RISK ENGINEERING GUIDELINE

Similar documents
RISK ENGINEERING GUIDELINE.

Vacant Building Loss Prevention Best Practices

Hot Work Permit. Can this job be avoided? Is there a safer alternative? Permit No.:

NITOL INSURANCE COMPANY LIMITED

OUTLINE FOR FIRE PREVENTION ACTIVITY

Well managed building mean risk is normal. Fire action notices should be displayed by all alarm break glass call points.

HOT WORK SAFETY PROGRAM:

Evacuation Fire Safety Program

Fire Prevention Plan

UNCONTROLLED IF PRINTED. Issued with the authority of the Chief Commissioner and General Manager of Scouts Australia NSW

Fire Risk Assessment

Management Practices: Fire Protection Impairments November 2015

1970s building housing main school reception and support offices. Well managed buildings with no significant risk of a fire occurring.

RISK ENGINEERING GUIDELINE

WELDING, CUTTING, AND BRAZING SAFETY PROGRAM

POSITION PAPER ON WATER MIST FOR FIRE FIGHTING APPLICATIONS

H&S Forum. Fire Safety Policy Glascote Academy

HOT WORK PERMIT PROCEDURES

7.0 SAMPLE PERMITS, FORMS AND CHECKLISTS SELF INSPECTION CHECKLIST

CFPA-E No 1:2014 F. Fire protection management system CFPA-E -GUIDELINES

This policy applies to all Hot Work jobs performed on the Calhoun mill property by AbitibiAbitibiBowater employees.

Builders Risk - Fire Prevention Inspection Checklist

1303 Trans Canada Way SE Medicine Hat, AB T1B 3Z9 Phone

Fire Prevention Plan

Fire System Impairment Policy

Fire Safety. A TUC guide for trade union activists

Glenmere Primary School Fire Safety Policy FIRE SAFETY POLICY. Revised on April Sam Conlon. Created by S.Conlon 1

Fire protection documentation. CFPA-E Guideline No 13:2015 F

Demolition Permit Application (Please print and complete ENTIRE form)

NOTTINGHAM CITY HOMES

KRISHNAMURTI FOUNDATION TRUST FIRE SAFETY POLICY. Last Review Date 30 June Next review date 30 August Health and Safety Officer

Subject: Fire Protection Impairment Program Reference: NFPA (see bottom of page 5) Effective Date: August 2014 Distribution All YC Employees

Insurers guidance on fire safety at work

Risk Management Services

Property Insurance Risk Management

Storage Questionnaire

NATIONAL COMPETENCY STANDARD

Fixed fire protection solutions

John Jay College of Criminal Justice HOT WORK PERMIT STANDARD OPERATING PROCEDURES

I. Scope: II. Environmental Health and Safety Fire Alarm System Impairment Program - Guideline Revision Date: April, 2018

THE REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE RISK ASSESSMENT SPORTS CENTRE

Loss Prevention Standards

Fire Safety Policy. Billy Hanafin H & S and Operations Officer. Fife Cultural Trust. Version 1.0 October 2013 Page 1

THE FACTORIES A D OTHER PLACES OF WORK ACT (Cap 514)

Hot Work Policy. Department of Risk Management. 1. Purpose. 2. Authority. 3. Scope

Fire Protection. A Health and Safety Guideline for Your Workplace. Introduction. Fire Prevention and Control. Workplace Assessment

Health & Safety Policy

Managing Fire Protection System Impairment

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

Conditions for the provision of services Valid from 1 November only for the Jablotron Alarms series of alarms

Facilities and Estates. Hot Works: Standard Operating Procedure. Document Control Summary

FIRE SAFETY PLAN FOR CONSTRUCTION, RENOVATION AND DEMOLITION SITES

ATM DEVICE THEFT & ATM GAS ATTACKS:

1.2 To ensure the safety of all persons working in or occupying a building where a hot work operation is performed.

Health and Safety Policy. Version Author Revisions Made Date 1 Colin Campbell First Draft March 2014

Loss Prevention Standards

Fire Safety Log Book 41 page fire safety log book to record all your fire S afety checks Unique Fire Bordesley Green East Stechford Birmingham B33 8RU

Slight Harm Moderate Harm Extreme Harm Low Trivial Risk Tolerable Risk Moderate Risk Medium Tolerable Risk Moderate Risk Substantial Risk

Fire Prevention STANDARD. LME-12: Uen Rev A

CLYST ST. MARY VILLAGE HALL

If there are more than ten people working other than on the ground floor,

THE REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE RISK ASSESSMENT HORSEFAIR HOUSE

Chapter 18 Welding Table of Contents

Sandwell Valley School and Sandwell Community Care Trust Training. 150 Birmingham Road, West Bromwich, B70 6QT

EXAMPLE FIRE PREVENTION AND PROTECTION PLAN WORKSHEET

DUQUESNE UNIVERSITY. Fire Protection System Impairment Program (Red etag Permit)

Fire Risk Assessment (FRA) Checklist

HOT WORK OPERATIONS March 23, 2018

Environmental emergency preparedness and response

Contractor Worksheet Underground Fires Major Hazard Standard

Fire protection on chemical manufacturing sites

Emergency shutdown systems. Procedures for bypassing ESD s

Regulatory Reform (Fire Safety) Order 2005 Category of Premises against the FSO 2005: Sleeping Accommodation

Fire Safety in Guest Harbours and Marinas

Department Of Public Works: Internal Operations

FIRE SAFETY FOR OFFICE WORKERS

PROTECTING FIRE SPRINKLER SYSTEM PIPES FROM FREEZING IN CHAPTER FACILITIES

NOT PROTECTIVELY MARKED. Fire Legislation

WATER SPRAY EXTINGUISHING SYSTEMS

Progressive Safety Services LLC 2

To: All SAAS Accredited Certification Bodies Subject: Clarification to Emergency and Health & Safety Requirements in the SA8000 Standard

DMP & RISK MANAGEMENT PLAN

Fire Risk Assessment Case Study

FIRE SAFETY MAINTENANCE INFORMATION for Agricultural Livestock Structures

2010 FIRE CODE OF NEW YORK STATE

S12 Fire Safety Risk Assessment H&SFS01-1 / 9

Procedure DESCRIPTION/OVERVIEW

Stillwater Area Community Services Center Inc.

TRAINING OCCUPATIONAL SAFETY, HEALTH PROTECTION AT WORK AND FIRE SECURITY

Fire Risk Assessment. Guidance Notes. Location details. Risk Rating. Assessors. General notes

SCALES NW EMERGENCY ACTION PLAN

THE FIRE SAFETY GUIDE FOR BUSINESS OWNERS

CHAPTER 61G15-32 RESPONSIBILITY RULES OF PROFESSIONAL ENGINEERS CONCERNING THE DESIGN OF FIRE PROTECTION SYSTEMS

Fire Safety Plan (FSP) Review Checklist 1

Table OUT OF SERVICE. Building Fire Video 1/15/ Inspection, testing and maintenance. Standards Further Referenced by FCNYS

- CONSTRUCTION FIRE SAFETY STANDARDS

Health, Safety and Wellbeing Management Arrangements. Core I Consider I Complex. Fire Safety. Health, Safety and Wellbeing Service

5 Key Stages to Risk Assessment

Technologies Gas extinguishing systems. MX 1230 Fire Extinguishing Systems Fighting Fire using 3M Novec 1230

Branch Solution Wood based panel plants. Fire protection solutions for wood based panel plants

Transcription:

RISK ENGINEERING GUIDELINE BUSINESS SHUTDOWNS HDI Risk Consulting Property www.hdi.global

Covering risks when the business is shut down. Timely planning and implementation of appropriate safety measures prevent losses. General. There may be various reasons for a company to shut down parts of their business for a certain period or even completely e.g. a dramatic order reduction in times of economic crises, strikes or business restructuring. Extended company holiday or seasonal business shutdowns may also be possible reasons. This may produce an additional local hazard potential. Hence, appropriate safety measures covering the risks should be planned and implemented well in advance. 1 Risk situation and loss example. It is true that production-specific and business-related risks are reduced or eliminated automatically when shutting down facilities or parts of facilities. However, insurers experience with losses reveals that quite different hazard potentials may arise at the same time, especially due to arson, vandalism and theft. The hazard to related downstream production areas must also be taken into account here. Example: Arson in a shut-down plant building During one night, a fire occurred in an empty building of a bankrupt meat and sausage processing business. The fire brigade was called only after the flames had penetrated the roof of the single-floor former shipping and production hall. As packaging materials were still stored in the area affected by the fire, the fire spread and caused a material loss of around 6.5 million. The reason of the loss: assumed intentional arson. Appropriate risk protection measures could have prevented or limited the loss considerably. When after a short temporary business shutdown, the planned restart of production operations is adversely affected by the loss event, the consequences are even more serious than in the above example. For this reason, the HDI Risk Consulting specialists recommend their customers to implement loss prevention measures that are appropriate for the risk prior to business shutdowns or the shutting down of units. Also, it is useful to use limited shutdown periods for thorough maintenance and inspections of production facilities and safety equipment in order to safeguard a company in the long term, or possibly even result in a higher safety level of the company then before the downtimes. 2 Which measures should be taken prior to a business shutdown? All unscheduled business shutdowns should be reported to the HDI contact person without delay. This is the only way to prepare and implement an individual set of measures in a coordinated and timely manner with HDI Risk Consulting. At the same time, it is important to adapt the property insurance cover to the changed risk situation in order to guarantee continued complete insurance coverage. The legal and contractual provisions (requirements), e.g. when an increased hazard is involved, must be considered.

Risk Engineering Guideline: Business shutdowns 3 A target related strategy of measures is essentially sub-divided into the following areas: 2.1 Protection against arson, theft and vandalism Protecting an industrial building against arson essentially requires the protection of the premises either by technical / structural means (fencing, lighting, mechanical / electric burglary protection) and / or by guarding which is adequate to the risk. The manpower, the number of guard rounds and the definition of the routes depends on the local situation. The experience gathered by the HDI Risk Consulting specialists shows that specific areas where high fire loads occur e.g. combustible materials stored at this location must be specially protected / monitored or be cleared during a business standstill / shutdown or be substantially reduced. The same considerations apply to external storage areas which are often a particular target for arsonists. As far as the theft risk is concerned, this also relates to goods of economic value. In addition, the following applies: The worse the general appearance of an operations building, e.g. due to broken windows, the greater the risk of offenders to engage in arson or vandalism attacks. Also, particular attention is required in case of repeated offences. For this reason, it is advisable to contact the HDI contact person in charge after every known arson attempt in order to jointly examine the existing protection measures and develop these further, as required according to the circumstances. 2.2 Minimisation of ignition sources Another increased hazard results from the probable substantial reduction of staff on the premises as they often are no longer permanently manned. are no longer permanently manned. This increases the risk of a fire not being detected in the critical early stages and not successfully extinguished. This is why it is important to anticipate and avoid ignition sources in advance as far as practically possible. The risk is of a considerable extent: According to the loss statistics prepared by insurers, around 30 percent of all fires are caused by defects of technical systems like electric lighting and power installations or mobile electric devices (see graphics on page 4). The latter include: coffee machines, water boilers, refrigerators, mobile heaters etc. In general, such appliances should be included in the scope of inspection of electric equipment and be dis connected from the power grid during extended shutdown periods by removing the plug from the socket outlet. 2.3 Minimisation of fire loads Fire loads should be minimised in storage as well as in production areas. Production facilities should be completely emptied, cleared and thoroughly cleaned prior to shutting them down. This also applies to some plant items e.g. to aspiration and filter systems, silos, conveyor systems etc. 2.4 Safety precautions relating to fire protection equipment Safety equipment should always be maintained in operational order, even in difficult economic environment, so that property losses can be avoided or significantly reduced. This applies particularly when locations are no longer manned or are only manned with a small number of employees, then automatic fire protection equipment such as fire protection gates, fixed protection and fire alarm systems become of particular importance. The following measures should therefore be carried out consistently: maintenance and repair work as well as the usual routine checks by specialist companies and acknowledged experts, transmission of alarms to a permanently manned office. Alarm delays should be deactivated for the duration of the shutdown phase, training of personnel regarding the operation of fire protection equipment. Important: If shutdown periods are to be used for performing alterations and / or repair work on fire protection systems such as the sprinkler system, the impairment of those systems must be reported to the responsible HDI contact person. This is essential to ensure that adequate alternative protection measures can be implemented by joint discussion.

4 2.5 Safety precautions on buildings and technical systems After shutting down the production facilities and disconnecting the electrical systems from the mains supply, the other utilities may require particular attention, e.g. gas consuming appliances which are no longer in operation during the shutdown period should be disconnected from the gas supply at the main shut-off valves (which are usually located externally). Systems containing water as well as pipes (fresh, heating, process and fire water) must be protected against frost unless safeguarded and monitored heating of the buildings can be ensured during the cold season. This applies in particular to water-filled wet pipe groups of fixed protection systems during frost periods. In the above cases, the building temperature must not drop to below +5 C without any frost protection measures in place, e.g. pipe insulations and trace heating. Draining wet-pipe sprinkler systems is not allowed as a precautionary measure as fire protection is no longer provided after such a step. In dry-pipe systems, it must be ensured that they will be thoroughly drained after a test flooding or before the frost period. 2.6 Other organisational measures Hot works represent an exceptionally high fire hazard: an undetected smouldering fire may develop into a largescale fire even hours after completing the hot works in question. For these reasons, it is particularly important that such activities involving hot work are carried out with utmost care and are thoroughly monitored. To support this approach, your HDI contact person will make Hot work permit forms available to you (see p. 5). The use of these hot work permit forms is to ensure that hot works on the premises are approved only after adequate protection measures are implemented prior to, during and after the works. One centrally responsible employee provided with rights and obligations directly by the business management should ensure the approval and the handing-over / acceptance of the works at a later date. Hot work permits may therefore have to be issued several times per day, depending on the location and the type of works. An in-house fire fighting group or a company fire brigade which may be available should be integrated into the protection concept as a support for providing additional protection in the work areas concerned. In addition, it is recommended to report the new operating situation to Causes of fire and loss amount Around 15 to 20 percent of all fire losses are attributable to negligent behaviour (see graphics right). For this reason, the personnel remaining on the premises and responsible for operations there should be prepared appropriately so they are able to handle the changed or new risk situation. The following measures must be emphasized in this context: updating / adaptation of alarm and emergency plans, e.g. regarding new contact partners / phone numbers, monitoring of hot works, especially works done at existing production equipment as well as roofs with combustible insulation. Arson Technical causes 27% Negligent behaviour Lightning strike 4% Overvoltage from lightning 4% Hot works 4% Explosion 3% 18% 37% Easily flammable and easily combustible substances 2% 0 10 20 30 Data source: Loss statistics of GdV (German insurer association)

Risk Engineering Guideline: Business shutdowns 5 the local police and fire brigade as well and / or to consider them in the planned measures. The fire brigade must have unrestricted access to all operational areas at all times. The risk situations arising in the process of a business standstill / shutdown are manifold and may increase the local hazard potential. For these reasons, we recommend that you contact your HDI contact person in good time in all circumstances. In the usual partner-like cooperation with the HDI Risk Consulting specialists, it can be ensured that your business is protected in the best possible way both technically and commercially during such periods. Note: Requirements made by authorities are not covered by our recommendations. 1. Supervisor 2. Executing contractor 3. Fire watch Hot work permit No.: Contractor (company or department):... Location (company, building, storey, room):... Blowtorch Cutting/Welding Grinding Brazing Shrinking/Hot-bonding Roof work... Work order:... to be carried out by:... Beginning of work:... Permit expiry:... Actual end:... Maximum validity: 1 shift Emergency number: Nearest phone/push-button alarm: Measures to be taken prior to beginning with the work Topic Action Req.* Compl.** Define the hazardous area, cordon off the area (radius at least 15 m, secure steel grating floors below) Safety instructions by the supervisor Work area Remove any combustible substances (gases, liquids, solids) and within or cover with non-combustible panels, mats 15 m/50 feet Wash/clean pipes/containers/appliances Cover/close openings, cracks, joints Inspect safety of work equipment CO 2 Dry powder Foam Water extinguisher Provision of extinguishing agents Wall hydrant, pressurised hose in work area Inergen/FM 200 If fire alarm systems are shut down, inform/coordinate with fire brigade Plant technology Specify alternative measures! Fire watch Instructions for fire watch Other Measures to be taken during the work Topic Action Req.* Compl.** Fire watch Continuous inspection of the hazardous area (also during work breaks) Interruption Person who carries out the work must secure the work equipment (close valves on gas cylinders, isolate electrical equipment) Measures to be taken after completion of the work Topic Action Req.* Compl.** Remove all work equipment from the area Work area Remove all covers with due care and attention Reconnect automatic fire alarm system Fire alarm system Inform fire brigade Inspection for a minimum of 30 minutes after completion of the work (fire extinguishers at the workplace) Supervision of the Checks every ½ hour for up to 4 hours (fire extinguishers at the workplace) work area Mobile fire alarm system Completion Remove barricade (after the Remove fire extinguishers and take them back to their correct location supervision) Record any incidents, if applicable Release of the work Parties involved Action Name (in print) Date/time Signature Supervisor Above listed measures are appropriate to cover any hazards that might occur Executing contractor Fire watch The work may only be started once all required fire protection measures have been implemented and the fire watch is present Knowledge of the listed measures Has taken note of the listed measures Transfer of the workplace following completion of the work Parties involved Action Name (in print) Date/time Signature Executing contractor Execution of the listed measures 403-HRC242GB 201611 Fire watch Supervisor Execution of the listed measures Execution of the listed measures and reconnection of fire alarm system *Required ** Completed Check list for preparing business standstills/ shutdowns Attached you will find a checklist for business shutdowns with the most important measures to secure your property. For more information please ask your responsible HDI Risk Consulting Risk Engineer in your HDI branch. HDI Risk Consulting GmbH π HDI-Platz 1 π 30659 Hannover π www.hdi.global

Checklist HDI Risk Consulting Property www.hdi.global Checklist: Measures for business shutdowns Measures Completed Remarks Yes No General information: Which business areas are shut down? (location, building, building section, systems, machinery)? For how long will the above business areas be probably shut down? Protection against arson, theft and vandalism: Are the premises completely enclosed by a fencing? Are all buildings/halls sufficiently protected against unauthorized access, e.g. by installing locks that are adequate for the risk as well as door and window protection? Are locks, doors and windows checked at regular intervals for damage and repaired without delay? Are burglar alarm systems provided (if yes, please give a brief description)? Are the premises supervised around the clock? Was the concept of premises monitoring by guards coordinated with HDI regarding the manpower, number of rounds and definition of the routes? Are safety-relevant rooms, the outer building shell and the fences checked every day (at least every 2 days)? Are the premises including the fence, any possible outdoor storage areas and the building envelope lit 24/7? (Alternative: lighting system controlled by motion detection alarms). Minimisation of ignition sources: Is an unrestricted ban on smoking in force on the entire premises during the business standstill? Are mobile electric appliances (coffee machines, water boilers, refrigerators, mobile heaters) disconnected from the power grid by removing the plug from the socket outlet? Are areas electrically centrally isolated? (If so, which areas?) Note: Safety-relevant equipment/systems such as fire protection systems or emergency lighting systems must not be affected by electrical isolation. Operative electric devices/systems should still inspected according to local and HDI requirements by an expert. Cleaning/minimisation of operational fire loads: Are all relevant production areas and rooms cleaned thoroughly prior to the business standstill? Are production facilities shut down completely and cleaned? Are unnecessary fire loads such as packaging which are not needed in the near future and combustible raw and base materials (solid/liquid or gaseous) removed from/reduced in the production and storage areas prior to the business standstill? Are stocks of combustible finished/semi-finished goods reduced to the greatest possible extent? Reduction in %: Reduction in %: Are combustible materials removed from yards, external areas etc. (as arson protection)? Are combustible materials must be stored at a distance of 20 m from buildings and 10 m from the boundary of the premises?

Measures Completed Remarks Yes No Are water, emulsion, lubrication and hydraulic oil contents removed from machinery and systems as a fire and frost protection measure if this can be justified from an operational/ technological point of view? Are machinery and systems protected against corrosion by greasing or by protective covers and checked at regular intervals? Safety precautions relating to fire protection equipment: Is the insurer notified about the shutdown of fire alarm or fixed fire protection systems if this is required at short notice in exceptional cases? Are compensation measures relating to fire protection coordinated with the insurer? Is maintenance work, revisions and repair work on fire protection systems (fire alarm system, fixed fire protection systems, fire protection gates, etc.) carried out by own personnel, specialist companies, by experts according to technical rules and at regular intervals? Is alarm transmission from fire alarm systems updated to reflect the possibly changed personnel situation? Is it ensured that in areas with water-filled wet pipe groups of fixed protection systems, the building temperature will not drop below +5 C and that sufficient freezing protection is provided by other measures, e.g. by redundant trace heating systems? Are all fire protection gates and doors closed as the business is shut down? Safety precautions on buildings and technical systems: Are vehicles parked in such a manner on the premises that they will not represent a fire hazard for the building, i.e. in areas covered by a sprinkler system or externally at a distance of at least 10 metres from buildings? Note: The local building code or legal requirements for garages must be considered. Are all systems containing water as well as pipes (fresh, heating, process and fire water) protected against frost unless safeguarded and monitored heating of the buildings can be ensured? Are gas consuming appliances which are not operating during the shutdown period disconnected from the gas supply at the main shut-off valves? Other organisational measures: Are particular safety precautions taken when performing hot works? Are hot work permits being issued before starting such works? Are alarm plans updated regularly, e.g. regarding new phone numbers and other changed conditions? Are selected employees informed 48 hours in advance through the local natural hazard information systems in order to take safety precautions e.g. in case of predicted storms or heavy rain? Is the safety and control personnel trained to handle the existing hazards/fire hazards and to operate the alarm systems and fire protection systems properly? Was the business shutdown reported to the insurer? Remarks / notes: Place, date Signature (optional) The experts in the local HDI branch offices or HDI Risk Condulting at +49 (0)5 11 / 6 45-32 19 will be glad to assist you with further information.

8 Risk Engineering Guideline: Business shutdowns About HDI Risk Consulting. HDI Risk Consulting GmbH supports major corporations, industrial and mid-size companies with loss prevention and in establishing risk management systems. HDI Risk Consulting offers its customers access to some 180 engineers and experts from a wide range of technical disciplines. We aim to support companies with the management of risks and the development of individual risk-based concepts for insurance cover. HDI Risk Consulting operates globally in the Property, Motor, Engineering and Marine markets, with particular focus on the identification and assessment of risks and the development of appropriate, individual protection concepts. HDI Risk Consulting GmbH is a wholly owned subsidiary of HDI Global SE. 403-HRC/REG158GB 201701 HDI Risk Consulting GmbH HDI-Platz 1 D-30659 Hannover Phone: +49 511 645-3219 Fax: +49 511 645-4542 Internet: www.hdi.global Imprint: In charge of the content: HDI Risk Consulting GmbH Layout: Insignio Kommunikation GmbH Pictures: istock Although we made every effort possible to ensure the accuracy of the information provided, no liability can be assumed for the currentness, correctness and completeness of the information. We neither intend, nor assume any obligation, to update or revise these statements in light of developments which differ from those anticipated.