BETTER PUBLIC TRANSPORT PROJECT WATERBEACH TO SCIENCE PARK AND EAST CAMBRIDGE CORRIDORS

Similar documents
BEDFORD BOROUGH COUNCIL PLAN IMPLEMENTATION MONITORING REPORT

Welcome to the Oakridge Centre Open House

WELCOME TO THE CHOUTEAU GREENWAY EQUITY WORKING GROUP!

WELCOME TO THE CHOUTEAU GREENWAY DESIGN, DEVELOPMENT AND CONSTRUCTION WORKING GROUP!

Cambridgeshire Horizons Quality of Life Programme

WELCOME TO THE CHOUTEAU GREENWAY ECONOMIC DEVELOPMENT WORKING GROUP!

Newcourt Masterplan. November Exeter Local Development Framework

Ebbsfleet Development Corporation

Cranfield University Masterplan

A community driven catalyst for an equitable, healthy, (economically viable and environmentally) sustainable corridor

Local Growth Planning in North Central Green Line Communities

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document

Kibworth Harcourt. Introduction. Introduction

3. Endorse the LRT vision in transforming Surrey into Connected-Complete-Livable communities, and more specifically, the official vision statement:

WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. REPORT TO: Planning Committee 1 April 2015 Planning and New Communities Director

9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO BOCA EAST INVESTMENTS LIMITED

Cambridge to Cambourne Busway (A428) Planning Appraisal. Prepared by Strutt & Parker LLP & Atkins on behalf of Greater Cambridge Partnership

A RESOLUTION SETTING FORTH CATS S COMMITTMENT TO COMPLETE STREETS

Strasbourg SUMP Award: Finalist factsheet. Local Transport facts. Urban transport policy objectives of the city:

Atlanta BeltLine, Inc. Pathways to Urban Sustainability

SCARBOROUGH SUBWAY EXTENSION. Scarborough Subway Extension. Final Terms of Reference

The proposals presented in September drew a large number of comments and feedback and have been grouped together as follows:

UDF PLANS AND GUIDELINES

GREATER CAMBRIDGE CITY DEAL. Urban Design Guidance for Transport Infrastructure Projects

Examination of South Cambridgeshire Local Plan

John M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference

SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building. Recommendation: Purpose:

Welcome. Site/11/04. Site/11/03. Proposed Site. 11,400 new homes needed in east Cambs

Welcome. Walk Around. Talk to Us. Write Down Your Comments

HS2 Hybrid Bill Petitioning. Summary of SMBC Asks 23/09/13. Background

HS2 Interchange Station Design

CITY COUNCIL AGENDA REPORT

Haydock Point. Welcome

Create Policy Options Draft Plan Plan Approval. Public Consultation Events. Phase 2

DUBLIN DOCKLANDS MASTER PLAN AND RELATIONSHIP WITH OTHER PLANS

South Cambridgeshire Local Plan

A428 Cambourne to Cambridge Better Bus Journeys Landscape and Planning Appraisal Cambridgeshire County Council. January 2017

C A M B R I D G E O X F O R D. Integrates rail and road

Western City District What we heard

Relief Line Project Assessment

The Chinese University of Hong Kong Campus Master Plan Stage 3 Stakeholders' Engagement Report

Strategic Environmental Assessment Screening Report. Dublin Port Masterplan Review 2017

LEICESTER & LEICESTERSHIRE 2050: OUR VISION FOR GROWTH CONSULTATION DRAFT

Route 110 Alternatives Analysis

S C O P E O F W O R K A P R I L

OUR GREATER SYDNEY A metropolis of three cities. OVERVIEW. connecting people. DRAFT Greater Sydney Region Plan

North District What we heard

European Level as set out in the European Commission s Transport White Paper - European Transport Policy for 2010: Time to Decide.

South of Eastern Strategic Direction Status Update

Longbridge Town Centre Phase 2 Planning Application

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

SUMMARY. An Attractive, Competitive and Sustainable GREATER MONTREAL. Draft Metropolitan Land Use and Development Plan. April 2011

CROSS RIVER TRAM: Linking key development, transportation and regeneration sites through the historical heart of London

Town of Oakville Streetscape Strategy

Summer North West Greenway Network - Information Booklet

North Fair Oaks Community Plan Summary and Information

WELCOME and introduction

BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY

City of Fort Lauderdale UPTOWN URBAN VILLAGE. Public Workshop December 7, 2016

Draft Eastern District Plan

Our collaborative vision for a. Wisbech Garden Town....a place of great expectations

Issues Requiring Future Study

Urban Design Manual PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction. Station Study Areas

CHAPTER 7: Transportation, Mobility and Circulation

TOD 101 CREATING LIVABLE COMMUNITIES WITH TRANSIT

Land at Fiddington Hill Nursery, Market Lavington

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF NOVEMBER 15, 2016

PSRC REVIEW REPORT & CERTIFICATION RECOMMENDATION

Green Square Town Centre

Urban Planning and Land Use

Public Open House. Overview of the Downtown Plan Official Plan Amendment April 23, 2018

Taking forward the All London Green Grid

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC

PLAN ELEMENTS WORKSHOP. April 5, 2016

Wallingford Neighbourhood Plan

Point A Point B Point C Point D. City of Hapeville Public Meeting July 25, 2017

BRE Strategic Ecological Framework LI Technical Information Note 03/2016

1 Spain. 1.1 Introduction

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

Illustrative Visual Impression DISSINGTON GARDEN VILLAGE

City of Tacoma Planning and Development Services

Published in March 2005 by the. Ministry for the Environment. PO Box , Wellington, New Zealand ISBN: X.

NEW REGIONAL OFFICIAL PLAN HIGH LEVEL PROCESS & FRAMEWORK

Growth Point Connectivity: Executive Summary

North Somerset Council Local Development Framework

THAT the attached Terms of Reference for the Thornhill Centre Street Study be approved.

Energy Efficient Strategies for Urban Transportation Planning

Report Date: January 28, 2014 Contact: Matt Shillito Contact No.: RTS No.: VanRIMS No.: Meeting Date: February 4, 2014

D-O LRT Zoning Discussion. Chapel Hill Boards & Commissions October 16, 2017

Barking Riverside Gateways Housing Zone. Development Opportunity for 3,000 homes & modern commercial space

and also to consider how Luas Line A1 will contribute to good planning and sustainable development in the area it serves.

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension

Advisory Group Meeting #2

NO: R035 COUNCIL DATE: FEBRUARY 24, 2014

JOINT DECLARATION BETWEEN THE EUROPEAN UNION AND THE REPUBLIC OF INDIA ON A PARTNERSHIP FOR SMART & SUSTAINABLE URBANISATION. New Delhi, 6 Oct 2017

GO Station Mobility Hubs: Draft Precinct Plans. Committee of the Whole July 12, 2018

Journeys and destinations.managing Mobility in Europe. EU Cohesion Policy

Midtown Greenway Land Use and Development Plan Executive Summary

The Tonsley Park Sustainable. Precinct

Transcription:

Report To: Greater Cambridge Partnership Joint Assembly 20 th September 2018 Lead Officer: Peter Blake GCP Director of Transport BETTER PUBLIC TRANSPORT PROJECT WATERBEACH TO SCIENCE PARK AND EAST CAMBRIDGE CORRIDORS 1. Purpose 1.1. The A10 Waterbeach to Science Park and East Cambridge corridors are two key radial routes in to Cambridge. They suffer considerably from congestion during peak times, particularly at the Cambridge end. There are also sites of planned or potential large development, such as Waterbeach barracks, Science Park expansion, and developments to the east of the City. 1.2. The corridors have been identified by the Greater Cambridge Partnership s (GCP s) Executive Board, as a priority project for developing public transport, walking & cycling improvements, linked to the development of proposals for a regional rapid mass transit solution. 1.3. The Joint Assembly is asked to note and comment on the emerging recommendations. 2. Context Strategic Case 2.1 The GCP is seeking to deliver a world class transport system for the Greater Cambridge area. This includes a vision for a public transport system that: Offers a genuine alternative to the car. Is rapid, reliable and, where possible, segregated from general traffic. Is an integrated network of bus, rail and mass transit services, including timetable, ticketing and information. Focuses on better serving the key employment centres outside of the city centre: Cambridge Science Park, Cambridge Biomedical Campus, West Cambridge and the cluster around Cambridge Airport. Is both affordable and feasible to deliver and sustain. 2.2 Between 2011 and 2031 significant additional new homes are planned and an increase in jobs in development locations to the north and east of Cambridge, Cambridge Northern Fringe, Cambridge North West, Cambridge Southern Fringe and Waterbeach. 2.3 Work is already underway on developing and delivering proposals for two key corridors; the A428 Cambourne to Cambridge and the A1307 Cambridge South East corridor. The Executive Board will be asked to give its approval to commence work on developing proposals for the A10 Waterbeach to Cambridge Science Park and Newmarket Road corridor into Cambridge from the east; including public engagement. Figure 1 below outlines the Waterbeach to Cambridge Science Park corridor. Figure 2 outlines the East Cambridge corridor.

Figure 1 Waterbeach to Cambridge Science Park corridor Figure 2 East Cambridge corridor 2.4 The GCP delivery programme is based on the policy framework established by the local planning and transport authorities. These include the emergent transport policy of the Cambridgeshire and Peterborough Combined Authority (CPCA) and in particular the compatibility of the project with the proposed Cambridge Area Metro (CAM) - a mass rapid transit scheme. 2.5 The Transport Strategy for Cambridgeshire and South Cambridgeshire (TSCSC), prepared in parallel with the submitted Local Plans, was adopted in March 2014 and provides a plan to manage the rising population and increasing demand on the travel network by shifting

people from cars to other means of travel; including public transport, walking and cycling. Policy within the TSCSC requires a range of infrastructure interventions on the A10 Waterbeach and East Cambridge corridors as a key part of the integrated land use and transport strategy, responding to levels of planned growth. The corridors are identified as key growth areas identified in the submitted Local Plan. The Local Plan policies for the strategic developments sites along the corridor requires High Quality Public Transport (HQPT) to link new homes to employment and services in and around Cambridge. Cambridgeshire and Peterborough Combined Authority 2.6 The CPCA was established in March 2017 and is led by an elected Mayor and Board comprising representatives from the constituent local authorities. The key ambitions for the CPCA include: Doubling the size of the local economy; Accelerating house building rates to meet local and UK need; and Delivering outstanding and much needed connectivity in terms of transport and digital links. 2.7 The CPCA is responsible for transport infrastructure improvement and the Local Transport Plan. The existing Local Transport Plan 2011 to 2026 remains the existing key transport policy framework at this time which emphasises the need for new developments to be supported by sustainable transport measures such as HQTP. 2.8 In December 2017 Steer Davies Gleave delivered an options appraisal report jointly funded by the Combined Authority and the GCP on high quality rapid transit schemes. This favoured a mass transit system in Cambridge based on innovative rubber tyred trams. 2.9 On 30 January 2018 the Combined Authority agreed to fund further development of the CAM Metro to Strategic Outline Business Case. CAM was formally adopted by the GCP on 8 February 2018. The Combined Authority resolved also to liaise with the Greater Cambridge Partnership (GCP) to ensure GCP s current and future plans for high quality public transport corridors were consistent and readily adaptable to the emerging proposition for a CAM Metro network. 2.10 The potential CAM network is set out in Figure 3 and includes an alignment towards both Waterbeach and Newmarket. Figure 3 Potential CAM network

2.11 The Combined Authority and GCP have subsequently undertaken a review of alignment between GCP schemes scheme and the emerging CAM. The review has concluded that the A10 Waterbeach to Cambridge is aligned, subject to detailed work on potential Park and Ride proposals as it follows the A10 Study Area Report. The eastern Cambridge corridor was not subject to review at this stage. 2.12 The findings of this review means that the schemes must continue to align and be future proofed so it can tie into any future CAM network. In exploring consistency of the options it is considered that the scheme developed by GCP will need to deliver: A high quality public transport system using rapid transit technology. High frequency, reliable services delivering maximum connectivity. Continued modal shift away from car usage to public transport. Capacity provided for growth, supporting transit-oriented development. State of the art environmental technology, will easily accessible, environmentally friendly fully electric vehicles (or similar). Fully integrated solution, including ticketing and linkages with the wider public transport network to maximise travel opportunities. 2.13 An officer CAM Programme Board is now meeting monthly where the development of schemes for these corridors can be discussed to ensure continued integration with the delivery of a rapid mass transit network. 3. Developing a Business Case 3.1 There is a need to commence work on developing proposals for improving high quality public transport, walking & cycling options along these two key corridors. The business case will be developed from five cases for investment in line with HM Treasury guidance and the Department for Transport s Transport Assessment Guidance. 3.2 The Executive Board report will seek approval to commence work including scoping of options, catchment area appraisal and to bring outline proposals back to the Executive Board for their consideration. 4. Public Consultation 4.1 The projects will be subject to public consultation and proposals for consultation will be brought to a future Executive Board. 5. Technical Work 5.1 The technical work will include understanding the current context and development proposals, which together set out the need for intervention include: Population and housing growth. Employment growth. The increasing need for travel. Levels of car ownership. The existing quality of transport infrastructure. Existing congestion levels. 5.2 Based on these issues the project objectives are:

To achieve improved accessibility to support the economic growth of Greater Cambridge. To deliver a sustainable transport network / system that connects areas along the corridors. Contribute to enhanced quality of life, relieving congestion and improving air quality within the surrounding areas along the corridor and within Cambridge City Centre. 6 Next Steps and Milestones 6.1 This report is to seek approval to commence work on the A10 Waterbeach to Cambridge Science Park and East Cambridge corridors. 6.2 Outline proposals and timeline, including proposals for public consultation, will be brought back to the Executive Board for approval. 6.3 Officers will work with the Combined Authority through the CAM Programme Board on the development of the proposals to ensure alignment with the delivery of the wider CAM network.