Congress Street Bridge Lighting Project Community Meeting. April 6, 2017

Similar documents
PLAN ELEMENTS WORKSHOP. April 5, 2016

Downtown Cleveland Alliance/Tremont

Posted by Calgary Public Library on November 1, 2012

Draft Downtown Waterfront Municipal Harbor Plan

Charles River Skate Park Project

Chapter 15. Public Art Guidelines 15.2 GENERAL DESIGN OBJECTIVES 15.1 INTRODUCTION AND PURPOSE 15.3 PUBLIC ART GUIDELINES

Request for Proposals

Sidewalks Street Lights

Rose Kennedy Greenway Ramp Parcels Study

SUN-B11-From Gray to Green; Revitalizing Milwaukee s Industrial Heart

PUBLIC WORKSHOP. Re-use of the Josiah Smith Tavern and Old Library. December 14, 2010

New Westminster Downtown Parking Strategy Public Open House #1 September 13, 2012

Silver Line Gateway. Extension of Silver Line Bus Rapid Transit (BRT) to Chelsea and East Boston. Public Informational Meeting Chelsea, MA

Boston Redevelopment Authority. Boston s s Planning and Economic Development Agency

Chelsea Creek Municipal Harbor Plan

Salem Strategic Assistance Panel December 11, Salem, MA

Agenda. 7 Wright Crescent Urban Design Study. Public Meeting and Urban Design Workshop. 1 INTRODUCTION AND BACKGROUND (City of Kingston)

City of Ashland. Attn: Laura Loucks; Sustainability Intern 601 Main Street West Ashland, WI

PRINCE GEORGE S PLAZA TRANSIT DISTRICT DEVELOPMENT PLAN AND TRANSIT DISTRICT OVERLAY ZONE UPDATE

The Great Molasses Flood Memorial:

Finding Design: Case Studies in the Creative Process

Bridgeport Comprehensive Waterfront Plan 2 nd Launch Neighborhood Meeting 3/9/16

SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building. Recommendation: Purpose:

City of Plattsburgh DRI: Downtown Streetscapes & Riverfront Access. Downtown Streetscape and Riverfront Access Design

Request for Proposal Congress Street Bridge Lighting

Urban Form Case Studies

VISUAL TERRAIN, INC. Lighting Design for Architecture, Attractions & The Arts Los Angeles Chicago Paris

Agenda. Where we are in the MHP process/regulatory review MHP components Proposed MHP Next steps

Option A FINAL AESTHETIC SIGNATURE BRIDGE PROPOSAL. SR 836/I-395/I-95 Project

Kenilworth Avenue and Town of Cheverly Industrial Study Briefing

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

Lynn Waterfront Master Plan

Building Exterior Lighting Grant Program. Applications will be reviewed April 1, July 1 and October 1, 2019

Great Plans for a Great City

PLANNING ADVISORY BOARD AGENDA OCTOBER

MY BILL OF RIGHTS.ORG COMMISSIONING GUIDELINES & STANDARDS VISION AND PROCESS

South of Eastern Strategic Direction Status Update

2017 Downtown Waterfront District Municipal Harbor Plan & Public Realm Activation Plan Supplement - February 16, 2018

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

Link Union Station (Link US) Project Open House September 26, 2018

DC Clean Rivers Project - Green Infrastructure Program. ACEC What s New at DC Water?

GLEN ROAD PEDESTRIAN BRIDGE ENVIRONMENTAL ASSESSMENT STUDY PUBLIC INFORMATION CENTRE #2 OCTOBER 24, 2017

CHARLES COUNTY GOVERNMENT RFP NO POPES CREEK RAIL TRAIL DESIGN

Downtown Waterfront Municipal Harbor Plan Advisory Committee

Downtown Cleveland s Main Avenue Bridge

PHASE ONE. A summary report: What the community told Alcoa during Phase One of the community engagement program for Point Henry 575.

10 Principles for a Sustainable Development of Urban Waterfront Areas

Johnson Street Bridge Public Realm Update

planning toronto s downtown Parks and Public Realm Plan Request for Proposals Information Meeting Andrew Farncombe, Project Manager August 19, 2015

SUBJECT: GO Station Mobility Hubs Preferred Concepts: Aldershot GO, Burlington GO and Appleby GO. Planning and Development Committee - Public Meeting

Call for Artists Gateway Island Ashland Oregon Requests for Qualifications (RFQ)

Creating a Supportive Organizational and Policy Framework Luisa Paiewonsky. John D. Pagini, AICP USDOT CCAPA PDO

Workshop 3. City of Burlington Waterfront Hotel Planning Study. September 14, The Planning Partnership

City Council Special Meeting AGENDA ITEM NO. C.

RESOURCE PACKET River Crossing

P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No Audit & Finance Standing Committee November 28, 2018

A Better City Request for Qualifications

Online Survey Results 1 Port Street East

Streets for People, Place-Making and Prosperity. #TOcompletestreets

Institutional Master Plan The Arnold Arboretum of Harvard University

PUBLIC SPACES MASTER PLAN UPDATE (POPS) Crystal City Citizen s Review Council October 24, 2018

UMass Amherst Design Center in Springfield

Higher Education Energy Efficiency Partnership Program BEST PRACTICES AWARDS

Corridor Enhancements

Introduction to the project Feedback from you to guide the plan Dig in to propel us forward quickly (survey) Clear understanding of roles moving

Cultural Arts & Marketing Department of Economic & Workforce Development

Transportation Working Team Duane Diggs, Co-Chair (VOICE Buffalo) Kelly Dixon, Co-Chair (GBNRTC) Paul Ray, Facilitator (UB Regional Institute)

John M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference

Request for Proposals For the purchase and redevelopment of Cityowned property in the Historic Downtown. 109 South Boyd Street

City of Ann Arbor Page 1

BUSINESS PLAN CEN/TC 250 STRUCTURAL EUROCODES EXECUTIVE SUMMARY

TAHOE CITY VISION PLAN June 2012

VILLAGE OF BOLTON HERITAGE CONSERVATION DISTRICT PLAN

Lynn Waterfront Master Plan

District Department of Transportation Office of Civil Rights. Disadvantaged Business Enterprise Supportive Services

OVERVIEW NEW PARK AT 318 QUEENS QUAY WEST

BRADENTON RIVERWALK EXPANSION MASTER PLAN

Official Plan Review: Draft Built Form Policies

Getting and Giving the Most

Chapter 11. Implementation Plan

SCTPO Project Summary September 2014

Corridor Management Committee. September 29, 2017

Panama City Beach Community Redevelopment Agency ON THE MOVE IN PCB

Local Government Community Development

Project Goal. RRRC Living Towns Planning Workshp. Town of Halifax Revitalization Project. Dynamic Planning & Management Duo: July 12, 2006

East River Waterfront Esplanade and Piers New York, New York Draft Environmental Impact Statement

Cohasset Municipal Harbor Plan Public Meeting #1. Harriman GEI Consultants FXM Associates May 31, 2018

Marketing to Architects and Designers

Appendix A COMMUNITY IMPROVEMENT PLAN DESIGN GUIDELINES

Clearwater Bluff/Waterfront Master Plan Stakeholder Coalition Meeting. June 2016

Waterfront West December 6, 2016

Downtown Whitby Action Plan

Municipal Development Plan 2013

Glen Road Pedestrian Bridge Environmental Assessment

DVASE 2018 Excellence in Structural Engineering Awards Program

Ilene R. Tyler, FAIA, FAPT, LEED AP, is a Principal and the Director of Preservation in the Ann Arbor, Michigan office of Quinn Evans Architects.

Community Advisory Council (CAC) Summit

District Facilities Master Plan

MAYFIELD WEST SECONDARY PLAN PHASE 2

Complete Streets Master Plan for Downtown New Britain CRCOG Transportation Committee Meeting Monday, December 9, 2013

Transcription:

Congress Street Bridge Lighting Project Community Meeting April 6, 2017

CSBLP Community Meeting Agenda Introductions Context for Lighting Project Initial Concept Designs Open Discussion Image: Boston Planning & Development Agency (credit: Landslides Aerial Photography 2

Hartranft Lighting Design Project team Andrea Hartranft Principal Paula Ziegenbein Sr. Consultant Kim Daley Senior Designer Klara Boyer Designer H a r t r a n f t L i g h t i n g D e s i g n

Firm profile Internationally recognized, award winning lighting design firm with Over 30 years experience on 1000+ diverse commercial lighting projects WBE with offices in North Carolina, Maryland and Massachusetts Architectural engineering, electrical engineering, architectural backgrounds Ability to realize large scale, complex lighting solutions Creative, thoughtful consideration given to sustainable project design Historic preservation & municipal experience Lighting design, controls design, daylight design, photometric calculations & studies, energy efficiency & lighting life cycle cost analysis Actively engaged in lighting industry associations IALD, IESNA, DLF, WILD, Light Boston H a r t r a n f t L i g h t i n g D e s i g n

Project experience Interactive Design Anacostia Water Tower (not yet built) Howeler & Yoon Architecture Tower will be visible from Downtown DC Tower is designed to be a living machine Changes to lighting may inform community regarding water quality, rainfall, river safety Design required to meet stakeholder approval Cultural Arts Commission Historic Preservation Board DC office of planning Local community

Jacobs Engineering Group Project team Peter Vasiliou, PE Manager Traffic Engineering Ray Walsh, PE Sr. Electrical Engineer David Massenzio, PE Structural Engineer Mario Rif Electrical Engineer

Jacobs Engineering Group Firm profile Who we are Diverse engineering consulting services: Buildings & transportation infrastructure Planning and consulting Program/Construction management 60+ years in business 200+ staff in New England offices Full complement of design disciplines including civil, structural, geotechnical, mechanical, electrical

Jacobs Engineering Group Inc. Lighting/Electrical 8 electrical engineers in New England Street & Bridge Lighting Experience Tobin Bridge Electrical & Lighting Longfellow Bridge Electrical & Lighting Edward Everett Square Lighting MassDOT Braga Bridge Lighting Study MassDOT Fall River Route 79 Lighting MassDOT Lowell Connector Lighting

Congress Street Bridge Congress Street Bridge is one of four existing bridges across the Fort Point Channel connecting Downtown Boston and the South Boston Waterfront Completed in 1930, rehabbed in 2008 Historic single-leaf, Strauss multiple-trunnion bascule bridge No longer operational Image: Historic American Engineering Record (HAER No. MA-38-34) 15

Illuminating Boston: The Diamond Necklace Report 2000 report issued by the City of Boston and LIGHT Boston for a vision of downtown Boston at night Identified 25 downtown landmarks for enhanced nighttime illumination, including the Fort Point Channel Specific recommendations for the Congress Street Bridge Lighting Project include: Remove and restore the major lanterns that crown [its] piers [which] should be lit and the massive counterweight strongly uplit. Strongly light the Boston Tea Party Ships [& Museum] Image: Illuminating Boston: The Diamond Necklace Project, City of Boston and LIGHT Boston 16

Congress Street Bridge Lighting Project In 2003, Fisher Marantz Stone developed concept lighting plan Funding for bridge lighting project secured through Article 80 and Ch. 91 licenses for nearby redevelopments, namely Atlantic Wharf Changes in lighting technology and urban fabric since 2003 Images: Fisher Marantz Stone, Congress Street Bridge Concept Lighting Design 17

Congress Street Bridge Lighting Project RFP Focus of RFP: Implementation of Illuminating Boston: The Diamond Necklace Project Use aesthetic lighting enhancements to reveal and reinforce historic functions and cultural significance of bridge Improve and enliven the atmosphere of the bridge Enhance public s access to and enjoyment of the city s waterfront Image: U.S. Library of Congress (HAER MAS, 13-BOST,77--4) 18

Congress Street Bridge Lighting Project Draft Schedule Concept design: April 2017 Preliminary design: July 2017 Public comment & permitting: Spring/summer 2017 Final design: September 2017 Installation: Fall/winter 2017 Boston Tea Party Reenactment: December 16 19

Our approach Respectful Responsive Realizable H a r t r a n f t L i g h t i n g D e s i g n

Link to Congress St. Bridge Video https://youtu.be/dsewpu23ag4

Design concepts

Design concepts

Design concepts

Design concepts Traffic indication

Design concepts Traffic indication

Design concepts Traffic indication

Design concepts Events

Design concepts User input Awareness Favorite color Motion

Design concepts User input Awareness Favorite color Motion

Design concepts Retrofit lanterns with Type III LED Replace nostalgic Edison filament LED

Realization Design review with respective stakeholders to gain necessary approvals Combined design and engineering skillsets to realize concepts Capabilities to meet aesthetic requirements of respective stakeholders Photometric calculations and studies to ensure lanterns perform as good as if not better than present Able to furnish complete construction documents for contractor bid Close proximity to job site Budgetary product and construction costs obtained Design concepts as shown are within budget target H a r t r a n f t L i g h t i n g D e s i g n

A long term plan LED life cycles of 50,000 hours for color changing lighting @ typical operating cycles of 6 hour/day 22 years LED life cycles of 100,000 hours for lanterns @ typical operating cycles of 12 hours/day 22 years All LED luminaires to have replaceable drivers and LED light sources Consider extended warranty on luminaires Consider long term plan for 3 rd party programming of light shows H a r t r a n f t L i g h t i n g D e s i g n

Questions & comments?