Design Presentation. Chief Operations Officer Willie Burroughs

Similar documents
REPORT CARD TO THE COMMUNITY MAY 15, 2018

Master Facility Planning Update School Board Meeting May 26, 2016

New High School Concept

Doing Business with Bartlett Cocke General Contractors

2014 Bond Project Guide

TIFT COUNTY SCHOOLS E-SPLOST HISTORY

Kerrville ISD has called for a bond election in the amount of $88,960,000 for November 6, 2018

Briar Crest Elementary

Mt. Diablo Unified School District 2010 Measure C Facilities Improvement Program

Ichabod Crane Central School District 2018 Capital Project Preliminary Estimate

Encumbered Balance (E-D) Branham HVAC Implementation Complete 100% 03/04/19 07/19/19 $765, $635, $635, $130, $0.

5 Year Capital Improvement Plan Update

Campus Middle School 4785 South Dayton Street Greenwood Village, Colorado 80111

Proposed Bond Construction Projects

Forest Hills Facilities Plan

2014 Bond District-wide Facility Repairs

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000

Design Review of Facility Improvement Projects

Master Project List Report

School District of Milton 5- Year Capital Maintenance and Improvement Plan

Wold Architects and Engineers. 332 Minnesota Street Suite W2000 Saint Paul, MN

Warren County Schools Plant and Operations

2014 Bond District-wide Facility Repairs

NYACK PUBLIC SCHOOLS CAPITAL IMPROVEMENT PLANNING PROCESS

Sagebrush Elementary School East Temple Place Aurora, Colorado 80015

Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15)

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

Allisonville Elementary School Facilities Highlights Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767

Oxford Hills School District Capital Renewal Plan Updated March 2017

Cherry Hill Public Schools BUILDING A SOLID FUTURE

Tillamook High School Bond Projects

FORT ERIE SECONDARY SCHOOL FACILITY INFORMATION. Lake Erie Corridor Secondary Schools Accommodation Review

MASTER PLAN DIAGRAMS DISTRICT CAMPUS OVERVIEW

Greenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111

Kenmore Town of Tonawanda Union Free School District : Capital Improvement Project Phase 2

E-SPLOST V. Facts and Information. August 2018

ESUHSD Measure G Bond Program Update: November 1, Alterations to Student Services Building and Streetscape Building 1200 (Gym) Modernization

SCCCD District Wide Facilities Master Plan

SAMUEL CLEMENS ADDITIONS & RENOVATIONS ( )

Meadow Point Elementary School East Grand Avenue Aurora, Colorado 80015

Chabot College: Plan Kickoff and Visioning Session with Student Senate

NEIGHBORS SOUTHWEST NEIGHBORHOOD MEETING December 17, 2014 BEAVERTON SCHOOL DISTRICT SOUTH COOPER MOUNTAIN HIGH SCHOOL

EXISTING CONDITIONS SUMMARY

2015 Building Condition Survey Summary Mosaic Associates Architects 02/19/16

LINCOLN HIGH SCHOOL MODERNIZATION BEX IV COMMUNITY MEETING JUNE 23, 2016

Ohlone College Measure G Project Scope Revisions

EMERYVILLE PLANNING COMMISSION STAFF REPORT

SCHEMATIC DESIGN PRESENTATION

Angela M. Bollinger. architecture & interior design project management facilities management PORTFOLIO

NYC Department of Education

SPLOST I, II, III,IV

White Bear Lake Area Schools District 624 ENERGY GUIDELINES

Measure R Measure R Interest Measure R Refunding

AIA Albuquerque 2016 Design Awards

NAZARETH AREA SCHOOL DISTRICT MAINTENANCE DEPARTMENT 357 Tatamy Road, Nazareth, PA FAX

NYC Department of Education

Facilities Management Services

Adopted DEFP FY16 - Amendment. Broward County Public Schools. Amended to Incorporate Board Approved Changes

High School Signature Projects

CITY OF TULSA PUBLIC FACILITIES & INFRASTRUCTURE

SCHOOLS + COMMUNITY rehabs, renovations, new construction

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14

Binghamton University Construction SUMMER 2012 HIGHLIGHTS

Measure W Review. East Nicolaus High School District March 9, 2017

DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students

Community Response Buchanan Elementary. December 13, 2016

TALLEY STREET ELEMENTARY SCHOOL CITY SCHOOLS OF DECATUR COMMUNITY PRESENTATION DECEMBER 6, 2017

Exhibit CC BALTIMORE COUNTY PUBLIC SCHOOLS

EDUCATIONAL SPECIFICATIONS NEW CONSTRUCTION TO: Oxford Middle School Location to be determined November 4, 2016 Approved by BOE on November 29, 2016

West Hartford Public School District

Michigan State University Barrier-Free/Accessibility Project Status Summary March 2017

2016 Bond Steering Committee Meeting

campus master plan VIRGINIA STATE UNIVERSITY

Ottawa Hills. Local Schools

Emergency Management Resource Guide. Appendix A: Crime Prevention Through Environmental Design CPTED Principles Checklist for Kentucky Public Schools

Florence High School / Middle School Page 1 of 3 Florence, WI

Telecommunications Survey

Clarendon Park Framework Plan. Chicago Park District Department of Planning & Development June 7, 2008

School District of New London. Community Listening Session & Referendum Consideration

GARDEN GROVE FIRE DEPARTMENT

2014 Exhibition of School Planning and Architecture. White Hill Middle School Campus Master Plan & Design. Ross Valley School District Fairfax, CA

NYC Department of Education

DCPS Execution report by funding year

NASSAU COMMUNITY COLLEGE. Garden City, New York Capital Committee Meeting January 12, :00 PM

Butler Junior High School

Educate Challenge. LONG RANGE FACILITIES PLAN Long Range Facilities Plan Committee. June 11, :30 pm 7:30 pm

DRAFT $252,790,000. Career & Technical Education Department. Departmental Needs. Estimated Cost of Departmental Needs. Departmental Meeting

LIVE OAK LIBRARY ANNEX PROJECT COUNTY OF SANTA CRUZ. October 22, 2018 COMMUNITY MEETING #2

Long Beach Unified School District Measure K Citizens' Bond Oversight Committee 2013 Annual Report

Long-Range School Facility and Technology Improvement Plan

Moreno Valley College: Conceptual Master Planning - Site Analysis Lasselle Street, Moreno Valley, CA 92551

Imagine RBC 2010 The Plan

HVAC / Boilers / Hot Water. Expected Life Span. very rough estimates Condition/Issue Age. Athletics / Gyms

LONG-RANGE FACILITIES PLAN

30% Design Community Meeting

Community Unit School District 200 Facilities

G W C C GREENMOUNT WEST COMMUNITY CENTER GWCA - COMMUNITY CENTER. design recommendations

UNIVERSITY OF WISCONSIN-PLATTEVILLE REQUEST FOR ARCHITECTURE & ENGINEERING PRE-PLANNING & DESIGN SERVICES. for. Williams Fieldhouse - Phase I

TRINITY LUTHERAN SCHOOL RENOVATIONS

PLATTEVILLE MIDDLE SCHOOL

Transcription:

Design Presentation Chief Operations Officer Willie Burroughs

Agenda Introduction Community Feedback Project updates 2

Feedback Citizens Advisory Committee meetings Growth and Development meetings Community meetings Stakeholder meetings Project Advisory Team meetings District-wide Department review meetings Campus leadership meetings Campus user group meetings 3

Feedback incorporated Bowden Academy Windows into the classrooms increase size Burbank High School IB World School Edison High School Dance Studio priority and size Fox Tech High School Master Plan campus consider 2016 bond as phase one Jefferson High School Seating in the secondary gym IB World School Lanier High School Band practice pad Murals Sam Houston High School Band practice pad 4

2016 Bond Projects at A Glance 5

Bowden Academy Total Project Budget: $11,078,573 Classroom spaces (general learning, science, art, music, special education) Restrooms Cafeteria/kitchen Heating, ventilation and air conditioning Plumbing and electrical Technology infrastructure for new and renovated spaces Lighting Fire sprinkler systems Special needs accessibility in entryways, restrooms, and other areas Front-entry modifications to improve security Roofing, building exterior and site improvements 6

Bowden Academy 7

Bowden Academy Highlights New secured vestibule New windows into classrooms New classroom infill addition New Flex Lab Mechanical and electrical system upgrades Improved site drainage New roof In new and renovated spaces New ceilings and finishes New LED lighting New storage cubbies New white boards New flexible furniture New digital teaching wall 8

Brackenridge Elementary School Total Project Budget: $11,966,712 Renovations and upgrades to include: Classroom spaces (general learning, science, art, music, special education) Restrooms Cafeteria/kitchen Stage Library Heating, ventilation and air conditioning Plumbing and electrical Technology infrastructure for new and renovated spaces Lighting Fire sprinkler systems Special needs accessibility in entryways, restrooms, and other areas Front-entry modifications to improve security Roofing, building exterior and site improvements 9

Brackenridge Elementary School 10

Brackenridge Elementary School Highlights Relocate library to the first floor Relocate administration to main entrance off parking lot New secured vestibule New science lab Mechanical and electrical system upgrades New windows New ceilings and finishes New LED lighting New white boards New flexible furniture New digital teaching wall New entry canopy at student dropoff 11

Brackenridge High School Total Project Budget: $50,362,447 Classroom spaces (general learning, dance/pep room, science, special education) Restrooms Cafeteria/kitchen Auditorium Heating, ventilation and air conditioning Plumbing and electrical Technology infrastructure for new and renovated spaces Lighting Fire sprinkler systems Special needs accessibility in entryways, restrooms, and other areas Front-entry modifications to improve security Athletic track re-coating Tennis court fencing Roofing, building exterior and site improvements 12

Bond 2016 Brackenridge HS 13

Bond 2016 Brackenridge HS Highlights New rite sized classrooms and science labs New windows into classrooms New secured vestibule Mechanical and electrical system upgrades New ceilings and finishes New LED lighting New white boards New flexible furniture New digital teaching wall 14

Burbank High School Total Project Budget: $79,439,675 Renovations and upgrades to include: Replace classroom buildings (general learning, science labs, special education) Heating, ventilation and air conditioning Auditorium and drama spaces Cafeteria/kitchen Black box theater Administration/New Front Door Plumbing and electrical Technology infrastructure for new and renovated spaces Lighting Fire sprinkler systems Special needs accessibility in entryways, restrooms, and other areas Remodel special education classrooms Front-entry modifications to improve security Athletic track re-coating Tennis court fencing Address preservation and documentation of mural artwork in cafeteria Roofing and exteriors of renovated buildings and site improvements 15

Bond 2016 Murals 16

Burbank High School 17

Burbank High School Highlights New three-story academic and administration building New future ready classrooms and science labs Mechanical and electrical system upgrades New ceilings and finishes New LED lighting New white boards New flexible furniture New digital teaching wall Fine Arts renovations New Black Box 18

Davis Middle School Total Project Budget: $20,286,485 Classroom spaces (general learning, science, special education) Restrooms Art and Music spaces Cafeteria/kitchen Auditorium Heating, ventilation and air conditioning Plumbing and electrical Technology infrastructure for new and renovated spaces Lighting Fire sprinkler systems Special needs accessibility in entryways, restrooms, and other areas Front-entry modifications to improve security Roofing, building exterior and site improvement 19

Davis Middle School 20

Davis Middle School Highlights New main entrance New secured vestibule New rite sized classrooms Mechanical and electrical system upgrades New windows New roof New ceilings and finishes New LED lighting New white boards New flexible furniture New digital teaching wall 21

Edison High School Total Project Budget: $21,939,497 Renovations and upgrades to include: Field House Replacement Athletic Facilities and Support Areas Auditorium Heating, Ventilation, and Air Conditioning Plumbing and Electrical Technology Infrastructure for New and Renovated Spaces Lighting Roof Replacement Fire Sprinkler Systems Special Needs Accessibility in Entryways, Restrooms, and Other Areas Front-Entry Modifications to Improve Security Athletic TRACK RE-COATING TENNIS COURT FENCING ROOFING, BUILDING EXTERIOR AND SITE IMPROVEMENTS 22

Edison High School 23

Edison High School Highlights New athletics field house Renovated primary gymnasium Renovated secondary gymnasium Fine Arts renovations Renovated auditorium New dance studio New black box 24

Fox Tech High School Total Project Budget: $26,264,880 Classroom spaces (general learning, science, special education) Restrooms Cafeteria/kitchen Heating, ventilation and air conditioning Plumbing and electrical Technology infrastructure for new and renovated spaces Lighting Fire sprinkler systems Special needs accessibility in entryways, restrooms, and other areas Front-entry modifications to improve security Roofing, building exterior and site improvements 25

Fox Tech High School 26

Fox Tech High School Highlights Relocate child nutrition services to the first floor Mechanical and electrical system upgrades New future ready classrooms and science labs New maker spaces New ceilings and finishes New LED lighting New white boards New flexible furniture New digital teaching wall 27

Sam Houston High School Total Project Budget: $33,190,150 Classroom spaces (general learning, science, special education) Restrooms Cafeteria/kitchen Auditorium Heating, ventilation and air conditioning Plumbing and electrical Technology infrastructure for new and renovated spaces Lighting Fire sprinkler systems Special needs accessibility in entryways, restrooms, and other areas Front-entry modifications to improve security Athletic track re-coating Tennis court fencing Roofing, building exterior and site improvements 28

Sam Houston High School 29

Sam Houston High School Highlights New secured vestibule New future ready classrooms and science labs New collaboration spaces Mechanical and electrical system upgrades New windows New roof New ceilings and finishes New LED lighting New white boards New flexible furniture New digital teaching wall 30

Irving Dual Language Academy Total Project Budget: $23,367,160 Renovations and upgrades to include: Classroom spaces (general learning, science, fine arts, special education) Restrooms Cafeteria/kitchen Auditorium Library Heating, ventilation and air conditioning Plumbing and electrical Technology infrastructure for new and renovated spaces Lighting Fire sprinkler systems Special needs accessibility in entryways, restrooms, and other areas Front-entry modification to improve security Roofing, building exterior and site improvements 31

Irving Dual Language Academy Science Labs Pre K Classrooms 32

Irving Dual Language Academy Highlights New secured vestibule New future ready classrooms and science labs New collaboration spaces Windows into the classrooms Mechanical and electrical system upgrades New ceilings and finishes New LED lighting New white boards New flexible furniture New digital teaching wall 33

Jefferson High School Total Project Budget: $59,816,244 Classroom spaces (general learning, science, special education) Restrooms Cafeteria/kitchen Black box theater Gymnasiums, athletic field house and support spaces Restore auditorium and library Foundation repairs Heating, ventilation and air conditioning Plumbing and electrical Lighting Fire sprinkler systems Special needs accessibility in entryways, restrooms, and other areas Front-entry modifications to improve security Technology infrastructure for new and renovated spaces Athletic track re-coating Tennis court fencing Roofing, building exterior and site improvements 34

Jefferson High School 35

Jefferson High School Highlights New future ready classrooms and science labs New collaboration spaces Mechanical and electrical system upgrades Foundation repairs Roof replacement New ceilings and finishes New LED lighting New white boards New flexible furniture New digital teaching wall Athletics renovations Primary & secondary gyms Fieldhouse Fine arts renovations Auditorium preservation Black Box renovations Set shop renovations 36

Lanier High School Total Construction Budget: $46,894,508 Renovations and upgrades to include: Classroom spaces (general learning, science, fine arts, special education) Restrooms Cafeteria/kitchen Auditorium Heating, ventilation and air conditioning Plumbing and electrical Technology infrastructure for new and renovated spaces Lighting Fire sprinkler systems Special needs accessibility in entryways, restrooms, and other areas Front-entry modifications to improve security Athletic track re-coating Roofing, building exterior and site improvements 37

Lanier High School Murals 38

Lanier High School 39

Lanier High School Highlights New main entrance New secured vestibule New future ready classrooms and science labs New collaborations spaces Windows into the classrooms Mechanical and electrical system upgrades New ceilings and finishes New LED lighting New white boards New flexible furniture New digital teaching wall New Band practice pad 40

Rogers Middle School Total Project Budget: $28,790,583 Classroom spaces (general learning, science, special education) Restrooms Art and Music Spaces Cafeteria/kitchen Auditorium Heating, ventilation and air conditioning Plumbing and electrical Technology infrastructure for new and renovated spaces Lighting Fire sprinkler systems Special needs accessibility in entryways, restrooms, and other areas Front-entry modifications to improve security Roofing, building exterior and site improvements 41

Rogers Middle School 42

Rogers Middle School Highlights New three story academic and administration building New secured vestibule New future ready classrooms and science labs New collaboration spaces Mechanical and electrical system upgrades New ceilings and finishes New LED lighting New white boards New flexible furniture New digital teaching wall 43

Tafolla Middle School Total Project Budget: $25,080,190 Classroom spaces (general learning, science, fine arts, music, special education) Restrooms Cafeteria/kitchen Auditorium Heating, ventilation and air conditioning Plumbing and electrical Technology infrastructure for new and renovated spaces Lighting Fire sprinkler systems Special needs accessibility in entryways, restrooms, and other areas Front-entry modifications to improve security Roofing, building exterior and site improvements 44

Tafolla Middle School 5 New HVAC Penthouses Renovated North Annex Building for swing space New Central Plant Accessible Gym entrance New covered dropoff at entrance Remodeled parking lot with ADA parking Completely Remodeled Classroom wing and Administration Offices New Security Entrance Vestibule 45

Tafolla Middle School Highlights New secured vestibule New rite sized classrooms and science labs New future ready classrooms and science labs Mechanical and electrical system upgrades New ceilings and finishes New LED lighting New white boards New flexible furniture New digital teaching wall 46

Bond 2016 Timeline 47

Bond 2016 Timeline Sam Houston HS Irving MS Jefferson HS Lanier HS Rogers MS Tafolla MS 48

Bond 2016 design presentation Questions 49