CITY of NOVI CITY COUNCIL

Similar documents
Project Profile BAR HARBOR

EXPO LINE COMMUNITY WORKSHOPS NOVEMBER 27 TH & DECEMBER 3 RD Los Angeles Department of City Planning

U T D N o r t h C a m p u s T O D and D o w n t o w n D e n t o n T O D

Living in Albemarle County s Urban Places

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF NOVEMBER 15, 2016

John M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

FOUR MILE RUN VALLEY WORKING GROUP AND CHARGE

Acknowledgments. City of East Peoria. City of Washington. Aldermen. Commissioners. Staff. Staff. Planning Consultant. David Mingus, Mayor

Request for Proposals: Architectural/Design Guidelines

Award Winners. Arlington City Center Winner Built Award

Sewanee Village + Request for Builder/Developer Proposals

ARLINGTON COUNTY, VIRGINIA

The transportation system in a community is an

Town Center (part of the Comprehensive Plan)

ARISE: The Rock Renaissance Area Redevelopment & Implementation Strategy

City of Bristol Route 6 Corridor Implementation Program

VILLAGE OF BOLTON HERITAGE CONSERVATION DISTRICT PLAN

Table of Contents. Elm Avenue Improvement Plan City of Waco, Texas. Introduction 1. Existing Context 1 Figure 1 2.

Por favor, levanten la mano si necesita traduccion en espanol Please raise your hand if you need Spanish translation

ATTACHMENT A. Town of Lebanon Village Center Study Proposal Cover Sheet (to be included with Proposal) Contract shall not exceed $48,500.

Request for Proposal

Madison St. Oak Park. Request for Proposals. Village Owned Parcel Madison Street Oak Park, Illinois Reissued May 25, 2018.

CITY of NOVI CITY COUNCIL

DENVER DESIGN DISTRICT GDP

UNIVERSITY AVENUE CORRIDOR REDESIGN JULY 10, 2017 KICK-OFF MEETING

CITY OF FARGO PARKING RAMP SITE EVALUATION

Broken Arrow Comprehensive Plan Update Public Workshop Meeting #3 January 23,

~!VAUGHAN NOV Z November 21, Mr. Denis Kelly, Regional Clerk The Regional Municipality of York Yonge Street Newmarket, ON L3Y 6Z1

Local Growth Planning in North Central Green Line Communities

Northwest commuter rail station US 36 BRT. Westminster Station

EXHIBIT A. Tax Increment Reinvestment Zone No. 1 (Town Center) First Amended Project Plan 1

Land Use. Hardware Street Vendor Mixed-Use

1.0 Purpose of a Secondary Plan for the Masonville Transit Village

ESTABLISH AN EFFICIENT TOWN CENTER

ANC 2A Presentation. November 9, 2006

Transportation Committee

Town of Cobourg Heritage Master Plan. Statutory Public Meeting

PUBLIC ENGAGEMENT & SIX THEMES OF THE PLAN

REQUEST FOR QUALIFICATIONS

PRIORITIES COMMITTEE MEETING

NO: R035 COUNCIL DATE: FEBRUARY 24, 2014

8implementation. strategies

Figure 1- Site Plan Concept

City of Brookfield 2035 Comprehensive Plan. DRAFT #2 October 6, 2009

Northside Interjurisdictional Specific Plan and EIR

PUBLIC NOTICE. All meetings will be held at Hinesville City Hall located at 115 East ML King Jr. Drive, Hinesville, GA beginning at 5:30 PM.

SW Ecodistrict A VISION PLAN FOR A MORE SUSTAINABLE FUTURE June 25, 2013

City Council Special Meeting AGENDA ITEM NO. C.

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

Request for Statement of Interest in Implementation of the Roosevelt Road Redevelopment Plan

PLANNING ADVISORY BOARD AGENDA OCTOBER

Mississippi Drive Corridor Revitalization. A DestinationTransportation Project...

2040 LUP is a part of the Comprehensive Plan and carries the same legal authority. Economic Challenges

Windsor Locks Transit-Oriented Development Planning Grant Request. Project Background

13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154

Implementation Guide Comprehensive Plan City of Allen

Introduction. Chapter 1. Purpose of the Comprehensive Plan Plan Organization Planning Process & Community Input 1-1

City of Long Beach. creating vibrant and exciting places

Citizen Engagement for a Sustainable Built Environment

Project Goal. RRRC Living Towns Planning Workshp. Town of Halifax Revitalization Project. Dynamic Planning & Management Duo: July 12, 2006

D2 Subway Project Development. Public Meeting September 12, 2018

4/8/2015 Item #10D Page 1

North Fair Oaks Community Plan Summary and Information

Rio/29 Future Land Use Alternatives. Rio/29 Small Area Plan Phase 1 December 12, 2016

PLAN ELEMENTS WORKSHOP. April 5, 2016

SUBJECT: Proposed Downtown Mobility Hub Precinct Plan and Proposed Official Plan Policies

Mobility Districts and Traffic Studies

City of Tacoma Planning and Development Services

, C-MS I June 3, 2016 $1500 pd chk #216918

Draft Cary Community Plan Review Part 3: Shop, Engage, Serve, Special Area Plans, Other Updates. October 27, 2015 Police Department Training Room

WELCOME TO THE CHOUTEAU GREENWAY DESIGN, DEVELOPMENT AND CONSTRUCTION WORKING GROUP!

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC

ADAMS NORTH TECHNOLOGY CENTER JSP 17-40

T H A T E V E R Y O N E

Anatomy of A Vibrant Downtown. Anatomy of a Vibrant Downtown

TEMPLE MEDICAL & EDUCATION DISTRICT

38 Queen s University Campus Master Plan Part 1

12/9/2013. HOLLYWOOD/PINES CORRIDOR PROJECT AMPO 2013 Annual Conference October 24, Our Perspective. Broward.

Table L-1 Summary Action Strategy. Action Item Timing Status Responsible Agency

3 Vision and Goals. Vision and Goals. Blueprint for Bloomsburg. Vision. Town of Bloomsburg Comprehensive Plan,

Cobb County Design Guidelines Mableton Parkway & Veterans Memorial Highway Community Design Workshop January 12, 2017

K. SMART ASSOCIATES LIMITED

Railyard Alternatives and I-280 Boulevard Feasibility Study. MTA Board Meeting May 6, 2014

Sheridan Boulevard S TAT I O N A R E A P L A N S H E R I D A N B O U L E VA R D S TAT I O N A R E A P L A N

Steering Committee Meeting

Public input has been an important part of the plan development process.

Economic Development & Housing Council Committee Comprehensive Plan Update September 20, 2005

LAND USE ELEMENT. Purpose. General Goals & Policies

THAT the attached Terms of Reference for the Thornhill Centre Street Study be approved.

Town of Oakville Streetscape Strategy

July 12, Columbus City Council City Hall 90 West Broad Street Columbus, OH RE: I-70/71 Columbus Crossroads Project

Rio/29 Small Area Plan. Design Plan & Implementation Framework Open House - January 25, 2018

September 25th, 2018 $2000 fee pd CC

Public Art Guidelines And Public Art Donation Program

Public Workshop #2 Summary

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

University of the District of Columbia Van Ness Campus Master Plan Community Open House 3. December 8, 2010

Town of Westport. Design Guidelines Development Committee Public Informational Presentation

FLORIN ROAD CORRIDOR Site Plan and Design Review Guidelines Checklist

Transcription:

CITY of NOVI CITY COUNCIL Agenda Item P November 23, 2015 SUBJECT: Approval to expand the scope of the Master Plan for La nd Use Contract to include a study of entire Grand River Avenue corridor, including the area west of the Novi Roa d intersection to Twelve Mile Road/Wixom Road in an amount not to exceed $23,250. SUBMITTING DEPARTMENT: Community Development g._._v\) CITY MANAGER APPROVAL: ~ EXPEN DITURE REQUIRED $23,250 AMOUNT BU DGETED $ 121,280 ($77,700 PREVIOUSLY COMMITTED) APPROPRIATION REQUIRED $0 LI NE ITEM NUM BER 101-807.00-816.000 BACKGROUND INFORMATION: On June 8, the City Council approved a contract for professional services with Clearzoning to review the Master Plan for Land Use and to facilitate a Vision Plan, in an amount not to exceed $77,700. The amount that had been budgeted for the project was $125,000, but a very reasonable quote was received from Clearzoning that also met the expectations of the Request for Proposals (RFP). The review of the Master Plan for Land Use is underway: the Planning Commission's Master Plan and Zoning Committee has been reviewing information provided to date; a resident survey has been completed; a business survey currently underway; stakeholder meetings have been held; and an Open House was held in October to for additional public participation. In addition to a complete review and refresh of the Master Plan, the RFP called for: Market Analysis of Land Use Needs, Future Land Use Plan, Build-Out Analysis, and Public Participation components As originally requested and approved, a Corridor Plan for the Grand River Avenue is being prepared for the section of Grand River Avenue from the intersection at Novi Road extending east to Haggerty Road. The Corridor Plan is intended to identify and incorporate community character aspects, seek to promote economic vitality, and help to recognize opportunities for development and redevelopment throughout the study area. A key concept will be to identify opportunities for mixed-use development, consistent with the areas planned for Town Center and Gateway East. Pedestrianoriented and transit-oriented elements are being reviewed, taking into consideration the recommendations of the Town Center Area Plan. Following discussions with key stakeholders and business owners along the Grand River Avenue Corridor, including representatives of the Suburban Collection Showplace and the

Michigan State Fair, City staff and our consultants learned about potential investments and redevelopment activities that are on the drawing board and under discussion by these key property owners extending west from the Suburban Collection Showplace. It would make sense at this time for the Planning Commission to carefully review the entire Grand River corridor as a part of the Master Plan Review and Update in order to identify appropriate land uses, community character aspects, and economic development opportunities for the full length of Grand River in advance of reviewing the anticipated development plans. Extending the Corridor study west from Novi Road to the western City limits at Twelve Mile/Wixom Road, will allow the planning process to incorporate findings for this key area of the City in the 5- year planning process. The attached quote from Clearzoning indicates that with the additional 3.1 miles of study area added to Novi's total 5.2 mile long Grand River Avenue corridor, an additional $23,250 will be needed to complete the work, including participation from Grissim Metz (Planners and landscape architects) and the Chesapeake Group (marketing surveys and assessments). The core Town Center Area (near Grand River and Novi Road) was studied in detail in 2014, and the findings of that study will be incorporated in the Grand River Avenue Corridor Plan. RECOMMENDED ACTION: Approval to expand the scope of the Master Plan for Land Use Contract to include a study of entire Grand River A venue corridor, including the area west of the Novi Road intersection to Twelve Mile Road/Wixom Road in an amount not to exceed $23,250. Mayor Gatt Mayor ProTem Staudt Council Member Burke Council Member Casey 1 2 y N 1 2 y N Council Member Markham Council Member Mutch Council Member Wrobel

PROJECT AREA MAP EAST PORTION AS IDENTIFIED WEST PORTION - EXPANDED AREA OF STUDY

[---------. - - - ---- --------- - -- -. - - - - -- "' - ---- ----~. ~--~----- ----. --------- - ---~---- --.. -- - ---- -- ---- -- ---- - ----, 2015 Master Plan for Land Use Update ~.. Grand River Corridor Study: L_ocation... ~.,.,., l 0 Initial Study Area 0 Extended Study Area """' Freeway - Major Streets -Minor Streets -+Railroad "C 0::.II:: (,) Q) Ill MileRd.II:: (,) Q) Ill Nine Mile

INITIAL DESCRIPTION SCOPE OF WORK (EAST PORTION GRAND RIVER AVENUE)

SCOPE OF W Task 5 Assessment of Environment and Open Space; a. Review previous studies on the city's natural features and open space to understand the potential threats to these natural resources. b. Develop sustainable development policies and other strategies, such as the GMA program, "Less Maintenance by Design," described at left, aimed to limit the impact of development on the city's natural resources. Grisslm Metz Andriese developed an innovat1ve program called "Less Maintenance by Design." It Is a specialized landscape and Irrigation evaluation service that Is developed to promote site sustain ability and site maintenance cost savings. The objectives are to:./ Provide significant short and long term maintenance cost savings./ Maintain the brand Image as a benchmark of quality./ Enhance a site's Image, making it attractive to patrons, tenants and anchor stores as well as enhancing the community./ Promote the longevity and sustain ability of the landscape Investment./ Promote 'green' market-ability and visibility Task 6 Grand River Avenue Corridor Development: a. Assess the appearance and economic vitality of the corridor in terms of land use mix, streetscape, circulation jmotorized and non-motorized), and building appearance. b. Develop recommendations related to development and redevelopment opportunities, which may include mixed use and/or transit-oriented development. Include strategies to address vehicular and pedestrian circulation and design standards. Task 7 Redevelopment Strategy/Plan: a. Based on the existing conditions overview, market analysis, and public input, our team will assist the Planning Commlsslon in identifying and prioritizing sites, neighborhoods and/or districts that are ready for redevelopment, infill development, or adaptive reuse. b. Outline goals and Implementation strategies for the defined locations. Include lead groups and measurable milestones to track achievements. Task 8 Plan Preparatfon: a. Goals & Objectives. Based on the existing conditions overview and public input, our team will assist the Planning Commission in updating the Master Plan goals, policies, and objectives b. Develop a Future Land Use Plan Map and supporting recommendations based on the existing conditions analysis, public Input, and goals and objectives. A narrative of the Intent of each land use category will be provided In tabular form. Graphics and implementation details illustrating specific proposals will be included as appropriate. L

NG

c/earzoning November 16, 2015 Barb McBeth, Deputy Director Via email Barb, You requested that the Grand River study area be expanded from approximately 1.5 miles (our original scope) to 5.2 miles (the entire length within the City). The original Grand River Plan Element was budgeted at $14,000 or $9,333 per mile. Applying that same per mile rate would be $48,522. In this case, we believe the core Town Center area (roughly 0.6 miles) can be removed and there will be some economies of scale with the balance being added. So with 3.1 miles of additional study area in the total corridor, the additional cost will be $23,250.00 (3.1 X $7,500 per mile). This cost includes the participation of Grissim Metz and the Chesapeake Group. Please let me know if you have any questions. Thank you, Rod Arroyo, AICP President Clearzon i ng, Inc. 28021 Southfield Road, Lathrup Village, Ml 48076 www.cl earzoning.com