Edmond Plan IV Update 2016, Descriptions and Recommendations for future Land Use for the Far Northeast Neighborhoods.

Similar documents
BROOKHILL NEIGHBORHOOD MODEL ZONING MAP AMENDMENT PREFACE TO APPLICATION

RESOLUTION NO R

Rapid City Planning Commission Rezoning Project Report

Urban Development Areas Bedford County

Warren County/Bowling Green Focus 2030 Comprehensive Plan VOLUME 1 INDEX

Baumgarten MPUD. Exhibit 3 Evaluation Criteria

Description of Preferred Alternative

PRELIMINARY REPORT. HIGHWAY 18 CORRIDOR NEIGHBORHOOD PLAN VILLAGE OF DOUSMAN November, 2014

Urban Development Areas Frederick County

Secrest Short Cut and Monroe Expressway Small Area Plan AUGUST 29, 2018

13. PRELIMINARY PLAT NO MILLS FARM - Vicinity of the southeast corner of 159 th Street and Quivira Road

LAND USE MEADOWS PLANNING AREA

CITY OF DUPONT LONG RANGE PLANNING PROJECTS 2017 COMPREHENSIVE PLAN CYCLE

E. RURAL COMMERCIAL/INDUSTRIAL PARK MODEL

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

OP Council Resolution June 16, Planning and Development Services

Neighborhood One. Location. Existing Land Use

2.7 ac park. TOTAL 5,403 DU 1,297,900 sf 1,105,450 sf 3.87 ac 5,563 DU 1,121,200 sf 1,105,450 sf 3.87 ac

City of Grande Prairie Development Services Department

Rapid City Planning Commission Rezoning Project Report

01 PROJECT DESCRIPTION

Mitchell Ranch South MPUD Application for Master Planned Unit Development Approval Project Narrative. Introduction

Amendment to the Elderberry Neighborhood Development Plan

Citizen Comment Staff Response Staff Recommended Revision Planning Committee

LAND USE TANGLEWILDE/THOMPSON PLACE PLANNING AREA. C. Identified Neighborhood Groups and Homeowner s Associations

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

2.0 AREA PLANS. Lakeside Business District. Lakeside Business District Land Use Categories:

Regulation Changes for Open Space and Similar Uses

Northeast Quadrant Plan

SHEFFIELD PARK Paulding County, GA DRI #588

DRAFT Subject to Modifications

Major Subdivision Sketch Plan Checklist

COUNTY OF ALBEMARLE PLANNING STAFF REPORT SUMMARY

Town of Portola Valley General Plan. Nathhorst Triangle Area Plan

RESIDENTIAL PLANNED UNIT DEVELOPMENT / SUBDIVISION AND REZONING CONCEPT AND DEVELOPMENT STAGE PLAN SUBMITTAL NARRATIVE

USA Addition of South & East Side Residential Parcels. USA Deletion of a Town of Christiana Parcel. Conversion from USA to Limited Service Area

Draft Stillwater 2030 Comprehensive Plan- Goals and Policies

LAND USE AMENDMENT DOWNTOWN COMMERCIAL CORE (WARD 7) MACLEOD TRAIL SE AND 5 AVENUE SE BYLAW 254D2017

INTRODUCTION. b. The extent to which such problems and objectives have been reduced or have increased subsequent to such date.

Chapter 5: Natural Resources and Environment

PLANNED UNIT DEVELOPMENT Date: April 5, 2018

Sorted citizen input comments in review of Blount County plans July, August, and September 2007

7,600 Residential Units 1,700,000 SF Non-Res 300-Room ALF 300-Room Hotel University School, Park, Civic parcels 1,889 ac flow-way/preservation

This chapter describes the purpose of the Plan, introduces how the Plan is organized and provides contextual background for the Plan.

GENERAL PLAN AND ENVIRONMENTAL IMPACT REPORT

APPENDIX C SPECIAL PLANNING AREAS

Chapter 10 IMPLEMENTATION RECOMMENDATIONS

LAND USE DESIGNATIONS AND ZONING CLASSIFICATIONS

TABLE 5-1 EXISTING LAND USES (2016)

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 5H

Ten Mile Creek Planning Area

UNIVERSITY OF MICHIGAN:

M E M O R A N D U M November 9, 2018

NOTICE OF PREPARATION

General Location Annex, Rezone & Preliminary Plat Lansdowne Addition, Unit Three

LOS ANGELES CITY PLANNING DEPARTMENT STAFF REPORT

Conservation Development

MOBILE CITY PLANNING COMMISSION LETTER OF DECISION. October 22, 2010

City Of Sparks Planning Commission Item

Development Agreement Public Meeting. June 26, 2013

4.0 INTRODUCTION TO THE ENVIRONMENTAL ANALYSIS AND ASSUMPTIONS USED

STAFF REPORT TO THE PLANNING COMMISSION April 30, Copper Creek of Nottingham 13 th Addition PUD Development Stage Plan and Final Plat

Sam Furr and McCord Road Huntersville, North Carolina

Pumpkin Hollow Neighborhood Development Plan. October 01, 2007

PLANNED UNIT DEVELOPMENT STAFF REPORT Date: June 2, 2016

Cross Country Neighborhood Development Plan

Section 2 Study Area

Rezoning Petition Final Staff Analysis October 15, 2018

City of Chickasaw Land Use Comprehensive Plan 2030 Chapter5-Draft(2)Public review_

NEWBRIDGE SPECIFIC PLAN PROJECT DESCRIPTION SEPTEMBER 24, 2012

Communities Plan. Parkland-Spanaway-Midland. LUAC Review of Draft Policies

Rezoning Petition Final Staff Analysis May 21, 2018

A citizen s guide to the. Comprehensive Plan. City of Lakeville, Minnesota 1

M E M O R A N D U M July 27, 2018

Westbound: A One-day Exploration of Growth

Subarea 4 Indian Creek. Vision The combination of park networks and transportation amenities make Subarea 4 the greenest hub in the Corridor.

BUILDER LOTS FOR SALE

Staff Report and Recommendation

What We Heard Public Engagement - Stage 1

Central and East Neighbourhoods - Hermitage Outline Plan

MILLS PARK & PANTHER CREEK GREENWAY

CITY OF LAKEWOOD 2012 THREE-MILE PLAN

TIRZ 17/Redevelopment Authority Capital Improvements Plan Projects

TUSTIN RED HILL DEVELOPMENT TUSTIN CITY COUNCIL WORKSHOP

INTRODUCTION PLANNING HISTORY

DOMINION BOULEVARD CORRIDOR STUDY AND ECONOMIC DEVELOPMENT STRATEGIC PLAN A MODEL FOR CHESAPEAKE S FUTURE

Town of Rico Three Mile Plan for Annexation

Gloucester County s Comprehensive Plan. The Community Connection

Exhibit A. 8:9 Scuffletown Rural Conservation District

Asbury Chapel Subdivision Sketch Plan

3.0 PROJECT DESCRIPTION

Please read the entire document

Mycoskie McInnis Associates represented by Cliff Mycoskie. Rdw Rudy s Arlington and I-20/South Collins, Ltd represented by Robert Dorazil

Rezoning Petition Final Staff Analysis June 18, 2018

Longhorsley Neighbourhood Plan

4.1 LAND USE AND PLANNING EXISTING CONDITIONS REGULATORY BACKGROUND LAND USES IN THE PLAN AREA SURROUNDING LAND USES

LAND USE AMENDMENT CORNERSTONE (WARD 3) 60 STREET NE AND COUNTRY HILLS BOULEVARD NE MAP 26NE BYLAW 22D2017

1INTRODUCTION. Purpose of the Truckee Railyard Master Plan

Request for Statement of Interest in Implementation of the Roosevelt Road Redevelopment Plan

S o u t h C e n t r a l O u t l i n e P l a n. Leduc Business Park. North Leduc Industrial Area Structure Plan C it y of Led u c.

Transcription:

TO: FROM: Edmond Planning Commission Robert L. Schiermeyer, City Planner DATE: October 2016 RE: Edmond Plan IV Update 2016, Descriptions and Recommendations for future Land Use for the Far Northeast Neighborhoods. Land Use elements suggested for the Far Northeast Neighborhoods: 1. Maintain the I-35 Corridor commercial land use projections. The commercial projections, actually extending to Air Depot in some cases, were recommended because utilities are available and the locations were along arterials that have the potential to be upgraded at a non-specific time in the future. These sites are not always immediately accessible to utilities but they could be served by extensions of the existing sewer and water systems, and if the opportunity is lost for these projected locations outside of the utility service area, the city will have to find new areas where utilities can be available. The city is less concerned about when the commercial would develop as to appropriate locations. 2. ODOT is proceeding with a Traffic Analysis of I-35 through Edmond. This should be completed in 14 + or months. 3. The Far Northeast Neighborhoods area is the largest of the 10 subareas. This area, east of I-35, west of Westminster Road, is not served by a significant infrastructure. The Plan Map identifies drainage basins that could be served from the Coffee Creek outfall sewer line. City water extends north of Covell, on Air Depot, and has just recently been extended north on Douglas, south of Sorghum Mill Road. Without both water and sewer, the north part of this subarea will continue to develop with acreage lots. There are already a significant number of acreage developments in this area. With the water and sewer extended from the Woodland Park development, all of the urban residential lots occur along Covell, Douglas, and Air Depot. The urban development area is approximately one-half mile either side of that corridor. Connection to city water has always been considered an important standard, where city waterlines are available, so that fire protection is possible. The Fire Department was recently able to maintain a desired ISO rating for East Edmond by providing additional information about how they can respond to developments in East Edmond. Commercial uses are projected at the Woodland Park development, where zoning is in place, and along Covell, west to Air Depot, and south on Air Depot. Commercial is projected along I-35, and that is part of the I-35 Corridor.

4. Historical development has included: Sleepy Hollow (25 lots), Hidden Lake (82 lots), Redbud Canyon (101 lots), Creek View (25 lots), Grand Timber (28 lots), Abbey Place (37 lots), Pheasant Pointe (42 lots), Canaan Creek Farms (26 lots), Belleau Wood (54 lots), Cardinal Ridge (49 lots), Forest Creek (45 lots), and Covey Run (36 lots). There are also numerous individual acreage lots spread throughout this 11,193 acres. More recent development has included Woodland Park, a Planned Unit Development at Douglas, proposed for 1,950 lots. In addition, Thunder Canyon has started the first phase and has the potential of 193 lots; Covell Valley has the potential of 348 lots; Cottage Grove has the potential of 128 lots; and the Timber Crest Addition has the potential of 188 lots. Recently, the Ridge Creek Addition, located west of Douglas Boulevard, provided for a further water line extension, and that project is planned for 168 lots. One Addition, the Hedgerow Addition, has been considered west of Air Depot, at Danforth, and that project proposes 319 lots. Lots east of Post Road and north of Danforth Road need to develop at a two acre lot minimum, since there are no utilities. The standards directing residential growth are provided for in the Subdivision Code, providing where utility connections are required and State Statutes providing for the two acre lots allowed on private street developments. RLS:lg UpdateFarNENeighborhoodsOct2016

TO: FROM: Edmond Planning Commission Members Robert L. Schiermeyer, City Planner DATE: October 2016 RE: Edmond Plan IV Update 2016, Specific Land Use recommendations regarding the Ordinance Plan Map, 2016. Far Northeast Neighborhoods During the last three years, this general area of neighborhoods has been the most rapidly growing part of Edmond, in terms of subdivision lots. Building permits have leveled off. The most rapid develop is contained in a corridor along Covell to Douglas, and Douglas north of Coffee Creek, and Air Depot south of Covell. This area is served with city utilities, so urban lot size development is possible. The boundaries north and south of this corridor are still developing with two acre lots, since city utilities are not available and are not practical to be extended. The commercial land areas are very limited, and are not new projections because they are along I-35. Even without frontage roads, or additional offramps/interchanges, the commercial along the interstate is the best location for commercial; it is also a location where utilities are available. Air Depot becomes the nearest arterial that will allow for traffic distribution, other than I-35. The only other commercial is at the Woodland Park project, with some locations along Covell Road. Other entities, such as the school district and Francis Tuttle, have purchased land, expecting growth. There has already been a substantial development of acreage lots, so the northern portion of this area is not likely to be a location for commercial or other higher density residential, unless utilities are extended by developers. In order to anticipate full development of what has already been approved, a water distribution line, and eventually a water tower, will be needed in the northern portion of these northeast neighborhoods. Larger buildings for the schools also demand full standard water service. The Plan Assessment process should include an assessment of conditions of the green infrastructure. Even if there was no requirement to set aside open space areas, the flood plains should provide for permanent open space, and some of the topography may coincidentally cause vegetative areas to be left in place. In a standard Plan Amendment or Rezoning Report, Urban Forestry could report on the status of their studies that they have already conducted. The other assessments would include the Master Transportation Plan, traffic studies, where

required, initial flood plain comments, waterlines and wastewater lines, fire code compliance and Building Code compliance. Reports, such as the Trails Plan, Parks Study, Bicycle Plan, and any results of a Community Connections meeting, should also be included in the staff report. Possible variances may need to be discussed early. RLS:lg UpdateSpecificRecommendations-FarNEOct2016

2 0 1 6 P L A N I V U P D AT E FA R N O RT H E A S T N E I G H B O R H O O D S P O P U L AT I O N A N D L A N D U S E - S TA F F W O R K I N G M A P Parks and Recreation Master Plan Notation: This area is identified as being in need of additional Neighborhood and/or Community Parks. NEIGHBORHOOD ABBEY PLACE ARBOR AT THE SUMMIT BELLEAU WOOD CANAAN FARMS CARDINAL RIDGE COFFEE COFFEE HILLS COTTAGE GROVE SPRINGS COVEY RUN VIEW DANFORTH HILL FOREST FOREST HILLS GRAND TIMBER HAMPDEN HOLLOW HARPER TRACT HEDGEROW HIDDEN HIDDEN LAKE KANALYS COLLEGEWOOD ACRES KELLOGG LITTLE MARJAYOUN LOST FOREST PHEASANT POINTE REDBUD CANYON RIDGE RIVA RIDGE SLEEPY HOLLOW COUNTRY STONEGATE TANGLE VINE THE PORCHES AT ARBOR THUNDER CANYON TIMBER CREST UNPLATTED WESTMINSTER GLEN WOOD LEAF AERO TOTAL: SUM RESIDENT UNITS 37 106 54 26 49 22 6 56 7 36 9 44 14 28 174 1 319 38 81 37 11 4 17 40 43 101 43 28 20 34 64 188 190 10 16 2025 *Highlighted text denotes multifamily units. FOREST COVEY RUN WOOD LEAF AERO Peavine Creek Sub-Basin 2 Acre Large Lots Unless City Utilities (Water, 30,000 s.f. lots) FOREST HILLS CANAAN FARMS PHEASANT POINTE ABBEY PLACE 11,174 SORGHUM MILL COFFEE HILLS 35 SLEEPY HOLLOW COUNTRY ARBOR AT THE SUMMIT HEDGEROW TIMBER CREST HAMPDEN HOLLOW CORNER RETAIL ABEL ADDITION ADDITION CROSSTIMBERS MUNICIPAL COMPLEX KELLOGG H.S. Edmond Public Schools COFFEE WESTMINSTER GLEN M.S. Edmond Public Schools TANGLE VINE Covell Dead End SPRINGS VIEW VILLAGE GOWER MEMORIAL CEMETERY THUNDER CANYON REDBUD CANYON BICKHAM SOFTBALL COMPLEX HIDDEN LAKE ESTIMATED MAX BUILD-OUT POPULATION 8,091 Landuse - COTTAGE GROVE HIDDEN KANALYS COLLEGEWOOD ACRES COFFEE STONEGATE FAR NE SUBAREA 2010 CENSUS POPULATION 2,186 GRAND TIMBER FAR NE SUBAREA TOTAL ACREAGE RIDGE Cowbell Creek Sub-Basin CROSS TIMBERS NORTHEAST ACREAGES AND ESTIMATED MAXIMUM BUILD-OUT 2 Acre Large Lots Dirt Road LITTLE MARJAYOUN BELLEAU WOOD F.P. 11.69% WESTMINSTER CITY LIMIT BOUNDARY UNDEV. 59.34% G.S. 0.80% POST Print Date: 2016 DOUGLAS PLANNING DEPARTMENT MIDWEST AIR DEPOT Far Northeast Neighborhoods City Limits South to N Arcadia Lake District Boundary I-35 East to Westminster DEV. 28.17% SINGLE FAMILY LARGE LOT S.F. (2 Acres) LAKE RESIDENTIAL LAKE PRESERVATION MULTIFAMILY RIVA RIDGE COMMERCIAL Deep Fork Sub-Basins COMMERCIAL HDR PUD OPEN DISPLAY COMMERCIAL CARDINAL RIDGE Town of Arcadia WASTEWATER TREATMENT PLANT DANFORTH DANFORTH HILL LOST FOREST NORTHERN BOUNDARY OF ARCADIA LAKE DISTRICT Commercial and Office is 623.90 Acres, or 5.6% of Total Land Area OFFICE INDUSTRIAL AGRICULTURE CIVIC PUBLIC CHURCH CITY EDMOND CITY OKC GREEN SPACE FLOOD PLAIN