PARK DATA THEMES SUMMARY:

Similar documents
SERVICE AREA VISION OPERATIONS AND MAINTENANCE EAST OF THE RIVER PARK MASTER PL AN

PARK PLANS OPERATIONS AND MAINTENANCE EAST OF THE RIVER PARK MASTER PL AN

Charles P. Johnson and Associates. Annapolis Landscape Architects

Long Branch-Wayne Local Park Renovation Project

Dowdy Park. Concept Plans TOWN OF NAGS HEAD NORTH CAROLINA. Developed by: Albemarle & Associates, Ltd VHB/ Vanasse Hangen Brustlin, Inc.

ANCHORAGE PARK REPORT CARD Assessing A Park s Appearance, Function, & Condition

SOUTHEAST SPORTS COMPLEX MASTER PLAN

Y Sports Complex PROGRAMMING Capitol Improvement Plan. Anticipated/Suggested Improvements. Sedgwick County Park: Sports Complex:

Neighborhood Districts

Memo Preliminary. City of Miamisburg Parks Site Reconnaissance

Benedict Fountain Park Meeting Notes Wednesday, February 15, 2012

CHAPPLES PARK MASTER PLAN

AVONDALE ESTATES GREENSPACE AD-HOC COMMITTEE

Canal Winchester Parks Master Plan. Public Meeting 2 Thursday, February 2 6:30pm

BENJAMIN BANNEKER PARK FRAMEWORK PLAN (PLAN ADOPTION)

James Madison Park Master Plan and Shelter Design

APPENDIX E. El Cerrito Parks and Recreation Facilities Master Plan Recommendations by Factor for Consideration

David Ache, representing Councilmember Hucker s office was present during the first portion of the meeting.

Design Specifications & Requirements Manual

OPPORTUNITIES AND CONSTRAINTS - OXBOW PARK ENTRANCE AND PUT-IN

More than 30 adults and 19 children were involved in these community workshops.

L-1 LEGEND HOMES AT DEER HILL LAFAYETTE, CALIFORNIA

CHAPPLES PARK MASTER PLAN. Presentation to Council April 10, 2017

Point Defiance Park. Master Plan Update. April 23 rd 2015

City Council March 27, Parks, Recreation, and Trails Master Plan

Athletic Facilities Needs Assessment

Design Considerations

South East Sports Complex Phase I

Community Advisory Council (CAC) Summit

MADISON MANOR PARK RENOVATIONS

1. Parks & Recreation Neighborhood Parks Community Parks Special Use Sites 2. Open Space 3. Trails

SAN FRANCISCO RECREATION + PARKS DEPARTMENT MARGARET HAYWARD PLAYGROUND COMMUNITY WORKSHOP #1 WEDNESDAY, JANUARY 27, 2016

Throughout. square. (Crystal City Vision Plan 2050)

A 2012 Clean and Safe Neighborhood Parks Bond Project. Katy Tang, District Supervisor. Jasmine Kaw, Landscape Architect Will Kwan, Architect

Errol Heights Park and Community Garden Frequently Asked Questions March 22, 2018

Focus Groups. 8 Focus Group meetings including 2 with staff, 1 with seniors, and 1 with students

Design Specifications & Requirements Manual

Bernie Dahl and Donald J. Molnar, Anatomy of a Park, 3rd edition, (Long Grove, IL: Waveland Press, 2003), 151.

VISION PLAN PRESENTATION - SEPTEMBER 28, 2013

Whitemarsh Comprehensive Plan Update: Housing & Land Use. Public Workshop #3: September 20, 2018

Recreation Facility Evaluation - Conclusions

Lasley Park Design Concepts Feedback from meeting on March 3, 2016

Citizen s Advisory Committee

Barrie Park Site Master Plan

Forest Grove Park Master Plan

Southward Community Recreation and Sports Park Southward Community Recreation and Sports Park Concept Design Images and Information.

TA B L E O F C ON T EN T S

Chapter 6. Overall Vision RECOMMENDATIONS. More Trail and Trail. Connections. Equal Access to Park. Facilities and Programs. Water Access.

Master Plan Presentation August 12, 2015

Southeast Quadrant Plan

REQUEST FOR COUNCIL ACTION

Mendota Heights 2040 Comprehensive Plan Draft Vers

MASTER PLAN IMPLEMENTATION COSTS. Appendix A

AGENDA Pony Barn Recreation Area Working Group

City of Los Angeles Department of Public Works

2. Analysis. DRAFT Gerald Richards & Pleasantview Park Master Plan

Public Recreation Spaces. Brian E. Saelens, Lawrence D. Frank, Christopher Auffrey, Lauren Elise Leary,

City of Naples Parks Master Plan (Draft)

South th E ast Communit ity Centre (SECC)

Community Co-Design Process. Create the ability to house a large school on the Cubberley site in the future.

Highbridge Park Enhance the picturesque park: Provide more opportunities for healthy activity: Improve forest and ecology health:

PARK M A I N T E N A N C E REPORT CARD

Minto-Brown Island. November 18, City of Salem, Parks & Transportation Services

ROBERTS FIELD BRANDING GOALS NEW BRANDING PROJECT

SPACE TYPES & REQUIREMENTS

VEHICULAR AND PEDESTRIAN CIRCULATION

Silver Creek Subdivision Public Park

New Park / Entry Court & Plaza Concept Design

PART TWO: PROJECT SPECIFIC DESIGN GUIDELINES

GENE FRIEND RECREATION CENTER Civic Design Review Concept Design DECEMBER14, 2015

Blue Line LRT Extension

Section 4 - Public Realm & Landscape proposals Landscape Masterplan. Section 4 52

SALEM FOREST RIVER PARK PRELIMINARY POOL AREA ASSESSMENT & MASTER PLAN STUDY. For the City of Salem

Outdoor Recreation Facilities Inventory

Draft Master Plan for Franklin Park

Park Types and Attributes

Community Design Guidelines. Port Wallace DRAFT

Missing Link Study Grand Rounds Parkway Planning and Design Introduction

3.0 Community Consultation. BW Land

February 27, 2018 City Council Presentation The Crown Jewel Park in the City of Fairfax

City of Naples Parks Master Plan

M-NCPPC Park System in

The Vision. Photo provided by The Minervini Group. 46 Vision, Objectives & Strategies

Cover Planning. January I-70 East Final Environmental Impact Statement

Burrus Old Mill Park

City of Gainesville Parks, Recreation and Cultural Affairs Infrastructure Sales Tax City Commission Approved Project List

Preliminary Sketch Plan for Fort Hunter Park

APPENDIX 4 NEWBURY TOWNSHIP TOWN CENTER MASTER PLAN

Memorial Park Workshop Notes March 20, :30 10:30am

master plan hodge park

PCAL Case Study Open Spaces: Blayney Heritage Park

Maplewood Avenue Downtown Complete Street Project

CITY OF GAINESVILLE PARKS, RECREATION AND CULTURAL AFFAIRS DEPARTMENT VISION 2020

Mix of Uses Guide for Transit-Oriented Development MIX OF USES

Exhibit A: Project Scope

Little Neck Planning Area

9. PARKS AND RECREATION

Preci nct P l ans Figure 56 Campus Aerial Photo, 2008 CAL STATE EAST BAY, HAYWARD CAMPUS MASTER PLAN

January 11, New benches installed. Paving of parking lot adjacent to piers and the canoe put-in. Near complete with clean up remaining.

Fort Washington & Upper Riverside Parks PlaNYC Survey Results

Transcription:

area and identified key themes that should be addressed in the upcoming design process. The following is a compilation of the themes identified (organized by park). Not every park was addressed in this meeting due

area and identified key themes that should be addressed in the upcoming design process. The following is a compilation of the themes identified (organized by park). Not every park was addressed in this meeting due

area and identified key themes that should be addressed in the upcoming design process. The following is a compilation of the themes identified (organized by park). Not every park was addressed in this meeting due GROUP 1 BARTON TRIANGLE CALEB DORR CIRCLE CHERGOSKY PARK LUXTON PARK ORLIN TRIANGLE TOWER HILL PARK TOWERSIDE (NEW) GROUP 2 CHUTE SQUARE ELWELL PARK HOLMES PARK MARCY PARK VAN CLEVE PARK BRIDAL VEIL REGIONAL TRAIL/ GRAND ROUNDS GROUP 1 Chergosky gardens noise buffers access/sidewalk connectivity paths for walking bad air quality GROUP 3 DICKMAN PARK LOGAN PARK MONROE PLACE TRIANGLE SIBLEY TRIANGLE ST ANTHONY PARK WASHINGTON TRIANGLE GROUP 5 ARCHITECT BOTTINEAU COLUMBIA PARK HIVIEW XCEL ENERGY GROUP 4 BELTRAMI JACKSON SQUARE NORTHEAST ATHLETIC WINDOM PARK NE BRIDAL VEIL REGIONAL TRAIL/ GRAND ROUNDS GROUP 6 AUDUBON PARK CAVELL PARK DEMING HEIGHTS PARK OAK CREST TRIANGLE WAITE PARK BRIDAL VEIL REGIONAL TRAIL/ GRAND ROUNDS Luxton safety parking underdeveloped area Barton Triangle pollution littler noise buffer need to maintain safety/isolation worth maintaining? community garden RESULTS FROM DATA JAM : 3/13/18

GROUP 1 continued Caleb Door area and identified key themes that should be addressed in the upcoming design process. The following is a Traffic compilation sidewalk of the repair themes identified (organized by park). Not every park was addressed in this meeting due heavy traffic-vehicles no official name pollution signs-traffic Tower Hill historic no play space ADA compliance steep (railings) park benches Orlin ADA poorly maintained Towerside very popular a concern walkers sports/athletics GROUP 2 Holmes Park needs better signs indicating it is not part of Marcy school skate boards and biking parks upgrade playground equipment gathering spaces better grass need better Elwell Don't like current fence hidden parking lot public art Van Cleve address ADA complains great diversity, need diverse activities adult fitness programs preschool & child programs visibility pf building needs to be better improved picnic area court maintenance want skate park

GROUP 2 continued area and Marcy identified key themes that should be addressed in the upcoming design process. The following is a compilation high of density the themes of use identified (organized by park). Not every park was addressed in this meeting due better use of space grills, community gathering space lots of hanging out ADA skate/bike park Chute Square ADA historic structure picnic tables with USB plug more pedestrian access gathering space GROUP 3 Dickman improvements parent seating more connection to the river better crosswalk pollinator garden ADA improvements senior programming Logan we would like to see participant #'s for baseball field improve SW quadrant of the park (activate) Sound blocking preschool age programming artistic signs/public art-highlight arts district better crosswalks St. Anthony Park connections to triangle parks in the area improvements to the hill-similar to gold medal park track look is a good idea Triangles (Washington, Sibley, and Monroe) public art gardens/pollinators

GROUP 4 area and identified Jackson Square key themes that should be addressed in the upcoming design process. The following is a compilation teen of spaces the themes identified (organized by park). Not every park was addressed in this meeting due indoor teen spaces sidewalk connections (midblock crossings, traffic calming) music play is popular better tot lot equipment connecting parking and bike racks to activity areas preserve basketball program conflicts (diamond and soccer field) large group gathering space Beltrami Circulation (midblock) Independent sports are popular gathering space (amphitheater, group) natural spaces traffic safety better quality paths Tree gap -confirm diversity Bike facilities group recreation that reflects shifting demographics the park's close proximity to the NE athletic facility may be affecting the use of the diamond Windom trails through parks need to be accessible walking is a priority energize/activate warming house during the summer large gathering space for big families to picnic green space + more athletic fields requested: can we do this together hilly park with high density of seniors - how accessible is upper park of park accessible pathways to activity areas better use of space more athletics connectivity to buildings more trees difficult bathroom access NE athletic crosswalks circulation neighborhood is less dense connectivity circulation

GROUP 5 park groups Xceldefined by a specific area within the service area. The groups reviewed the data packet for their area and great identified river road key access themes that should be addressed in the upcoming design process. The following is a compilation drainage of the issues themes identified (organized by park). Not every park was addressed in this meeting due awkward layout urban agriculture more trees improve local access batting cage Hiview courts nature improve bathrooms trees Columbia Park Destination park courts picnic areas dog parks-large+small dog bike+pedestrian loop around park Bottineau trees improve park layout better pedestrian crossings Architect habitat enhancement urban agriculture sidewalks good pedestrian access

GROUP 6 park groups Deming defined Heights by a specific area within the service area. The groups reviewed the data packet for their area and highest identified point, key beautiful themes trees, that strong should relationship be addressed to neighborhood in the upcoming design process. The following is a compilation strong of naturalized the themes park identified (organized by park). Not every park was addressed in this meeting due slow down traffic ADA accessibility need for interpretation (nature, signage, birdwatching) nature play Oak Crest stormwater or pollinator garden benches public art Waite more gathering places that are less isolated children's programming stormwater improvements (baseball) playground for younger children (replace field) schedule + programming fields entrance to rec center Audubon Park lack of accessibility most people travel by walking better walkways parking lot is in poor condition greenspace and courts are important what to do with area in middle of site (low area near ball fields) vehicular traffic is difficult more seating needed/improved need children's programming Cavell need better soccer fields improve restrooms accessibility (bike racks) desire for water feature/naturalized area (identity making) more seating