Creative Engineering Group Inc, (Creative) Construction Engineering and Inspection (CEI) Professionals

Similar documents
Construction Engineering & Inspection

FDOT/FTBA Construction Conference Work Plan

I-4 Beyond the Ultimate. Florida Transportation Builders Association February 9, 2018

SOLICITATION J P1 Construction Engineering Services for Wiles Road Riverside Drive to Rock Island Road

Construction Engineering & Inspection Services Transit Bus Stop Infrastructure for the Broward County Transit Division (BCT)

2040 Long Range Transportation Plan

Fall 2017 Construction Update

Rt. 29 Solutions Project Delivery Advisory Panel. January 7, 2016

4.1 Build Alternative 1 Construction Phasing

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

PUBLIC HEARING. Thursday, December 14, 2017 FDOT Urban Office 2198 Edison Avenue Jacksonville, FL 32204

SR 483 Clyde Morris Boulevard FDOT District 5

New Stanton Project Update July 3, 2012

AASHTO SUBCOMMITTEE ON DESIGN. June 15, 2006 MARK ROBINSON, P.E. DISTRICT 5 INTERSTATE PROGRAM MANAGER FLORIDA DEPARTMENT OF TRANSPORTATION

Southern Gateway Project and Public Green

Project Status. Construction is underway for Phase 3. Overall Project Area and Schedule. Schedule of Current Construction Phases.

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Moving The Metro. A special construction update for the metro Omaha area.

Capital Projects impacting Odenton Town Center

ROAD CONSTRUCTION. 36 June 2014 ROADS&BRIDGES

I-95 Girard Avenue Interchange Near Neighbors Meeting. Project Status

I-25 / Rio Bravo Interchange. I-25 / Rio Bravo Interchange. Presenters 11/30/2016 THIRD PUBLIC MEETING DECEMBER 1, 2016 NMDOT CN A300280

Design Services for Wiles Road Broward County Project #104026

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

SR 916/NW/NE 135 Street Public Hearing

Spring 2018 Construction Update

FDOT D4 Complete Streets

Municipality of Anchorage. Community Council Survey Capital Projects Needs Ranking Survey (ALPHABETICAL) Airport Heights

We d like to thank you for attending this Wekiva Parkway Section 8 Preliminary Design Update hosted by the Florida Department of Transportation.

Capital Projects in and near Odenton Town Center

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

Highway & Bridge Capabilities

PROPOSED IMPROVEMENTS

TENNESSEE DEPARTMENT OF TRANSPORTATION Project Status. No Projects Under Development in Campbell County

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: ,

I-95 Interchange & Ellis Road PD&E Study

2014 PSPE Philadelphia Chapter Outstanding Engineering Achievement Award Nomination

Memorandum CITY OF DALLAS

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

2017 Asphalt Contractors Association of Florida Pavement Awards

2017 Investment in Infrastructure Expo February 28, 2017 Jason Jonas, P.E. Public Works Director

SR 924 West Extension to the HEFT

Highway 417 Expansion East

Project Overview. Fairfax County Parkway Widening Fairfax County. Get Involved. Public Information Meeting. Contact Information

SR 836 Southwest Extension

Public input has been an important part of the plan development process.

I-66 EASTBOUND WIDENING INSIDE THE BELTWAY PARDON OUR DUST MEETING

Introductions. Improvements Project. Project Limits. Project Components 6/23/2010. Davie-Cooper City Chamber of Commerce Wednesday, June 23, 2010

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM Transportation Authorities Project Descriptions

Meeting Purpose: Date and Time: Location: Attendance: Handouts:

Wiles Road from University Drive to Riverside Drive

Boca Raton II Tri-Rail Station PD&E Study and 30% Documents Public Kick-Off Meeting. August 29, 2017 Spanish River Library

Town of Yucca Valley Capital Improvement Projects Report July 24, 2014

TRANSPORTATION COMMITTEE

Great Lakes North Central South Central FAX: (718) CONTACT PERSON: ADDRESS: Daniel Hom, PE, Engineer-in-Charge

FOR IMMEDIATE RELEASE DATE: FRIDAY, AUGUST 31, Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP?

I-90 Mississippi River Bridge & Interchange Project

Northeast Anthony Henday Drive Manning Freeway to Whitemud Drive Welcome to this Construction Information Session

City of Deerfield Beach. Fire Rescue

BALL CAMP PIKE Phase II From Middlebrook Pike to Andes Road NEW CONSTRUCTION Spring 2007

CAPA ASPHALT & AIRPORT PAVEMENT MARCH 27, 2019

I-75/I-475 Interchange Upgrade Project Informational Meeting Tuesday, July 27, 2010

Derby-Shelton Bridge Pedestrian and Bicyclist Enhancements [1]

City of Fort Lauderdale UPTOWN URBAN VILLAGE. Public Workshop December 7, 2016

A Connected Region for Our Future. Tampa Bay Regional Planning Council

Panama City Beach Community Redevelopment Agency Condo Con Property Owner Conference & Expo November 14, 2014

CURRICULUM VITAE REZA MARSHAL, MECE, PE, PTOE

Hunt Highway CELESTE PEMBERTON, CFM, CPM PINAL COUNTY CARLOS SANCHEZ SORIA, PE T.Y. LIN INTERNATIONAL

PROJECT SHOWING MINUTES

North Carolina Department of Transportation Project Development and Environmental Analysis Branch

Welcome. Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals:

TAC/CAC, TPO Project Update February 2016

Welcome. Tina Fischer. East Tampa Area Community Working Group September 25, Collaborative Labs, St. Petersburg College

TENNESSEE DEPARTMENT OF TRANSPORTATION Project Status. SR-37 US-19E No Projects Under Development in Carter County

Supporting our communities. Bridges

IMPLEMENTATION STRATEGIES. In This Chapter. Goals & Strategies 182 Project List 183 Future Land Use 186 CHAPTER 11 IMPLEMENTATION STRATEGIES

AGENDA ACTION ITEMS INFORMATION ITEMS

COLLIER BOULEVARD (CR 951) CORRIDOR

Henderson County Project Prioritization Discussion

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT-2

7,600 Residential Units 1,700,000 SF Non-Res 300-Room ALF 300-Room Hotel University School, Park, Civic parcels 1,889 ac flow-way/preservation

Rt. 29 Solutions Project Delivery Advisory Panel. December 3, 2015

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

HILLSBOROUGH COUNTY Greenways and Trails Plan Update. Executive Summary. Date

Places29: List of Implementation Projects

PD&E STUDY SR 9/I-95 FROM SOUTH OF SR 870/COMMERCIAL BOULEVARD TO NORTH OF CYPRESS CREEK ROAD FM # ETDM 14222

SCTPO Project Summary September 2014

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: ,

AGENDA ITEM 3A Red Hills Coastal Parkway

I-4 Poinciana Parkway Connector Project Development and Environment (PD&E) Study. OCX Board Meeting

Please see attached for more detailed project information. Project Schedule Designer Award by SBC Executive Sub-Committee December 21, 2015

DESIGN CRITERIA PACKAGE

Fairfax County Parkway (Route 286) Widening Project

Prince William Street Project (Grant Avenue to Wellington Road)

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Public Officials/Design Advisory Meeting #12. Bensalem Township Municipal building, 2400 Byberry Road Bensalem, PA

Executive Summary. NY 7 / NY 2 Corridor

MPRD s Keith Mione (Community) Park Midlothian Road Entrance Traffic Signals

Transcription:

ABOUT US Creative Engineering Group Inc, (Creative) is a Construction Engineering and Inspection (CEI) firm established in 2006 by two Principals Rick Estripeaut & Sri Mavanur. In the last decade Creative s has worked on a broad range of projects, including some large Design-Bid-Build and Design- Build projects for Florida Department of Transportation (FDOT). Creative is FDOT certified in several work categories and a Dis-advantaged Business Enterprise firm. Over the past decade, we have successfully completed more than 100 transportation projects, as Prime Consultant and Sub Consultant, earning numerous industry accolades. Our skilled team of Professionals have participated in a wide range of transportation, civil engineering and public/institutional projects; demonstrating expertise in the areas of highways, bridges, toll plaza facilities, drainage, utilities and buildings. Our Senior Project Engineers, Project Administrators, Contract Support Specialists, Inspectors and Resident Compliance Specialists are recognized among the top in our industry. We realize that our greatest asset is the members that make up our Creative Family and together the commitment we offer our clients and our communities. Our top priority is to ensure our clients are completely satisfied with the services we provide and that during the process we maintain the public s safety at the forefront of every job.

OUR MANAGEMENT TEAM Rick Estripeaut PE Sri Mavanur Milan Nikolich PE William (Rusty) Causey PE President/ CEO/ Project Administrator Senior Project Engineer Senior Project Engineer Senior Project Engineer Al Miller Dave Jefferson Timir Shah PE Devi Thummal CPA Project Administrator Project Administrator Project Engineer Comptroller

4 Senior Project Engineers OUR TEAM 6 Project Administrators 3 CSS 4 Assistant Project Administrators 14 Senior Inspectors 6 RCS 11 Inspectors 2 Administrative Assistants 55 Employees in total 1 Environmental Specialist 4 Corporate Support

SPANISH RIVER/ FAU INTERCHANGE SCOPE OF WORK OWNER: DISTRICT IV PALM BEACH OPERATIONS Work includes construction a new interchange at Spanish River Boulevard and I-95, reconstruction of Spanish River Boulevard bridge over Boca Airport Road/ I-95/CSX, widening of Yamato Road, widening of FAU Boulevard, construction of 8 new bridges, widening of 5 existing bridges between Spanish River Boulevard and Yamato Road, signalized intersection improvements, new lighting, the addition of an auxiliary lane and a full depth 11 shoulder along NB & SB I-95 between Glades Rd and Congress Ave, sound wall construction along Yamato Road and along I-95, MSE wall construction, new signing & pavement markings and the construction of 2new multi-use trail underpasses beneath the CSX RR and beneath Yamato Road. Project Length: 2.5 Miles Project Limits: I-95 North of Glades Road to Congress Avenue in the City of Boca Raton. Start Date: January 13, 2014 Completion Date: Spring 2018 Estimated Construction Cost: $69 Million FDOT reference: Kevin Micocci PE (561)719-7793

SUNRISE INTERCHANGE SCOPE OF WORK OWNER: TURNPIKE ENTERPRISE Improving traffic flow through modifications to the interchange at Florida s Turnpike and Sunrise Boulevard. Adding a new entry ramp to the southbound Turnpike from eastbound Sunrise Boulevard and a new exit ramp from northbound Turnpike to eastbound Sunrise Boulevard. Removing the existing toll plaza at the northbound Turnpike entrance and converting all ramps to allelectronic tolling. On Sunrise Boulevard replacing and raising the existing bridge over the Turnpike. Widening the lanes, bike lanes and enclosed pedestrian walkway. Installing new noise reduction barriers. Project Length: 0.807 Miles Project Limits: Sunrise Boulevard between NW 56 th Avenue and NW 47 th Avenue Start Date: November 2015 Contract Duration: 1210 days Completion Date: Late 2019 Estimated Construction Cost: $49.5 Million FDOT Reference: Roxanne Riggs PE (954)934-1296

HEFT* SCOPE OF WORK OWNER: TURNPIKE ENTERPRISE The Turnpike will be widened to twelve and eight lanes, including Express Lanes. Noise reduction barriers will be built along qualifying residential areas along both sides of the Turnpike. The Turnpike/State Road 874 interchange will be realigned. Work also includes asphalt milling and resurfacing, bridge widening, landscaping, drainage, lighting, signage and traffic signal improvements on SW 168th Street, SW 152nd Street, SW 117th Avenue and SW 120th Street. Construction of two third level bridges for extension of SR874 over CSX Rail Road, HEFT Mainline & SW 152 nd Street exit ramp. Project Length: 5.9 Miles Project Limits: Turnpike Widening, Express Lanes and Interchange Improvements from North of SW 184th St./Eureka Dr. to South of SW 104th St./Killian Pkwy. Start Date: August 16, 2013 Completion Date: June 18, 2018 Estimated Construction Cost: $156 Million FDOT Reference: Pacifico Castillo PE (954) 444-8050 * Creative Engineering Group Inc was a major sub consultant for this project.

KANNER HIGHWAY SCOPE OF WORK OWNER: DISTRICT IV TREASURE COAST OPERATIONS Work on this project includes widening Kanner Highway from a four-lane divided highway to a six-lane divided highway. Widening the bridge over the South Fork St. Lucie River, drainage improvements, including construction of five retention ponds; guardrail improvements, signalization upgrades and turn lane and bicycle lane improvements. Project Length: 4.3 Miles Project Limits: SR-76 from Lost River Road to south of Monterey Road. Start Date: September 6, 2016 Completion Date: Spring 2019 Estimated Construction Cost: $20.8 Million FDOT Reference: Chad Rucks PE (772)429-4938

BIG JOHN MONAHAN* SCOPE OF WORK OWNER: DISTRICT IV TREASURE COAST OPERATIONS The purpose of this project was to increase capacity and improve safety by upgrading this section of SR 710, including the replacement of the Big John Monahan Bridge over St. Lucie Canal. SR 710. The Bridge has a 55 feet vertical clearance and 100 feet of horizontal clearance between the fender systems at the St Lucie Canal. The scope of the project also included new drainage system installation, bridge fender systems, landscaping and irrigation. Project Length: 1.743 Miles Project Limits: From SW Trail Dr. to east of the SR-76 connector ramps. Start Date: September 23, 2011 Completion Date: June 2014 Estimated Construction Cost: $31.91 Million FDOT Reference: Kristopher Kehres PE (772) 429-4927 * Creative Engineering Group Inc was a major sub consultant for this project.

US- 1 WIDENING SCOPE OF WORK OWNER: DISTRICT IV TREASURE COAST OPERATIONS Milling and resurfacing the roadway; widening the roadway in Indian River County from a four-lane roadway to a six-lane roadway from the county line to south of Oslo Road; new bridge construction; construction of new sidewalk on the west side of US 1 from the Cypress Bay Mobile Home Park to just south of Oslo Road and on the east side of US 1 from the south approach of the bridge to just south of Oslo Road; construction of sound walls on the west side of US 1 in front of the Cypress Bay Mobile Home Park; upgraded traffic signals at US 1 and Highland Drive; construction of three ponds; drainage; and landscaping. Project Length: 2.4 Miles Project Limits: From North of Kings Highway in St. Lucie County to south of Oslo Road in Indian River County. Start Date: Spring 2012 Completion Date: November 6, 2015 Estimated Construction Cost: $23.2 Million FDOT Reference: Katherine Kehres PE (772) 429-4889

KINGS HIGHWAY* SCOPE OF WORK OWNER: ST. LUCIE COUNTY / FDOT TREASURE COAST Improvements to the Kings Highway at the intersection of Indrio Road. Kings Highway will be expanded to a four-lane divided highway with designated buffered bicycle lanes and pedestrian facilities. Indrio Road will be improved immediately West and East of the intersection with dual thru lanes to accept the traffic turning movements off of Kings Highway. The intersections of Indrio Road at the Lakewood Park Elementary school will have designated left and tight turning movements. For pedestrians, the project includes the construction of a 12-foot wide shared use path along the west of Kings Highway from the intersection south and along Indrio Road from the intersection west past the Lakewood Park Elementary School to Seminole road. Project Length: 0.917 miles N- S and 0.758 miles E- W Project Limits: Kings Highway and Indrio Road Intersection Improvements. Start Date: June 12, 2017 Completion Date: Spring 2019 Estimated Construction Cost: $17.8 Million FDOT Reference: Dale Walker (772) 429-4879 * Creative Engineering Group Inc was a major sub consultant for this project.

RAVENSWOOD BRIDGE SCOPE OF WORK OWNER: DISTRICT IV BROWARD OPERATIONS The improvements under this project consist of replacing the existing bridge over the Dania Cut-Off Canal, including replacement of the existing fender system. The work will consist of existing bridge demolition and new bridge construction. Additional improvements include the reconstruction of Ravenswood Road, installation of new roadway drainage, canal dredging and armoring, and placement of new signing and pavement markings. Project Length: 0.284 Miles Project Limits: Ravenswood Blvd from SW 45 th Street to SW 42 nd Street. Start Date: November 30, 2015 Completion Date: March 02, 2018 Estimated Construction Cost: $4.9 Million FDOT Reference: Angela Freeman PE (954) 931-6179

PGA BOULEVARD RAMP BRIDGE SCOPE OF WORK OWNER: TURNPIKE ENTERPRISE This interchange improvement project involved the replacement of the existing northbound ramp bridge over the Florida s Turnpike mainline at PGA Blvd at MP 109. The new bridge increased the vertical clearance, spanned both the future eight-lane section of Florida s Turnpike and the existing Florida Gas Transmission (FGT) lines located east of the northbound lanes. In addition to the bridge construction, extensive coordination occurred with FGT to clear impacts of all project improvements. Additional improvements included increasing the northbound exit ramp capacity from a single lane to two lanes beyond the ramp terminal. The scope of the project also incorporated interchange drainage, signing and pavement marking, ITS, and lighting improvements. Project Length: 0.75 Miles Project Limits: SR-76 from Lost River Road to south of Monterey Road. Start Date: September 10, 2012 Completion Date: November 1, 2013 Estimated Construction Cost: $6.1 Million FDOT Reference: Ken Hudson (954) 934-1134

SR- 80 RESURFACING SCOPE OF WORK OWNER: DISTRICT IV PALM BEACH OPERATIONS The Improvements under this Contract consist of milling and resurfacing, signing and pavement markings and traffic monitoring sites along State Road-80 (US- 98/US-441). Milling and resurfacing of mainline including correction of three longitudinal depressed segments and correction of cross slopes of inside lane and inside shoulder using overbuild asphalt layer. Thermoplastic pavement markings, replacement of single and multi-post signs, object markers and non-flexible delineators. Project Length: 14.8 Miles Project Limits: RR Crossing #853357V to County Road 880. Start Date: January 01, 2018 Completion Date: October 2018 Contractor: Ranger Construction Industries Inc. Estimated Construction Cost: $14.08 Million FDOT Reference: Jacques Beaubrun (561) 370-1143

THANK YOU! Contact us at : Corporate office: 7735 NW 146th Street Suite # 301 Miami Lakes, FL 33016 St. Augustine Address: 32 Master Drive St Augustine, FL 32084 info@cegroupfl.com 786-362-6626 904-314-3234 http://cegroupfl.com