New High School Concept

Similar documents
Forest Hills Facilities Plan

REPORT CARD TO THE COMMUNITY MAY 15, 2018

Master Facility Planning Update School Board Meeting May 26, 2016

Briar Crest Elementary

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14

Design Presentation. Chief Operations Officer Willie Burroughs

School District of Milton 5- Year Capital Maintenance and Improvement Plan

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000

Campus Middle School 4785 South Dayton Street Greenwood Village, Colorado 80111

Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15)

2014 Bond Project Guide

Kerrville ISD has called for a bond election in the amount of $88,960,000 for November 6, 2018

William S. Hart Union High School District. MODERNIZATION UPDATE May 7, 2008

Greenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111

NYACK PUBLIC SCHOOLS CAPITAL IMPROVEMENT PLANNING PROCESS

Ohlone College Measure G Project Scope Revisions

DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students

5 Year Capital Improvement Plan Update

PLATTEVILLE MIDDLE SCHOOL

TIFT COUNTY SCHOOLS E-SPLOST HISTORY

Rockwell/Johnson School Renovations Project. Existing Conditions September, 2016

Meadow Point Elementary School East Grand Avenue Aurora, Colorado 80015

Proposed Bond Construction Projects

Master Project List Report

Cherry Hill Public Schools BUILDING A SOLID FUTURE

Tillamook High School Bond Projects

FORT ERIE SECONDARY SCHOOL FACILITY INFORMATION. Lake Erie Corridor Secondary Schools Accommodation Review

Michigan State University Barrier-Free/Accessibility Project Status Summary March 2017

Exhibit CC BALTIMORE COUNTY PUBLIC SCHOOLS

Design Review of Facility Improvement Projects

Oxford Hills School District Capital Renewal Plan Updated March 2017

Facility Improvements

Kenmore Town of Tonawanda Union Free School District : Capital Improvement Project Phase 2

TRINITY LUTHERAN SCHOOL RENOVATIONS

Calmeca Academy of Fine Arts and Dual Language

PROCTOR TERRACE ELEMENTARY SCHOOL

Doing Business with Bartlett Cocke General Contractors

Edward Jenner Elementary Academy of the Arts

Measure W Review. East Nicolaus High School District March 9, 2017

MUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

Allisonville Elementary School Facilities Highlights Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767

Francis M McKay Elementary School

Sidney Sawyer Elementary School

PBK K-12 Bryan ISD Administration Building Bryan Independent School District \\ Bryan, Texas. Design Presentation.

MUKWONAGO SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

Warren County Schools Plant and Operations

John Palmer Elementary School

Ichabod Crane Central School District 2018 Capital Project Preliminary Estimate

Josefa Ortiz De Dominguez Elementary School

Alessandro Volta Elementary School

Genevieve Melody Elementary School

Sagebrush Elementary School East Temple Place Aurora, Colorado 80015

Long Branch-Wayne Local Park Renovation Project

Richard Henry Lee Elementary School

2014 Bond District-wide Facility Repairs

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect

Beaufort County Community College. Maintenance and House Keeping Plan

Maintenance Road Show

Joseph Brennemann Elementary School

Oconomowoc Area School District Facility Construction Update August 25, 2017

2014 Bond District-wide Facility Repairs

Charles W Earle Elementary School

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District

CLEVELAND HEIGHTS UNIVERSITY HEIGHTS CITY SCHOOL DISTRICT MONTICELLO & ROXBORO MIDDLE SCHOOLS INTERIOR DESIGN

2015 Building Condition Survey Summary Mosaic Associates Architects 02/19/16

EXISTING CONDITIONS SUMMARY

Oscar DePriest Elementary School

DeWitt Clinton Elementary School

SCHEMATIC DESIGN PRESENTATION

F & S Caretaking Department Design Standards For New or Renovated U of T Premises February 2015

Community Response Buchanan Elementary. December 13, 2016

What does it take to maintain a campus? What are the costs? UNIVERSITY OF ALASKA FAIRBANKS

MARY CRAPO CENTER Miller Road, Swartz Creek, Michigan

Washington Irving Elementary School

NYC Department of Education

30% Design Community Meeting

January 11, New benches installed. Paving of parking lot adjacent to piers and the canoe put-in. Near complete with clean up remaining.

Agustin Lara Elementary Academy

DRAFT. Widen Elementary School Site Summary 74,523 SF. Introduction

NARRATIVE REPORT. Underlayment Paper for Linoleum. The Asbestos Bulk Sample Results Table includes asbestos sampling data.

LAMPETER-STRASBURG SCHOOL DISTRICT Lampeter, Pennsylvania 17537

NYC Department of Education

NYC Department of Education

SCHOOLS + COMMUNITY rehabs, renovations, new construction

Imagine RBC 2010 The Plan

7/14/2016 CITY HALL ADA ENHANCEMENT/REMODEL ACTION PLAN 1978 Construction

First Floor. Historic Hall of Waters Assessment and Feasibility Study

NEIGHBORS SOUTHWEST NEIGHBORHOOD MEETING December 17, 2014 BEAVERTON SCHOOL DISTRICT SOUTH COOPER MOUNTAIN HIGH SCHOOL

George B Swift Elementary Specialty School

Binghamton University Construction SUMMER 2012 HIGHLIGHTS

1002 S. Vandeventer Ave: Drive-Thru Variance. Site Address: 1002 S. Vandeventer Ave. Request: Drive-Thru Variance. Company Name: White Castle

WESTERN ILLINOIS UNIVERSITY

Fall 2017 Construction Update

West Hartford Public School District

Adopted DEFP FY16 - Amendment. Broward County Public Schools. Amended to Incorporate Board Approved Changes

Updated: 8/16/ Facilities Profile

LANGAN LANDSCAPE ARCHITECTURE + PLANNING FOR COLLEGES & UNIVERSITIES

MOUNT PLEASANT MIDDLE SCHOOL HVAC. M-01 Heating Plant: M-02 Heating & Ventilating Systems: Livingston School District Mount Pleasant Middle School

Blue Springs Park. Park Land Established: Developed Acres: 12 acres Undeveloped Acres: 2 acres

Transcription:

Approved Bond Projects for Alamance-Burlington Schools In November 2018, Alamance County citizens approved a $150 million bond project proposal. Bond funds will pay to construct a new high school and provide renovations and upgrades to 8 of the district s 36 schools. New High School Concept

New High School* Bond Issue: September 2020 Target Completion: May 2023 Two levels of classrooms Double height media center Auxilary gym Gym support Two levels of classrooms *Concept Image Only Main gym Double height main street with Clerestory Double height dining area Main entry Administration Auditorium support Auditorium will pay for the construction of a new 1250 student high school with a core capacity of 1500 situated between Southern Alamance and Eastern Alamance high schools to help alleviate overcrowding. Completed project will include: Land acquisition Utilities to site School building construction of approximately 240,000 SF Athletic fields and associated buildings for concessions, ticketing, restrooms Project Costs Include: Professional Fees Survey Soil borings Construction testing & inspections Furniture, Furnishings & Equipment Allowance Technology Allowance Parking and drives Stormwater measures (retention ponds, etc.) Survey Cost Estimate: $67,012,616 Soil borings Go to www.abss.k12.nc.us ABSS Bond Timeline

Southern High School Bond Issue: September 2020 Target Completion: December 2022 Year built 1959 Building area: 158,626 SF Acres: 89.5 includes Southern Middle Classroom capacity: 1100 students Number of students 1,499 (2017-2018) 136.27% capacity will pay for the following at Southern Alamance High School: Add 27,525 SF building space to provide: Demolish 2 buildings and construct 2-story classroom building to replace 16 classrooms and restrooms plus 6 classrooms 5 science labs 3 resource rooms Cafeteria/Dining Expansion Replace damaged floor tiles; patch cracked terrazzo flooring Exterior window replacement & caulk where needed Renovate multi-restroom facilities with new plumbing fixtures, tile, partitions and paint Roof replacements or repairs where needed Remove lockers to widen hallways for improved traffic flow Replace non-ada compliant cabinet, sinks, door hardware Replace aging mechanical systems Add humidity controls to HVAC Replace campus walkway canopy system Cost Estimate: $20,661,931

South Mebane Elementary Bond Issue: September 2020 Target Completion: April 2022 Year built 1956 Building area: 57,062 SF Acres: 26 Classroom capacity: 575 students Number of students 629 (2017-2018) 109.39% capacity will pay for the following at South Mebane Elementary: Addition of 16 classrooms Addition of new kitchen Renovate existing kitchen space for dining expansion Replace vinyl composite tile flooring and carpet; replace with tile Renovate multi-restroom facilities with new plumbing fixtures, tile, partitions and paint Remediate water infiltration where buildings intersect Add humidity controls to HVAC upgrades or installations Replace windows in cafeteria and media center Replace non-ada compliant cabinetry, sinks, door hardware Cost Estimate: $8,482,880 Provide ADA accessible main entrance Repair damaged/cracked sidewalks Roof replacement/repair where needed Replace gymnasium flooring Fix erosion issues on site

Cummings High School Target Completion: December 2022 Year built 1970 Building area: 204,845 SF Acres: 73.5 includes Broadview Classroom capacity 880 students Number of students 956 (2017-2018) 108.54% capacity will pay for the following at Cummings High School: Auditorium lobby addition Purchase specialty equipment for Fine Arts programs Exterior window replacement & caulk Renovate multi-restroom facilities with new plumbing fixtures, tile, partitions and paint Replace non-ada compliant cabinets, sinks, door hardware Update acoustics, rigging, lighting and A/V systems in auditorium Replace carpeting and seating in auditorium Cost Estimate: $10,867,063 Replace sheet carpeting and vinyl/composite tile Remediate poor drainage at parking lots and around buildings Re-key building

Graham High School Target Completion: December 2022 Year built 1968 Building area: 149,500 SF Acres: 42.2 includes North Graham Classroom capacity: 915 students Number of students 786 (2017-2018) 85.90% capacity will pay for the following at Graham High School: Purchase equipment for specialized trades programs Flooring replacement including removal/abatement of remaining asbestos tiles Exterior window replacement & caulk where needed Renovate multi-restroom facilities with new plumbing fixtures, tile, partitions and paint Remediate cracking in concrete masonry block walls Cost Estimate: $7,619,063 Provide tempered water at eye wash stations in shop areas Replace non-ada compliant cabinets, sinks, door hardware Roof replacement or repairs where needed Add humidity controls to HVAC where needed Replace campus walkway canopy system Replace chorus room platform Repair damaged sidewalks and curbs

Williams High School Target Completion: December 2022 Year built 1950 Building area: 256,767 SF Acres: 23.57 Classroom capacity: 1180 students Number of students 1,214 (2017-2018) 102.88% capacity will pay for the following at Williams High School: Exterior window replacement & caulk where needed Renovate multi-restroom facilities with new plumbing fixtures, tile, partitions and paint Remove media center carpet; replace with tile Replace non-ada compliant cabinets, sinks, door hardware Replace auditorium seating and carpet/remediate/remove remaining asbestos Add restrooms for auditorium area Repair structural issues at exterior auditorium stairs Re-key building Roof replacement/repairs where needed Cost Estimate: $4,646,400

Eastern High School Target Completion: March 2023 Year built 1961 Building area: 158,626 SF Acres: 50.06 includes Woodlawn Classroom capacity: 985 students Number of students 1,273 (2017-2018) 129.24% capacity will pay for the following at Eastern Alamance High School: Add 7,618 SF building space to provide: Cafeteria/Dining Expansion 4 classrooms 2 classrooms Exceptional Children program 1 resource room Cost Estimate: $11,657,249 Exterior window replacement where needed Renovate multi-restroom facilities with new plumbing fixtures, tile, partitions and paint Roof replacement or repairs where needed Humidity controls/hvac upgrades where needed Canopy replacement/repairs Replace auditorium seating Replace non-ada compliant cabinetry, sinks, door hardware Remove lockers to widen hallways for improved traffic flow Grading work to correct eroding slopes Update switchboard/wiring

Western High School Target Completion: March 2023 Year built 1960 Building area: 136,200 SF Acres: 38.94 Classroom capacity: 1085 students Number of students 1,212 (2017-2018) 111.71% capacity will pay for the following at Western Alamance High School: Add 7,618 SF building space to provide: Cafeteria/Dining Expansion 4 classrooms 2 classrooms Exceptional Children program 1 Career/Technical Education lab 2 resource rooms Restrooms Cost Estimate: $12,400,611 Flooring replacement remove/abate remaining asbestos tiles Exterior window replacement & caulk where needed Renovate multi-restroom facilities with new plumbing fixtures, tile, partitions and paint Roof replacement or repairs where needed Humidity controls/hvac upgrades where needed Replace campus walkway canopy system Replace auditorium seating Replace non-ada compliant cabinetry, sinks, door hardware Remove lockers to widen hallways for improved traffic flow Rework exterior sidewalks for better accessibility

Pleasant Grove Elementary Target Completion: March 2023 Year built 1929 Building area: 42,465 SF Acres: 16.38 Classroom capacity: 324 students Number of students 283 (2017-2018) 87.35% capacity will pay for the following at Pleasant Grove Elementary: Flooring replacement to include removal/abatement of remaining asbestos tile Renovate multi-restroom facilities with new plumbing fixtures, tile, partitions and paint Exterior window replacement where needed Repair entrance canopy Add humidity controls to HVAC upgrades or installations Replace non-ada compliant cabinetry, sinks, door hardware Fix erosion issues on site Repair damaged/cracked sidewalks Roof replacement/repair where needed Replace aging electrical panels Replace aging mechanical equipment Cost Estimate: $6,474,192