I-95 Girard Avenue Interchange Near Neighbors Meeting. Project Status

Project Status. Construction is underway for Phase 3. Overall Project Area and Schedule. Schedule of Current Construction Phases.

Corridor Enhancements

TRANSPORTATION & STREET DESIGN

AESTHETIC APPEARANCE. Design Guidelines for Grade-Separated Pedestrian, Cyclist and Equestrian Structures

I-25 / Rio Bravo Interchange. I-25 / Rio Bravo Interchange. Presenters 11/30/2016 THIRD PUBLIC MEETING DECEMBER 1, 2016 NMDOT CN A300280

People who are members of historically disenfranchised racial, ethnic, cultural, and other identity groups are encouraged to apply.

4.9 Mendocino Avenue Corridor Plan Design Guidelines

VEHICULAR AND PEDESTRIAN CIRCULATION

West Dennis Center: Bass River to Old Main Street. West Dennis Business District: Old Main Street to Dennis Commons

MEMORANDUM. This memo deals with proposed amendments to previously issued Development Permit No for Park Royal North.

Allen Street Civic District Redevelopment Area Plan Redevelopment Plan & Proposal State College Planning Commission State College Redevelopment

July 12, Columbus City Council City Hall 90 West Broad Street Columbus, OH RE: I-70/71 Columbus Crossroads Project

Executive Summary. NY 7 / NY 2 Corridor

St. Clair Avenue West Area Transportation Master Plan

Cleveland Innerbelt Bridge / Central Viaduct City Planning Commission November 6, 2009

Places29: List of Implementation Projects

City of Guelph - Wilson Street Parkade / Wilson Street Reconstruction Proposed Project Schedule April 21,

FROM DUPONT CIRCLE NORTH TO CALIFORNIA STREET, NW. Welcome!

SCTPO Project Summary September 2014

MARINA BAY NEIGHBORHOOD PRESENTATION. City of Richmond Officer Bradley A. Moody Memorial Underpass. April 11, 2012

Urban Design 9Identity

Open House RIVER DES PERES GREENWAY: LANSDOWNE SHREWSBURY METROLINK TO FRANCIS R. SLAY PARK

2040 Long Range Transportation Plan

McDonald s Restaurant - Purcellville Town of Purcellville Special Use Permit Statement of Justification July 24, 2014

LOCATION AND DESIGN DIVISION

US-10/US-31 Corridor Planning Charrette Summary. Resilient Ludington Mason County, Michigan

Appendix 2. Implementation Project Descriptions Page A2-1

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND NATIONAL CAPITAL PARK AND PLANNING COMMISSION

The Center Street Project

ADOPTED AT NOVEMBER 15, 2012 PACC MEETING

STATE OF TENNESSEE DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL DIVISION

TEAM INPUT SUMMARY. Postcard Image?

PROJECT SHOWING MINUTES

CHARLOTTESVILLE. Streetscape ENTRANCE CORRIDOR DESIGN GUIDELINES. Amendments adopted by City Council March 7, Design Principles...

Public input has been an important part of the plan development process.

Project Overview. Fairfax County Parkway Widening Fairfax County. Get Involved. Public Information Meeting. Contact Information

APPENDIX D: Visual and Aesthetic Conditions for NCCU Station Refinement. Durham-Orange Light Rail Transit Project

Mavis Road Class Environmental Assessment

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT

Project Overview. Get Involved. Public Information Meeting. Contact Information

FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016

Derby-Shelton Bridge Pedestrian and Bicyclist Enhancements [1]

WEST LOOP DESIGN GUIDELINES CHECKLIST

SECTION 4(f) DE MINIMIS DOCUMENTATION

Rosslyn Plaza PDSP (SP #422) SPRC Staff Presentation

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT-2

Transportation. Strategies for Action

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

Rt 29 Solutions Hydraulic Planning Advisory Panel. September 28, 2017

Fifth and Detroit Street Design May 2017 Capital Improvements Committee. DOWNTOWN Street Design

BROADWAY-ARBUTUS POLICIES. Adopted by City Council on July 7, NOTE: To be considered in combination with applicable guidelines

TRANSPORTATION COMMITTEE

Clay Street Bridge Replacement Project

W O R K S H O P S U M M A R Y

Project Goal. RRRC Living Towns Planning Workshp. Town of Halifax Revitalization Project. Dynamic Planning & Management Duo: July 12, 2006

Fairfax County Parkway (Route 286) Widening Project

Public Information Meeting

BUILDING SCALE AND SETBACKS 5 ELEMENTS:... 5 FAÇADES (COMMERCIAL/RESIDENTIAL) 5

MAIN STREET RECONSTRUCTION PROJECT PRE-CONSTRUCTION PUBLIC INFORMATION SESSION AGENDA

Clairtrell Area Context Plan

ROAD CONSTRUCTION. 36 June 2014 ROADS&BRIDGES

3.0 master plan concept

Adelaide Street / Canadian Pacific Railway (CPR) Grade Separation Class Environmental Assessment. Public Information Centre 3

Moving The Metro. A special construction update for the metro Omaha area.

Small Area Plan. South Gateway

FREEWAY/TOURIST DISTRICT

CONFORMED AGREEMENT INCORPORATED REVISIONS PER AMENDMENT DATED: APRIL 2, 2013 FOR REFERENCE

REQUEST Current Zoning: O-15(CD) (office) Proposed Zoning: TOD-M(CD) (transit oriented development mixed-use, conditional)

2 January 13, 2010 Public Hearing APPLICANT: AUTOBELL CAR WASH, INC

Potential Green Infrastructure Strategies May 6, 2015 Workshop

NEWSLETTER #03 BEAUDESERT ROAD LOGAN MOTORWAY

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004

SR-2 Freeway Terminus Improvement Project

Appendix 2. Implementation Project Descriptions

New York Avenue Streetscape and Trail Project Public Meeting #1 Summary

Rapid Transit Implementation Working Group

TRANSPORTATION. Part 1: Background. Section 1: Introduction. P a g e 70

Access Management: An Overview

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

Carson Street Streetscape Improvements. Request for Proposals

AGENDA ACTION ITEMS INFORMATION ITEMS

City of Fairfax, Virginia City Council Work Session

INFRASTRUCTURE EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities

Middlebury RS 0174(8)

TOWN OF BETHLEHEM MEETING SUMMARY LOCAL WATERFRONT REVITALIZATION PROGRAM UPDATE

Urban Design Brief. 875 Wellington Road. Proposed One-Storey Fast Food Restaurant and Two-Storey Restaurant. Wellington Harlech Centre Inc.

Main Street Reconstruction From Ninth Line to Stouffer Street. Town of Whitchurch-Stouffville. Public Information Centre

VISION AND GUIDING DESIGN PRINCIPLES

SBCAG STAFF REPORT. MEETING DATE: March 17, 2016 AGENDA ITEM: 5I

Landscape Architecture Urban Design Planning

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

14 October 10, 2012 Public Hearing APPLICANT: MPB, INC

GUIDELINES REPLACEMENT HOUSING GUIDELINES LOCATION INTRODUCTION URBAN DESIGN GUIDELINES

WELCOME TO OPEN HOUSE # 3

Prospect Community Plan Update Public Meeting November 2, 2017 OVERVIEW PROSPECT BEAUTIFICATION/CONNECTIVITY PLAN

PIKE PINE RENAISSANCE: ACT ONE. October 19, 2017

Pipeline Trail Master Plan Preliminary Concept Design. O Connor Mokrycke Consultants May 14, 2015 meeting

Transcription:

Route 29 Project Delivery Advisory Panel Meeting Minutes Meeting 5 of the Route 29 Project Delivery Advisory Panel (PDAP) was held at the Virginia Center for Transportation Innovation and Research in Charlottesville, Virginia on. Meeting information included: Meeting Agenda Presentation addressing agenda items All material distributed at the meeting is available at route29solutions.org In attendance: Pete Borches, Chip Boyles, Morgan Butler, Eddie Giles, Mark Graham, Satyendra Huja, Chuck Lebo, John Nunley, Brad Sheffield, Jim Tolbert, Karen Weiner, Henry Weinschenk. Facilitator: Philip Shucet. VDOT Technical Team support members were also in attendance. The PDAP reviewed summaries of issues included in 38 individual comments submitted on the project website, one Share Your View comment on the website, and one letter to Governor McAuliffe. The comment summaries are included in the meeting presentation. Responses to the issues were discussed during the meeting and are recorded on the meeting video posted on route29solutions.org. The RFQ and RFP schedules were reviewed and are also included in the meeting presentation. Recommendations from the panel from previous meetings were addressed: A multi-use path on Route 29 Widening is under consideration. A public discussion feature was added to the route29solutions.org website. Albemarle County design guidelines will be referenced in the RFP. The Southern Environmental Law Center hired a landscape architect to develop concepts for the Rio interchange to create a visual gateway. Panel member 1

Morgan Butler of the SELC shared those concepts with the panel as well as key recommendations: Allow specific monetary allowances for design elements. Include a landscape architect on the contractor s team. Include architectural elements. Provide safe pedestrian crossing. Use green or sustainable elements. The SELC concepts are posted on the project website as part of these meeting minutes. The technical team noted that contractor teams have already formed in response to the Request for Qualifications, therefore it would not be appropriate to force a change in team structure. Summer traffic counts were conducted and fall counts are underway. A projectspecific traffic model will be ready in October. In addition to the fall weekend counts taken on September 6 and planned for September 13, it was recommended that additional weekend fall counts be taken on weekends when there is not a UVA football game. (This recommendation has been accepted and additional fall weekend counts will be taken on a non-football weekend.) FHWA-approved Categorical Exclusions for Route 29 Widening and the Rio Grade Separated Intersection have been posted on the project website for public review. The review period expires on September 24, 2014. Letters distributed to property owners in early September mistakenly referenced the intent to purchase right-of-way for a utility corridor and stormwater management areas. While the use of a utility corridor at the Rio intersection has been under consideration, there is no design for such a corridor and no decision whether to move forward with a utility corridor. Another option for utility relocations is to use the existing right of way. There will not be a utility corridor outside the right-of-way unless property owners agree it s mutually beneficial. An update will be provided at the Sept. 25 PDAP meeting. Several options are being explored to comply with new stormwater management regulations, including underground storage and water quality credits. Off rightof-way impacts will be minimized. An update will be provided at the Sept. 25 PDAP meeting. Joel DeNunzio reviewed the updated design for Rio, the maintenance of traffic plan for Rio and typical sections for 29 Widening - all of which are posted on the project website. 2

Rio construction features: Bridge length was reduced from 500 feet to 350 feet. Before excavation begins, retaining walls could be constructed at night, with lanes reopening for morning rush hour. A signalized intersection will be added at Berkmar during construction to facilitate traffic detours and for emergency response access. Rio maintenance of traffic: Two southbound lanes and three northbound lanes on 29 will remain open during construction. Rio Road will close to through traffic and left turns May 23-Sept. 2, 2016. Rio closure could be avoided or minimized by building an overpass instead of an underpass. The panel did not support the development of an overpass option. The following material will be provided for the next PDAP meeting: Rio intersection traffic volumes and level of service ratings. Review of Route 29/250 Bypass ramp at Best Buy construction and maintenance of traffic plans. Detour plan for Rio intersection. Schematics of general construction techniques. Hillsdale Extension update. General points that will be included in the RFP. The next panel meeting is Sept. 25. The meeting was open to the public, streamed live, and is available on video at route29solutions.org 3

Route 29/Rio Intersection Design Southern Environmental Law Center Kennon Williams Landscape Studio Goal: Ensure that an efficiently functioning and compact interchange can significantly improve traffic flow while: (a) reflecting the community s identity and visual aesthetic; (b) enhancing bicycle and pedestrian access as well as vehicular traffic; and (c) minimizing environmental impacts. a. The intersection will function as a highly visible gateway in an important commercial section of the Route 29 corridor. It should convey a positive sense of the community and reference Charlottesville s unique sense of place. b. Although cars are a primary focus of the interchange, it should also provide safe and pleasant pedestrian and bicycle access across the intersection. c. Reflecting the community s identity, the design should incorporate green/sustainable features as much as possible. Key recommendations: 1. Establish specific monetary allowances in the RFP for design elements (architectural treatment of bridge and wall facings, lighting, decorative railings, custom landscaping, custom streetscapes). Proposals should explain how the bidders will most effectively spend that specific allowance to achieve the design goals. 2. Ensure a prominent role on the design team for an Architect/Landscape Architect. The design should be considered an architectural effort as well as an engineering one. Require the design team to be composed of engineers (traffic, structural, civil) and a Design Architect and/or Landscape Architect who has a clear record of urban work or knowledge; ensure the architect has a primary role in the design effort. 3. Architectural elements: a. Articulated overpass façade that looks like a bridge. (See sketch and photo examples.) b. Break up the mass of the retaining wall facings with some articulation (e.g., column-like relief in front of façade of textured concrete or brick or stone). Consider growing clinging tough vines such as Boston Ivy on walls between columns. (See sketch and photo examples.) c. Use lighting with fixtures that hang low to the ground; adhere to County s lighting ordinance; night-time lighting of bridge façade from below. 4. Safe pedestrian/bicycle crossing: Make road crossings safe by providing: a. A simplified street design: It will be safer for pedestrians and bicyclists if the layout of the deck is as simple and direct as possible especially the sidewalks and crosswalks (avoid diagonals). (See sketch.) b. Textured crosswalks that are wide enough for bike and pedestrians and painted a contrasting color to the street; generous medians and resting zones. c. Sidewalks differentiated from the road edge by curb and planting strip. 5. Green /sustainable bridge: a. Maximize use of plantings. b. Incorporate low-impact stormwater BMPs into design, including consideration of the green spaces on the deck. c. Use energy-efficient lighting. d. Use local materials wherever possible (brick, stone). Note: Many of these same concepts and treatments are also needed for the Berkmar Bridge. 1

PRELIMINARY SKETCH - Overpass Facade Southern Environmental Law Center Overpass Facade kennon7@embarqmail.com

PRELIMINARY SKETCH - Overpass Walls Southern Environmental Law Center Overpass Walls kennon7@embarqmail.com

PRELIMINARY SKETCH - Intersection Aerial Southern Environmental Law Center Intersection Aerial Sketch kennon7@embarqmail.com