ANNEXUREIII D: FIRE PROTECTION SYSTEM SECTION ADDRESSABLE FIRE DETECTION AND ALARM SYSTEM Supply, Installation, testing and commissioning of Analogue Addressable Fire Alarm Control panel with battery backup for 8 hours normal operation and 5 minutes alarm operation. Panel to have number of loops based on quantity of detectors mentioned in the respective item below. The control panel, battery charger etc. shall be UL listed. The panel shall be calculate below quantity of devices with adequate loop arrangements and with 5% capacity additional for future use. & The panel shall be consisting with 40 x 4 line character LCD display and 485 for networking. Cost shall be included for required control module & control relay modules (Location ground floor BMS Room ) NO Supply, installation, testing and commissioning of Repeater panel FOR Each floor and security cabin. Nos 0 3 Supply, installation, testing and commissioning of Analogue Addressable PhotoElectrical detector with programmable for timed automatic sensitivity selection with base, junction box and other accessories as required and detectors shall be UL listed.(osd) Nos 355
4 5 6 7 8 Supply, installation, testing and commissioning of Analogue Addressable Photo Thermal Multi Criteria Detector (PTMCD) with programmable for timed automatic sensitivity selection with base, junction box and other accessories as required and detectors shall be UL listed. Nos 5 Supply, installation, testing and commissioning of Response indicator for all detectors located above false ceiling 5 Supply, installation, testing and commissioning of Analogue Addressable Fault isolator module capable of monitoring shorted loop circuit and automatically restore communication when shorted conditions are corrected. Supply, installation, testing and commissioning of Horn cum Strobe rated at 8 DBA @ 3m for Audible annunciation and 75cd flashing at Hz for visual indication. Supply, installation, testing and commissioning of Addressable Single action Manual pull station having an integrally mounted addressable moudle that monitors and reports contact status. Nos 90 Nos 50 Nos 50 ANNEXUREIII 9 Supply, installation, testing and commissioning of Addressable monitor Module Nos 0 0 Supply, installation, testing and commissioning of Addressable Control Relay Module 0
ANNEXUREIII Supply, laying & fixing of x.5 sq. mm, PVC insulated copper Cable confirming to IS standards and specifications.(below ceiling or in shafts/walls etc) Rmt 000 Supply, laying & fixing of x.5 sq. mm, PVC insulated copper wires confirming to IS standards and specifications. (Underground including excavation, back filing, proper manner sand & brick work as per standard electrical manner.) FOR SECURITY CABIN. Rmt 00 3 Supply, laying & fixing of perforated G.I. sheet cable tray with necessary angle iron suspension supports, anchor, fastners etc. complete. Maximum height of suspension shall not exceed 500mm size of the tray is a) 00mm x 50mm x 4SWG. Rmt 500 4 Supply, installation, testing & commissioning of photo electric integrated low flow duct detectors complete with mounting relays and housing. Nos 50 AUTOMATIC SPRINKLER SYSTEM (REPAIRING & REWORK) 3
ANNEXUREIII Supplying, installing, testing and commissioning of G.I. pipes confirming to IS 39 Pt I heavy grade with painting, suitable type of supports, (shall be hanger type for all size pipes which run below the slab & for wet risers C Channel to be used) with anchor fasteners, bolts nuts, clamps, "U" bolts shall be of malleable specials. Reducers, Tees, Elbows, flanges. Including cutting, welding, fixing in/ on walls, ceiling by using suitable supports etc. as per drawings. The quoted rate shall also include for chasing chipping walls, making bore holes in walls / floor and making them good with filler material and finished in cement mortar etc. complete. a) 65mm nominal dia Rmt 30 b) 50mm nominal dia Rmt 48 c) 40mm nominal dia Rmt 36 d) 3mm nominal dia Rmt 48 e) 5mm nominal dia Rmt 7 4
ANNEXUREIII Supplying, installing, testing and commissioning of G.I. pipes confirming to IS 39 Pt I heavy grade with painting, suitable type of supports, Reducers, Tees Elbows, flanges, including cutting, welding, as per drawings. The rate quoted should be included with anticorrosive treatment with 4mm polymer corrosion resistant tape as per IS 0, overlap shall be 5mm minimum, cement mortar etc. complete. a) 50mm nominal dia Rmt 6 b) 80mm nominal dia Rmt 6 3 Providing and fixing 5mm dia CP gunmetal / brass sprinkler head with temperature of operation 68 deg. C at working pressure of 75 psi, quartzoid bulb and set to operate at specified temperature. a) Pendant type Nos 0 b) Upright type Nos c) Pendant type 9 deg. C FOR PANTRY. Nos 6 4 Supplying, installing, testing and commissioning C.I Butterfly valves as per BS: 555 (PN0) slim seal standard lever operated type with required flanges, nuts, bolts etc. complete. a) 50mm nominal dia Nos b) 00mm nominal dia Nos c) 80mm nominal dia Nos d) 65mm nominal dia Nos 5
ANNEXUREIII 5 Supplying, installing, testing and commissioning of Gun metal chrome finished Ball valves as per (PN0) with fitting of screwed end type. a) 50mm nominal dia Nos 6 b) 5mm nominal dia Nos 6 Providing and fixing electrically operated flow indicating switches with threaded connection for minimum flow of 900 Ipm for indicating water flow in sprinkler branch line on each floor with necessary junction box installed in accessible plate 00mm nominal dia Nos a) b) 80mm nominal dia Nos c) 65mm nominal dia Nos 7 Supplying and fixing approved make 5mm dia automatic air release valve with unions etc. complete. 8 UL Listed Sprinkler Flexible drop pipes made of Corrugated SS Tubing to with stand 6 Bar pressure with all support accessories with false ceiling framing work a) 000 mm long Nos 500 FIRE HYDRANT SYSTEM Supplying, erecting and commissioning of landing Hydrants comprising of the following in the fire duct. a) no. Stainless steel short branch pipe with nozzle. Nos 8 FIRE SUPPRESSION SYSTEM (FM 00] FOR UPS AND SERVER ROOMS Fire Fighting System for Server & UPS, Electrical rooms 6
Designing, supply, installation, testing & commissioning of CCOE certified 80 L capacity. Seamless cylinders with valve assembly & protection cap, pressure gauge, Safety burst disc and with low Nos pressure supervisory switch for FM00 gas installed on cylinder valve with Cylinder Pressure Operated Head with Hose & accessories, install on the Cylinder Valve cylinder support arrangements etc. complete.. Supply of OEM Factory Filled FM 00 Gas. kg 70 ANNEXUREIII 3 supply, installation, testing & commissioning of 4 VDC.0 amps, Resettable Electrical cum Mechanical actuator for FM 00 Cylinder with Cylinder Support Assembly, floor mounted, Flexible rubber discharge hose, with braided reinforcement Make: Kidde or equivalent Designing, supply, laying & fixing/ installation of the FM 00 piping will be, as per flow calculations, Sch 40, ASTM A06 Gr. B with seamless 4 3000 psi Socket weld fittings, Discharge nozzles, rigid angle supports, coats of zinc primer & 3 coats of P.O red paint. The equipments should be ISI Marked and Indian Seamless. Supply, Installation, Testing & Commissioning of Two zone gas release panel with all requisite mounting accessories and it should be able 5 integrate with other related and BMS System. The Panel should be Complete with Red Colour Housing, Power supply, required Battery charger & 30 min battery backup Supply, Installation, Testing & Commissioning of Manual Abort 6 Stations with DPDT Relay, The Abort will be monitored simultaneously by Fire Alarm System Supply, installation, testing & commissioning of Manual Release 7 Stations with DPDT Relay, The Release switch will be monitored simultaneously by Fire Alarm System. Job 4 7
Supply, installation, testing & commissioning of Sign Board with 8 Marking "Gas Discharge. Do Not Enter". Should Operate on 4 V DC, Driven Through Gas Release Panel / CM (for use outside room) 9 0 Supply, installation, testing & commissioning of Sign Board with Marking "Gas discharge Evacuate immediately". (for use inside room) Supply, installation, testing & commissioning of Cylinder Discharge Pressure Switch, Shall be installed on the FM 00 piping. ANNEXUREIII TESTING COMMISSIONING OF HYDRANT AND SPRINKLER SYSTEM Testing commissioning of existing hydrant and sprinkler system with necessary addition and alterations for the smooth functioning of the system complete including additional coat of paints where ever required as per engineerincharge's directions with necessary sign boards, floor plan indicators, warning boards, entry exit indicators, etc. complete. Providing warranty for the entire firefighting, fire detection and fire suppression system for a period of one year from the date of handing over the system with proper documentations. Job Job TOTAL 8