Final Land Use and Development Opportunities Report 5.0 Environmental Impact/Environmental Consequences

Similar documents
WESTSIDE SUBWAY EXTENSION August 13, 2010 Page 4-25

Table of Contents. Land Use and Development Opportunities Report Table of Contents

There are no buildings on the site, which is entirely paved. Buildings east of the site consist of one- to three-story industrial-type buildings.

WESTSIDE SUBWAY EXTENSION PROJECT. Addendum to the Visual and Aesthetic Impacts Technical Report

WESTSIDE SUBWAY EXTENSION. Visual and Aesthetics Impacts Technical Report

Archaeological Resources Supplemental Survey Technical Report

Crenshaw/LAX Transit Corridor Project

EXPO LINE COMMUNITY WORKSHOPS NOVEMBER 27 TH & DECEMBER 3 RD Los Angeles Department of City Planning

WILSHIRE. Community Plan

Final Environmental Impact Statement/Final Environment Impact Report Appendix K Responses to Comments Received

4. ENVIRONMENTAL IMPACT ANALYSIS 7. LAND USE AND PLANNING

TRANSIT NEIGHBORHOOD PLANS PROGRAM OVERVIEW

Corridor-Level Approaches to Creating Transit-Oriented Districts

Section Regulatory Framework/Methodology. Land Use and Development

Whittier Greenway Trail. Est. 2009

City of Los Angeles CALIFORNIA

The transportation system in a community is an

Right-of-Way Acquisitions and Relocations Technical Memorandum

IV. ENVIRONMENTAL IMPACT ANALYSIS H. LAND USE AND PLANNING

the avenues district streetscape master plan

CRENSHAW TRANSIT CORRIDOR DRAFT EIS/EIR Executive Summary SUMMARY OF IMPACTS. ES.16 Summary of Impacts. Page ES-41

WEST LOOP DESIGN GUIDELINES CHECKLIST

Fiscal Impact Statement: There is no General Fund impact as administrative costs are recovered through fees.

Eastside Transit Corridor Phase 2 Draft Environmental Impact Statement/ Environmental Impact Report APPENDIX N

1.0 PROJECT PURPOSE AND NEED

Appendix L 2006 LADOT Pedestrian and Traffic Counts

East Corridor Final Environmental Impact Statement

LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY (LACMTA)

5.9 LAND USE Existing Conditions Historic Land Use Trends Existing Land Use Distribution

5.4.6 Cumulative Operational Impacts

West Broadway Transit Study Initial Screening of Alternatives Memo

II. PROJECT DESCRIPTION

APPENDIX J SHPO COORDINATION

CHAPTER 7: Transportation, Mobility and Circulation

3.0 PROJECT DESCRIPTION

Table of Contents G.1.a Water Resources - Surface Water - Drainage

3.0 PROJECT DESCRIPTION

ENVIRONMENTAL IMPACT ANALYSIS A. AESTHETICS 1. INTRODUCTION

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

Expo Line Transit Project. Project Status Update Meeting West End Corridor Segment C

Appendix D Community Impact Assessment

4.0 AFFECTED ENVIRONMENT AND ENVIRONMENTAL CONSEQUENCES

Figure East End of 2 nd Street Tunnel

A community driven catalyst for an equitable, healthy, (economically viable and environmentally) sustainable corridor

Welcome. Comprehensive Plan & Transportation Plan Open House November 7, 2012

4.5 Land Use Environmental Setting

RECOMMENDATION REPORT

Urban Planning and Land Use

DOWNTOWN AREA PLAN. June 9, 2009

4.1 AESTHETICS INTRODUCTION METHODOLOGY

6.11 Land Use Introduction Regulatory Setting Regional Plans and Policies. Santa Clara Valley Transportation Authority

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT

BeltLine Corridor Environmental Study

Transit Oriented Development. PB PlaceMaking Group RTD Planning & Development Committee May 4, 2010

Eastern Terminus TECHNICAL MEMORANDUM CENTRAL BROWARD EAST-WEST TRANSIT ANALYSIS BROWARD COUNTY, FLORIDA

THE GREEN VISION WORKSHOP Friday, November 6, 2009

Metro Orange Line Extension Four Years Early and $61 Million Under Budget

I. INTRODUCTION. Project Background and Study Area

VISUAL RESOURCES 1. INTRODUCTION 2. EXISTING CONDITIONS. a. Visual Character

A. OVERVIEW OF ENVIRONMENTAL SETTING

STREET DESIGNATIONS AND STANDARD ROADWAY DIMENSIONS

Equity and Environmental Justice B. MINORITY, ELDERLY, AND LOW INCOME POPULATIONS IN THE STUDY AREA

Sheridan Boulevard S TAT I O N A R E A P L A N S H E R I D A N B O U L E VA R D S TAT I O N A R E A P L A N

1071 King Street West Zoning Amendment Application - Preliminary Report

Wilshire Non-Parcel Resources 01/26/15

TOD 101 CREATING LIVABLE COMMUNITIES WITH TRANSIT

DRAFT Land Use Chapter

New Rail Hubs along High Speed Rail Corridors The Urban Design Challenge

IV. ENVIRONMENTAL IMPACT ANALYSIS I. LAND USE PLANNING

Pine Island Road Corridor Master Plan

TOD IMPLEMENTATION BEST PRACTICE TOOLBOX Leveraging Transit for City Shaping

DRAFT Civic Center Station Area Plan. Executive Summary

4.1 LAND USE AND HOUSING

Wadsworth Boulevard S TAT I O N A R E A P L A N

Improving Communities Through the Arroyo Seco Sustainability Campaign and Watershed Assessment

We d like to thank you for attending this Wekiva Parkway Section 8 Preliminary Design Update hosted by the Florida Department of Transportation.

Stakeholders Advisory Working Groups (SAWGs) Smart Growth and TOD Land Use (#11) SAWG Meeting

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT-2

NOTICE OF PREPARATION

March 30, Keyes Van Nuys Honda Dealership Keyes Motor, Inc.

Final Environmental Impact Statement/Final Environment Impact Report Appendix K Responses to Comments Received

CHAPTER 1. Ms. Guajardo s Class - Central Elementary CH 1 1

Santa Monica Chamber of Commerce DSP Subcommittee s DSP EIR Scoping Comments and Preliminary Comments on the DSP Framework

Chapter 4. Linking Land Use with Transportation. Chapter 4

IV. ENVIRONMENTAL IMPACT ANALYSIS B. AESTHETICS 1. VIEWS

Transportation. Strategies for Action

APPENDIX D: BACKGROUND AND VISION

Appendix I-A3 DENAIR COMMUNITY PLAN

The River Future. San Gabriel River Confluence with Cattle Canyon Creek Improvements Project (the Cattle Canyon Project)

APPENDIX D: Visual and Aesthetic Conditions for NCCU Station Refinement. Durham-Orange Light Rail Transit Project

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

IV. ENVIRONMENTAL IMPACT ANALYSIS G. LAND USE

4 LAND USE DESIGNATIONS

Attachment D Eastside Transit Corridor Phase 2 Technical Study Route Options Screening Analysis and Community Outreach Executive Summary April 2017

Expo Light Rail Line. Expo Line Community Meeting Phase 2 Design Update November 2011

III. GENERAL DESCRIPTION OF ENVIRONMENTAL SETTING

Tyvola & Archdale Transit Station Area Plan. June 5, 2008

Table of Contents. Cultural Resources Technical Report Table of Contents

Tysons Circulator Study: Process and Preliminary Results Summary. March 2012

Isabel Neighborhood Plan: Alternatives

Transcription:

Figure 5-11. Wilshire/16th 1/4-Mile Station Area August 16, 2010 Page 5-27

Figure 5-12. Wilshire/4th 1/4-Mile Station Area August 16, 2010 Page 5-28

5.7 Alternative 4 Westwood/VA Hospital Extension Plus West Hollywood Extension This 14.06-mile alternative encompasses all of Alternative 2 (see Alternative 2 alignment description above), from the existing Metro Purple Line Wilshire/Western Station to Wilshire/VA Station, and an alignment that extends from the existing Metro Red Line Highland/Hollywood Station to the Wilshire/La Cienega Station of Alternative 1 (see description of the West Hollywood alignment below). The portion of this alternative that encompasses Alternative 2 follows the same alignment from Wilshire/Western to Wilshire/VA. All optional stations along Alternative 2 could be used for this alternative as well. In addition, this alternative includes the West Hollywood Extension, which extends from the existing Metro Red Line Highland/Hollywood Station. From a new station in this location (described below), this alignment extends southerly, centered under Highland Avenue, and continues south under Highland Avenue to just north of Lexington Avenue. At this point, the alignment curves to the southwest, traversing under properties and under Citrus Avenue, Mansfield Avenue, Orange Drive, and Sycamore Avenue. At the intersection of Sycamore Avenue and Santa Monica Boulevard, the alignment continues westerly under the center of Santa Monica Boulevard. The alignment continues centered under Santa Monica Boulevard to just east of the Santa Monica/San Vicente Boulevard intersection. From this intersection, the alignment curves south and is centered under San Vicente Boulevard to Melrose Avenue. It then continues southward in a straightened alignment under a curving San Vicente Boulevard, paralleling Sherbourne Drive, crossing under Beverly Boulevard, and is then centered under San Vicente Boulevard again where it stays under the center of San Vicente and crosses under La Cienega Boulevard. Just past La Cienega Boulevard, at Hamilton Drive, the alignment curves south and then southwesterly to cross under La Cienega Boulevard and Le Doux Road, to the Wilshire Alignment (Alternative 1). 5.7.1 Regional Land Use and Development Similar to Alternatives 1 through 3, the Westwood/UCLA Extension Plus West Hollywood Extension Alternative could have an indirect role in the pattern of growth and development within the study area by making those areas around the stations attractive as transit-oriented type development. In general, growth is constrained by access and circulation as well as land use controls within the Westside Corridor. The existing transportation network is constrained by the high volume of automobiles that are attracted to this job rich area. Alternative 4 would provide an alternative mode of access and circulation. As a result future development in the Westside Corridor could occur in the form of transit-supportive land uses along the Wilshire and Santa Monica Boulevard Corridors, and in particular, within a 1/4-mile radius from stations. SCAG forecasts 3,273 new housing units and 3,933 new jobs for the proposed station areas (1/4-mile radius) identified under Alternative 4. This represents two percent of the new housing units and one percent of the new jobs within the Westside Corridor. The proposed project would serve the corridor by providing a linkage to the larger regional transportation network and expanded travel options and reduced congestion. The project would not affect land use compatibility at the regional level. August 16, 2010 Page 5-29

Therefore, no direct or indirect adverse effects associated with regional land use would result. 5.7.2 Local Land Use and Development 5.7.2.1 Division of an Established Community Direct Impacts Under the Alternative 4, the rail system would be fully underground and would not introduce any physical barriers that could divide a community. Planned development and redevelopment near station portals would adhere to local zoning ordinances and would not likely be to introduce barriers which would alter or divide the existing community. The additional segment in Alternative 4 would connect Hollywood and West Hollywood with neighboring communities along the Wilshire Corridor. Thus, Alternative 4 would not result in direct adverse effects related to the division of an established community. Indirect Impacts Similar to Alternatives 1 through 3, Alternative 4 would not introduce any new barriers which could divide the community. Stations and station area development would enhance circulation and connectivity resulting in more unification of the existing community. Thus, Alternative 4 would not result in indirect adverse effects related to the division of an established community. Applicable Land Use Policies Table 5-5 provides a discussion of additional related local land use policies involving the City of West Hollywood and community of Hollywood. Policies listed in Table 5-1 would also apply to Alternative 4. Alternative 4 would be consistent with the goals and policies of the applicable jurisdictions along the alignment. Alternative 4 would reduce automobile usage, provide opportunity for joint development and cooperation, enhance regional connectivity, minimize environmental impacts, and maximize transit ridership. Therefore, Alternative 4 would be consistent with applicable local land use policies and no adverse effects would result. 5.7.3 Adjacent or Surrounding Land Uses Figure 5-13 through Figure 5-17 show the surrounding land uses within a 1/4-mile of the additional proposed station areas under Alternative 4. 5.7.3.1 Direct Impacts The additional proposed stations under Alternative 4 would occur along an existing transit route and would not introduce a new land use type into the area. Figure 5-13 through Figure 5-17 show that the proposed stations would be located in vibrant areas developed with a mix of commercial, office, and residential land uses. Station portals located in or adjacent to open plazas will be integrated into current and future developments. This mix of uses would be compatible with a transit system and the proposed stations identified under Alternative 4 would not result in direct adverse effects associated with land use compatibility. 5.7.3.2 Indirect Impacts The proposed stations under Alternative 4 may provide an opportunity for transit-supportive development. Initial development opportunities would be limited to vacant parcels and August 16, 2010 Page 5-30

parking lots. Under Alternative 4, approximately 18 parcels would be acquired by Metro for construction staging and equipment storage; however no substantial property acquisition would occur at the five additional stations in Alternative 4. As shown in Figure 5-13 through Figure 5-17 the potential for development at these stations is limited. The areas with the most vacant parcels are at Santa Monica/La Brea and Santa Monica/San Vicente. The areas with the least restrictive land use controls are at the Santa Monica/La Brea and Hollywood/Highland Stations. These areas could provide the highest potential for transit oriented development. The SCAG growth projections for this segment are low compared to the rest of the Corridor. The transit oriented development that could occur as a result of the proposed project is anticipated to be consistent with current growth projections and would not significantly alter the composition and character of existing land uses. Therefore, Alternative 4 would not result in indirect adverse effects associated with land use compatibility. 5.7.4 Mitigation Measures Alternative 4 would not result in direct or indirect adverse effects related to land use, and no mitigation measures are necessary. Table 5-5. Additional Goals and Policy Consistency for Alternative 4 Goal and Policy Cooperation and Joint Development Opportunities Continue to coordinate with SCRTD, LACTC, (Metro) and other regional transit agencies to serve residents and users to West Hollywood and to assess the need for the expansion or adjustment of fixed-route service Maximize Ridership Through Design and Location Continue planning and improving the public transportation system for the community, including people-mover systems in high intensity areas as well as the proposed Metro rail system Jurisdiction Identifying Policy City of West Hollywood General Plan Hollywood Community Plan Source: Cities of Los Angeles, West Hollywood, and Beverly Hills, 2009. Discussion Metro is the lead agency for the proposed project and has had extensive coordination with the City of West Hollywood in the planning and design of the expansion of the existing fixed route system. Alternative 4 would significantly improve the existing fixed guideway system and establishes a foundational base on which to build upon in the future. August 16, 2010 Page 5-31

Figure 5-13. Hollywood Highland 1/4-Mile Station Area August 16, 2010 Page 5-32

Figure 5-14. Santa Monica/La Brea 1/4-Mile Station Area August 16, 2010 Page 5-33

Figure 5-15. Santa Monica/Fairfax 1/4-Mile Station Area August 16, 2010 Page 5-34