FROST CAMPUS MASTER PLAN SIR SANDFORD FLEMING COLLEGE

Similar documents
Derry Green Corporate Business Park

Overview and Update of the Rutgers-New Brunswick Physical Master Plan. January 2015

University of the District of Columbia Van Ness Campus Master Plan Community Open House 3. December 8, 2010

Downtown Streetscape Manual & Built Form Standards

University of Denver Land Use Plan Update I. Executive Summary

1 Welcome! UBC Okanagan Master Plan Update - Open House

University of Saskatchewan CAMPUS MASTER PLAN. Senate Meeting Preliminary Presentation. April 21, 2018 DIALOG ECS DA WATT

38 Queen s University Campus Master Plan Part 1

implementation r expression in landscape

New-Cast Mixed-use Development Proposal King Street West, Newcastle, Ontario

Mark-up of the effect of the proposed Bronte Village Growth Area OPA No.18 on the text of section 24, Bronte Village, of the Livable Oakville Plan

18 May 2016 CAMPUS MASTER PLAN UPATE

6.1 University Projects

Potential Green Infrastructure Strategies May 6, 2015 Workshop

C a m p u s I d e n t i t y

COMMUNITY DESIGN. GOAL: Create livable and attractive communities. Intent

The Vision. Photo provided by The Minervini Group. 46 Vision, Objectives & Strategies

This is the East Carolina University Comprehensive Facilities Master Plan Final Draft Plan Review. This workbook reviews the campus draft master plan

01 Welcome! About Ontario Shores

Figure 3-1: Public Realm Plan

REPORT TO BOARD ON PREFERENCES tbp/architecture CCSF Facilities Master Plan, October 23, 2016

Town of Cobourg Heritage Master Plan. Statutory Public Meeting

A Vibrant Downtown. Chapter 5 Cary Public Art Opportunities 31

CHAPPLES PARK MASTER PLAN

Downtown Whitby Action Plan

Phase 1 : Understanding the Campus Context. Phase 2 : APPROACHES - Alternates & Preferred Plan

3.0 master plan concept

11.0 TRANSPORTATION ELEMENT

Part C. Main Campus Plan Frameworks PAGE 59 UNIVERSITY OF REGINA / CAMPUS MASTER PLAN 2011

Attachment 1 TOWN OF NEW TECUMSETH. Manual for the Preparation of an Urban Design Report

UTSC SECONDARY PLAN COMMUNITY OPEN HOUSE

Workshop 3. City of Burlington Waterfront Hotel Planning Study. September 14, The Planning Partnership

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN

The Capital Design Advisory Committee St. Mary s College of Maryland & Historic St. Mary s City

The Chinese University of Hong Kong Campus Master Plan Stage 3 Stakeholders' Engagement Report

East Bayshore Road Neighbourhood

WESTERN ILLINOIS UNIVERSITY

7Page 91 CLEMMONS COMMUNITY COMPASS 7 COMMUNITY CHARACTER

4. INDUSTRIAL 53 CASTLE ROCK DESIGN

There are five comprehensive goals that inform the Urban Design element at FIU. They are:

Preci nct P l ans Figure 56 Campus Aerial Photo, 2008 CAL STATE EAST BAY, HAYWARD CAMPUS MASTER PLAN

District Facilities Master Plan

BELLEVUE COLLEGE Campus Master Plan February 29, 2016 (Space Needs Updated on 04/13/2016) Bellevue College Campus Master Plan April 13, :08 PM

Riverwalk Dreams compiled by Thomas P. Healy November 16, 2017

Welcome! UBC Community Conversations. Proposed new community garden space in Chancellor Place and Wesbrook Place. Traffic flow on Iona Drive

URBAN DESIGN BRIEF. 2136&2148 Trafalgar Road. Town of Oakville

UNIVERSITY TOWN NEIGHBOURHOODS 5.2 ECO-CORRIDOR MELBOURNE CAMPUS MASTER PLAN 2014

THE CIVIC DISTRICT DEVELOPMENT OPPORTUNITIES

8.0 Built Form Framework

PUBLIC RIGHT-OF-WAY IN THIS CHAPTER PUBLIC REALM

EXISTING CONDITIONS 41. Existing Conditions

VICTORIA DOWNTOWN DEVELOPMENT PLANNING

CAL POLY MASTER PLAN UPDATE, March 2015

ELK GROVE GENERAL PLAN VISION

ROCHESTER INSTITUTE OF TECHNOLOGY Active Transportation Improvements 2010

WESTERN ILLINOIS UNIVERSITY

Complete Neighbourhood Guidelines Review Tool

URBAN DESIGN BRIEF 181 Burloak Drive, Oakville

EXISTING COMPREHENSIVE PLAN

Appendix A COMMUNITY IMPROVEMENT PLAN DESIGN GUIDELINES

Silverdale Regional Center

ESTABLISH AN EFFICIENT TOWN CENTER

North Oakville East Parks Facilities Distribution Plan. November, 2009

Planning Districts INTRODUCTION

12 February CAMPUS MASTER PLAN UPDATE Focus Group - Wayfinding & Signage

U n i v e r s i t y o f S o u t h C a r o l i n a A i k e n. Land Plan Study

Welcome. Walk Around. Talk to Us. Write Down Your Comments

WELCOME TO THE CHOUTEAU GREENWAY EQUITY WORKING GROUP!

The University District envisions, in its neighborhood

Public input has been an important part of the plan development process.

Parks Master Plan Implementation: Phase I Waterfront Use and Design REPORT #: September 7, 2016 File #

TH E U N IVE RSIT Y O F FLO R I DA LANDSCAPE MASTER PLAN REPORT

section five BEAUTIFICATION PLAN

CAMPUS MASTER PLAN DRAFT PLAN UPDATE JANUARY

Neighborhood Districts

Whitemarsh Comprehensive Plan Update: Housing & Land Use. Public Workshop #3: September 20, 2018

4- PA - LD - LIVELY DOWNTOWN. LD - Background

ARTICLE 6: Special and Planned Development Districts

lot flankage Y street 16m 6m landscape strip for large site 3m landscape strip for small medium site

URBAN DESIGN BRIEF URBAN DESIGN BRIEF 721 FRANKLIN BLVD, CAMBRIDGE August 2018

Lehigh Acres Land Development Regulations Community Planning Project

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004

Planning Board Briefing

T e c h n i c a l M e m o r a n d u m. October Date. Georgia State University Master Plan Update. Project

10.0 Open Space and Public Realm

CONTENTS 6.1 URBAN DESIGN

Cambridge. West Cambridge site. What is a Shared Facilities Hub? Welcome

Achieving a Vision. Master Plan 2009 Belknap Campus August 10 11, UofL Belknap Campus Master Plan Update

The Master Plan Framework

SECTION TWO: Overall Design Guidelines

Westwind Developments Ltd. PIONEER LANDS AREA STRUCTURE PLAN - PROPOSED AMENDMENT

11 February CAMPUS MASTER PLAN UPDATE Focus Group - Design Guidelines

CHAPTER 7: VISION AND ACTION STATEMENTS. Noble 2025 Vision Statement

BROOKHILL NEIGHBORHOOD MODEL ZONING MAP AMENDMENT PREFACE TO APPLICATION

New York Avenue Streetscape and Trail Project Public Meeting #1 Summary

The Lower SaLuda Greenway

Community Design Guidelines. Port Wallace DRAFT

Pedestrian and Bike Bridge LOGO

Town of Peru Comprehensive Plan Executive Summary

UNIVERSITY TOWN NEIGHBOURHOODS 5.5 HOUSING MELBOURNE CAMPUS MASTER PLAN 2014

Transcription:

FROST CAMPUS MASTER PLAN SIR SANDFORD FLEMING COLLEGE SEPT 2015

TABLE OF CONTENTS 1.0 Introduction 01 1.1 Master Plan Purpose 1.2 About The Campus 2.0 The Campus Master Plan 05 2.1 Vision Statement 2.2 Guiding Principles 2.3 Frost Campus Master Plan - Annotated core area Plan 2.4 Frost Campus Site Master Plan 2.5 Site Master plan Overview 2.6 Building and Interiors Master Plan Overview 3.0 Phasing and Implementation 27 3.1 Introduction 3.2 Prioritization & Phasing

1.0 INTRODUCTION

Existing Image of the Frost Campus Community Gardens vi

1 1.1 MASTER PLAN INTRODUCTION The Frost Campus Master Plan provides a comprehensive review of the Campus functions, and offers key recommendations that support the delivery of a first class education in Environmental and Natural Resource Studies as envisioned in the Campus Strategic and Growth Plans. The role of the Master Plan is to provide overall guidance on improving Campus circulation, elevating awareness of Campus activities, creating outdoor classrooms, locating / expanding new facilities and buildings, and upgrading existing interior spaces. At Frost Campus, Fleming College provides a high quality education to students in a number of rapidly growing and culturally relevant fields. Many of the courses and programs taught on Campus are at the forefront of sustainable and technical education, with strong ties to their supporting industries. Frost is unique amongst institutions in the way that programs use indoor and outdoor space, and maintain and store equipment. This is a result of the hands-on approach to teaching and the Campus innovative offerings. The Master Plan is structured to address the immediate needs of the existing Campus and to provide a holistic Campus Vision that looks 5, 10 and 15 years in the future. This Master Plan Executive Summary document is divided into 3 Sections 1.0 Introduction: Master Plan Introduction and Campus Overview 2.0 The Campus Master Plan: Guiding Principles and Campus Master Plan Recommendations 3.0 Implementation: Prioritization of the Campus Master Plan Recommendations including Phasing and Costing.

Fleming College - Executive Summary Frost Campus Master Plan Brook McIlroy/ 2 1.2 ABOUT SIR SANDFORD FLEMING S FROST CAMPUS 1.3.1 CAMPUS ORGANIZATION Frost Campus is approximately 68.2 hectares (168.5 acres) in size and is centrally located in the City of Kawartha Lakes in Lindsay, Ontario. The Campus is bounded to the west by Angeline Street, to the east by the Scugog River, to the north by existing residential lands and a cemetery, and to the south by open space lands. The site appears to be mostly flat but gently slopes toward the Scugog River to the east. The Main Building complex is located at the north end of the Campus. The buildings used by Heavy Equipment are located in the southeast quadrant of the Campus. The yards east and south of the building are used for the operation of machinery. Parnham Training Centre - Resources Drilling and Blasting s Building is located south-west of the Main Campus Building and the area south of the building is used for demonstrations and training. The Arboriculture and Natural Resources Law building is located between Parnham Training Centre and the Main Building complex. Two residences are located at the west end of the site near Angeline Street, as well as a baseball diamond and the Field House. There are three entrances to the Campus. Entrances from the north are Adelaide Street and Albert Street, and from the west Auk Trail is accessed from Angeline Street. The three entrances are interconnected by existing parking lots. Parking has been organized into several lots, which are separated by shelter belt trees that enhance the natural setting. 1.3.2 CAMPUS GROWTH Frost has identified a goal to increase student enrollment to 2000 by 2020-2021. This represents an increase of approximately 350 students, or a 17% growth from today s enrollment. Continuing Education, Contract Training and new natural resource and environmental program offerings are the focus for the Frost Campus and have been identified as future areas of growth. Increasing the number of women and international students is also an objective of the Campus. The Master Plan will need to accommodate this planned student growth with larger capacity classrooms and labs as well as improved social and working spaces.

3 MARY STREET W ANGELINE STREET ADELAIDE STREET SOUTH ALBERT STREET SOUTH TOWN OF LINDSAY RECREATION CENTRE THE FIELD HOUSE AUK TRAIL FLEMING COLLEGE TRAIL MAIN ENTRANCE FROST CAMPUS MAIN BUILDING COMPLEX NATURAL RESOURCES WING AUK S LODGE TILAPIA BUILDING (To be replaced) EXISTING RESIDENTIAL BUILDINGS 1 + 2 ARBORICULTURE / NR LAW BUILDING PARNHAM TRAINING CENTRE - RESOURCES DRILLING AND BLASTING GENERAL AREA OF COMMUNITY GARDENS GREEN SPACE TIMBER SPORTS FIELD WHITE PINE TRAIL HEAVY EQUIPMENT BUILDING EAST TRAINING FIELD RESEARCH AND AQUACULTURE PONDS SMITH FARM OUTDOOR EDUCATION CENTRE NESTING BOXES RESTORATION PROJECT WETLAND SCUGOG RIVER ARBORETUM SOUTH TRAINING FIELD Existing Campus Aerial Map

2. THE CAMPUS MASTER PLAN

Fleming College - Executive Summary Frost Campus Master Plan Brook McIlroy/ 6 2.1 VISION STATEMENT Frost Campus will continue to be a leader in environmental and natural resource sciences, setting standards for education, training, innovation and research.

7 2.2 GUIDING PRINCIPLES Guiding Principles have been tested and developed through consultation with stakeholders, administration and students. The principles below set priority setting directions and provide a foundation for best practices at Frost. 1 The Compact Sustainable Campus: A compact Campus where classes are small and contribute to a strong sense of community. 2 Natural Campus Beauty: An inspiring setting for studies and a great backdrop for outdoor education, exploration and recreation. 3 Welcoming Campus: Orienting and engaging students and visitors through a welcoming sequence of entries and spaces. 4 Dynamic Learning Environment: A destination Campus with a hands-on learning environment where graduates are job ready. 5 Getting There Easily: Improved access and wayfinding to places both within and beyond the Campus, including downtown Lindsay and surrounding Fleming College Campuses.

Fleming College - Executive Summary Frost Campus Master Plan Brook McIlroy/ 8 2.3 FROST CAMPUS MASTER PLAN - ANNOTATED CORE AREA PLAN 9 9 9 17 11 25 1 2 24 4 22 10 8 5 18

9 20 The maps and drawings in Section 2 describe the overall Frost Campus Master Plan Site recommendations. A more detailed breakdown of the Master Plan Recommendations is provided in Section 4.0 of the Full Master Plan Document. 5 8 11 5 24 21 14 1. New Angeline Street Entrance with entrance road, sidewalk and double row of trees 15 19 5 2. Future Residence Building 3. Enhanced Trans Canada Trail 4. New West Entrance addition and renovations 13 23 5. Future Academic Building 6. New Green House / Classroom Academic Building 7. New Consolidated Campus Trail Network (throughout) 8. New Frost Campus Ring Road 9. Parking Lot Greening 16 10. New Parking Lot 11 11. New Accent Paving areas (for hard surface areas within the Ring Road only) 12. Future Outdoor Classroom with seating 13. Bus Stop 14. Sheltered Bike Parking 15. New Main Entrance Drop-Off and Transit Hub 16. New Main Entrance Addition 17. Future Expanded Field House 11 6 12 18. Parnham Training Centre - Resources Drilling and Blasting Building Addition 19. Rain Garden 20. Outdoor Classrooms 3 24 21. New continuous sidewalk to northern parking lots and residential neighbourhoood 22. Expanded Butterfly Garden 23. Main Courtyard with existing trees trails and naturalized planting 24. Future T-Intersection with Stop Sign and Crosswalk 25. New Windmill Location

Fleming College - Executive Summary Frost Campus Master Plan Brook McIlroy/ 10 2.4 FROST CAMPUS SITE MASTER PLAN 16 8 2 11 7 3 12 1 6 3 8 4 10 7 16 13 9 See section 3.3.4 for Core Area Blow-up 5 16 23 18 15 14 19 23 1 22 21

11 1. New Angeline Street Entrance with entrance road, sidewalk and double row of trees 2. Improved Albert Street Entrance with sidewalk connections to Parking Lot G 3. Future Gateway Signage Locations 4. Future Residence Building 5. Enhanced Trans Canada Trail 6. New West Entrance addition and renovations 7. Future Academic Building 8. New Frost Campus Ring Road 9. New Green House / Classroom Academic Building 10. New Parking Lot 21 5 16 11. New Main Entrance (Addition, Landscape and Turning Circle) 12. Future Expanded Field House 13. Parnham Training Centre - Resources Drilling and Blasting Building Addition 14. Heavy Equipment Expansion 6 15. Paved Heavy Equipment Parking Lot 16. Outdoor Classrooms (with shelters and/or seating) 17. Expanded Campus Arboretum (throughout) 18. Enhance Outdoor Education Building 21 19. Future new secondary access point 20. Wetland Restoration Areas 16 20 21. Improved Drainage Areas for Heavy Equipment Operator Training or Shelter 22. Nesting Area 23. Sustainable Agriculture Fields

Fleming College - Executive Summary Frost Campus Master Plan Brook McIlroy/ 12 2.5 SITE MASTER PLAN OVERVIEW 2.5.1 LANDSCAPE - FIRST APPROACH The overall structure of the Campus is based on a landscape-first approach. A network of connected landscapes (quads, courtyards, forested areas and tree allee s) are recommended to define the over-riding structure that determines the placement of building additions, new buildings, roads and parking areas. This landscape-first approach is synergistic with the College s identity as a centre of excellence for environmental sustainability. In this sense, the form of the evolving Campus will reinforce and strengthen Frost s unique brand-identity. Campus Master Plan Diagram highlighting formalized courtyards and quad, water courses, and the existing tree canopy

13 Key recommendations related to the Landscapefirst approach are outlined in Section 4.0 and are summarized below: Create a variety of outdoor teaching spaces that blend with the landscape. The landscape design should focus on a diversity of flora and fauna, storm water management techniques, water features and landscape varieties. Plant trees with a variety of streetscaping and landscaping technique, including linear tree trenches, soil cells, orchards and naturalized forest planting to provide teaching and research opportunities. Orient the Campus Master Plan around a series of landscapes. Each landscape should have a different naturalization approach. Each approach expands on the existing Campus structure and includes the Rain Garden, the Butterfly Garden, the Adelaide Street Courtyard, the Geo-Thermal Gardens and the Agriculture Gardens. Looking south west from the Albert Street Entrance toward the New Main Entrance Building, through the Rain Garden and Naturalized Courtyard (pink arrow below highlights location of rendered view) Looking south west from the Albert Street Entrance toward the Core Campus Area, pink arrow highlights location of rendered view above.

Fleming College - Executive Summary Frost Campus Master Plan Brook McIlroy/ 14 2.5.2 CIRCULATION The Master Plan is based on the objective to enhance the arrival experience, create a positive image and rationalize on-campus circulation. The Angeline Street Entrance will become the formal arrival and welcoming point to Frost Campus, and Albert and Adelaide Streets will become secondary entrances. The visual dominance of parking areas, as experienced from the Angeline entrance, will be mitigated through landscaping and tree-planting. New paths, to encourage active transportation, will be featured for pedestrians and cyclists. These will be clearly marked and illuminated, giving priority for active transportation. The future Ring Road delineates academic development sites, provides a cohesive pedestrian and trail network and introduces a number of sustainable storm water management features including bio-swales and a rain garden. Key recommendations related to the Ring Road are outlined in Section 4.0 and are summarized below: Promote a sense of arrival to Frost Campus through a hierarchy of entrances (2) and gateway features with clearly defined internal street networks, prominent landscape and architectural expression, and entry and wayfinding signage. Frame the new Ring Road (1) network with new buildings, additions and an expanded system of courtyards and open spaces. Looking east along the new Angeline Street Entrance towards the West Wing Addition, the new residence buildings is shown on the right and the New Field House on the left.

15 Improve connections between the Core Campus Area and adjacent community, recreational areas and residences. Keep surface parking lots around the periphery of the Core Campus, with the majority of Campus activities located within a 500m / 5 minute walking radius. Green existing surface parking lots with tree planting and naturalized edges. Reconfigure and formalize the Trans Canada Trail along the edge of the future Ring Road system with barrier free surface materials, wayfinding and interpretive signage, pedestrian amenities, landscaping and buffer planting. Balance vehicular access with pedestrian and bicycle circulation and safety to promote active transportation that demonstrates a commitment to sustainability. Develop a transit-hub at the main drop-off area with a weather protected and heated waiting area. 1 2 NEW RING ROAD NEW ENTRANCE ROAD 3 4 CONSOLIDATED MAIN ENTRANCE DROP-OFF AND TRANSIT HUB REMOVE ROAD SEGMENT 1 3 4 2 1 Diagram showing Core Campus Area circulation recommendations

Fleming College - Executive Summary Frost Campus Master Plan Brook McIlroy/ 16 2.5.3 BUILDING AND ADDITIONS A number of new buildings and additions are recommended. Most of these projects are located in the Core Campus Area. They include: Future residence building (1); New field house (2); West wing addition (3); Future west Campus academic building (4); The main entrance addition (5); 2 new east Campus academic buildings (6+7); A new green house facility with classrooms (8); and An new entrance addition to the existing Cafeteria (9). Teaching Space Addition to the Parnham Training Centre - Resources Drilling and Blasting Building (10) Outside of the Core Campus area, additions to the Parnham Training Centre - Resources Drilling and Blasting Building as well as the Heavy Equipment Centre, are recommended. Additionally, the outdoor education facility is recommended to have an interior renovation and an entrance vestibule addition. These recommendations are outlined in more detail in Section 4.0. Key Master Plan recommendations for Buildings and Additions include: Retain a sense of human scale in new buildings and emphasize views between indoor and outdoor spaces, barrier-free design, weather protection, and access to natural light. Incorporate wood as a prevalent architectural material, and a neutral colour pallet both of which are evocative of the Campus forested and natural setting. 6 7 5 2 9 3 1 4 8 10 Looking northwards at the Core Campus Area, highlighting the new buildings and additions.

17 2.5.4 OUTDOOR SPACES The programming and character of outdoor spaces on the Campus should be synonymous with Frost s program offerings. The Master Plan looks to strengthen the naturalized character of the Campus, protect existing trees and shelter belts, increase the programming of outdoor spaces for teaching, increase the Campus tree canopy and introduce a number of new outdoor classrooms. These recommendations are outlined in more detail in Section 4.0. Key Master Plan recommendations for outdoor spaces include: Capitalize on the forested and natural setting by expanding the inventory of tree species, and by enhancing the existing tree canopy. Preserve and expand the pattern of shelter belt, double-row, coniferous tree stands. Preserve and enhance the Campus as a living laboratory by establishing seamless transitions between indoor and outdoor learning spaces. Formalize outdoor classroom spaces for booking during the term. Incorporate a hierarchy of sustainable elements and features, relating to the preservation of water resources, into the design of streets and open spaces. Replace and relocate the existing windmill to a more prominent location at the Angeline Entrance. Increase the prominence of, and level of activity along, the Scugog River. 6 7 5 Looking north east towards the two new East Academic Buildings and the New Albert Street Entrance Courtyard with Rain Garden and consolidated Main Entrance Drop-Off area.

Fleming College - Executive Summary Frost Campus Master Plan Brook McIlroy/ 18 2.6 BUILDING AND INTERIORS MASTER PLAN OVERVIEW 2.6.1 INDOOR SPACES A number of space planning and building additions recommendations have been developed following a detailed review of the existing interior Campus spaces and extensive consultation with faculty, staff and administration. The space planning recommendations look to achieve a number of key goals including the consolidation of student services, creation of a dedicated industry area, transformation of corridors into vibrant working and social spaces, renovation of the Geology Labs and the introduction of larger, more flexible, classrooms. These recommendations have been developed to address both the existing Campus needs and the future Campus population growth. The space planning recommendations outlined in this Plan will change how people arrive at the Main Building Complex and rationalize how people are already using the buildings today. These recommendations are outlined in more detail in Section 4.0. Key Master Plan recommendations for indoor spaces include: Expand the existing Main Building Complex entrance to establish a sense of arrival for students, staff, faculty and visitors alike, while incorporating space for common areas, wayfinding information. Consolidate Student Services. Introduce a main entrance information Booth. Relocate and expand the Book Store. Establish a dedicated Industry Area. Open the Library up to the corridor with a larger more informal entranceway. Create a more visible entrance to the Cafeteria that connects to the adjacent social spaces. Precedent image showing corridors with a mix of social and working spaces

19 Renovate the existing Computer Lab with updated furnishings and introduce a variety of student working configurations. Relocate the Principal s office to a more central location on the 2nd Floor across from the Main Boardroom. Upgrade all main entrances, corridors and common areas with contemporary material finishes, new paint, improved lighting, and wayfinding information. Provide barrier-free access to level one at the Main Entrance, with a mezzanine treatment on level two, a new elevator, and a beacon which will establish an iconic architectural element and focal feature, while offering panoramic views of the entire Campus. Encourage a range of student activities in all corridors and common areas including socializing and a combination of individual and group-based work. Expand key existing classrooms and laboratories to increase student capacity through the consolidation and reorganization of existing learning and office spaces. Upgrade existing classrooms and laboratories with contemporary material finishes, new paint, new furnishings, and state-of-the-art learning technologies while maintaining flexibility in design and layout to accommodate changing needs over time. Display relevant artifacts, including animal species, plant species, and rock samples within the new Main Building entrance to encourage awareness of Frost Campus unique features and course offerings. The following pages provide an graphic overview of the key interior space planning recommendations for the Main Campus Complex. Precedent image showing divided informal working spaces for groups with plug in and network access

Fleming College - Executive Summary Frost Campus Master Plan Brook McIlroy/ 20 2.6.1 CORE BUILDING RECOMMENDATIONS GROUND FLOOR Bookstore En E Expanded Cafeteria Entrance Staff Lounge Facilities Legend Proposed Uses Administration / Principal Office Bookstore / Common Space Entrance Hall Extension Classrooms/Seminar Room/Lab Storage Relocated Offices Expanded Cafeteria Entrance

21 Office Office Lab Storage Storage Office Office Lab trance Hall xtension Office / Storage Classroom Classroom Storage Environmental Technology Centre Storage Ground Floor Plan showing Core Campus Interior Recommendations

Fleming College - Executive Summary Frost Campus Master Plan Brook McIlroy/ 22 2.6.2 CORE BUILDING RECOMMENDATIONS SECOND FLOOR E Industry Administration / Principal Office and Boardroom Legend Proposed Uses Administration / Principal Office Dedicated Industry Areas Entrance Hall Extension Student Services Storage

23 trance Hall Extension Storage Student Services Student Services Addition 2nd Floor Plan showing Core Campus Interior Recommendations

Fleming College - Executive Summary Frost Campus Master Plan Brook McIlroy/ 24

3. PHASING AND IMPLEMENTATION 25

Fleming College - Executive Summary Frost Campus Master Plan Brook McIlroy/ 26

27 3.1 INTRODUCTION 3.1.1 AN APPROVED PLAN The Campus Master Plan is approved by the Board of Governors as a Frost Campus directional document. In implementation the plan guides Campus improvements, development character, and prioritization of expenditures. It will be the responsibility of Campus Leaders and the Facilities Department to ensure that projects are measured against the Campus Master Plan Recommendations. A review should be completed at all stages of a Project Planning and Development Process to ensure that it is in keeping with the Vision, Priorities and Standards that are outlined in this document. 3.1.2 UPDATING THE PLAN In order to respond to changing needs over time, the Campus Master Plan will evolve through amendments, as necessary, and updates every five years. PLAN AMENDMENTS All projects should follow the principles and priorities of the Frost Campus Master Plan, or an amendment is purposely made. Amendments can be defined as major or minor. Major amendments are when the change would significantly affect the communal interest or the quality of the Campus environment. Major Amendments should be reviewed by a Steering Committee made up of representatives from Fleming College and Frost Campus and where appropriate have Campus community participation. Major Amendments should also be approved by the Board of Governors. Minor amendments would be approved by Campus Leaders or Senior Fleming College Administrators, who will report the changes to the Board of Governors and the Campus community once made.

Fleming College - Executive Summary Frost Campus Master Plan Brook McIlroy/ 28 PLAN MONITORING Every two years, a report on any measures taken to implement the Campus Master Plan made to the Board of Governors. GENERAL UPDATES The Campus Master Plan be reviewed at five year intervals, and approved by the Board of Governors. The Master Plan s principles, priorities and directions be reconsidered, and accumulated amendments incorporated. TESTING PROJECTS AGAINST THE PLAN The Master Plan Implementation team (including Facilities, Finance, Planning, the Frost Campus Principal and key Senior Campus Leaders) tests all projects against the Campus Master Plan, and reports consistency or otherwise to the Board of Governors. An important criterion is how the project s program and location will contribute to the needs of the Campus as a whole, as well as to the needs of the specific group of users, by meeting a majority of planning principles. During schematic design, the Campus Master Plan s principles and demonstrations provide guidance, and measures for establishing compliance. Each submission for approval at the Board of Governors includes a report on the project check against the Campus Master Plan. The Facilities Department should prepare a Master Plan Checklist that can be used to assess compliance of capital projects with the recommendations and guidelines contained in the Master Plan.

29 3.2 PRIORITIZATION & PHASING Campus Master Plan recommendations can be undertaken as series of phases in accordance with funding availability. Generally the phasing recommendations for this Campus are in order of priority: Improve Sense of Arrival. Expand and Improve the Existing Laboratories and Classrooms. Expand Outdoor Classroom Opportunities on Campus. Improve Campus Circulation for Vehicles, Pedestrians, Cyclists and Transit User. Construct New Academic Greenhouse and Classroom Facility. Consolidate Student Services. Create Dedicated Industry Space. Renovate Main Entrance. Construct New Academic and Residence Buildings as Required. The following list of Campus wide and interior improvements are organized according to Immediate, Short, Medium and Long Term Categories (some project s many be considered consecutively): Phase 1 - IMMEDIATE (0-2 YEARS) Outdoor Education Building Renovation and Addition. Geology Laboratories Renovations. General Corridor Improvements (Ground Floor). General Classroom Improvements (equipment and furniture). Courtyard Improvements. Trees (materials only). Seating Areas. Entrance Signage. Wayfinding Signage. Phase 2 SHORT (2-5 YEARS) Front Entrance Interior Renovation Second Floor. Industry Space Renovations. Principal s Office Renovation. Front Entrance and Book Store Interior Renovation. East Wing Computer Room and Corridor Improvements. Library Entrance Retrofit. General Classroom Improvements. General Corridor Improvements (Second Floor). Main Entrance Renovation and Addition. New Combined Greenhouse and Classroom Facilities. Construct the Ring Road from Angeline Street to Albert on the north side of the Campus with Bioswales. New trails and sidewalks through out the Campus. Outdoor Classroom Shelters. Courtyard Naturalization. Expansion to Heavy Equipment Building. Phase 3 MEDIUM (5-10 YEARS) Expansion to Parnham Training Centre - Resources Drilling and Blasting Building. New Consolidated Student Services Renovation and Addition. General Classroom and Laboratory Improvements. Improved Theatre Seating. New Facilities and Staff Lounge Renovation. Cafeteria Entrance Expansion. New Academic Building A and B at Albert Street Entrance. Construction of the south west portion of the Ring Road from Albert Street to the Field House. Pave the Heavy Equipment Parking Lot. Introduce accent Paving Areas for vehicular surfaces within the Ring Road. Construct the Rain Garden at the Albert Street Entrance. Construct Covered Walkway from Albert Street to Main Entrance. New Wind Turbine -100-kW (at new entrance) Site Lighting. Phase 4 LONG (10+ YEARS) Training Centre and Learning Services Area Renovation. West Wing Expansion. New West Entrance Academic Building. New Field House Building. New Residence Building.