Appendix 29. Mount Emerald Wind Farm Fire Management Plan Prepared by RATCH Australia Corporation Limited

Similar documents
Well managed building mean risk is normal. Fire action notices should be displayed by all alarm break glass call points.

Rural Fire Management Manual for UQ Gatton Campus

1970s building housing main school reception and support offices. Well managed buildings with no significant risk of a fire occurring.

BUSHFIRE MANAGEMENT PLAN (BMP)

UNCONTROLLED IF PRINTED. Issued with the authority of the Chief Commissioner and General Manager of Scouts Australia NSW

Appendix J Framework Fire Prevention and Suppression Plan. Prepared by Idaho Power Company 1221 W Idaho Street Boise, ID 83702

FIRE SAFETY POLICY & EMERGENCY EVACUATION POLICY

EMLC Academy Trust. Fire Safety Policy 2017/19. Every child deserves to be the best they can be

Practical guide to rural fire. Put fire safety into your plan

Environmental Management System

FIRE SAFETY & EMERGENCY EVACUATION STRATEGY AND POLICY

Project: Location: Date Prepared: Last Reviewed:

NITOL INSURANCE COMPANY LIMITED

Fire Risk Assessment

Fire Safety Management

H&S Forum. Fire Safety Policy Glascote Academy

Farm Fire Safety. The number of farm fires is on the increase - don t let your farm become a statistic! Working to protect. Acting to save.

To: All SAAS Accredited Certification Bodies Subject: Clarification to Emergency and Health & Safety Requirements in the SA8000 Standard

Plan GRAND RENEWABLE WIND LP HALDIMAND COUNTY ONTARIO AUG 26, 2013

Fire Prevention Plan for St. Barbara Hall 3904 Winding Way

Open Burning Permit Program Reference Manual

Fire Safety Procedures & Risk Assessment Policy

Appendix U.1 Bushfire Management Plan September 2011

Contractor Worksheet Underground Fires Major Hazard Standard

HEALTH AND SAFETY FIRE SAFETY POLICY Putnoe Primary School

Millfield Schools Fire Risk Prevention Policy

GENERAL - Regulatory. Fire Policy, Risk Assessment and Prevention (ISI 12a) Fire Procedures (ISI 12b)

Fire Safety, Procedures and Risk Assessment Policy

NOT PROTECTIVELY MARKED. Fire Legislation

Landscaping Management Plan. Woodlawn Mechanical Biological Treatment Facility. Veolia Environmental Services Australia Pty Ltd

Local Rules: Fire Safety

Fire Safety Policy. Investing in success. Dukes Centre Dukes Avenue Kingston KT2 5QY 1. Policy

HOW TO GET YOUR SCHEME APPROVED

EXAMPLE FIRE PREVENTION AND PROTECTION PLAN WORKSHEET

Fire Safety Policy. (The Regulatory Reform (Fire Safety) Order 2005) Last Reviewed: January Next Review: January 2019

FIRE SAFETY POLICY LEEDS METHODIST MISSION. Oxford Place Centre

Fire Prevention Plan for Residence Life 1625 Musketeer Drive

KING S HOUSE SCHOOL FIRE RISK MANAGEMENT POLICY & PROCEDURES

Fire Risk Assessment. Guidance Notes. Location details. Risk Rating. Assessors. General notes

109 Bushfire Plan - Public BUSHFIRE PLAN

FIRE RISK ASSESSMENT Self Assessment

Fire Protection. A Health and Safety Guideline for Your Workplace. Introduction. Fire Prevention and Control. Workplace Assessment

FIRE RISK ASSESSMENT

GHS 8-4 Fire Policy and Procedures

Fire Safety Management Policy. This plan should be read in conjunction with the Health and Safety Policy.

Slight Harm Moderate Harm Extreme Harm Low Trivial Risk Tolerable Risk Moderate Risk Medium Tolerable Risk Moderate Risk Substantial Risk

Appendix H Trans Mountain Tank Farm Fire Protection Meeting INTER OFFICE MEMORANDUM

KRISHNAMURTI FOUNDATION TRUST FIRE SAFETY POLICY. Last Review Date 30 June Next review date 30 August Health and Safety Officer

Fire Safety Plan (FSP) Review Checklist 1

Fire Safety Plan (FSP) Review Checklist 1

in Major Countries (Table 1-1) The Official Name of the Country England Germany France America Korea China United Kingdom of Great Britain and Norther

Fire risk management plan. MH/05/Revised/06/17

PASCOE S PTY LTD EMERGENCY RESPONSE MANUAL. (Public Version) SOP 517. July 2015

Fire Safety Policy. Document Author: Director of Estates, Fleet & Facilities Management

APPENDIX D Inspection Check List for Chartering Non-UNOLS Vessels

FIRE & EVACUATION PLAN PARADISE LOST

BOCO ROCK WIND FARM ENVIRONMENTAL ASSESSMENT VOL APPENDIX 20. Boco Rock Wind Farm Bushfire Emergency and Evacuation Plan

Fire Prevention Plan for Bellarmine Parish Center 3832 Ledgewood Avenue

GREAT DENHAM PRIMARY SCHOOL FIRE SAFETY POLICY September 2017

Fire safety procedure

Fire Prevention Plan for Alter Hall 3743 Ledgewood Drive

Steritech Wetherill Park Pollution Incident Response Management Plan (PIRMP) Steritech Pty Ltd. Pollution Incident Response Management Plan (PIRMP)

- CONSTRUCTION FIRE SAFETY STANDARDS

FIRE PROCEDURES 1. APPOINTMENTS

CONTRACTOR GUIDELINES

Fire Safety. A TUC guide for trade union activists

FORM MUST BE SIGNED AND RETURNED FOR VENDOR PARTICIPATION

MistMax Pro; A WaterMist fire skid designed for your UTV or smaller fire fighting vehicle. TM TM

Contents HEALTH AND SAFETY MANAGEMENT SYSTEMS FIRE PREVENTION AND EVACUATION PROCEDURE. 1. Introduction. 2. Warning in the event of fire

Fire Prevention Plan for Campus Services Building 1630 Musketeer Drive

Steritech Pty Ltd. Pollution Incident Response Management Plan (PIRMP) WETHERILL PARK Environment Protection Licence No

FIRE SAFETY PLAN. Ceramics/Sculpture Building 47 Service Rd 1 S Winnipeg, MANITOBA. May / Prepared by: Chris Pancoe

Fire Safety Protocol

protection community A Fire Force

Fire Safety Policy 29/09/2017. Holme Grange School Whole School Policy Including EYFS. Fire Safety Policy

Fire Safety Policy 2018/19

Fire Safety Policy. Billy Hanafin H & S and Operations Officer. Fife Cultural Trust. Version 1.0 October 2013 Page 1

Fire Safety Policy and Procedures

Tuition, Medical and Behaviour Support Service

FIRE SAFETY MANAGEMENT PLAN

Sydney Ship Repair & Engineering Pty Ltd. Emergency Pollution Incident Response Management Plan

Chapter 8: Cultural Heritage Assessment

FIRE PREVENTION, PROCEDURES AND RISK ASSESSMENT POLICY

161 Rosebery Avenue, London, EC1 Fire Safety Management Plan & Evacuation Procedures

FIRE SAFETY MANAGEMENT PLANS DEVELOPMENT GUIDE A GUIDE TO DEVELOPING

Genex Kidston Connection Project: Draf t Environmental Assessment Report Powerlink Queensland

Appendix D Fire Safety Requirements

Fire. This policy applies to all members of our school community, including those within the EYFS setting.

Level 2 Award in Fire Safety (QCF) (SCQF Level 5 in Scotland) Unit 1 title: Fire safety principles

SEABANK 3. Interim Landscape and Design Statement

AFEC FIRE ENGINEERING TEMPLATE FOR CLIENTS INTERNALLY COMPLETED RISK ASSESMENT

CAPE BYRON RUDOLF STEINER SCHOOL

Landscape Management Plan. South Keswick Solar Farm

CITY OF MOUNT GAMBIER BUILDING FIRE SAFETY COMMITTEE

St. Vincent s Health System Page 1 of 6

Xavier Field Office Fire Prevention Plan. for. Xavier Field Office Dana Avenue

REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE EMERGENCY PLAN

Fire Safety. Presenter, Kevin V Coleman September 14 th 2016

Fire Prevention Plan for

"EVACUATION PROCEDURES"

Transcription:

Mount Emerald Wind Farm, Herberton Range North Queensland Environmental Impact Statement Volume 3 Appendix 29 Mount Emerald Wind Farm Fire Management Plan Prepared by RATCH Australia Corporation Limited PR100246 / R72894; Volume 3 Final November 2014

REVISION 2 July 2013

REVISION PREPARED REVIEWED STATUS Revision 1 Terry Johannesen 13 Feb 2012 Draft Revision 2 Terry Johannesen 20 Jul 2013

TABLE OF CONTENTS 1 EXECUTIVE SUMMARY... 4 1.1 Overview... 4 1.2 Existing Site Conditions... 4 1.3 Climatic conditions... 4 1.4 Risk... 4 1.5 Management Plans... 5 2 DESIGN PHASE... 5 3 CONSTRUCTION PHASE... 5 3.1 Inductions and Training... 5 3.2 Site Layout... 5 3.3 Vehicles... 6 3.4 Fire Fighting Facilities... 6 3.5 Signage... 7 3.6 Hot Work Permits... 7 3.7 Smoking... 7 3.8 Emergency response Plan... 7 4 OPERATIONS PHASE... 7 4.1 Inductions and Training... 7 4.2 Site Layout... 8 4.3 Vehicles... 8 4.4 Fire Fighting Facilities... 8 4.5 Signage... 9 4.6 Hot Work Permits... 9 4.7 Smoking... 9 4.8 Emergency response Plan... 9 4.9 Fluid Store... 9 APPENDIX 1 INTERIM SITE PLAN... 10 Appendix 30 20130720 Fire Management Plan - Draft Page 3 of 10

1 EXECUTIVE SUMMARY 1.1 OVERVIEW MOUNT EMERALD WIND FARM The Fire Management Plan has been prepared to overview the approach to fire management during the Design, Construction and Operations Phases. 1.2 EXISTING SITE CONDITIONS The site is situated at the northern most end of the Herberton Range, which forms part of the Great Dividing Range between the natural landmarks of Walsh Bluff and Mount Emerald, at a range of elevations between 750 to 1000 metres. The land is dominated by of a series of three, approximately parallel ridges running in a south-east to north-west direction with a large area (~500 ha) of relatively flat country located in the north-western section. The property is currently accessed via a 4WD only track which follows the path of a transmission line (Powerlink - Chulumbin to Woree 275kV) that roughly dissects the property. Two other vehicle tracks, branch from this track to access the northern and southern areas of the site. The site is not currently grazed by domestic stock and consists entirely of remnant vegetation which can be described as relatively low open scrubland. 1.3 CLIMATIC CONDITIONS The climate of the site as indicated by the long-term weather records obtained for the nearby township of Walkamin is monsoonal, with alternating wet and dry seasons that typically last for 4 and 8 months respectively (Weatherzone, 2011), although this can vary considerably depending on the severity of the El Nino/Southern Oscillation. Statistics obtained for the nearby Bureau of Meteorology site at Mareeba Airport show a maximum temperature range from 19 O C in June to 39 O C in November whilst minimums range from 4 O C in July to 24 O C in November. Average annual rainfall is 1032mm with the wettest month being February (250mm) and the driest month September (8mm). The majority of rainfall (80%) falls within the months of December to March. 1.4 RISK The risk of a wind turbine catching fire is considered low. The greater risk is from fire during construction or a grass or bush fire entering the site. Key aspects which will minimise the risk of fire include: A well designed and constructed road network through out the site. Personnel on site who understand how to respond quickly to a fire and use the equipment available on site. Appendix 30 20130720 Fire Management Plan - Draft Page 4 of 10

Accessible sources of water. Adequate fire fighting facilities. 1.5 MANAGEMENT PLANS The Health and Safety Management Plan and the Emergency Response Plan will be developed and will be ready for implementation during the Construction Phase. 2 DESIGN PHASE The Design Phase of the wind farm will initially involve siting the wind turbine generators (WTGs) and other associated infrastructure. WTGs will generally be placed in cleared areas on ridge lines and spurs. A network of high quality gravel roads suitable for large truck movements will interconnect the WTGs. The design of this road network will occur during the Design Phase. Since the WTGs, roads and hardstands are located on cleared portions of the site, there is minimal fuel to feed a fire. The site road network does provide some form of fire break. Road designs (generally 10m wide) will be suitable for regular large and heavy loads, travelling in both directions at the same time. Road gradients and cross falls will be suitable for large loads. Site plans will locate water troughs, tanks, dams, and any other sources of water. A copy of the interim Site Plan is included in Appendix 1. 3 CONSTRUCTION PHASE 3.1 INDUCTIONS AND TRAINING All personnel and visitors onto the site will be required to attend an induction when they first arrive on site. Part of this induction will include aspects of the Fire Management Plan. The District Fire Warden will be invited to attend a Toolbox talk at the beginning of the dry season (April/May) with follow up refresher presentations conducted throughout the construction of the Project. Representatives from each major contractor will be shown how to use the fire fighting equipment on the back of project vehicles. Inductions will also address the smoking policy on site, emergency phone numbers, aspects of the Crisis Management Plan and the muster area. 3.2 SITE LAYOUT The District Fire Warden will be taken on regular site tours and provided with site plans showing the project infrastructure such as WTGs, roads, main compound and substation. GPS locations will be provided for all WTGs and water sources such as troughs, dams and tanks. Appendix 30 20130720 Fire Management Plan - Draft Page 5 of 10

The major road in the area is the Kennedy Highway which links the towns of Mareeba, Walkamin, Tolga and Atherton. Road access to site from the Kennedy Highway will be via Hansen Road - Springmount Road Kippin Drive. The project area is contained within Rural Fire Brigade zone of the Springmount District Fire Warden, and shares boundaries with Atherton (east), Walkamin (north-east), Narcotic Creek (north) and Arriga (north-west). The site is located within the following road distances to local fire and rescue services; Mareeba 28km Atherton 30km Dimbulah 48km All site roads and hardstands will be maintained in good condition and can act as firebreaks. 3.3 VEHICLES Diesel powered vehicles shall be used on site and petrol driven vehicles shall only be used if fitted with spark arrestors. Vehicles shall be driven on formed roads and surfaces wherever possible to avoid the collection of debris under the vehicle that may cause a fire to start. All project vehicles will contain a fire extinguisher and CB radios. The two project utilities from the Contractors will be fitted with a water tank, diesel pump, 30m fire hose and a knapsack spray. 3.4 FIRE FIGHTING FACILITIES The main compound will contain a water tank (approx. 50,000 litres capacity) collecting water from the buildings in the compound. The tank will be fitted with outlets allowing fire trucks to connect to the tank. Should the water level drop below a set point a water truck will deliver water to the tank. Adjacent to the water tank will be a fire hose reel (30m) and a diesel pump to provide coverage in and around the buildings. All buildings will be fitted with smoke detectors and contain portable fire extinguishers. All fire extinguishers will be checked on a 12 monthly basis. Any landscaping around the buildings will include native plants with fire retardant characteristics. Access to water troughs, dams and tanks throughout the properties will provide alternative sources of water should they be required. Each WTG contains a fire extinguisher in the base of the tower and up in the nacelle. Appendix 30 20130720 Fire Management Plan - Draft Page 6 of 10

If the civil works contractor is working on site at the time of the fire, the use of graders, water trucks, front end loaders and bobcats may be possible. 3.5 SIGNAGE Signage at the main compound will state the emergency numbers for the Owner s Operations Manager, Contractor s Service Manager, District Fire Warden, and the radio channel to contact the Fire Brigade. CB radios are located in the Administration Building and the project vehicles. 3.6 HOT WORK PERMITS No waste materials shall be burnt on site. All rubbish shall be disposed of in the appropriate manner. Where it may be necessary to undertake hot works e.g. welding, cutting, a hot work permit shall be issued. This will set procedures to be followed regarding where the work is undertaken, fire fighting equipment and personnel to be in attendance and the timing for the work to be well defined. No naked flames will be permitted on site. 3.7 SMOKING Smoking on site will be restricted to designated smoking areas and cigarettes are to be extinguished in ashtrays only. Cigarettes are not to be thrown on the ground or from vehicles. 3.8 EMERGENCY RESPONSE PLAN An Emergency Response Plan will be prepared for the Construction Phase. This Plan will detail the procedures to be followed in the event of a fire. In the event of a fire all resources and expertise available on site are to be made available to the local Fire Brigade. Personnel on site will comply with directions given by the local Fire Brigade. Personnel are only expected to fight small fires within their level of competence. The local Fire Brigade will be called immediately if the fire cannot be controlled. 4 OPERATIONS PHASE 4.1 INDUCTIONS AND TRAINING All personnel and visitors onto the site will be required to attend an induction when they first arrive on site. Part of this induction will include aspects of the Fire Management Plan. Inductions will also address the smoking policy on site, emergency phone numbers, aspects of the Emergency Response Plan and the muster area. Appendix 30 20130720 Fire Management Plan - Draft Page 7 of 10

4.2 SITE LAYOUT MOUNT EMERALD WIND FARM The Fire Brigade will be taken on regular site tours during the Operations Phase and provided with site plans showing the project infrastructure such as WTGs, roads, main compound and substation. GPS locations will be provided for all WTGs and water sources such as troughs, dams and tanks. The major road in the area is the Kennedy Highway which links the towns of Mareeba, Walkamin, Tolga and Atherton. Road access to site from the Kennedy Highway will be via Hansen Road - Springmount Road Kippin Drive. The project area is contained within Rural Fire Brigade zone of the Springmount District Fire Warden, and shares boundaries with Atherton (east), Walkamin (north-east), Narcotic Creek (north) and Arriga (north-west). The site is located within the following road distances to local fire and rescue services; Mareeba 28km Atherton 30km Dimbulah 48km All site roads and hardstands will be maintained in good condition and can act as firebreaks. 4.3 VEHICLES Diesel powered vehicles shall be used on site and petrol driven vehicles shall only be used if fitted with spark arrestors. Vehicles shall be driven on formed roads and surfaces wherever possible to avoid the collection of debris under the vehicle that may cause a fire to start. All project vehicles will contain a fire extinguisher and CB radios. One utility will be fitted with a water tank, diesel pump, 30m fire hose and a knapsack spray. 4.4 FIRE FIGHTING FACILITIES The main compound will contain a water tank (approx. 50,000 litres capacity) collecting water from the buildings in the compound. The tank will be fitted with outlets allowing fire trucks to connect to the tank. Should the water level drop below a set point a water truck will deliver water to the tank. Adjacent to the water tank will be a fire hose reel (30m) and a diesel pump to provide coverage in and around the buildings. All buildings will be fitted with smoke detectors and contain portable fire extinguishers. All fire extinguishers will be checked on a 12 monthly basis. Any landscaping around the buildings will include native plants with fire retardant characteristics. Appendix 30 20130720 Fire Management Plan - Draft Page 8 of 10

Access to water troughs, dams and tanks throughout the properties will provide alternative sources of water should they be required. Each WTG contains a fire extinguisher in the base of the tower and up in the nacelle. 4.5 SIGNAGE Signage at the main compound will state the emergency numbers for the Owner s Operations Manager, Contractor s Service Manager, District Fire Warden, and the radio channel to contact the Fire Brigade. CB radios are located in the Administration Building and the project vehicles. 4.6 HOT WORK PERMITS No waste materials shall be burnt on site. All rubbish shall be disposed of in the appropriate manner. Where it may be necessary to undertake hot works e.g. welding, cutting, a hot work permit shall be issued. This will set procedures to be followed regarding where the work is undertaken, fire fighting equipment and personnel to be in attendance and the timing for the work to be well defined. No naked flames will be permitted on site. 4.7 SMOKING Smoking on site will be restricted to designated smoking areas and cigarettes are to be extinguished in ashtrays only. Cigarettes are not to be thrown on the ground or from vehicles. 4.8 EMERGENCY RESPONSE PLAN An Emergency Response Plan will be prepared for the Operations Phase by the Operations Team during the Construction Phase. This Plan will detail the procedures to be followed in the event of a fire. In the event of a fire all resources and expertise available on site are to be made available to the local Fire Brigade. Personnel on site will comply with directions given by the local Fire Brigade. Personnel are only expected to fight small fires within their level of competence. The local Fire Brigade will be called immediately if the fire cannot be controlled. 4.9 FLUID STORE All fluids will be stored with a designated building. Adequate ventilation will be incorporated into the design of the building. The appropriate types of fire extinguishers will also be installed on the outside of the building. Appendix 30 20130720 Fire Management Plan - Draft Page 9 of 10

APPENDIX 1 INTERIM SITE PLAN Appendix 30 20130720 Fire Management Plan - Draft Page 10 of 10