APPEDIX B Project Sheets As part of Advance Apex, many of the projects discussed in both Chapter 5 - Roadway Element and Chapter 7 - Transit Element were examined in greater detail. Each project sheet corresponds to an individual roadway, intersection, or transit project recommended through the planning effort. Each sheet provides a description of the project and its key attributes with a corresponding map and/or cross section. For roadway projects, multimodal facilities that currently exist or are planned as part of the project are noted with an X, while a P indicates partially completed existing facilities. For easy identification, projects are highlighted in a black outline. Appendix B B1
PC-1: APEX BARBECUE ROAD WIDEIG PC-4: APEX PEAKWAY WIDEIG LEGTH Widening 1.32 miles LEGTH Widening 0.89 miles Olive Chapel Elementary KELLY RD OLIVE CHAPEL RD Scotts Ridge Elem Site APEX BARBECUE R R SALEMST RD COTEXT AREA [ P ] Side Path Olive Chapel Road Old US 1 Suburban/Transit-Oriented Development Mid-term $8,700,000 [ X ] Side Path R LAURA DUCA RD OLD MILL VILLAGE DR OLD RALEIGH RD Ten Ten Road Laura Duncan Road COTEXT AREA Town Center/Suburban Mid-Term $8,000,000 [ ] Side Path [ X ] Side Path MI LAO AVE EVAS RD HOLLAD RD 0 0.125 0.25 0.5 R OLD US 1 HWY S R Roadway Recommendation R Integrated Growth, Quality of Life, Safety, Mobility and V/C Ratio: 0.39 Volume: 6,203 [ X ] Transit Route Lanes: 3 V/C Ratio: 0.34 Volume: 5,344 CETER ST 0 0.125 0.25 0.5 Downtown, Integrated Growth, Quality of Life, Sense of Place, Mobility and SCHIEFFELI TE TE RD TE TE RD [ X ] On-street Bike Lanes: 4 with median V/C Ratio: 0.67 V/C Ratio: 1.04 Volume: 14,269 Volume: 24,765 B2 B3
PC-5: APEX PEAKWAY WIDEIG PC-7: APEX PEAKWAY WIDEIG Widening Widening LEGTH 0.51 miles LEGTH 1.6 miles Laura Duncan Road Salem Street COTEXT AREA Salem Street Town Center/Suburban/ Transit-Oriented Development OLIVE CHAPEL RD Baucom Elementary HUTER ST COTEXT AREA S Salem Street Town Center/Suburban/ Transit-Oriented Development SALEM ST 0 0.125 0.25 0.5 AMBERGATE STA GRAD CETRAL STA Downtown, Integrated Growth, Quality of Life, Sense of Place, Mobility and LAURA DUCA RD [ ] Side Path V/C Ratio: 0.42 Volume: 6,279 Mid-Term $8,000,000 [ X ] Side Path Lanes: 4 with median V/C Ratio: 0.31 Volume: 9,732 R 0 0.075 0.15 0.3 WILLIAMS ST SALEM ST SALEM ST Downtown, Integrated Growth, Quality of Life, Sense of Place, Mobility and TIGE RD W CHATHAM ST R JAMES ST R CETER ST Apex Middle Apex Elementary [ ] Side Path V/C Ratio: 0.34 Volume: 5,559 ear-term $20,000,000 [ X ] Side Path Lanes: 4 with median V/C Ratio: 0.40 Volume: 10,631 B4 B5
PC-8: PERRY ROAD EXTESIO EW LOCATIO PC-9: DAVIS DRIVE WIDEIG & EW LOCATIO LEGTH ew Location 1.90 miles Apex Peakway FARM POD RD LEGTH Widening/ew Location 1.10 miles US 64 1 PRISTIE WATER DR APEX W SQUARE BLVD JESSIE DR WILLIAMS ST C 55 Bypass COTEXT AREA Transit-Oriented Development Long-Term $24,300,000 HOLT RD OLD JEKS RD R Salem Middle DAVIS DR VICIITY MAP Salem Elementary SALEM CHURCH RD COTEXT AREA Farmpond Road Suburban/Transit-Oriented Development ear-term $10,000,000 C 55 BYPASS [ ] Side Path [ ] Side Path SALEM ST 64 SALEM ST Apex High [ ] Side Path [ X ] Side Path [ X ] Freight Route [ X ] Freight Route Integrated Growth, Mobility and Lanes: /A V/C Ratio: /A Volume: /A Lanes: 4 with median V/C Ratio: 0.52 Volume: 16,929 Integrated Growth, Quality of Life, Safety, Mobility and V/C Ratio: 0.95 Volume: 23,976 Lanes: 4 with median V/C Ratio: 0.67 Volume: 30,560 B6 B7
T PC-11: GLADSOG DRIVE COECTIO PC-14: HOLLAD ROAD EXTESIO EW LOCATIO JESSIE DR LEGTH ew Location 0.72 miles Horton Park Drive C 55 APEX BARBECUE RD Scotts Ridge Elem Site LEGTH ew Location 0.71 miles Kelly Road S Salem Street WILLIAMS ST "Ö 55 DISORETTE L GLADSOG DR HOR PARK DR R COTEXT AREA Suburban ear-term $5,100,000 [ ] Side Path [ X ] Side Path R KELLY RD HOLLAD RD EXT POE ACRES COTEXT AREA [ ] Side Path Suburban/Transit-Oriented Development Mid-Term $15,000,000 [ ] Side Path WILLIAMS ST COLBY CHASE DR Integrated Growth, Mobility and Collector Roadway Recommendation Lanes: /A V/C Ratio: /A V/C Ratio: 0.34 Volume: /A Volume: /A R "Ö540 Integrated Growth, Mobility and SCOTTS RIDGE TRL! SALEM ST Lanes: /A Lanes: 3 V/C Ratio: /A V/C Ratio: 0.35 Volume: /A Volume: 1,961 CROSS SECTIO B8 B9
PC-18: HOR RIDGE BOULEVARD COECTIO PC-20: JEKS ROAD WIDEIG HUMIE OLIVE HOR RIDGE BLVD OLD US 1 RICHARDSO RD Collector Roadway Recommendation ew Location LEGTH 1,19 miles Horton Ridge Boulevard Richardson Road COTEXT AREA Suburban Mid-Term $11,000,000 [ ] Side Path [ X ] Side Path WIMBERLY RD GREE LEVEL CHURCH RD 0 0.125 0.25 0.5 Green Level High ROBERTS RD R JEKS RD KELLY RD MORRIS ACRES RD Turner Creek Elementary Turner Creek Elementary WILLIAMS ST C 55 HOLT RD BEAVER CREEK COMMOS DR LEGTH COTEXT AREA [ P ] Sidewalk [ ] Side Path Widening 2.17 miles C 55 Wimberly Road Suburban/Transit-Oriented Development Mid-Term $7,800,000 [ X ] Side Path Quality of Life, Mobility and Lanes: /A V/C Ratio: /A Volume: /A V/C Ratio: /A Volume: /A Integrated Growth, Safety, Mobility and V/C Ratio: 0.20 Volume: 7,224 Lanes: 3 V/C Ratio: 0.30 Volume: 4,914 B10 B11
PC-21: JEKS ROAD WIDEIG & REALIGMET PC-23: JESSIE DRIVE (EXTESIO) EW LOCATIO JEKS RD 64 WIMBERLY RD Integrated Growth, Safety, Mobility and LEGTH COTEXT AREA [ ] Side Path V/C Ratio: 0.16 Volume: 3,868 Widening/Realignment 0.51 miles Wimberly Road US 64 Suburban ear-term $1,800,000* *Does not include [ X ] Side Path SPRIGS APEX OLD HOLLY Lanes: 4 with median V/C Ratio: 0.28 Volume: 8,614 0 0.125 0.25 0.5 1 TECHOLOGY DR "Ö540 JESSIE DR APEX W SQUARE BLVD C 55 BYPASS "Ö 55 WILLIAMS ST Heritage Leadership Academy Integrated Growth, Safety, Mobility and ew Location LEGTH 2.67 miles C 55 Tingen Road COTEXT AREA Transit-Oriented Development ear-term $31,600,000 [ ] Side Path [ X ] Side Path [ X ] Transit Route [ X ] Freight Route Lanes: /A Lanes: 4 with median V/C Ratio: /A V/C Ratio: 0.27 Volume: /A Volume: 8,274 CROSS SECTIO CROSS SECTIO B12 B13
PC-25: KELLY ROAD WIDEIG PC-26: LAURA DUCA ROAD WIDEIG WIMBERLYRD Olive Chapel VICIITY MAP JEKS RD 64 R MORRI Elementary KELLY RD S ACRES RD OLIVE CHAPEL RD WILLIAMS ST OLD JEKS RD Widening LEGTH 5.23 miles Jenks Road Old US 1 COTEXT AREA Suburban ear-term $48,300,000 AMBERGATE STA LAURA DUCA RD Apex High LEGTH COTEXT AREA Widening 1.08 miles Hunter Street Apex High Town Center/Transit- Oriented Development ear-term $7,100,000 RICHARDSO RD MILAOAV E HUMIE OLIVE EVAS RD RD APEX 0 0.25 0.5 0.1 Apex Friendship BARBECUE RD RD HOLLAD Integrated Growth, Safety, Mobility and R OLD Scotts Ridge Elem Site 1 US R ST SALEM "Ö540 R R R [ P ] Sidewalk [ ] Side Path [ X ] Side Path [ X ] Transit Route [ X ] On-street Bike Lanes: 4 with median V/C Ratio: 0.43 V/C Ratio: 0.26 Volume: 9,434 Volume: 12,177 HU TER RD RD R 0 0.125 0.5 0.1 OLD RALEIGH RD Downtown, Quality of Life, Safety, Sense of Place, Mobility and [ P ] Side Path V/C Ratio: 0.63 Volume: 11,786 [ X ] Side Path [ X ] Transit Route [ X ] On-street Bike* *Shared lanes from Hunter Street to Apex Peakway Lanes: 3 V/C Ratio: 0.44 Volume: 15,538 B14 B15
PC-27: MILAO AVEUE COECTIO PC-28: SALEM WIDEIG LEGTH ew Collector 0.11 miles Mount Zion Church Road Milano Avenue 64 LEGTH Widening 0.64 miles Apex Peakway US 64 MILAO AVE MT ZIO CHURCH RD COTEXT AREA Suburban/Rural ear-term $1,400,000 SALEM ST COTEXT AREA Suburban/Transit-Oriented Development ear-term $3,000,000 [ ] Side Path [ X ] Side Path [ ] Side Path [ X ] Side Path 0 0.25 0.5 0.1 Collector Roadway Recommendation 0 0.25 0.5 0.1 AMBERGATE STA [ X ] Freight Route [ X ] Transit Route [ X ] Freight Route Mobility and Lanes: /A V/C Ratio: /A Volume: /A V/C Ratio: /A Volume: /A Integrated Growth, Safety, Mobility and V/C Ratio: 1.0 Volume: 19,607 Lanes: 3 V/C Ratio: 1.47 Volume: 24,213 B16 B17
PC-32: OLD RALEIGH ROAD/LAKE PIE ROAD WIDEIG PC-37: PERCUSSIO DRIVE COECTIO R Apex High RD LAURA DUCA R OLD RALEIGH RD PIE PLAZA DR Eva Perry Regional Library LAKE OLD PIE DR RALEIGH RD Corridor - Widening LEGTH 1.08 miles Apex Peakway Old Raleigh Road COTEXT AREA Suburban Mid-Term $13,000,000 [ P ] Sidewalk [ P ] Side Path [ X ] Side Path R THRIFTWOOD DR SMITH RD Future PERCUSSIO DR STEPHESO RD R ew Minor Collector LEGTH 1.47 miles Smith Road Sunset Lake Road COTEXT AREA Suburban Mid-Term $8,700,000 [ ] Side Path [ X ] Side Path [ X ] Transit Route [ X ] Transit Route SCHIEFFELI 0 0.075 0.15 0.3 CETER ST Quality of Life, Safety, Mobility and Lanes: with median V/C Ratio: 0.57 V/C Ratio: 0.38 Volume: 8,780 Volume: 10,963 0 0.075 0.15 0.3 SUSET LAKE RD Integrated Growth, Mobility and Collector Roadway Recommendation Lanes: /A V/C Ratio: /A V/C Ratio: /A Volume: /A Volume: /A CROSS SECTIO CROSS SECTIO B18 B19
PC-38: PRODUCTIO DRIVE COECTIO PC-39: REUIO CREEK PARKWAY COECTIO CLASSIC RD RELIACE AVE LEGTH ew Major Collector 0.67 miles Reliance Avenue Jessie Drive LEGTH ew Collector 0.38 miles Existing Reunion Creek Parkway Smith Road COTEXT AREA Suburban COLBY CHASE DR COTEXT AREA Suburban PRISTIE WATER DR PRODUCTIO DR ear-term $5,900,000 Heritage Leadership Academy WILLIAMS ST MAP STRAY WHITE AVE REUIO CREEK PKWY SMITH RD ear-term $3,100,000 [ ] Side Path [ X ] Side Path FUTURE 540 [ ] Side Path [ X ] Side Path JESSIE DR Collector Lanes: /A "Ö55 SUSET LAKE RD Collector Roadway Recommendation Lanes: /A Integrated Growth, Mobility and V/C Ratio: /A Volume: /A V/C Ratio: /A Volume: /A Integrated Growth, Quality of Life, Safety, Mobility and V/C Ratio: /A Volume: /A V/C Ratio: /A Volume: /A CROSS SECTIO CROSS SECTIO B20 B21
PC-40: RICHARDSO ROAD EW LOCATIO PC-41: RICHARDSO ROAD EW LOCATIO HUMIE OLIVE RD MAP HOR RID GE RD RICHARDSO RD OLD US 1 Apex Friendship LEGTH COTEXT AREA [ ] Side Path Integrated Growth, Mobility and Lanes: /A V/C Ratio: /A Volume: 2,345 ew Location 2.33 miles Humie Olive Road Old US 1 Suburban ear-term $22,600,000 [ X ] Side Path [ X ] Street-Side Greenway Lanes: 4 with median V/C Ratio: 0.17 Volume: 10,718 OLD US 1 MAP RICHARDSO RD Integrated Growth, Mobility and 1 ew Location LEGTH 0.91 miles Old US 1 US 1 COTEXT AREA Suburban Long-Term $17,900,000* *Does not include Interchange [ ] Side Path [ X ] Side Path [ X ] Street-Side Greenway Lanes: 3 V/C Ratio: /A V/C Ratio: 0.55 Volume: 5,005 Volume: 6.904 CROSS SECTIO CROSS SECTIO B22 Street-Side Greenway is not shown in cross-section. Street-Side Greenway is not shown in cross-section. B23
PC-44: ROBERTS ROAD WIDEIG PC-45: S SALEM REALIGMET LEGTH Widening 1.46 miles Green Level Church Road SALEM ST LEGTH Realignment 0.56 miles Existing S. Salem Street Green Level High COTEXT AREA Jenks Road Suburban COTEXT AREA Future Major Collector Transit-Oriented Development GREE LEVEL CHURCH RD MAP PARLER DR ROBERTS RD "Ö540 ear-term $10,500,000 [ P ] Sidewalk [ ] Side Path [ X ] Side Path HOLLAD RD SCOTTS RIDGE TRL ST SALEM REALIGMET SALEM ST CJS APEX ASSEMBLAGE Long-Term $7,000,000 [ ] Side Path [ ] Side Path [ X ] Transit Route JEKS RD 0 0.125 0.25 0.5 [ X ] On-street Bike R Quality of Life, Safety, Sense of Place, Mobility and V/C Ratio: 0.06 Volume: 6,262 Lanes: 3 V/C Ratio: 0.55 Volume: 6,904 Integrated Growth, Safety, Mobility and V/C Ratio: 0.43 Volume: 6,111 Lanes: 4 with median V/C Ratio: 0.25 Volume: 6,959 CROSS SECTIO CROSS SECTIO B24 B25
PI-2: APEX BARBECUE ROAD AT S SALEM ROUDABOUT PI-3: CULVERT AT CETER ROUDABOUT APEX BARBECUE RD SALEM ST! R Apex Barbecue Road X- S Salem Street COTEXT AREA Transit-Oriented Development Mid-Term $3,100,000 ITERSECTIO DETAILS IMPROVEMET TYPE [ ] Realignment [ X ] Roundabout! R OLD RALEIGH RD OLD MILL VILLAGE DR CULVERT ST CETER ST Culvert Street X- Center Street COTEXT AREA Town Center Long-Term $3,000,000 ITERSECTIO DETAILS IMPROVEMET TYPE [ ] Realignment [ X ] Roundabout!! Recommendations Integrated Growth, Safety 0 0.03 0.06 0.12! Recommendations Downtown, Safety, Sense of Place IMAGERY CROSS SECTIO IMAGERY B26 B27
PI-4: GREE LEVEL WEST ROAD AT WIMBERLY ROAD ROUDABOUT PI-6: HOLLAD ROAD AT KELLY ROAD ROUDABOUT Green Level West Road Holland Road X- Wimberly Road X- Kelly Road COTEXT AREA Rural/Suburban COTEXT AREA Suburban Long-Term Long-Term $4,000,000 $3,100,000 R GREE LEVEL WEST RD ITERSECTIO DETAILS IMPROVEMET TYPE [ ] Realignment [ X ] Roundabout VICIITY R MAP HOLLAD RD KELLY RD ITERSECTIO DETAILS IMPROVEMET TYPE [ ] Realignment [ X ] Roundabout WIMBERLY RD Safety 0 0.025 0.05 0.1! Recommendations Integrated Growth, Safety, Mobility and IMAGERY CROSS SECTIO IMAGERY B28 B29
PI-7: HOLLAD ROAD AT C 540 GRADE SEPARATIO PI-8: HOLT ROAD AT OLD JEKS ROAD ROUDABOUT HOLLAD RD Scotts Ridge Elem Site "Ö540 Scotts Ridge Elem Site X- COTEXT AREA ITERSECTIO DETAILS IMPROVEMET TYPE [ ] Realignment [ ] Roundabout Holland Road C 540 Surban/Transit-Oriented Development Mid-Term $12,400,000 HOLT RD VICIITY MAP R OLD JEKS RD Salem Middle Salem Elementary X- COTEXT AREA ITERSECTIO DETAILS IMPROVEMET TYPE [ ] Realignment [ X ] Roundabout Holt Road Old Jenks Road (east) Suburban/Transit-Oriented Development Long-Term $3,100,000 [ X ] Grade Separation KELLY RD 0 0.0275 0.055 0.11! Recommendations Integrated Growth, Safety, Mobility and 0 0.03 0.06 0.12! Recommendations Integrated Growth, Safety IMAGERY CROSS SECTIO IMAGERY B30 B31
PI-10: JAMES AT S HUGHES ROUDABOUT PI-14: VERIDEA PARKWAY ITERSECTIO REALIGMET James Street Veridea Parkway SALEM ST WILLIAMS ST Apex Middle X- COTEXT AREA S Hughes Street Town Center ear-term $3,100,000 VERIDEA PKWY X- COTEXT AREA Future Jessie Drive Transit-Oriented Development Long-Term $3,100,000 TIGE RD JAMES ST! R ITERSECTIO DETAILS IMPROVEMET TYPE [ ] Realignment [ X ] Roundabout VICIITY MAP JESSIE DR ITERSECTIO DETAILS IMPROVEMET TYPE [ X ] Realignment [ ] Roundabout S HUGHES ST TECHOLOGY DR 0 0.0325 0.065 0.13! R! Recommendations Downtown, Safety, Sense of Place 0 0.0325 0.065 0.13!! Recommendations Integrated Growth, Mobility and IMAGERY CROSS SECTIO IMAGERY B32 B33
PI-15: OLD RALEIGH ROAD/HUTER AT LAURA DUCA ROAD/MASO ROUDABOUT PI-16: OLIVE CHAPEL ROAD AT EW HILL OLIVE CHAPEL ROAD ITERSECTIO REALIGMET Roundabout SALEM ST LAURA DUCA RD X- COTEXT AREA Old Raleigh Road/ Hunter Street Laura Duncan Road/Mason Street Town Center ear-term $3,400,000 X- COTEXT AREA Oive Chapel Road ew Hill Olive Chapel Road Rural ear-term $6,000,000 HUTER ST R OLD RALEIGH RD ITERSECTIO DETAILS IMPROVEMET TYPE [ ] Realignment [ X ] Roundabout VICIITY MAP ITERSECTIO DETAILS RD EW HILL OLIVE CHAPEL OLIVE CHAPEL RD IMPROVEMET TYPE [ X ] Realignment [ ] Roundabout OLD MILL VILLAGE DR CETER ST 0 0.03 0.06 0.12! Recommendations Downtown, Quality of Life, Safety, Sense of Place 0 0.0325 0.065 0.13! Recommendations Safety IMAGERY CROSS SECTIO IMAGERY B34 B35
PI-17: PERRY ROAD AT S HUGHES ROUDABOUT PI-18: PLEASAT PLAIS AT US 1 GRADE SEPARATIO R JAMES ST WILLIAMS ST X- COTEXT AREA Perry Road S Hughes Street Town Center ear-term $3,100,000 PLEASAT PLAIS RD X- COTEXT AREA Pleasant Plains Road US 1 Suburban Long-Term $12,400,000 R PERRY RD ITERSECTIO DETAILS IMPROVEMET TYPE [ ] Realignment [ X ] Roundabout VICIITY MAP ITERSECTIO DETAILS IMPROVEMET TYPE [ ] Realignment [ ] Roundabout [ X ] Grade Separation 0 0.0375 0.075 0.15 APEX PEWY! Recommendations Downtown, Safety, Sense of Place 0 0.0325 0.065 0.13! Recommendations Integrated Growth, Safety, Mobility and IMAGERY CROSS SECTIO B36 B37
PI-20: SALEM CHURCH ROAD/DOTSO WAY AT SALEM /OLD APEX ROAD ROUDABOUT PI-21: SCHIEFFELI ROAD AT US 1 GRADE SEPARATIO X- COTEXT AREA Salem Church Rd/Dotson Wy Salem St/Old Apex Rd Suburban Mid-Term $5,000,000 X- COTEXT AREA Schieffelin Road US 1 Suburban ear-term $12,400,000 SALEM CHURCH RD R SALEM ST Laurel Park Elementary ITERSECTIO DETAILS IMPROVEMET TYPE [ ] Realignment [ X ] Roundabout VICIITY MAP ITERSECTIO DETAILS IMPROVEMET TYPE [ ] Realignment [ ] Roundabout [ X ] Grade Separation 0 0.0375 0.075 0.15! Recommendations Safety Safety, Mobility and IMAGERY CROSS SECTIO IMAGERY B38 B39
PI-22: SMITH ROAD AT STEPHESO ROAD ROUDABOUT TE TE RD X- COTEXT AREA Smith Road Stephenson Road Suburban Mid-Term $3,000,000 EWLEAF DR SMITH RD R ITERSECTIO DETAILS IMPROVEMET TYPE [ ] Realignment [ X ] Roundabout SMITH RD STEPHESO RD 0 0.045 0.09 0.18! Recommendations Integrated Growth, Safety IMAGERY CROSS SECTIO B40
APEX CIRCULAR BEAVER CREEK C OMMOS DR Pearson Farms Open Space Scotts Ridge Elem Site OLIVE CHAPEL RD APEX BARBECUE RD 0 0.15 0.3 0.6 Haddon Hall Open Space W WILLIAMS ST Apex Jaycee Park S SALEM ST Baucom Elementary HUTER ST C.C. Jones Memorial Park West Street Park Apex Elementary TIGE RD Lexington Open Space SALEM ST Hunter Street Park Apex Middle JAMES ST Sue Helton Memorial Park CETER ST LAURA DUCA RD Clairmont Park E WILLIAMS ST The proposed circulator route would provide local transit service throughout the town, and offer connections to existing regional transit services. Circulator transit services are intended to operate within a small geographic area such as within a municipality. Primarily running along C 55, the proposed circulator route would operate within the downtown limits, providing mobility between retail, commercial, and recreational destinations, as well as connections between downtown areas and existing regional transit. KEY PLACES AD COECTIOS PLACES Downtown Apex Cambridge Village C 55 Corridor Apex Middle Downtown, Integrated Growth, Quality of Life, Sense of Place, Mobility and Beaver Creek Commons Apex Jaycee Park POTETIAL TRASIT COECTIOS Wal-Mart Go Triangle Route 305 Go Triangle Route 311 Holly Springs Express B42