BELTEXCO GLOVES 18 PSIG SNG (LPG AIR MIX) PROJECT BY DEA

Similar documents

Why settle for anything less?

Following are the systems proposed as per NBC & Local Fire Authority:

HOT WATER VAPORIZER "FEED-BACK"

PART 1 - GENERAL 1.1 WORK INCLUDED

TRIMAX ASIA ENGINEERING & CONSTRUCTION (PG U )

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1.

Hiren Industrial Corporation

Phillips. HORIZONTAL AND VERTICAL ASSEMBLIES For Ammonia (R-717) and Halocarbon Refrigerants

HALLMARK INDUSTRIES INC. HALLMARK INDUSTRIES INC. Safety WARNING WARNING. Must reset the voltage! Shallow Well Jet Pumps

Vacuum Oil Purifier (VOP) (5 Pages. June 2017)

OPERATING INSTRUCTIONS

we make air move Double Inlet Centrifugal Fans (Forward Curved) FBD Series (Square Outlet Metric Size)

1.1 This section applies to air handling units for HVAC Systems.

HIGH CAPACITY PRODUCT LINE

Technical Specification For Design and supply of Water Mist cum CAFS (Compressed Air Foam System) Backpack Fire Fighting System

TITAN SERIES Complete Central Chiller & Pump Tank Package 20 to 70 Tons 20 F to 70 F

Technical Discussion on

This place covers: Devices, apparatus and methods to prevent fires from happening, and to fight or contain active fires.

Rotavapor R-220 SE Technical data sheet

5. CONDENSATE PUMPS/UNITS

HID312, HID525 and HID540 Meridian Ice Maker-Dispensers Technical Service

Domestic Pump Series VCMD TM Combination Vacuum & Boiler Feed Unit

Design and Supply of Fire Equipments. External Fire Fighting Systems.

CHGV AIR COOLED WATER CHILLER WITH HYDRAULIC EQUIPMENT AIR / WATER 47 to 78 kw

FLANGE-MOUNT CENTRIFUGAL PUMPS

SPECIFICATIONS MODEL E859C MINI DEHYDRATOR

Firefighting Monitors Tunnels Fire Protection Systems. Integrated Fire Safety and Security Solutions

HIGH CAPACITY PRODUCT LINE

PART 1 - GENERAL 1.1 WORK INCLUDED

RHP120 RHP300 Steam Boiler Series

TECHNICAL AND USER REQUIREMENTS FOR PERSONAL ALERT SAFETY SYSTEMS

Ultra-Safe EXP Unit Heater

RL/1 SERIES. One Stage Light Oil Burners FIRING RATES LIGHT OIL RL 34/1 MZ kw

INTRODUCTION THIS MANUAL INCLUDES IMPORTANT SAFETY INFORMATION

Rotavapor R-220 Pro Technical data sheet

Burner Comparisons. Typical Competitor s Burner

BURNERS/ FLARES. VAREC BIOGAS 244W Series WASTE GAS BURNER & IGNITION SYSTEM

Rotavapor R-220 Pro Technical data sheet

Operation Manual R205BV, R209BV

R100 Oil-Less Refrigerant Recovery Unit

ULTRA-SAFE Explosion-proof Duct Heaters

Operation and Maintenance Haskris LX-Series, R-Series, WW-Series, OPC-Series

Enclosure 4- RISK ASSESSMENT

and Sprinkler System in Resalat Tunnel of Tehran

UK arotherm Schematics and installation guide

ULTRA-SAFE EXP. Applications E X P L O S I O N - P R O O F H E A T E R S

Performance and safety features of a 2 x cbm LPG-import terminal built in China

Global Property. SEMIANNUAL FIRE PROTECTION EQUIPMENT INSPECTION REPORT Date of Inspection Location:

YOUR PROCESS DEMANDS THE MOST DEPENDABLE TEMPERATURE CONTROL UNIT AVAILABLE.

CFD OIL 2008 COMPUTATIONAL MODELING OF JET FIRES. August 19th, 2008 Norman Neumann Marcelo Mendes

TENDER NOTICE. Kolhapur Zilla Sahakari Dudh Utpadak Sangh Ltd. B-1, M.I.D.C., Gokul Shirgaon, Tal. Karveer, Dist. Kolhapur

RecoverX-CAR Contaminated Automotive Refrigerant Recovery System Operation and Maintenance Manual

Power Flame Incorporated

COMPANY OVERVIEW IN PURSUIT OF OUR COMPANY GOALS WE ARE COMMITTED TO: - Continual improvement. - Trained and dedicated personnel

K 3 Premium Full Control

QA16 Addressable Panel Programming Manual V3.07.3

Armstrong Flo-H2O Water to Water Instantaneous Heater Installation and Maintenance & Operation

CHG AIR COOLED WATER CHILLER WITH CONDENSATION BY HELICOIDAL AIR 8 to 17 kw

1 TECHNICAL CHANGES. MUZ-A09NA MUZ-A09NA - 1 MUZ-A09NA - U1 MUZ-A09NA - U2 1. Refrigerant system diagram has been changed.

Capture at Source FILTERMAX FILTER MODULES WITH AUTOMATIC CLEANING

Installation Instructions

K Operating Instructions. Before first use of the unit read these operating instructions and act in accordance with them.

User s Information Manual

INTRODUCTION. Special Applications of Package Air Conditioners. Instant Cooling Requirement in Wedding Ceremonies

TECHNICAL. Series 18. Pump Packages

EB-M*-** Midsize Electro-Boiler BL509. EB-S-**/EB-WX-**-2 TS Standard Electro-Boiler BL506. EB-CX-** TS Commercial Electro-Boiler BL508

FEEDWATER TANK WITH DEAERATOR DATASHEET. Capacity 1000 to lt Operating Pressure 0,5 bar

UF424 and UN324. Technical Service

Service Parts for models UF424 and UN324

TECHNICAL INFORMATION L / A 1

DuPont Formacel Z-2. Safety and Handling of DuPont Formacel Z-2: Thermoplastic* Foam Extrusion Applications FOAM EXPANSION AGENT TECHNICAL INFORMATION

As a standard, heat exchangers are provided with flange water connections (BS Standard Table E). All evaporator are supplied fully insulated.

Series 4XSHV 18 Frame Driver 76mm Spherical Solids Handling

NOW. Fall Heating Specials. Take Advantage of Torrco s Fall Heating Program tailored to YOUR needs! If you don t see it, ask us! Stock Up. & $ave!

ULTRA-SAFE Explosion-proof Duct Heaters

Air-Cooled Global Chiller

Dual Agent Unit w / Atmospheric Tank 200 Litres DAHR 01

Deaerator. Specifications

INSTALLATION INSTRUCTIONS FOR 7330*5511 OR 7330*5512 MOUNTING KIT 7330B751 CONTROL BOX KIT (12 VDC COOL ONLY)

Installation Instructions

Natural Gas & Propane Burners

DIVISION 21 FIRE SUPPRESSION

Ramp up. Ramp up. Ramp up 7,540 3,414 3,957 3,761 3,800. Fire Hose Reel. Fire. Lift Lobby Granito tiles DN DN 2,932 ENTRANCE GATE

ACCESSORIES ITEM NUMBER. Digital timer, burning and ventilating. RT1, RT2, RT3 IT1 DA1 Thermostat for CH 12/18. fault detector.

INSTALLATION INSTRUCTIONS FOR 8330*5511 MOUNTING KIT

Refrigerant Changeover Guidelines HFC R-404A/R-407A/C/F to R-448A/R-449A. Leading the Industry with Environmentally Responsible Refrigerant Solutions

PRODUCT LINE. Highest Quality, Best Service

INSTALLATION & OPERATION Rev 1.00A DISTRIBUTED EXCLUSIVELY BY CMA DISHMACHINES KNOTT AVENUE GARDEN GROVE, CALIFORNIA 92841

OPERATING INSTRUCTIONS FOR THE TP18SX-HP


SECTION ROTARY-SCREW WATER CHILLERS

PHYSICAL FACILITIES Consultant s Handbook Specifications Division 21 Fire Suppression 3000 Fire Pumps

Custom Design TYPE SHM Steel Horizontal Make-up Boiler Feed Pumps and Custom Design TYPE SHEM. BULLETIN 107 Revised 5/17

Meets the Highest Standards in Sanitary Cleaning

City of Duluth Festival Center 04/25

School of Fire & Safety, GSFC University

AEU1. Explosion-Proof Electric Air Heater For Hazardous Locations

Technical Ventilation

SUPPLY,INSTALLATION,TESTING AND COMMISSIONING OF SPRINKLER SYSTEM AND FIRE ALARM SYSTEM FOR AIR INDIA LIMITED AT SHAMSHABAD, HYDERABAD.

Transcription:

BELTEXCO GLOVES 18 MMBTU@15 PSIG SNG (LPG AIR MIX) PROJECT BY DEA Dynamic Engineering & Automation Leader in Energy Technologies Web: www.dea.com.pk

Installation, Commissioning and Startup of state of the art Synthetic Natural Gas - SNG (LPG Air Mix) Plant at Beltexco Gloves, Karachi PROJECT DETAILS Date of Completion: September 06, 2013 OEM: Location: Designed by: Plant Capacity: Aether dbs, USA Karachi Export Processing Zone, Pakistan M/s Aether dbs, USA 18 MMBTUH @ 15 PSIG

Equipments for SNG (LPG AIR MIX) Plant The SNG Plant we have setup at BELTEXCO GLOVES consist of different modules. The major components include: - LPG Gas Storage Tank - LPG Transfer Pump - SNG Blending System - Venturi Based System And Control Panel - Vaporizer - Fire Fighting Equipments - Gas Detection System LPG Gas Storage Tank: The reservoir shown has a capacity to store 5 Metric Tons of LPG. The shape of reservoir used is Hemi-spherical, it consist of Liquid suction, Liquid Return and Vapor line. It is equipped with safeties including PRV (Pressure Relief Valve), Filling Valve, and Magnetic Gauge

LPG Transfer Pump: The Pump shown is of 3 HP explosion proof motor, and it s of 1475 RPM, it s a three phase pump (400 Volts). It is compatible for fulfilling the requirement of system. SNG Blending System (Vaporizer & Control Panel): The SNG system shown is of 18 MMBTU capacity designed by Aether dbs, USA. It has one Venturi which is shown below; one tank in which mixture of water and glycol is filled and other parts of vaporizer is shown below.

Venturi Based SNG System: Capacity = 18 MMBTU/HOUR Pressure = 15 PSIG Control Panel The shown picture is of the control panel that is used to turn ON the LPG transfer pump and as well as the indication came of any fault it can be reset by this panel. Vaporizer: These are the internal parts of system, vaporizer control panel, cut off switches, Honeywell Valve, Ignitition Transformer, Temperature gauge etc.

Fire Fighting Equipments Fire Monitor: Supply of Fire Water Monitor with Jet Nozzle Water Flow: 2500 lit/min. Construction: 2.5 Carbon Steel Schedule 40 Water Inlet: 3 Ø, # 150 flange, Option of Foam Inductor. Fire Monitor and Hose Reel with Foam: Fire Monitor test with Foam inductor Max. Feeding Pressure of 10 bar Bowzer water sprinkler shed This is the Bowzer shed of Beltexco Gloves used when Bowzer temperature increased

Gas Detection Sysytem This is the control room of GT-System.There are four gas detector which placed in different places and on output Hooters are connected. Implementation and Testing: All the equipments were implemented as per the maps and directions keeping in mind the entire international standards. The equipments were then connected through the pipes and valves were placed accordingly. The lines were then checked through the Hydro testing as for any leakages throughout the system. After successfully checking for any leakages and fixing those we found the system was ready to go through the testing phase. Flare is shown in the picture when plant commisioning is done and test the gas vant from discharge line