Downtown Cleveland s Main Avenue Bridge

Similar documents
Jefferson Street Pedestrian Tunnel Mural Project 2018

CALL TO ARTISTS: REQUEST FOR QUALIFICATIONS

TERMS OF REFERENCE. General

PUBLIC ART CALL LIONS GATE COMMUNITY CENTRE. For Expressions of Interest Submission Deadline: March 18, 2018 Project Value: $85,000(inclusive)

RIVERWALK EAST PUBLIC ART DESIGN PROJECT

In March 2012, the County of Yolo was awarded a grant from the California State Department of Parks

CALL TO ARTISTS Expression of Interest (EOI)

MY BILL OF RIGHTS.ORG COMMISSIONING GUIDELINES & STANDARDS VISION AND PROCESS

RESOURCE PACKET River Crossing

REQUEST FOR QUALIFICATIONS

TREASURE ISLAND PHASE ONE PROJECTS PUBLIC ART PROJECT OUTLINE

City of Ashland. Attn: Laura Loucks; Sustainability Intern 601 Main Street West Ashland, WI

City of North Vancouver

CALL FOR ARTIST QUALIFICATIONS SUBMISSIONS. DIA Urban Arts Projects Phase One

Call for Artists for: Design and Construction of Environmental Art Activation Story Mill Community Park, Bozeman, MT

Request for Qualifications For Administration of the 2016 Summer Sprout Program

Posted by Calgary Public Library on November 1, 2012

REQUEST FOR QUALIFICATIONS Entrance: Entertainment and Sports Center

Call for Artists Gateway Island Ashland Oregon Requests for Qualifications (RFQ)

CALL TO ARTISTS REQUEST FOR QUALIFICATIONS STart PUBLIC ART PROGRAM

City of Havana, Prairieland Community Development & 353 Court LLC

TOWN OF MIDLAND TERMS OF REFERENCE AND REQUEST FOR PROPOSALS

Sign Here: Syracuse. Request for Proposals. Call to Artists

Public Art Plan. We have elected to submit Public Art Plans before or concurrently with the CSP Submittal per the FDP Manual

Downtown Cleveland Alliance/Tremont

Sewanee Village + Request for Builder/Developer Proposals

REPORT FOR ACTION. 88 Queen Street East Public Art Plan SUMMARY

This Review Is Divided Into Two Phases:

Vision & Land Use. Discussion. Historic Preservation Plan. Foggy Bottom Campus Plan:

PUBLIC ART COMMISSION TOWN OF PELHAM Public Art Installation as a Gateway Feature Stage 2: Competition Brief for Public Art Proposals

hermitage town center

Ivywild On The Creek PRELIMINARY CREEK DISTRICT MASTER PLAN

7th Annual Oak Park Sculpture Walk

Toronto and East York Community Council. Robert Freedman, Director, Urban Design

Montana Rail Link Park

Workshop 3. City of Burlington Waterfront Hotel Planning Study. September 14, The Planning Partnership

Deadline For Submissions: December 14, 2017 Winter Garden 2017 Selected Submissions

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004

Toronto East York Community Council. Robert Freedman, Director, Urban Design P:\2013\CLUSTER B\PLN\TEYCC\TE13055

Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions

REQUEST FOR QUALIFICATIONS

The Master Plan Framework

Place Brief. National Collections Facility (NCF site)

Long Lost Allies? Walking Advocates & Business District Organizations. Matt Kazinka Lake Street Council. Shaina Brassard Seward Redesign

Maple Leaf Square 15 York Street Public Art Plan

Waterfront Development Master Plan

4 Park Planning and Design

People who are members of historically disenfranchised racial, ethnic, cultural, and other identity groups are encouraged to apply.

A Better City Request for Qualifications

PUBLIC ART COMMISSION FOR KIRKSTALL, LEEDS ARTIST BRIEF

PLANNING ADVISORY BOARD AGENDA OCTOBER

A Public Art Project for the New Pittsburgh Arena INTRODUCTION 1

Bloor St. W. Rezoning - Preliminary Report

Robert Freedman, Director, Urban Design

Build on community input

St. Clair Avenue West Area Transportation Master Plan

ELK GROVE GENERAL PLAN VISION

Request for Qualifications. Knowledge Park Pedestrian/Cyclist Connectivity Planning and Design

Request for Expressions of Interest & Call for Qualifications Maplewood Townhomes 433 Seymour River Place

Parks Master Plan Implementation: Phase I Waterfront Use and Design REPORT #: September 7, 2016 File #

REQUEST FOR PROPOSAL (RFP)

THAT the attached Terms of Reference for the Thornhill Centre Street Study be approved.

WELCOME. Welcome to our second public exhibition on proposals for the redevelopment of the Paddington Central Management Office.

Contact: Alex Taranu ( ) or Karl Walsh ( )

South of Eastern Strategic Direction Status Update

Urban Design Manual PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction. Station Study Areas

INNERBELT BRIDGE PUBLIC MEETING #2

CHAPTER 8 ISSUES, CONCERNS, CONSTRAINTS AND OPPORTUNITIES

CALL FOR ARTISTS. For interactive, performance-based art at LOVE Park during the 2018 Fringe Festival

Strategic plan framework Steering Committee Meeting

John M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference

Public input has been an important part of the plan development process.

Toronto East York Community Council. Robert Freedman, Director, Urban Design

ARLINGTON COUNTY, VIRGINIA

Table of Contents. Executive Summary... vii

Development Solicitation Request for Qualifications. The Historic Hollering Place Development

City Center Neighborhood Plan

Building Exterior Lighting Grant Program. Applications will be reviewed April 1, July 1 and October 1, 2019

REQUEST FOR QUALIFICATIONS

The transportation system in a community is an

DOWNTOWN NORFOLK COUNCIL ACTION PLAN. Strategic Initiatives Focus Area Objectives. Departmental Focus Area Key Objectives

Artist Call for Expressions of Interest Port Kells Hall Mosaic Project RFEOI #

Georgetown Business Improvement District. Request for Proposals. Georgetown Gateways Project

CALL TO ARTISTS, DESIGNERS, AND LANDSCAPE ARCHITECTS ROUNDABOUT SITE DESIGN FOR NAIADS SCULPTURES

A Vibrant Downtown. Chapter 5 Cary Public Art Opportunities 31

Call for Artists Deadline: April 27, 2018

expectations for new development W A T E R F R O N T D R I V E

Public Art Component - Guildford Aquatic Centre. The Parks, Recreation and Culture Department recommends that Council:

Call for Digital Designers Requests for Proposals (RFP) for Frostburg Lamppost Banner Design

Hopkins. Development Guidelines May Overview. Sponsored by: Blake Road Corridor Collaborative City of Hopkins

CITY OF LAWRENCE REQUEST FOR QUALIFICATIONS (RFQ)

7437, 7439 and 7441 Kingston Road - Zoning By-law Amendment and Site Plan Control Applications - Preliminary Report

VILLAGE OF BOLTON HERITAGE CONSERVATION DISTRICT PLAN

The City of Bowie Arts Committee Bowie, Maryland ART IN PUBLIC PLACES PROGRAM Request for Proposals

MEMORANDUM. DATE: March 15, Chairman and Members Community Redevelopment Agency. Leif J. Ahnell, C.P.A., C.G.F.O. Executive Director

PLAN ELEMENTS WORKSHOP. April 5, 2016

Public Meeting & Workshop 1 April 26,2016

PORT OF VANCOUVER WATERFRONT DEVELOPMENT. Concept Development Plan City Center Redevelopment Authority April 20, 2017

Corridors. Re-vitalize our Corridors and Gateways

Urban, Economic and Social Development Plan (PDUES) For the Marconi Alexandra, Atlantic, Beaumont, De Castelnau Sectors

Transcription:

Downtown Cleveland s Main Avenue Bridge Underpass Improvement Competition Project Summary Downtown Cleveland Alliance seeks a creative professional or team (architect, designer, artist, engineer, landscape architect or combination thereof) to propose unique and attractive design solutions for the area under and around the Main Avenue Bridge Underpass, centered at the intersection of West 9 th Street and Main Avenue in Downtown Cleveland. This location is a critical pedestrian, bicycle, and vehicular connection between the Warehouse District and the Flats East Bank, with infrastructure, history, and functional potential to inspire the highest level of creative treatments. Background Downtown Cleveland Alliance recently completed a strategic planning process to create a holistic vision and tactical plan for improving the physical connectivity of Downtown Cleveland. The resulting plan, Step Up Downtown, enumerates eighteen (18) key connections where real or perceived gaps or barriers impede the experience of Downtown Cleveland as continuous and traversable. The full plan can be found at www.stepupdowntown.org. The Project Area lies largely in the shadows of the Main Avenue Bridge, a historic structure widely recognized as an integral part of Cleveland s rustbelt landscape. Opened in 1939, designed by Cleveland based architects Walker and Weeks and Osborn Engineering (still headquartered in Cleveland today), the Bridge was the longest span in Ohio until the Toledo Skyway was built in 2007. Today, however, the underpass creates a dark and uninviting pedestrian environment as well as a challenge for vehicular wayfinding. It creates division within neighborhoods that could otherwise feel connected as two complementary mixed-use environments. Downtown Cleveland s Warehouse District, located just east of the Cuyahoga River, comprises the former wholesale and commercial center of Cleveland. This historic district includes warehouses that contained large hardware distributors, marine suppliers and garment manufacturers; smaller wholesale and retail establishments for dry goods, grocers, and tool suppliers. Major office buildings of the iron, coal, railroad and shipping industries were also centered here. 2.4.15 Main Avenue Bridge Underpass Improvement Competition Downtown Cleveland Alliance 1

Today the buildings are filled with loft apartments, businesses, restaurants and entertainment. The tree lined streets bustle with activity as residents, office workers and visitors enjoy all the Warehouse District has to offer. West 9 th Street is a major north/south street of the Warehouse District. Main Avenue is an east/west street that leads from the Warehouse District down to the Flats East Bank, where major redevelopment is underway. The Flats are a significant part of Cleveland s history. Once the home of our rich industrial heritage and later a thriving waterfront entertainment district, today the Flats are experiencing another renaissance as a true mixed use environment serving industry, business, recreationists, residents, and maritime interests. On the north side of Main Avenue, a new 23 floor office tower and Aloft Hotel featuring three restaurants opened in 2013. Phase two of this project is soon to be complete, bringing additional office space, 243 residential units, and more restaurants, retail and entertainment to the river front, as well as a public board walk that will provide Downtown with renewed access to the water. The southwest corner of West 9 th Street and Main Avenue is the site of Cleveland s original lighthouse, and the Warehouse District s public realm plan includes the creation of a pocket park along West 9 th overlooking Main Avenue as it descends into the Flats. This gathering spot would serve the many residents in and around the Project Area. Project Area Images and Maps West 9 th Street at the top of Main Avenue the site of Cleveland s original lighthouse Top of Main Avenue looking west Bottom of Main Avenue looking east 2.4.15 Main Avenue Bridge Underpass Improvement Competition Downtown Cleveland Alliance 2

2.4.15 Main Avenue Bridge Underpass Improvement Competition Downtown Cleveland Alliance 3

About the Competition This is an open Request for Qualifications (RFQ) from established creative professionals based anywhere in North America who are interested in a highly visible and impactful project in Downtown Cleveland, Ohio. Up to three (3) respondents will be chosen from the submitted RFQs to develop design solutions for this project (referred to hereafter as Proposers). The Proposers will be chosen by a committee of distinguished professionals in urban design, architecture, the public and nonprofit sectors, as well as the Project Site s private sector stakeholders. The Selection Committee will review each RFQ for the following: 1. Statement of interest in the project 2. Understanding of project goals 3. Description of design team 4. Relevant experience 5. Artistic elements in work samples 6. Demonstrated ability - either directly or through collaboration - to carry design concepts through construction documents and project management Requirements of Selected Proposers Selected Proposers will be expected to make an initial exploratory site visit, as well as a second visit to present final proposals. A presentation to a jury and stakeholder group will be considered the final submission for the competition. A representation of the final submission must also be provided in electronic format for the jury to consider. The presented proposals should consist of a design strategy for the designated Project Area, including but not limited to streetscape elements, lighting, and artistic treatments. Final design work and engineering will not be expected to be completed for this competition, but the proposal must include cost estimates for that work. Detailed guidelines, site plans, development context, and budgetary constraints will be provided to selected Proposers upon the exploratory visit. Proposers can expect an approximate total budget of $800,000 inclusive of all professional fees, expenses for design, fabrication, shipping, engineering, insurance, site preparation, and installation costs. Preference will be given to phase-able projects to allow for staged fundraising efforts. Stipend for Selected Proposers Selected Proposers (or Proposer Teams) will be paid an honorarium of $8,500 plus reimbursable travel costs of up to $3,000. The honorarium will be paid 50% up front and 50% upon completion of the competition. Competition Evaluation and Criteria The final proposals will be presented to a jury and stakeholder group qualified to select a design strategy that is unique to Cleveland and accomplishes a set of objectives that will include: To improve real and perceived safety of the Project Area through creative solutions that include lighting. 2.4.15 Main Avenue Bridge Underpass Improvement Competition Downtown Cleveland Alliance 4

To create a positive experience as pedestrians, cyclists, and drivers traverse the Project Area To enhance physical connectivity between the Warehouse District and the Flats, with consideration for Cleveland s seasons and variable conditions within those seasons. To create an identity for the Project Area, going beyond beautification to truly achieve creative placemaking. To take into consideration future repair and maintenance that will need to be done to the Main Avenue Bridge. Project Timeline March 6 th, 2015 4:30pm On or before April 1 st, 2015 April 2015 Week of July 13 th, 2015 On or before August 7 th, 2015 August September, 2015 Spring, 2016 Deadline for Request for Qualifications Up to 3 finalist Proposers invited to participate in Competition Exploratory Site Visits Presentations of final proposals Winning design selected Contract negotiations, final design work and engineering Fabrication and installation RFQ Submission Instructions & Contact Please submit materials on or before March 6 th, 2015 at 4:30pm. Refer to the About the Competition section above for RFQ guidelines. Digital submissions in a single PDF file are preferred and can be submitted by email to Laura Wiegand at lwiegand@downtowncleveland.com (maximum file size 50MB) or via flash drive to: Laura Kushnick Wiegand Director, Development & Community Relations Downtown Cleveland Alliance 1010 Euclid Avenue, 3 rd Floor Cleveland, OH 44115 Questions may be addressed to Laura at 216-325-0975 or the email above, or to Thomas Starinsky, Associate Director of the Historic Warehouse District Development Corporation, at tstarinsky@warehousedistrict.org, or 216-325-0937. 2.4.15 Main Avenue Bridge Underpass Improvement Competition Downtown Cleveland Alliance 5