DESIGN PUBLIC HEARING. Phase II

Similar documents
The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

Pennsy Greenway Trail

PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S.

Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions

Potential Green Infrastructure Strategies May 6, 2015 Workshop

Onondaga County Sustainable Streets Project. Onondaga County Planning Federation June 7, Onondaga County Sustainable Streets Project 1

A. INTRODUCTION B. PROJECT LOCATION

Citizen Information Meeting

Princess Anne Road. Phase VII (CIP 2-195) Citizens Information Meeting

PUBLIC HEARING. Thursday, December 14, 2017 FDOT Urban Office 2198 Edison Avenue Jacksonville, FL 32204

Welcome. Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals:

Chesterfield County Project Update

Project Overview. Get Involved. Public Information Meeting. Contact Information

East Corridor Final Environmental Impact Statement

IOWA HIGHWAY 57 / WEST 1 ST STREET STUDY PUBLIC INFORMATIONAL MEETING APRIL 22, 2014

Lambeth Main Street Streetscape Improvements

ROAD CONSTRUCTION. 36 June 2014 ROADS&BRIDGES

We d like to thank you for attending this Wekiva Parkway Section 8 Preliminary Design Update hosted by the Florida Department of Transportation.

City of Toronto. Emery Village Transportation Master Plan

Derby-Shelton Bridge Pedestrian and Bicyclist Enhancements [1]

Alternatives Development Three conceptual alternatives were developed for the Race Road/Jessup Village Planning Study and are described below:

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

Preci nct P l ans Figure 56 Campus Aerial Photo, 2008 CAL STATE EAST BAY, HAYWARD CAMPUS MASTER PLAN

Reconnecting New Haven: Downtown Crossing

CITY OF LARKSPUR Staff Report. August 21, 2013 Council Meeting UPDATE ON TRANSPORTATION AUTHORITY OF MARIN (TAM) GREENBRAE CORRIDOR WORKING GROUP

SUMMARY Downtown Malabar Meeting on July 30, 2013 State Road (SR) 514 (Malabar Road) Project Development and Environment (PD&E) Study

Mississippi Skyway Preliminary Engineering Report

Goals for Tonight s Meeting

4.1 Build Alternative 1 Construction Phasing

Date: April 10, 2017 City Council Work Session April 24, 2017: Status Report on the Comprehensive Plan Update and Transportation Master Plan

Asbury Chapel Subdivision Sketch Plan

Public Open House. Welcome! Presentation at 5:15 p.m. Please sign-in at the registration table

Mavis Road Class Environmental Assessment

COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING

New York Avenue Streetscape and Trail Project Public Meeting #1 Summary

A PPEARANCE REVIEW BOARD

REQUEST FOR COUNCIL ACTION 6A AGENDA ITEM

NOTICE OF PREPARATION

Southern Gateway Project and Public Green

Town of Portola Valley General Plan. Nathhorst Triangle Area Plan

Capital Projects in and near Odenton Town Center

Welcome to the. Open House

Project Overview. Fairfax County Parkway Widening Fairfax County. Get Involved. Public Information Meeting. Contact Information

Memorandum CITY OF DALLAS. Riverfront Boulevard Design From Continental Avenue to Cadiz Street

Meeting Display Boards for Public Hearing on the Wilson Transfer Station Project held Tuesday, February 18, 2014.

North York Centre South Service Road

SR-2 Freeway Terminus Improvement Project

Capital Projects impacting Odenton Town Center

Tricia Millington, RLA New York State Department of Transportation

Tyvola & Archdale Transit Station Area Plan. May 15, 2008

Rt. 29 Solutions Project Delivery Advisory Panel. January 7, 2016

Small Area Plan. South Gateway

Oconee Rivers Greenway Project. TSPLOST 2018 Project # 5 Project Concept Sub-projects 7, 8, 9, 10, & 11. Mayor & Commission Work Session

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

SECTION 4(f) DE MINIMIS DOCUMENTATION

Transportation. Strategies for Action

Public Hearing. Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, open house at 4 p.m., formal presentation at 5 p.m.

Welcome. Community Consultation Meeting November 28, Review and discuss the Bathurst Quay Neighbourhood Plan Framework

Metro Orange Line Extension Four Years Early and $61 Million Under Budget

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS

Sustainable Development Call for Projects Western Infrastructure Project Submissions

Commissioners Road West Realignment Environmental Assessment

Planning Districts INTRODUCTION

COMMISSION ACTION FORM

Strachan Ave. Overpass Community Design Update. October 26, 2010 Stephen Lipkus Executive Director Georgetown South Project GO Transit

Public Information Centre #1

Transportation Committee

2017 General Obligation Bond

WESTERN ILLINOIS UNIVERSITY

Route 1 Corridor Study

City of Edmonton. Walterdale Bridge Replacement and Approach Roads Evaluation. Concept Planning Study. Final Report

Public may provide comments on the GDP within the next two weeks (December 24)

Urban Planning and Land Use

St. Clair Avenue West Area Transportation Master Plan

Tyvola & Archdale Transit Station Area Plan. June 5, 2008

PIN ONONDAGA CREEKWALK PHASE II EMINENT DOMAIN PROCEDURE LAW DESIGN PUBLIC HEARING TUESDAY, JULY 26, P.M.

RIVER ARTS DISTRICT TRANSPORTATION PROJECT

The transportation system in a community is an

BeltLine Corridor Environmental Study

Mary Hills Nature Area. Roadway Lighting. The Minneapolis Clinic of Neurology Courage Kenny Rehabilitation Institute

WELCOME TO OPEN HOUSE TWO November 28, 2018

OP Council Resolution June 16, Planning and Development Services

PREPARED FOR: PLATTEVIEW ROAD CORRIDOR STUDY EXECUTIVE SUMMARY

Executive Summary. NY 7 / NY 2 Corridor

Michigan City Alternative Analysis Realignment Study. Progress Status Update Report Presentation to City Council February 1, 2012

Expo Line Transit Project. Project Status Update Meeting West End Corridor Segment C

Burloak Drive Grade Separation

3rd Cycle 2012 Amendment Staff Report

Bostwick Road. Municipal Class Environmental Assessment. Public Information Centre #2 June 14, City of London

hermitage town center

OVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS

TRANSPORTATION ELEMENT

Places29: List of Implementation Projects

Master Plan Class Environmental Assessment for Downtown Mississauga Road Improvements

SR 916/NW/NE 135 Street Public Hearing

Kankakee River Bridge & Track Improvements Supplemental Environmental Assessment. May 5, 2016

Reconstruction Project. Wayzata Task Force Meeting September 3, 2009

CITY OF INVER GROVE HEIGHTS A G E N D A CITY COUNCIL WORK SESSION June 3, :00 PM INVER GROVE HEIGHTS CITY HALL COUNCIL CHAMBERS

Recreational Pathway Crossing of Richmond Street Municipal Class Environmental Assessment. Public Information Centre #2 April 22, 2015

Transcription:

CITY OF SYRACUSE DEPARTMENT OF ENGINEERING STEPHANIE A. MINER, Mayor MARY E. ROBISON, City Engineer DESIGN PUBLIC HEARING Phase II City of Syracuse Onondaga County Tuesday, July 26, 2016 at 7:00 P.M. Southwest Community Center 401 South Avenue, Syracuse, NY N PROJECT ENDS WALTON STREET PROJECT AREA PROJECT BEGINS WEST COLVIN STREET

CITY OF SYRACUSE DEPARTMENT OF ENGINEERING STEPHANIE A. MINER, Mayor MARY E. ROBISON, City Engineer DESIGN PUBLIC HEARING Phase II City of Syracuse Onondaga County Tuesday, July 26, 2016 at 7:00 P.M. PROGRAM Registration Informal Question & Answer Period 6:00 p.m. to 7:00 p.m. 6:00 p.m. to 7:00 p.m. and following the Hearing Design Public Hearing Russell Houck Syracuse Dept. of Engineering Chuck Stanton C&S Engineers, Inc. Eileen Moore NYS Department of Transportation 7:00 p.m. to Adjournment Call to Order and Introduction, Purpose and Format of Hearing Project Background & Update Discussion of Design Alternatives Right of Way Acquisition and Relocation Discussion SHORT BREAK Russell Houck Syracuse Dept. of Engineering Presentation of Public Comments Closing Statements and Adjournment

PURPOSE OF HEARING This Design Public Hearing is being held in accordance with the provisions of Article 2 of the Eminent Domain Procedure Law (EDPL). The purpose of this Design Public Hearing is to provide an opportunity for interested individuals, groups, officials and agencies to become acquainted with and express comments on the city s proposal to extend the Creekwalk from Armory Square to Colvin Street. Oral or written statements and comments on the project may be made at this hearing. Oral Statements will be recorded and made part of the hearing record. Persons wishing to make a statement should indicate yes on a registration card available at the sign-in table. Written comments may be introduced at the hearing or presented to the city no later than August 9, 2016 and will become part of the official record. All comments will receive careful consideration and will be used to assist in the final routing of the preferred alternative. Written comments should be forwarded to: Mr. Russell Houck Project Manager City of Syracuse Engineering Department 233 East Washington Street, 401 City Hall Syracuse, NY 13202 Information on property acquisition and relocation assistance procedures for this project is available at the hearing or from: Ms. Eileen Moore Regional Real Estate Officer NYS Department of Transportation 109 South Warren Street Syracuse, NY 13202 PROJECT BACKGROUND This project will extend the existing Creekwalk bicycle/pedestrian facility which provides a main north-south connecting route through the city by which pedestrians and bicyclists can travel from multiple origins to many destinations in a safe, efficient, and aesthetically pleasing manner. This is the second phase of a three phase overall plan to complete this main route from the southern corporation limit of the city, north to Onondaga Lake, connecting to the trail that will ultimately encircle Onondaga Lake. It also connects to the major east-west bicycle/pedestrian route across the state, the Canalway trail. PROJECT OBJECTIVES The primary objective of this project is to extend the existing Creekwalk bicycle/pedestrian facility so that it will serve as a spine through the city by which pedestrians and bicyclists can travel from multiple origins to many destinations in a safe, efficient, and aesthetically pleasing manner. Specific objectives of this project are: To transport non-motorized travelers along a scenic bicycle/pedestrian route to various destinations along the Onondaga Creek corridor between West Jefferson Street and West Colvin Street in an efficient, cost effective, continuous and safe manner. To serve the transportation needs of nonmotorized travelers of all ages and abilities including joggers, bicyclists, skaters and people with disabilities by providing facilities and amenities that make the trail available for all. To stimulate interest in alternative modes of transportation to motor vehicles for local short distance commuting in order to reduce automobile traffic volume on surrounding roadways and to improve air quality through reduction of hydrocarbon emissions. To create a permanent bicycle/pedestrian trail link between the existing Creekwalk

Phase I section and Kirk Park/West Colvin Street. To expand the regional bicycle/pedestrian transportation capability by expanding links from the south side of the City of Syracuse to Onondaga Lake and the statewide Canalway Trail system. To act as a catalyst for economic development, stimulating growth along the Creekwalk corridor, taking full advantage of the Onondaga Creek dynamics without adversely affecting the hydraulic capacity, the environment or cultural resources. To create a bicycle/pedestrian link that will facilitate future extension of the Creekwalk to the City's Onondaga Valley area. To integrate the trail into the surroundings while preserving the integrity of historical and cultural elements. DESIGN ALTERNATIVES Various design alternatives have been evaluated, reviewed and discussed to determine if they meet the project objectives. The alternatives considered were narrowed to three as follows: The No Build or Null Alternative. The null alternative does not meet any of the project objectives and therefore is not considered a feasible alternative. Alternative 1: Alternative 1 starts off in Kirk Park and runs along the west side of Onondaga Creek through the park and continues into Lower Onondaga Park near the creek. At Rich Street, Alternative 1 crosses over the Rich Street Bridge and continues along the creek on the east side through public right-of-way (ROW) to Midland Avenue. Alternative 1 then crosses the Midland Avenue Bridge over Onondaga Creek and then runs along the west rim of the creek behind several Midland Avenue commercial and residential properties and several ROW fee acquisitions will be necessary. Alternative 1 leaves the rim of the creek just north of Temple Street, and heads toward West Onondaga Street. At this point, Alternative 1 crosses West Onondaga Street and runs down West Street, making use of a recently completed cycle track along this corridor as part of the Creekwalk. Alternative 1 continues northward along West Street until passing under the NY Susquehanna and Western Railroad, immediately after which it makes a short diversion over to Walton Street where it then runs along existing sidewalk to meet with Creekwalk Phase I. Alternative 1 meets the project objectives and is therefore considered a feasible alternative. Alternative 2: Alternative 2 likewise starts off in Kirk Park on the west side of Onondaga Creek, but instead of running along the creek, it runs along existing Onondaga Creek Boulevard which the City has plans to convert to a bicycle/pedestrian greenway, but which will still need to provide vehicular access in some areas. Alternative 2 continues into Lower Onondaga Park along the Centennial Drive and Onondaga Park Drive until reaching Rich Street. At Rich Street, Alternative 2 stays on the west side of the creek and runs along Marginal and Hovey Streets. Along Hovey Street, Alternative 2 drops down to the creek shelf for approximately 1000 feet, ramping back up to street level near Midland Avenue. At Midland Avenue, Alternative 2 runs along the west side of Midland to the intersection of Midland and Bellevue where it then crosses Midland and runs along the east side of Midland Avenue to West Taylor Street, essentially in the same location as the existing sidewalk. At West Taylor Street, Alternative 2 joins the Alternative 1 alignment until reaching West Onondaga Street.

At West Onondaga, Alternative 2 runs eastward along the West Onondaga sidewalk, crosses West Adams and West Onondaga Streets, and then continues to the intersection of West Onondaga and Gifford Streets. At Gifford Street, Alternative 2 routes through the Trolley Lot and under the NY Susquehanna and Western Railroad via a narrow underpass and runs along West Jefferson Street to meet the terminus of Creekwalk Phase I. Alternative 2 meets the project objectives and is therefore considered a feasible alternative. PREFERRED ALTERNATIVE The feasible and prudent alternative that best meets the project objectives is Alternative 1. Throughout the public participation process, the consistent feedback was to keep the Creekwalk as close to the creek as possible. There were also comments to utilize the existing cycle track along West Street. Alternative 1 accomplishes this request more thoroughly than Alternative 2 for over 2/3 of the project, albeit at the expense of taking many ROW strip parcels from properties along Midland Avenue. Unlike Alternative 2, Alternative 1 is less likely to be seasonally inundated by high water levels and Alternative 1 does not include any nonstandard features. WORK ZONE TRAFFIC CONTROL During construction, traffic will be maintained on existing streets utilizing a minimum of one lane of traffic in each direction. There will be occasional alternating single lane traffic with flagger control at times of trail construction adjacent to the street. Access will be maintained to all properties during construction. RIGHT-OF-WAY INFORMATION Information on property acquisition and relocation assistance procedures for those who must move as a result of the project are available at this hearing, or from the Regional Real Estate Officer, Ms. Eileen Moore, NYS Department of Transportation, 5 th Floor, State Tower Building, 109 South Warren Street, Syracuse, New York 13202 (Phone: 315.448.7321). PROJECT SCHEDULE It is anticipated that bids for the project will be opened in late 2018, with construction commencing in the spring of 2019 and project completion by the end of 2020. ESTIMATED CONSTRUCTION AND REAL ESTATE ACQUISITION COST The estimated construction and project costs of the proposed alternative are as follows: Construction Cost Engineering and CI Right-of Way Cost Total Project Cost $7.6 million $1.6 million $1.9 million $11.1 million No. of Property Impacts 34 (1 active business, 1 multi-family residence) The estimated construction costs are preliminary and could change significantly as a result of detailed design and additional investigations. City of Syracuse Representatives: Russell Houck, Engineering Andrew Maxwell, Director of Planning and Innovation Owen Kearney Assistant Director of Planning NYSDOT Representatives: Richard Sawczak, Region 3 Planning Group Eileen Moore, Region 3 Real Estate Group (Phone: 315.448.7321) C&S Engineers Representatives: Chuck Stanton, C&S Engineers, Inc. Doug Stansbury, C&S Engineers, Inc.

DESIGN PUBLIC HEARING TUESDAY, JULY 26, 2016 ONONDAGA CREEKWALK PHASE II JEFFERSON STREET TO COLVIN STREET CITY OF SYRACUSE ONONDAGA COUNTY WRITTEN COMMENTS Written comments are invited from anyone interested in the project. Comments may be submitted at the end of the meeting or mailed to Russell Houck, Project Manager, City of Syracuse Engineering Department, 233 East Washington Street, 401 City Hall, Syracuse, NY 13202. Please provide comments by August 9, 2016. Name Address Representing (if a business) Written comments may also be submitted by e-mail: RHouck@syrgov.net