UNIVERSITY OF OREGON OREGON BACH FESTIVAL CPC Presentation February 11, 2016

Similar documents
Office of Campus Planning. Subject: Campus Planning Committee Meeting, November 16, 2015

Office of Campus Planning. Subject: Campus Planning Committee Meeting, February 11, 2016

STORMWATER TOOL BOX 4.1

REBUILD GUTTER AND ROLLED CURB TO MATCH EXISTING DETAIL. (TYPICAL) REPAIR EXISTING BENCH FINISH. RETURN TO EXISTING LOCATIONS.

Landscape and Streetscape Design 2.5

CAMPUS MASTER PLAN DRAFT PLAN UPDATE JANUARY

SOUTH UNIVERSITY Street Design Setting a Direction for Schematic Design

ATLAS, NEWCASTLE. (SP)A004 Scale ATLAS CONCEPT DESIGN FOR OCCUPANCY ARCHITECTURE, LLC. MATT KIRKPATRICK 1705 SE ASH STREET CONCEPT PAGE

A PATTERN LANGUAGE (Christopher Alexander) List of Patterns 1. INDEPENDENT REGIONS 2. THE DISTRIBUTION OF TOWNS 3. CITY COUNTRY FINGERS

CAMPUS DESIGN GUIDELINES

OVERLAKE VILLAGE STATION

EXISTING CONDITIONS. Bellevue College Fountain Renovation

VEHICULAR AND PEDESTRIAN CIRCULATION

FREEWAY/TOURIST DISTRICT

DESIGN GUIDELINES. Seattle Children s Major Institution Master Plan. Approved May 7, 2010

Michigan State University Barrier-Free/Accessibility Project Status Summary March 2017

City of Lafayette Staff Report Design Review Commission

RA1.01. Project Description:

FRAMEWORK OF DESIGN REVIEW:

SOUTH UNIVERSITY Street Design Alternatives in Progress

Rocky Mountain Public Media

CAMPUS PLANNING COMMITTEE STAFF REPORT SAMARITAN SPORTS MEDICINE INSTITUTE AT OSU 10/21/2013

WELCOME TO FINAL DESIGN

AIA Albuquerque 2016 Design Awards

Planning Board Hearing October 20th, 2016

Chapter 4: Jordan Road Character District

3. Flexibility of changing use of technology needs should be an integral part of the design of learning spaces. Walls that are easily reconfigured.

Stanford Memorial Grove Inventory, as of 01/20/ Trees originally were planted at 72 sites (sites had multiple names/programs).

PUBLIC RIGHT-OF-WAY IN THIS CHAPTER PUBLIC REALM


Presentation of Concept Design to Parish 29 January 2017 ST. PETER S PARISH HOUSE

Village of Pemberton DOWNTOWN ENHANCEMENT INITIATIVE FRONTIER STREET PILOT PROJECT WE NEED YOUR HELP TO REVIEW THE PLAN

ROCHESTER INSTITUTE OF TECHNOLOGY Active Transportation Improvements 2010

Dudley Branch Library Renovations

SFMTA PHELAN LOOP AND PUBLIC PLAZA PHELAN OCEAN AVENUE

U n i v e r s i t y o f S o u t h C a r o l i n a A i k e n. Land Plan Study

Design Considerations

INSTITUTIONAL USE DESIGN COMPATIBILITY TECHNIQUES

tarleton oak Board of Architectural Review Original Submission Date: April 24, 2018 (Phase I & II) Resubmission Date: June 26, 2018 (Phase II Only)

130TH STATION: NEIGHBORHOOD CONTEXT PLAN

Record of the March 7, 2011 Campus Planning Committee Meeting

November 21, Planning Commission Charter Township of Lyon Grand River Ave. New Hudson, MI 48165

3.13. Development Guidelines

192nd Ave NE Corridor Design Requirements

HOOVER-UNION TRIANGLE

Centennial Hall Planning Comments Public Meetings, 9/19/2011. General Comments

Gerlinger Field Green (x)

public review draft Key objectives for this chapter are:

MEMO 1. INTRODUCTION PURPOSE & PROCESS REQUEST

\\ Comprehensive Facilities Master Plan. Design Guidelines

V. Gateways GATEWAYS / V-1

Campus Outdoor Lighting Plan

CONTEXT + PROGRAM. CONTEXT - Site Photos RIALTO THEATRE STATION DEPOT HOTEL CONGRESS GREYHOUND SITE 4TH AVENUE BROADWAY BOULEVARD

Jewel. Platte. of the. Plattsmouth Main Street Landscape Architecture by HDR

BUSINESS DISTRICT DESIGN GUIDELINES

EXISTING CONDITIONS 41. Existing Conditions

CITY OF MERCER ISLAND DESIGN COMMISSION STAFF REPORT

CENTERS AND CORRIDORS

Dowdy Park. Concept Plans TOWN OF NAGS HEAD NORTH CAROLINA. Developed by: Albemarle & Associates, Ltd VHB/ Vanasse Hangen Brustlin, Inc.

EXTENDING THE ACADEMIC CAMPUS University Street Feasibility Study

Town Center Design Guidelines

EXISTING CONDITIONS SUMMARY

3.0 master plan concept

1999 Approval to replace World War I monument and relocate plaques Approval to rehabilitate the Chase Mill building and surrounding site

University of Saskatchewan CAMPUS MASTER PLAN. Senate Meeting Preliminary Presentation. April 21, 2018 DIALOG ECS DA WATT

Gateway commercial MIXED USE MASTER SITE PLAN. CITILAND AIrDRIE GATEWAY VENTURE INC. airdrie GATEWAY COMMERCE CENTRE. airdrie, ALBERTA FEBRUARY 2012

URBAN DESIGN PEER REVIEW PANEL MINUTES

Arterial Mainstreets ottawa.ca

Harmony Technology Park Third Filing, Second Replat Custom Blending, Project Development Plan/Final Development Plan - FDP #130021

C a m p u s I d e n t i t y

Chapter 5: Mixed Use Neighborhood Character District

University of Washington

Division VI Community Mixed Use (CMU) Architectural Guidelines and Standards

Long Branch-Wayne Local Park Renovation Project

30% DRAFT GAINSBORO PARK IMPROVEMENT PROJECT THE CITY OF PLEASANT RIDGE CITY OF PLEASANT RIDGE, OAKLAND COUNTY, MICHIGAN

built form design guidelines

Reconnecting to a Forgotten River St. Cloud MN. Aaron Hanson Design Design Thesis LA 572, Thesis, Spring 2012

Standards (R-3) Figure B-11: R-3 Residential Standards Exhibit

Campus Master Plan Description Section 6 Storm water management and people places at campus buildings. Section 6 Campus MP Description

A detailed Access Guide to The Iron Bridge & Tollhouse

Cit of Kitchener Ur 6 an Design Manual PARTA. Desi n for _--::

lot flankage Y street 16m 6m landscape strip for large site 3m landscape strip for small medium site

18 May 2016 CAMPUS MASTER PLAN UPATE

BELLEVUE COLLEGE Campus Master Plan February 29, 2016 (Space Needs Updated on 04/13/2016) Bellevue College Campus Master Plan April 13, :08 PM

I. VISUAL/AESTHETICS/NEIGHBORHOOD CHARACTER. b. Existing Conditions Views from Kimball Avenue

FRUITVALE TRANSIT VILLAGE (Phase 2) Residential Project

Maplewood Avenue Downtown Complete Street Project

ATTACHMENT 9 DRC DESIGN REVIEW COMMITTEE SUMMARIES: PRELIMINARY DESIGN REVIEW Page 1 of 8

R STREET CORRIDOR NEIGHBORHOOD Site Plan and Design Review Supplemental Guidelines Checklist

LANDSCAPE PLAN - GROUND

IV.63 Heritage Landscapes LLC, Preservation Landscape Architect & Planners

Table of Contents. Elm Avenue Improvement Plan City of Waco, Texas. Introduction 1. Existing Context 1 Figure 1 2.

LOS ANGELES MISSION COLLEGE MASTER PLAN Master Plan DESIGN & DEVELOPMENT PRINCIPLES

Arboretum Design Guidelines University of Illinois Arboretum. Prepared by Sasaki Associates, Inc

SMALL LOT DESIGN STANDARDS. An Illustrated Working Draft for Test Implementation

campus master plan VIRGINIA STATE UNIVERSITY

FROST CAMPUS MASTER PLAN SIR SANDFORD FLEMING COLLEGE

Carlsbad Village Redevelopment Concept Summary of Features

ARCHITECTURAL REVIEW BOARD SUPPLEMENTAL PACKAGE 3402 PICO BLVD SANTA MONICA, CA APRIL 10, 2017

FLORIDA STATE UNIVERSITY MASTER PLAN 3 Urban Design

Transcription:

UNIVERSITY OF OREGON OREGON BACH FESTIVAL CPC Presentation February 11, 2016

LARGE SCALE CAMPUS TRANSPORTATION SITE ARRANGEMENT BUILDING DESIGN Campus Trees Good Neighbor Main Gateways Open-Space Framework Open University Outdoor Classroom Sustainable Development Universal Access Welcoming To All Bike Paths, Racks, And Lockers Local Transportation Area Looped Local Roads Paths And Goals Pedestrian Pathways Peripheral Parking Shielded Parking And Service Areas Spillover Parking Road Crossings Activity Nodes Building Complex Connected Buildings Existing Uses / Replacement Family Of Entrances Main Building Entrance Positive Outdoor Space Public Outdoor Room Quiet Backs Seat Spots Site Repair Sitting Wall South Facing Outdoors Tree Places Use Wisely What We Have Four-Story Limit Architectural Style Operable Windows Flexible and Longevity Future Expansion Wholeness of Project Wings of Light Quality of Light Organizational Clarity Building Hearth Office Connections Public Gradient Fabric of Departments No Signs Needed Faculty-Student Mix Places to Wait Enough Storage Building Character and Campus Context Arcades Pools of Light Materials and Operations CAMPUS PATTERNS

History and Identity Gateway to Campus A Front Door Series of Outdoor Courtyards A Building Within a Building Within a Complex PROJECT SPECIFIC PATTERNS

pathways campus edges ALDER STREET CAMPUS EDGE HEDCO EDUCATION BUILDING CLINICAL SERVICES BUILDING SOUTHWEST CAMPUS AXIS DESIGINATED OPEN SPACE BEALL CONCERT HALL SCHOOL OF MUSIC AND DANCE designated open space project site PIONEER CEMETERY OBF PROJECT SITE KINCAID CAMPUS EDGE E 18th AVE HARRIS Oregon PROJECT Bach NAME Festival 0' 15' 30' 60' 120' N PROPOSED SITE SITE PLAN - CONTEXTUAL 0' 15' 30' 60' 120' OREGON BACH FESTIVAL DATE Exhibit P-100 N

BIKE PARKING (20) Uncovered spaces LEGEND PROPERTY LINE EXISTING CONIFEROUS TREES To remain, Typ. EXISTING TREES TO REMAIN SCHOOL OF MUSIC AND DANCE BENCH, Typ. STORMWATER PLANTER COVERED BIKE PARKING (32) Covered Spaces REHEARSAL COURTYARD EXISTING PAVING To remain. PROPOSED DECIDUOUS TREES PROPOSED CONIFEROUS TREES PEDESTRIAN LIGHT POLE CAMPUS STANDARD, Typ. EVERGREEN SCREEN TREE GRATE STORMWATER PLANTER HVAC UNIT PEDESTRIAN LIGHT POLE NORTHWEST COURTYARD EVERGREEN SCREEN 12 PARKING SPACES (2 ADA) EUGENE PIONEER CEMETERY RETAINING WALL BIKE PARKING BENCH CONCRETE WALK TRANSFORMERS ASPHALT PAVING EVERGREEN SCREEN PLANT BED STORMWATER PLANTER PROPERTY LINE BIKE PARKING (6) Uncovered spaces STORMWATER PLANTER BUILDING SIGNAGE BIKE PARKING (6) Uncovered spaces TREE GRATE, Typ. EXISTING WHITE OAK TREE To remain. R I S S T PREVIOUS SITE PLAN

PREVIOUS CPC COMMENTS REGARDING SITE DESIGN: Consider extending the concrete paving across the driveway to emphasize the pedestrian experience. Consider simplifying the route from the east to the courtyard so that pedestrians are not going up and down stairs unnecessarily. Attempt to maximize the effective size of the courtyard by reconsidering the position of the ramp. Take into consideration the need to move instruments through the courtyard. Pay close attention to the quality of the pedestrian experience on the north-south pathway through the site.

PROPOSED SITE PLAN

Landscape

NATIVE Native Trees TREES Doug Fir Pacific Dogwood TREES Trees FOR for STORMWATER Stormwater Planters PLATERS California Incense Cedar Persian Parrotia River Birch Katsura TREES Trees for ON 18th 18TH Amelanchier Vine Maple Rocky Mountain Maple Pyramidal European Hornbeam Seven Sons Tree Columnar Tulip Tree Stewartia

URBAN Urban Edge EDGE MASSINGS Massings

CEMETERY Cemetary Edge PLANTING STORMWATER Stormwater PLANTERS Planters NORTH GREENROOF North WALL Greenroof AND Wall HVAC and SCREENING HVAC Screening CAMAS Camas at AT White WHITE Oak OAK Tree TREE

COURTYARD Cloister Courtyard REHEARSAL Small ROOM Northern GARDENCourtyard

Malus tschonoskii Upright Crabapple Stewartia japonica Japanese Stewartia Cornus 'Eddie's White Wonder' Eddie's White Wonder Dogwood Styrax japonicus Japanese Snowbell

LANDSCAPE SEGMENTAL RETAINING WALLS

SOUTH ELEVATION - PREVIOUS VIEW FROM 18th AVE

SOUTH ELEVATION - PREVIOUS VIEW FROM 18th AVE

MAIN ENTRY OFF 18th AVE - PREVIOUS

MAIN ENTRY OFF 18th AVE

SOUTH-WEST CORNER ALONG 18th AVE - PREVIOUS

SOUTH-WEST CORNER ALONG 18th AVE

OBF COURTYARD VIEW FROM THE NORTH-WEST - PREVIOUS

OBF COURTYARD VIEW FROM THE NORTH-WEST

End