AvalonBay Communities + BRIDGE Housing. Mission Housing Habitat for Humanity Pacific Union Development Corporation

Similar documents
BALBOA RESERVOIR COMMUNITY ADVISORY COMMITTEE CITY & COUNTY OF SAN FRANCISCO MEETING MINUTES

REPORT TO BOARD ON PREFERENCES tbp/architecture CCSF Facilities Master Plan, October 23, 2016

SFMTA PHELAN LOOP AND PUBLIC PLAZA PHELAN OCEAN AVENUE

Future Proposed Development

PROPOSED DEVELOPMENT PRINCIPLES & PARAMETERS for the BALBOA RESERVOIR

UCSF Parnassus Heights Re-Envisioning Process

Though functionally a part of the Ocean Avenue Neighborhood Commercial

Silver Line CPAM UPDATE. Transportation and Land Use Committee October 14, 2016

PUBLIC EIR SCOPING MEETING

Union Station Master Plan Task 2 Briefing

PROPOSED DEVELOPMENT PRINCIPLES & PARAMETERS for the BALBOA RESERVOIR

University of Saskatchewan CAMPUS MASTER PLAN. Senate Meeting Preliminary Presentation. April 21, 2018 DIALOG ECS DA WATT

TOWN COUNCIL / PLANNING COMMISSION

Community Task Force Meeting June 19, Planned Development 500 Huntington WENTWORTH INSTITUTE OF TECHNOLOGY

TO: Denver Planning Board FROM: Analiese Hock, Senior City Planner DATE: March 13, 2018 RE:

Public may provide comments on the GDP within the next two weeks (December 24)

University of the District of Columbia Van Ness Campus Master Plan Community Open House 3. December 8, 2010

3.1 community vision. 3.3 required plan elements

INTRODUCTION TO THE CONCEPTUAL SITE PLANS

Sacramento Public Library Authority

ORANGE LINE TRANSIT NEIGHBORHOOD PLANS VAN NUYS NEIGHBORHOOD COUNCIL, PLUM COMMITTEE DEPARTMENT OF CITY PLANNING, CITY OF LOS ANGELES

Design Alternatives Workshop. Hilfiker Park Master Plan Workshop #2

INDEPENDENCE BOULEVARD AREA PLAN. June 24, 2008

PLAN ELEMENTS WORKSHOP. April 5, 2016

Allen Street Civic District Redevelopment Area Plan Redevelopment Plan & Proposal State College Planning Commission State College Redevelopment

PLACEMAKING & MOBILITY WORKSHOP. January 27, 2016

Stadium District Masterplan

BALBOA RESERVOIR REQUEST FOR PROPOSALS RESPONSE MASTER DEVELOPERS: AVALONBAY COMMUNITIES & BRIDGE HOUSING

4/8/2015 Item #10D Page 1

BROOKLYN PARK / 85TH AVE LRT STATION CDI DEVELOPMENT GUIDELINES DRAFT

SHERIDAN PARKING STRUCTURE PUBLIC INFORMATION MEETING November 11, :00 pm - 8:00 pm

NAPA COUNTY HEALTH AND HUMAN SERVICES AGENCY MASTER PLAN UPDATE BOARD OF SUPERVISORS MEETING MARCH 20, 2012

Draft Cary Community Plan Review Part 3: Shop, Engage, Serve, Special Area Plans, Other Updates. October 27, 2015 Police Department Training Room

Transportation Working Team Duane Diggs, Co-Chair (VOICE Buffalo) Kelly Dixon, Co-Chair (GBNRTC) Paul Ray, Facilitator (UB Regional Institute)

City Council Special Meeting AGENDA ITEM NO. C.

East Midtown Greenway East 53 rd 61 st Street. Community Board 8 Project Introduction November 16, 2017

SF REC & PARK STANYAN STREET IMPROVEMENT. Supervisor London Breed District 5. Project Manager Dan Mauer Recreation and Parks Department

BALBOA RESERVOIR COMMUNITY ADVISORY COMMITTEE CITY & COUNTY OF SAN FRANCISCO MEETING MINUTES

At first Work Session on October 22, At second Work Session on November 19, At third Work Session on December 3, 2015

Notice of Preparation (NOP) of an Environmental Impact Report and Public Scoping Meeting for the Alameda Shipways Residential Project

South th E ast Communit ity Centre (SECC)

Public Meeting. October 25, 2016 Industry. Project Funded By: ADJACENT PRIVATE DEVELOPERS/OWNERS

Building Great Neighbourhoods. Strathcona

DRAFT Land Use Chapter

The Cambie Corridor 2015 Fall workshop series. What we heard WORKSHOP OUTLINE

Crofton Manor 2803 West 41st Avenue WHAT WE HEARD. Public Consultation: Phase 1

- INVITATION - COURTESY INFORMATIONAL MEETING

DESIGN WORKSHOP. November 17, 2015

Slot Home Task Force Meeting #5 Phase 2 June 8, 2017

Civic Center District

WESTERN ILLINOIS UNIVERSITY

Mr. Craig Young, Managing Principal Tidewater Capital 25 Taylor Street San Francisco, CA October 27, 2014

2035 General Plan Update and Belmont Village Specific Plan. Joint Study Session with the City Council and Planning Commission April 12, 2016

Oakridge Redevelopment: New Park Concept Overview and Phase 1 Engagement Results

WAC #7 3/14/14. Coachella General Plan Update

Isabel Neighborhood Plan: Alternatives

Honorable Mayor and Members of the City Council. Submitted by: Eric Angstadt, Director, Planning and Development

UNCW CAMPUS MASTER PLAN

India Basin/Hunters Point Shoreline Community Workshop May 21, 2008

City Council Presentation November 6, 2017

Philip A. Ginsburg, General Manager Dawn Kamalanathan, Director, Capital & Planning Division

Elderberry, Pioneer, Junction

PINE CURVE REZONING. BACKGROUND Purchased as two parcels in 2001 and 2002

Enhanced Planning Process

ANC 2A Presentation. November 9, 2006

TOWN OF NEW CASTLE - Master Plan Update

REVIEW AND EVALUATION OF REGIONAL LAND USE

Coronation Park Neighbourhood Plan. Open House #2 15 September 2016

UO North Campus Conditional Use Permit Project

Summary of Public Input & Discussion of Alternatives

Subject: 30 Otis Street, Evaluation of Shadow on Proposed 11th and Natoma Park

District Facilities Master Plan

Roosevelt Station: Transit-Oriented Development. Workshop #3 - February 22, 2017

1.0 Purpose of a Secondary Plan for the Masonville Transit Village

EYA Presentation to ANC 5A Committee of the Whole. The Josephite Seminary Property Washington, DC. April 13, 2016

California Environmental Quality Act (CEQA) Environmental Review Process

Vision & Land Use. Discussion. Historic Preservation Plan. Foggy Bottom Campus Plan:

Lehigh Acres Land Development Regulations Community Planning Project

Minto In Kensington Open House. Thursday March 23, pm Hillhurst Sunnyside Community Association Ave NW

Denver Moves: Transit Task Force

ATTACHMENT A 09/12/2011. Attachment A - 1. A. Preliminary Future Transit Station Sub-area

CIVIC CENTER PUBLIC REALM PLAN OVERVIEW

Community Visioning Workshop Prep

Welcome to the Oakridge Centre Open House

SOUTH LAMBETH ESTATE REGENERATION MASTERPLAN OBJECTIVES. Proposed masterplan objectives. What is currently proposed

Re: Alameda Point Update Review and Comment on SunCal s September 19, 2008 Development Concept

EXPO LINE COMMUNITY WORKSHOPS NOVEMBER 27 TH & DECEMBER 3 RD Los Angeles Department of City Planning

SUBJECT: Proposed Downtown Mobility Hub Precinct Plan and Proposed Official Plan Policies

LELAND & VISITACION PARK COMMUNITY MEETING

City Plan Commission Briefing #2

Presentation of the Staff Draft. July 17, 2014 SSRVP Team, Area 3

It Takes A Village.. Preserving Rural Character In Standish

ASPEN HILL Minor Master Plan Amendment

NORTH CIRCULAR ROAD - REGENERATION IN ACTION

DATE: June 20, 2018 Civic Design Review Committee of the Arts Commission FROM: Nicholas Perry, Senior Planner (415)

Mill Woods Town Centre Proposed Rezoning LDA

CENTRAL ESTUARY PLAN AVISION FOR OAKLAND S WATERFRONT

Metro. Activity Center Design Guidelines. Recommendations For Developing Focused, Mixed-Use Commercial/Residential Centers

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

North Downtown Specific Plan MEMORANDUM

Transcription:

AvalonBay Communities + BRIDGE Housing Mission Housing Habitat for Humanity Pacific Union Development Corporation

Tonight s Agenda Recap of discussion from last CAC meeting Updates on meetings with Stakeholders Overview of our preliminary Base Plan Environmental Evaluation Application Next Steps Phase II of Community Workshops Balboa Reservoir CAC Presentation 4/9/18 2

Master Planning Timeline Fall 2014 Fall 2017 Winter 2018 Spring-Fall 2018 Fall 2018 Winter 2019 1 2 3 4 5 COMMUNITY ENGAGEMENT 1 CAC Development of Parameters RFP Development 4 Phase II Continue Development of Masterplan 2 Phase I Initiate Masterplan & Community Engagement Process 5 Submit Draft Masterplan to City based on Technical and Community Feedback 3 Initiate Technical Review & Feedback Balboa Reservoir CAC Presentation 4/9/18 3

Community Engagement Schedule Phase I: October April 2018 1. CAC: Introductions (Oct 2) 2. CAC: Public Open Spaces (Nov 13) 3. Walking Tour (Dec 2) 4. CAC: Transportation, Circulation & Parking (Dec 11) 5. CAC: Housing Types and Distribution (January 22) 6. CAC: Preview of Fiscal Feasibility Legislative Package (Feb 12) 7. CAC: Master Plan Updates (Tonight) Balboa Reservoir CAC Presentation 4/9/18 4

Community Engagement Schedule Phase II: April December 2018 8. Open House: Community Planning (April 20/21) 9. Community Van Tour of Affordable Housing in San Francisco (May) 10. Community Walk from the Reservoir to BART (May) 11. Open House: Open Space Possibilities at the Reservoir (June) 12. CAC: Architecture, Building Locations, Massing & Design Precedents (July) 13. Community Park Day (September) 14. Open House: Sustainability (October) 15. CAC: On an Off Site Transportation: Walking, Biking, Transit, Autos & Parking (November) 16. Reservoir Community Holiday Celebration (December) Balboa Reservoir CAC Presentation 4/9/18 5

Phase II of Community Engagement Balboa Reservoir CAC Presentation 4/9/18 6

Community Feedback from 02/12/18 CAC Fiscal analysis needs to consider impact on City College Public funds should not be used towards garage, should go towards housing instead City College students rely on existing parking City College needs a plan to help students and staff to get to campus without driving Clarify how parking garage impacts overall parking ratio for development Balboa Reservoir CAC Presentation 4/9/18 7

Community Feedback from 02/12/18 CAC New units will generate revenue to support transit improvements Impact fees should be target to support improvements in the neighborhood San Francisco needs more housing close to transit, consider building more units than currently proposed Current public transit is not adequate to accommodate the proposed number of new residents Need to hear more from MTA about how local transit service will be improved Balboa Reservoir CAC Presentation 4/9/18 8

QUESTIONS & COMMENTS Master Planning Process Overview of 02/12/18 CAC Meeting Balboa Reservoir CAC Presentation 4/9/18 9

Overview of Reservoir Site With plan from 2017 proposal Riordan High School Sunnyside Judson Ave Over the pas Westwood Park Lee Ave Phelan Ave City College I 280 Balboa Park Mission Terrace Ingleside Lick Wilmerding High School Balboa Park BART Station Balboa Reservoir CAC Presentation 4/9/18 10

RIORDAN HIGH SCHOOL Plan from 2017 Proposal Approximately 1100 units PLYMOUTH AVE SAN RAMON WAY WESTWOOD PARK PHELAN AVE CCSF CAMPUS CLOUD CIRCLE SCIENCE CIRCLE 2.0 acre central park open towards the west Approximately 67 for sale townhomes adjacent to Westwood Park Pedestrian oriented with streets and auto circulation at the perimeter CCSF MULTI USE BUILDING CLOUD CIRCLE INGLESIDE Balboa Reservoir CAC Presentation 4/9/18 11

PLYMOUTH AVE SAN RAMON WAY WESTWOOD PARK For Sale Townhomes For Sale Townhomes Market Rate Low Income Moderate Income Park Low Income Moderate Income Market Rate Market Rate RIORDAN HIGH SCHOOL Habitat for Humanity CCSF MULTI USE BUILDING PHELAN AVE CLOUD CIRCLE SCIENCE CIRCLE CCSF CAMPUS CLOUD CIRCLE Concept Plan from 01/22/18 CAC Meeting Townhomes increased to approximately 100 forsale units SFPUC Parcel expanded to 80 feet in width Shape and location of open space and buildings still evolving INGLESIDE Balboa Reservoir CAC Presentation 4/9/18 12

Base Plan This is an illustrative drawing of our new base plan This plan is intended as a starting point for further community input Streets, open space, and buildings have been adjusted based on community feedback This is not the final plan, but it does show one option of how all the pieces fit together Includes approximately 1100 units, the same number as our original proposal Balboa Reservoir CAC Presentation 4/9/18 13

Central Park 2.0 acre public park at the heart of this new community Park shifted towards Lee Avenue to create stronger connection to CCSF, and the Sunnyside and Ingleside neighborhoods Buildings shelter park from prevailing winds while preserving views to west Shape and location of park is still flexible Balboa Reservoir CAC Presentation 4/9/18 14

SFPUC Parcel Large underground water mains are located in this 80 wide zone, no buildings allowed in this area SFPUC land can be used as a park or street. In base plan SFPUC parcel is envisioned as 1.0 acre active park Provides continuous pedestrian connection from Unity Plaza to Ingleside Library Garden Design will developed in collaboration with SFPUC and with community Balboa Reservoir CAC Presentation 4/9/18 15

Pedestrian Greenways Larger open spaces are linked by greenways that promote walking Potential connection to Westwood Park Pathway adjacent to Riordan HS with views to Mount Davidson Over 4 acres of publicly accessible open space Balboa Reservoir CAC Presentation 4/9/18 16

Neighborhood Open Space Network Goal to connect to the network of pedestrian ways and recreation space Pedestrian way connecting to Science Circle at CCSF Four connection points to Ocean Avenue Views towards Mt Davidson Courtyard open space at each new residential block Balboa Reservoir CAC Presentation 4/9/18 17

Community Garden Multi use Lawn Lawn Terrace Central Park Preliminary Concept Sketch Concept sketch to help understand the scale of central park space. Park will include large green spaces, play areas, views, to west, and areas sheltered from the wind. Final plan will be developed with community Playground Picnic Area Balboa Reservoir CAC Presentation 4/9/18 18

New open space takes advantage of connections to Ocean Avenue Active recreation next to Lee Ave and Whole Foods. Green areas on west end with connection to Library Garden SFPUC Open Space Preliminary Concept Sketch Connection to Library Multi use lawn Existing Water Line Childcare Playground Connection to Whole Foods Flexible/event space /basketball Connection to Unity Plaza Balboa Reservoir CAC Presentation 4/9/18 19

SFPUC Open Space Potential Uses Wide range of creative uses that can be considered Active uses that take advantage of activity at Whole Foods and Ocean Avenue Design will done in collaboration with SFPUC and with community Balboa Reservoir CAC Presentation 4/9/18 20

Streets and Auto Access In this base plan, the public streets are moved closer to Central Park to improve access to park and to residential blocks Preserves pedestrianoriented character with raised crossings for pedestrians. Bike lanes at Lee Avenue, shared bike access at other streets. See additional road options in slides below. Balboa Reservoir CAC Presentation 4/9/18 21

Public Garage Provides public parking for the CCSF community, residents, and neighbors Public garage is located below Blocks G & F Will continue to study other options for location of public garage Total number of spaces will depend on outcome of parking studies Balboa Reservoir CAC Presentation 4/9/18 22

Townhomes Conceptual layout for approximately 100 for sale townhomes Townhomes are 3 stories maximum in height 2 stories adjacent to Westwood neighbors Final arrangement of townhomes will be developed based on input from neighbors and community Balboa Reservoir CAC Presentation 4/9/18 23

Pedestrian Auto Mews 3 Story Townhomes Townhomes Preliminary Concept Sketch 2 Story Townhomes at West Edge Enlarged plan shows option with townhomes facing shared courts Side yards adjacent to rear yards at Plymouth with limited windows. Private Rear Yards Pedestrian Auto Entrance Courts Balboa Reservoir CAC Presentation 4/9/18 24

Building Heights Building heights similar to what was proposed in the original plan. Taller buildings adjacent to Lee Avenue and to Ocean Avenue. Within each block, buildings step down to create variety in scale and character Balboa Reservoir CAC Presentation 4/9/18 25

Building Heights Site Section EXISTING RESIDENTIAL NEW RESIDENTIAL NEW PARKING Balboa Reservoir CAC Presentation 4/9/18 26

New Residential buildings are similar in scale to buildings at City College Largest buildings at Reservoir are lower than Science Hall Site Overview Site Section Balboa Reservoir CAC Presentation 4/9/18 27

Ground Floor Activation Buildings will have active ground floor uses at open spaces and pedestrian ways. Community serving Childcare located near Ocean Avenue Shared community room overlooking the Central Park Openings and visual connections to mid block courtyards will increase activity and encourage walking Balboa Reservoir CAC Presentation 4/9/18 28

Base Plan The Base Plan is not a final plan! The Base Plan represents one option of how all these pieces fit together, and an important starting point for further community input We will continue to develop options based on feedback from the community and stakeholders. The following slides provide examples of options under consideration Balboa Reservoir CAC Presentation 4/9/18 29

Base Plan Variations The master Plan will continue to evolve. We are considering variations for all of the elements below: Open space Building heights Location of Public Garage Location of community amenities Street locations Balboa Reservoir CAC Presentation 4/9/18 30

Site Plan Variations: Opt. 1 Public Street on SFPUC parcel adjacent to Whole Foods Potential for larger open Central Park Less open space adjacent to Ocean Avenue Base Plan Balboa Reservoir CAC Presentation 4/9/18 31

Site Plan Variations: Opt. 2 More direct street connection to Phelan Larger auto free zone at north end of site Loss of green way next to Riordan High School Base Plan Balboa Reservoir CAC Presentation 4/9/18 32

QUESTIONS & COMMENTS Preliminary Master Plan EE Process Balboa Reservoir CAC Presentation 4/9/18 33

Potential CEQA Timeline EE Submittal Notice of Preparation (NOP) & Public Scoping Draft Environmental Impact Report (DEIR) Initial Study Technical Studies Response to Comments City responses to public comments on Draft EIR Certification of Final EIR Planning & SFPUC Commission Project Approvals Spring 2018 Early 2019 2019 2019 Phase II Master Planning Develop and Refine Draft Master Plan Balboa Reservoir CAC Presentation 4/9/18 34

Environmental Evaluation Number of Units to be evaluated Environmental Evaluation Application will include three scenarios for the number of units on site Our base scenario is 1100 units, the number we believe is feasible to build on site The low scenario will include 900 units The high scenario will include 1300 units Balboa Reservoir CAC Presentation 4/9/18 35

Environmental Evaluation Example Technical Diagrams Environmental Evaluation application includes technical diagrams that address specific issues. This is a draft of the Open Space diagram. It is not a final design, but it provides enough information about the size and location of the open space to begin evaluation process. Design can evolve as long as the amount of open space remains the same. EE may include variants on location of open space, similar to variants on location of streets. Preliminary EE Park and Open Space Plan Balboa Reservoir CAC Presentation 4/9/18 36

Environmental Evaluation Example Technical Diagrams This is a preliminary diagram showing the size of the residential blocks. This is not a final design but it provides enough information to evaluate the general size of the building sites. The design can still evolve as the size of the residential blocks does not increase significantly. The EE application can also include design variants, such as the optional street layouts. Preliminary EE Site Plan Balboa Reservoir CAC Presentation 4/9/18 37

April 20 21 Open House Project team on site to discuss range of topics 1. Open Space Options 2. Pedestrian, Bike and Auto circulation 3. Design of Townhome neighborhood 4. Community Amenities 5. Architectural Character 6. Sustainability 7. Options for Phasing Balboa Reservoir CAC Presentation 4/9/18 38

Balboa Reservoir CAC Presentation 4/9/18 39

QUESTIONS & COMMENTS EE Process April 20/21 Open House Email Feedback: balboareservoir@gmail.com Website: balboareservoir.com Balboa Reservoir CAC Presentation 4/9/18 40