River Kleine Nete : Creating ecological flooding zones at recreation areas

Similar documents
Lake and Stream Restoration Project

Sectoral workshop on Green infrastructure implementation. Multiple benefits of Green Infrastructure

Policy for management and protection of the coast

THE SEINE- SCHELDT PROJECT Design & Build Harelbeke. ir. Ellen Maes, project engineer SMART Rivers 2011, 15th of September 2011

The climatic weather forecast

Biodiversity Conservation

SECTION 5: REACH RECOMMENDATIONS/MAPS

Urban runoff in my neighborhood (Capitol Hill) is heavy with trash and other debris.

North Branch of Cypress Creek Ecological Restoration: A Comprehensive Approach to Stream Restoration

Step by step, the construction of a coherent overall restoration on the Seine estuary the role of GIP Seine-Aval

Sustainable Urban Drainage Systems (SuDs)

Green Infrastructure Case Study Template

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date:

Weston s Wetlands, Stormwater, & Open Space

SUMMER VILLAGE OF SUNRISE BEACH

Water Sensitive Urban Design results and principles

elbridge Core Strategy

Rotterdam Climate Proof

Green Infrastructure. IENE 2012 International Conference

Overview Report. Proposed Development

CITY COUNCIL AGENDA REPORT

GREEN NETWORK APPLICATIONS IN ESTONIA

Infrastructure, Development and Enterprise Services. Natural Heritage Action Plan (NHAP) Project Initiation

TERRESTRIAL NATURAL HERITAGE SYSTEM STRATEGY APPENDIX F: MODEL POLICIES FOR THE IMPLEMENTATION OF THE TARGET TERRESTRIAL NATURAL HERITAGE SYSTEM

Name of Action: Arrangement of beach locations on the River Vikhra

Welcome to our public exhibition

Just The Basics: Illicit Discharge. What does it mean to me?

Making the case for Sustainable Transport Project Potential

Dr.- Ing. Andreas Hendricks Land consolidation and land development more than reorganizing land property

Poisoned Park? How Exide s Lead Contamination Risks Frisco s Grand Park

WRC in Mechelen (Belgium)

Peoria has a tremendous opportunity to get sewer overflows under control and fight stormwater runoff head-on

SHORELINE, FLOOD AND COASTAL DEFENCE MANAGEMENT PLANS

Overview of Development Plan in Guyana, South America. Prepared by Stefan John Director of D&J Invesments. October, 2016

Development of green infrastructure in EU regions Nature-based solutions delivering multiple benefits

Appendix I. Checklists

River Restoration in Urban Areas. Petra Podraza

Why the workshop, why the cases?

ADDENDUM TO BIOLOGICAL SCOPING SURVEY REPORT, BOTANICAL SURVEY AND WETLAND DELINEATION

FLOOD ISSUE 62 INTRODUCTION

STREAM BANK STABILIZATION THORPS MORTIMER RECREATION AREA Grandfather Ranger District SITE LOCATION & DRAINAGE AREA

Natura 2000 network or a sum of sites

7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES

Edgeley Pond + Park Public Meeting

Green Roofs and Stormwater Management Virginia Stovin

Upper Dean Landscape Character Area: A1 Landscape Character Type: River Valley

Green Infrastructure Enhancing Europe's Natural Capital

Introducing Green Infrastructure for Coastal Resilience

Christchurch City Council Civic Offices 53 Hereford Street Christchurch. Submission on: The Draft Annual Plan 2014/15

Town of Peru Comprehensive Plan Executive Summary

DEALING WITH STORM WATER MANAGEMENT

Old Mill Community Association Bioretention Facility

Town of Windham. Planning Department 8 School Road Windham, ME voice fax

Reconnecting rivers in urban areas; challenges and considerations

THE BASQUE DECLARATION TRANSFORMATIVE ACTIONS TO CREATE MORE PRODUCTIVE, SUSTAINABLE AND RESILIENT CITIES

Sustainable Urban Drainage Systems (SuDS): Design and Implementation

POLICY SRT/D4 STORMWATER MANAGEMENT

WILLIAM STREET STORM SEWER OUTFALL. PUBLIC INFORMATION CENTRE March 23, 2017

Welcome to our public exhibition

Putting a LID on Stormwater Pollution. Michele Loudenback, RPES Stormwater Enforcement Water Quality Division

INTRODUCTION PLANNING HISTORY

PRESENTATION ON JOHANNESBURG S BIODIVERSITY PROGRAMME

PICTURE CANYON Planning Riparian-Wetland Refugia in an Urban Setting

3-2 Environmental Systems

COMMUNITY LED REGENERATION CURRENT & FUTURE INITIATIVES FRANK RALLINGS - UNIVERSITY OF BRIGHTON

Guiding Landowners in Stream Restoration. The Science, Practice & Art of Restoring Native Ecosystems 2015

IDENTIFICATION TO IMPLEMENTATION THE JOURNEY OF CITY RESILIENCE

RIVER RECREATION AND CONSERVATION: LESSONS FROM COLORADO S 2013 FLOODS

Samuel E. Paul War Memorial Recreation Area Natural Resource Inventory

Roeshot & Burton SANG. Hinton Admiral Estate

Chapter 3 Site Planning and Low Impact Development

Rainwater Management an issue for the 21 st Century. Hydrological Cycle

UNIVERSITY TOWN NEIGHBOURHOODS 5.2 ECO-CORRIDOR MELBOURNE CAMPUS MASTER PLAN 2014

ENVIRONMENTAL ISSUES and TEN-T PROJECTS Key elements for a sustainable network development

SITE ASSESSMENT CHECKLIST

Green Infrastructure Basics

Christine Toner, Consultation Leader

Urban Water Management and Soils (ESRM 311 & SEFS 507)

Town of Lyons Parks Flood Recovery Planning Process. Photograph courtesy of Ed Bruder

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

Green Streets An Innovative Street Design Approach

Smart Growth Development Checklist

Use of Best Management Practices

Stormwater in a Liveable City Towards an Evidence Based Policy Framework. Associate Professor Phillip Johnstone

Stream Corridor Management Plan

Once Upon a Gravel Pit: Reconnecting Floodplain through Aggregate Extraction

Empowering Local Action for Coastal Resilience in Massachusetts. Bruce K. Carlisle MA Office of Coastal Zone Management

Implementing sustainable water strategy through development industry engagement

POND Construction. Perry L. Oakes, PE State Conservation Engineer Natural Resources Conservation Service

LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN. APPENDIX G - Stormwater Study Findings & Stormwater Solutions

Lake O the Pines Master Plan Revision Public Information Meeting April 25 & 27, 2017

Rochford District Council Allocations Development Plan Document: Discussion and Consultation Document Sustainability Appraisal

Woodland Conservation and the Master Plan

Arkansas River Corridor

PROJECTS OF DUBRUTO URBAN PLANNING 22 February 2016 Centurion Lake Redevelopment - Symbio City

ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville. Environmental Screening Report

Nature & Biodiversity

Rain Gardens. A Welcome Addition to Your Landscape

Libby Zemaitis October 18, 2017 Climate Outreach Specialist, NYS DEC Hudson River Estuary Program

RURAL ZONE - POLICY. Rural Zone Policy. Issue: Rural Environment. Ruapehu District Plan Page 1 of 8

Transcription:

Stoffel Moeskops Lange Kievitstraat 111-113 bus 64 B-2018 ANTWERPEN T +32 3 205 81 25 s.moeskops@vmm.be River Kleine Nete : Creating ecological flooding zones at recreation areas \\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\ Interreg North Sea Region Project: Building with Nature WP4: Natural Catchment Laboratories \\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\ 1 Kleine Nete river restoration The Kleine Nete is a rain river which winds across the sandy north-east of Flanders as a blue-green ribbon. It is one of the most natural rivers in the dense populated Flanders. On the one hand, the agriculture sector, which is the principal land user along the Kleine Nete, bears the water in case of high floods. Buildings are rare and so the valley is hydrological seen mainly unspoilt. On the other hand, the valley of the Kleine Nete is ecologically very valuable, protected by Flemish and European legislation. Significant populations of rare fish species can still be found here. Figure 1: Location of Kleine Nete river in Flanders, the northern region of Belgium However, the river itself has endured some changes in the seventies. In order to make the wet valley grounds more suitable for large-scale agriculture, the river has been straightened, broadened and deepened. This has several consequences. The water is evacuated more efficiently, which increases the flood risk in downstream areas. The groundwater levels went down by the enhanced drainage, causing a loss of groundwater dependent habitat species. It also meant a loss of natural habitat and migration facilities of biotic communities within the water system and by so a decline of the ecological value of the Kleine Nete valley. As the embankments are located very close to the river, they are vulnerable to erosion. By so, they need continuous pagina 1 van 13

maintenance. Also there is loss of water storage capacity caused by for example the building of dikes, cutting off meanders and elevation of grounds by landfills owing to several sectors (agriculture, recreation,...). Figure 2: Course of the Kleine Nete in the past To mitigate the major disturbance of the river system, a river restoration program was set up. Goals are: Creation of more water storage capacity Realisation of ecological added value Restoration of the structure of the water course The following projects are fitted within the river restoration program: Fish passages at the weirs of Grobbendonk, Herentals, Kasterlee and Retie (established) Dike replacement near the city of Grobbendonk (established) Excavation of a former sand deposal area of 15 ha, known as Hellekens near the city of Herentals (works in progress) Remeandering in the nature reserve Olens Broek near the city of Olen (design finished) Creating ecological flooding zones at recreation areas near the city of Kasterlee (pre design phase) Dike replacement and construction of a winter bed near the cities of Geel and Kasterlee (building permit delivered) Remeandering and construction of a swamp area near the city of Geel (works will start summer 2018) River Kleine Nete: creating ecological flooding zones at recreation areas page 2 van 13

2 Recreation areas Three recreation areas are situated along the Kleine Nete at the municipality of Kasterlee. These recreation areas have an economic function. It is not evident making alterations to the water course here. The economic sector is on the one hand vulnerable to the consequences of climate change, e.g. increased flood risk, and on the other hand not willingly to cede space with an economic function to river adaptation works, e.g. water storage areas. A challenge is present to find innovative solutions for multifunctional use of space. By rearranging the bank zone of the Kleine Nete, we intent to create a win-win situation for both the river and the recreation areas. It means that we are looking for an innovative solution in which the functions of the water course and the recreation are combined. This is understood as multifunctional use of space. The project can be considered as a pilot project / laboratory on how hard, rather economic allocations can be conformed to water and ecological systems. The recreation areas attract lots of people, which provides opportunities to install educational and sensitization facilities. For most people, enterprises and even local authorities, climate change and his consequences is something they have heard from, but they don t know how it affects them and which actions should be done concretely. It is not considered a priority. The challenge is not only to inform the different stakeholders (population, local authorities, enterprises,...), but also to involve them actively in the elaboration of adaptation measures. In this manner we can create more awareness, responsibility and understanding for the needed public works. The 3 recreation areas are camping site Korteheide, amusement park Bobbejaanland and recreation site Ark van Noë. Together, they represent 1,6 km of banks. The main reasons to integrate these areas into the river restoration program are: - Comprehensiveness: if these areas are included, the Kleine Nete river will we adjusted for a continuous 10 km - Public support: lots of owners in the neighbourhood had to cede land. It concerns mainly agriculture, forestry, pasture. It would be difficult to accept if the harder economic sites would not be affected. 3 Characteristics of the Kleine Nete near the recreation areas The section of the Kleine Nete near the recreation areas has a width at the bottom of 9 meter. The width between the banks is 17 meter. The bottom lies more or less 3,5 meter under the surface level. The average discharge is 4 m³/s which can increase to 33 m³/s for a storm with return period 100 years. The catchment area of the Kleine Nete is 573 km² and belongs to the Scheldt basin. Return period Discharge Water depth Average 4 m³/s 1,7 meter 2 years 23 m³/s 3,6 meter 10 years 29 m³/s 3,7 meter 100 years 33 m³/s 3,8 meter River Kleine Nete: creating ecological flooding zones at recreation areas page 3 van 13

4 Camping site Korteheide 4.1 Description Figure 3: Section Kleine Nete Camping site Korteheide is adjacent to the Kleine Nete for a distance of 400 meter. Roughly 40 meter inland, an historical cut off meander is still present in the landscape. It is in use as fishpond. More northly a pond is located (seepage water), used as swimming pool. A limiting condition for the rearrangement of the bank zone is the preservation of the camping facilities, i.e. number and quality of the standings for caravans. North of the camping site two areas are present on which new standings for caravans can be allocated as compensation for a possible loss in the bank zone. These two compensation zones can only be brought into use for a surface area equal to the camping site surface area given to nature or water. In other words: a compensation is allowed, a bare extension of the camping site is not allowed. River Kleine Nete: creating ecological flooding zones at recreation areas page 4 van 13

4.2 Design proposal The design consists of: - Reconnection of a part of the old, cut-off meander to the river. The other part will be kept in use as fishing pond as it is more difficult to create a new fish pond further from the river where the ground level is higher - The area between the meander and the river will be turned into an ecological, inundatable place. Summer camping is still allowed, but there will be no infrastructure. It is needed to remove 58 campers to the compensation areas. - Two compensation zones will be used to relocate the 58 campers. At the moment, these zones are covered with conifers, which will be cut down (28.000 m²) - A small stream around the camping site will be upgraded and connected to the Kleine Nete river system. The estimated costs are: - Construction of new camping terrain and relocation of the caravans: 750.000 euro - Construction of green area, including side works on bank Kleine Nete: 250.000 euro - Construction of meander: 150.000 euro - Upgrading small stream: 50.000 euro - TOTAL: 1.200.000 euro River Kleine Nete: creating ecological flooding zones at recreation areas page 5 van 13

River Kleine Nete: creating ecological flooding zones at recreation areas page 6 van 13

5 Amusement park Bobbejaanland 5.1 Description Amusement park Bobbejaanland is adjacent to the Kleine Nete for a distance of 850 meter. The area between the amusement park and the Kleine Nete is in use as parking places for visitors. Offering sufficient parking places to visitors is already a problem for Bobbejaanland at the moment. A limiting condition for the rearrangement of the bank zone is a preservation of the number of parking places. The rearrangement should imply an improvement of the landscape experiencing. The rather bare car park can be transformed into a nice place by which the visit starts with a pleasant walk from car to amusement park. The strong separation between Kleine Nete and recreation area should be abandoned. River Kleine Nete: creating ecological flooding zones at recreation areas page 7 van 13

River Kleine Nete: creating ecological flooding zones at recreation areas page 8 van 13

5.2 Design proposal The design consists of: - Lay a 10m buffer strip between parking and river (loss of 50 parking places) - Digging of a new meander: 4,50m bottom width (loss of 164 parking places) - Reconversion of inundatable parking island between meander and Kleine Nete - Construction of new two storey parking garage to compensate loss of parking places. The garage will implicate a loss of 96 parking places on the ground level. One level of the garage can store 307 cars. By so, the loss in parking places is compensated by one level. If the amusement park wishes to increase the parking capacity, it is possible to make a two storey parking garage. The estimated costs are: - One level garage of 307 parking places: 2.700.000 euro - Construction of meander: 150.000 euro - Construction of parking island including 4 bridges and green area: 850.000 euro - TOTAL: 3.700.000 euro River Kleine Nete: creating ecological flooding zones at recreation areas page 9 van 13

6 Recreation site Ark van Noë 6.1 Description Recreation site Ark van Noë is adjacent to the Kleine Nete for a distance of 300 meter. Roughly 60 meter inland, an historical cut off meander is still present in the landscape. It is in use as fishpond. Between the Kleine Nete river and the meander there is an artificial pond which was used for swimming in the past. River Kleine Nete: creating ecological flooding zones at recreation areas page 10 van 13

6.2 Design proposal The design consists of: - Dike improvement works along the Kleine Nete using natural materials - Reconnection to the river of the old, cut-off meander - Re-organisation of the entrance to the site to increase the water experience. Parking places will be relocated to the north of the meander. Visitors will enter the site by a new footbridge. The estimated costs are: - Construction of meander, bank works on meander and Kleine Nete, including land purchase: 200.000 euro - 3 new bridges: 300.000 euro - TOTAL: 500.000 euro River Kleine Nete: creating ecological flooding zones at recreation areas page 11 van 13

7 Questions We would like to know your opinion about this project. Here are some guiding questions: General Do you have any experience with similar cases? Which points of attention do you see? The realisation of the project is accelerated by pressure from neighbouring farmers who had to cede land and had a hard time accepting that more popular areas would not be affected. Do you think the water manager as a public service has to take this into account? The recreation areas are surrounded by farmland. Here, the water manager has expropriated a 15m strip along the Kleine Nete to create a two stage channel and new dikes. Designing concepts with meanders or compensatory parking places and caravans in agriculture areas would be cheaper, but affects again the agricultural sector. Would you consider such solutions? Design concept What do you find positive / negative about the design proposals? Which other solutions do you propose? Do you think too much importance is set to the interests of the private companies who own the recreation sites? The recreation areas have to adapt themselves more to a new natural river system. The meanders are not considered as free meandering water courses. Which bank protection do you propose? How would you conceive the embankments? River Kleine Nete: creating ecological flooding zones at recreation areas page 12 van 13

Financial The redevelopment of both sites will have little impact in reducing the flood risk, but there will be positive effects on other goals of river restoration. Which are the main benefits you think of and how can they financial be valued? Do you think comparing costs and benefits, the investments are worth it? Who has to pay for the realisation of the project? Do you think the government has to bear all the costs? Do you propose a certain distribution key? For the case of the amusement park: should they increase the price of a parking ticket in order to finance the project? What is an acceptable price? Educational Which educational / sensitization possibilities do you see to promote the Kleine Nete river and water management? Which concrete measures do you propose and on which themes? River Kleine Nete: creating ecological flooding zones at recreation areas page 13 van 13