EPN Reprocessing. Christof Völksen. Bayerische Kommission für die Internationale Erdmessung.

Similar documents
GOALS AND ACTIVITIES EUREF TECHNICAL WORKING GROUP OF THE. EUREF 2015 Symposium Leipzig, Germany June 3-5, C. Bruyninx for the EUREF TWG

EPN Analysis Coordinator Report

Status of the EPN Troposphere Products

EPN Analysis Coordinator Report Heinz Habrich Federal Agency for Cartography and Geodesy

Programme EUREF Symposium 2017

The EUREF Permanent Network

PROPOSAL FOR PARTICIPATION TO ESEAS (EUROPEAN SEA-LEVEL SERVICE)

EPN DENSIFICATION STATUS REPORT

EUREF-IP from pilot project to operational status

Twenty Years of EPN: Network Challenges Ahead

new Italian Permanent Network RDN of GPS stations: the Contribution of the

EUREF-TWG Project: Monitoring of official national ETRF coordinates on EPN web

Network Coordination of the EUREF Permanent Network

The EUREF Permanent Network: Recent Achievements

EPN CB News. Carine Bruyninx Royal Observatory of Belgium EPN Central Bureau. EUREF AC Workshop Meeting, Bern, Oct , 2015

Status and Performance of the EUREF Permanent Tracking Network

ISO Coordinate Reference Systems Registry

KTIMATOLOGIO S.A. M. Gianniou KTIMATOLOGIO S.A. (Hellenic Cadastre) Geodetic Department.

C. Bruyninx, L. Legrand, F. Roosbeek

EPN Status and Network Management

EUREF s Reference Networks EPN, UELN, and ECGN Basis for Tectonic Monitoring and Investigations in Europe

Today s EPN and its network coordination

CURRENT DEVELOPMENTS OF THE LITHUANIAN NATIONAL GEODETIC CONTROL

The EUREF Permanent Network : Recent Achievements

EPN CB Report. Carine Bruyninx EPN CB. EPN Central Bureau EUREF TWG Meeting, March , Lisbon Royal Observatory of Belgium

The EPN Infrastructure: Status, Monitoring and Plan

Real-Time GNSS - EUREF-IP

Research for the Development of Safety Standards

Safety systems (AL3) and systems relevant to Safety

EEN-E Measurement and Control of Energy Systems DRYING OF BIOMASS IN A FIXED BED DRYER LABORATORY EXERCISE INSTRUCTIONS

New requirements for IEC best practice compliance

Guidelines. Safety Integrity Level - SIL - Valves and valve actuators. February Valves

The IMS Infrasound Network: Status and State-Of-The-Art Design

Permanent Network. EPN Central Bureau EUREF TWG Meeting, May 31, 2005, Vienna, Austria Royal Observatory of Belgium

Implementation Guidance for ISO 9001:2008

Hands On: Introduction to Safety Workshop Presented by Robert Jones Manufacturing in America March 14-15, 2018

Option 7A Alignment Map. 100-year Floodplain with or without Project

SECTION 12 LANDSCAPE

IP TRONIK. Project Scope: Simulation of car refrigerant circuit with the software GT SUITE and its comparison with real test bench measurements

Annex D: Project Logframe Matrix

Testing strategy and timeline of E-det 80k. Christian Koffmane for the MPG HLL team

API MANUAL OF PETROLEUM MEASUREMENT STANDARDS

Protection Coordination Workshop. Robert W. Cummings Director of System Analysis and Reliability Initiatives

Certification Report of the ST3000 Pressure Transmitter

City Council and Planning & Zoning Commission Workshop March 20, 2018

MapCHECK 3. The New Benchmark for 2D IMRT QA. Your Most Valuable QA and Dosimetry Tools

Preliminary Sea Level Rise Case Study: Navarre Beach, FL

Community Visioning Workshop Prep

Reverse Engineering of a Household Fan. UEET101 Section 1 Group 1 Final Proposal Draft

Delta Doped L3 CCD Imagers for Low Surface Brightness UV Astronomy: From GALEX to the IGM

Solar Still - Improved Distillation

Columbus Thermal Control System On-Orbit Performance. Jan Persson (ESA/ESTEC, The Netherlands) Zoltan Szigetvari (EADS Astrium, Germany)

Application Note. Application Note for BAYEX

Electric Power Group Presents. Welcome!

INSTRUMENTATION FOR MARINE BLACK CARBON MEASUREMENTS

Assessment of the Probabilities that Staff and/or Patients Will Detect Fires in Hospitals

Comparative Performance of HFO Blends in a Condenser

A New Approach for Modeling of Hot Air-microwave Thin Layer Drying of Soybean

IIRSM UAE 69 th Branch Meeting. Name of Facilitator: Matt Cox Date: 7 th March, 2018

Process Safety Workshop. Avoiding Major Accident Hazards the Key to Profitable Operations

The urban dimension of cohesion policy

ASEAN Standards and Quality Bulletin Volume 1, July Address. Front Cover. Foreword. Consultation on Standards in ASEAN. Managing for Quality

2035 General Plan Update and Belmont Village Specific Plan. Joint Study Session with the City Council and Planning Commission April 12, 2016

Certification Report of the ST 3000 Pressure Transmitter with HART 6

Are there any new or emerging trends in technology that will impact the scope and work activities of the TC? Please describe briefly.

ISA Instrument Specification Forms

January 21, Re: NOPR to Revise Water Heater Test Procedures. Docket No. EERE 2011 BT-TP Dear Ms. Edwards,

Analysis of freeze protection methods for recuperators used in energy recovery from exhaust air

Victoria Street Pedestrian Bridge

TECHNICAL REPORT IEC/TR Fibre optic communication system design guides Part 11: Multimode launch conditions. Edition 1.

ABNJ Deep Seas Project:

ANALYSIS OF HUMAN FACTORS FOR PROCESS SAFETY: APPLICATION OF LOPA-HF TO A FIRED FURNACE. Paul Baybutt Primatech Inc. and

Economic Impact of Building Regulations

Real Time Pipeline Leak Detection on Shell s North Western Ethylene Pipeline

BSI the UK voice into European and national standards

D Implementation of a DEMO system related to Smart Fault Management in LV network (normal/storm conditions)

General Plans. Tom Dansie, AICP Steve Pastorik, AICP

How to assess a development application under SPA

DRAFT MEETING MINUTES. Dated Reference ISO/TC 215/ WG7 N 0297 ISO/TC 215 PLENARY AND WG MEETINGS ISO/TC215 HEALTH INFORMATICS WG7 DEVICES

HEAT REMOVAL TESTS FOR THE HIGH PERFORMANCE VAULT STORAGE SYSTEM OF SPENT NUCLEAR FUEL

Standards for ITS, the perspective of CEN/TC278

Continuous Commissioning: A Valuable Partner to Retrofit Projects

Learning from High Energy Physics Data Acquisition Systems Is this the future of Photon Science DAQ?

Case Study Berlin. Abstract. WP 3 Urban Development

Displacement Ventilation in Classrooms

Arctic Council s WG PAME

Davis Soil Moisture and Temperature Station Protocol

How Does A Lighting Laboratory Play Its Role In MVE. Jing Wang Global Efficient Lighting Centre

Study of Hot-air Recirculation around Off-road Tier-4 Diesel Engine Unit Using CFD Abbreviations Keywords Abstract Introduction and Background

The Mode of Urban Renewal Base on the Smart City Theory under the Background of New Urbanization

MSSI Electrical introduction. 14 March 2016 Light and Building Markus Harlinghausen, CAPIEL Vice President

Analogue to Digital Telecare. Technical Advisory Board. 21 st June 2017 Work Stream 3 Procurement

Siemens Process Automation End-user Summit- 2011

Path into a green future

Standardisation activities in the field of HMI for road vehicles

J. R. Qualey III, L. Desmarais, J. Pratt Simplex Time Recorder Co., 100 Simplex Drive, Westminster, MA 01441

Sensor Systems Network Design and QA/QC Brian Stacey

Impact of Failed Steam Traps on Process Plants - Food and Beverage

Application of Lean Production Concept in Organisation of Gear Wheels Manufacturing

Planning and Permitting

Transcription:

EPN Reprocessing a new EPN Project Christof Völksen Bayerische Kommission für die Internationale Erdmessung (BEK) http://epn-repro.bek.badw.de

Coordinates are dependent on: Reference system realizations Introduction Analysis strategy t Correction models (e.g. PCV [abs]) } so are the orbits and ERPs Therefore inconsistencies in the coordinates (time series) are obvious if one of the above factors has been changed. First global reprocessing initiative has been carried out by Potsdam- Dresden-Group for 1994-2006. Currently the IGS is involved in the reprocessing of the global IGS network (REPRO1). Solutions of the EPN are strongly dependent d on the products used! Therefore inconsistency are transferred by the applied products. }

Time Series of Position Changes Station Wettzell http://www.epncb.oma.be/

Evolution of the Initiative for the EPN Project Reprocessing Reprocessing activities have been started by several LACs of the EPN: EPN related: WUT entire EPN *), ROB **), BEK *), SGO **), DEO ***) Others: IGN, OLG, GOP, SUT Products used: *) PDR05, **) IGS-final, ***) JPL-Products Six LACs indicated an interest to participate in a reprocessing initiative of fepn during the LAC workshop in Frankfurt 2008. The analysis coordinator (BKG) confirmed to combine the reprocessed solutions (similar interest by SGO). EPN Central Bureau would set up a dedicated data center with all the available data (RINE). Draft of a charter and presentation to the TWG in Budapest Feb. 2009. Establishment of a new EPN Project Reprocessing chaired by Christof Völksen (BEK).

Participation LAC Data Center ASI (MicroCosm/ GIPSY) BEK BKG () DEO GOP IGE () IGN () () NKG (Bernese/GAMIT) OLG ROB SGO SUT SWISSTOPO WUT (BERNESE/ GAMIT) Each LAC will participate in the project Reprocessing! More contribution than in the standard EPN processing can be expected: software analysis strategies Very positive resonance by the different LACs!

Processing Flow Analysis

Software For the reprocessing activities iti of the EPN different software packages would be available: BERNESE 5.0 (8), MicroCosm 2007.00 (ASI), GIPSY/OASIS (ASI, DEO, BEK?), GAMIT(WUT/NKG)? Different software packages will foster the discussion on the best analysis strategy. Tropospheric mapping function (e.g. VMF, GMF GAMIT, BERNESE: near future GMF/GPT, etc.) Different approaches for the comparison are possible: Sub-network (e.g. BERNESE) by sub-network (GAMIT) or EPN (BERNESE) by EPN (GAMIT) (also GIPSY / MicroCosm)

Standards Standards have to be defined beforehand (task of the WG). Application of abs. PCV (type mean or individual calibrations) Conform with the IGS Best available (individual calibrations), (much) later near-field Mapping functions to be used (available in all software packages to be used) NMF, GMF, IMF or VMF Datum realization Regional (e.g. define selected reference sites) Global approach (see Legrand & Bruyninx 2008) Exchange of solutions? Standard SINE (coordinates and covariance matrix) SINE including NEQ (soon to be released by BERN)

Input Products (ORBIT+ERP) For the coordinated d reprocessing activities iti of the EPN the best available products should be used. Available are: PDR05 (of the Potsdam-Dresden-Group) (http://iscd.gfz-potsdam.de) Reprocessed orbits by the different IGS analysis centers are available at CDDIS: (ftp://cddis.gsfc.nasa.gov/pub/gps/products/week/repro1) Combined reprocessed IGS final are yet not available and cannot be expected before the release of the ITRF08 (probably bl by the end of 2009). GLONASS orbits are not included in the reprocessed products! Currently only the PDR05 products cover a sufficient large time span to reprocess the entire EPN (1994-2006+).

Working Plan (Pilot Phase) Establishment of a working group Reprocessing that t coordinates the multiple task of this project. Redistribution of the EPN sites with the focus on redundancy (preferred 3 LACs for each site?). Selection of suitable sets of reprocessed products as input for the first analysis of the 2006 data (pilot phase). Each participating LAC shall setup the facilities for the reprocessing of the 2006 data. Development of a common strategy to be used by all participating LACs. (e.g. current EPN-Strategy)

Working Group Reprocessing Christof Völksen (Chair) BEK Stefan Schaer LPT Rolf Dach AIUB/ CODE Lotti Jivall NKG Carmela Ferraro ASI Martin Lidberg NKG Rosa Pacione ASI Cornelia Aichhorn OLG Heinz Habrich BKG Günter Stangl OLG Wolfgang Soehne BKG Carine Bruyninx ROB Rui Fernandes DEO Juliette Legrand ROB Jan Dousa GOP Ambrus Kenyeres SGO Vratislav Filler GOP Jan Hefty SUT SUT Macelino Valdes IGE Miroslava Igondova SUT Miguel A. Cano IGE Alessandro Caporali UPA Bruno Garayt IGN Mariusz Figurski WUT/MUT Daniel Ineichen LPT Karolina Szafranek WUT/MUT

Time table Pilot Phase

Working Plan (after Pilot Phase) Analysis of the complete EPN data set (1996-200x) applying the new strategies and standards. Analysis of the daily/weekly coordinates by the participating LACs and supplying the results to the analysis coordinator. Combination of the different solutions by the analysis coordinator, reports and feedback to the working group and the LACs. Estimation of reprocessed coordinates and velocities for the entire EUREF permanent network.

Conclusions Reprocessed coordinates are consistent t according to the applied standards (models, software, analysis strategy), reference system realization and used products. Each LAC will establish reprocessing capabilities. Management of large data sets will allow to improve, based on the long time data sets, the reference system realization (ITRF08, ITRFxx..). Reprocessing capabilities will also be used on smaller regional networks (national level as already done). Long time geodynamic studies will certainly be improved due to the consistent time series. Reprocessing will probably become an important part of the analysis of GPS data for the coming years (Repro x).