this has had some recent enhancements, it is focussed heavily on traffic engineering. The crossing has high numbers of pedestrians, but the sense is hurry up and move on. THE PROPOSAL To make Clapham Junction crossing more like a public square. This will require a more people-focussed approach that includes better paving, more planting, fountains and street furniture. Planting could include lavender to celebrate Lavender Hill. Existing Proposal

NORTHCOTE LIBRARY PLACE THE PROBLEM The library is an important civic amenity; it currently has almost no identity on Northcote Road and will have even less when it is redeveloped across the street. THE PROPOSAL The idea is to create a mini civic centre near the library by narrowing the carriageway, to create space for dwelling and meeting. The highway at this point could have a raised platform to provide access for all to the library, as well as a water feature and seating. Existing Proposal

SPREADING THE BENEFITS TO THE NEIGHBOURING COMMUNITIES For the benefits to be enjoyed by the wider community, side links away from the route also need enhancement and more attractive landscaping. An example is Patrick Passage, which links Home Road to Winders Road. This proposal for simple landscaping improvements will enhance and link the Spine more deeply into the neighbouring communities. The link could be continued right the way through to Battersea High Street by the Katherine Low Centre. Existing Proposal

DELIVERY The overall vision could be developed and implemented in sections over several years. However, it is recommended that some of the major elements such as the tree and lighting strategy, the rail underpass and Falcon Road and Battersea High Street should be delivered as quickly as possible, to signify the changes to come and to encourage a sense of Battersea Rising. Funding is always an issue, but all sources should be explored such as Transport for London, Lottery, Community Infrastructure Levy etc. It is recommended that the Council establish a Steering Group consisting of the local council, residents, local businesses, community and advocacy groups, such as Wandsworth Living Streets and the Battersea Socety. AUTHORS: CAMILLA WEEN. INIGO JIMENEZ. MARK GOLDSTEIN

GOLDSTEIN WEEN ARCHITECTS Unit 56, 15-17 Ingate Place, London SW8 3NS 020 7498 2111 JUNE 2018