HPS Controls Ltd. Series 600 LFI / CFI Series 700 HFS Zone Control Stations. Heating and Radiant Floor Zone Control Stations

Similar documents
HPS Controls Ltd. Series 600 LFI / CFI Series 700 HFS Zone Control Stations. Heating and Radiant Floor Zone Control Stations

HPS Controls Ltd. Series 100 LTV / CTV Zone Control Stations. Heating and Radiant Floor Zone Control Stations. Installation Instructions

Table of Contents. Installation, Operation, and Maintenance Manual V100 Series

THE HEATING BOX. Training Manual. Model KD-HBO100 & KD-HBC100. * KD-HB100 (Open-Loop System) * KD-HBC100 (Close-Loop System)

INSTALLATION INSTRUCTIONS and OPERATING MANUAL. *Aquastat is a registered trademark of Honeywell International, Inc.

ECO1ZN3P, ECO2ZN4P ECO

INSTALLATION INSTRUCTIONS and OPERATING MANUAL. *Aquastat is a registered trademark of Honeywell International, Inc.

INSTALLATION INSTRUCTIONS

Instruction Sheet. Variable Speed - Outdoor Reset (00-VR) 00 Cartridge Circulator

be liable for any other loss or damage, whether direct, indirect, incidental or consequential.

INSTALLATION INSTRUCTIONS and OPERATING MANUAL. *Aquastat is a registered trademark of Honeywell International, Inc.

2.A MANIFOLD SHUNTS MINI SHUNTS

INSTALLATION INSTRUCTIONS and OPERATING MANUAL. *Aquastat is a registered trademark of Honeywell International, Inc.

Instruction Sheet 00 Variable Speed Delta T (00-VDT)

Low Temperature Stainless Steel Panel Series Installation and Commissioning Guide

ERGOMAX 7 INSTALLATION

Heat Transfer Products, Inc. 120 Braley Road East Freetown, MA The first totally integrated multiple boiler management control.

Multiple Boilers Electro TS Series Application EB-C-STG5

- Data Brochure D 260. Boiler Control /09

WMWLB / WMWFM / WTWLB / WTWFM Series Hydronic Heating Unit

Viessmann B1HA Boiler Series

INSTALLATION INSTRUCTIONS and OPERATING MANUAL. *Aquastat is a registered trademark of Honeywell International, Inc.

Applications and Piping Strategies for Condensing Boilers - Introduction

120 VAC SYSTEM CONTROL KIT Model: CK-63

Storage Tanks. Instruction Manual. To the Installer: Please attach these instructions next to the water heater.

NXM2G Installation and Operating Manual

Indirect Water Heater

NIBCO Radiant Panel Model RHP-3

Table of Contents. Installation, Operation, and Maintenance Manual ELBPxx

- Data Brochure Boiler Control 274

SYSTEM CONTROL KIT Model: CK-41P

TECHNICAL INSTRUCTIONS

EASY$ TIP SHEETS. Energy Advice Saving Yukoners Money. How hydronic heating systems work

- Application Boiler Control 260

Basic Radiant Panel Model RHP-2-4

PRE-ASSEMBLED RADIANT CONTROL PANEL INSTALLATION MANUAL

Owner s Manual PCS PRO

MDV. Mixing Degas Vessel. For Spa Ozone Generators Installation & Operations Manual Rev.C

Instruction Sheet X Pump Block (XPB)

Boiler Demand Mix 1 Demand Mix 2 Demand DHW Demand Setpoint Demand

Standard and CELDEK Evaporative Cooler Modules Installation, Operation, and Maintenance Manual

WKS 4000 SERIES (USA only) --INSTALLATION INSTRUCTIONS--

- Data Brochure Universal Reset Control 364

Installation Manual NPE-180A/240A WARNING. Add-on Controller Installation Kit

NIBCO Radiant Panel Model RHP-2-4

6 PIPING ARRANGEMENTS

The Universal Reset Control 363 is a microprocessor based control designed to maximize the comfort and efficiency provided by a hydronic

Allcan TM Installation Manual

INSTALLATION 125 PSI (8.6 BAR) MAXIMUM OPERATING PRESSURE

24 VAC SYSTEM CONTROL KIT Model: CK-91F and CK-91FG

WIRING DIAGRAMS R410A MODELS PAC 2OAC/2OACH CAC OWC PWC

Comfort Series Instant Hot Water System

Installation Manual WARNING. Add-on Controller Installation Kit NPE-180A/210A/240A

JH Series Installation

hydronics WHAT S WRONG WITH THIS SCHEMATIC?

Sentry LIQUID LEVEL CONTROLLER MODEL 120 OPERATING MANUAL.

INSTALLATION 125 PSI (8.6 BAR) MAXIMUM OPERATING PRESSURE

6 Zone 120/60/1vac 3A 24 VAC class 2 2 x 40 VA 2 x 5 amp fuses 1/6 hp, 120 VAC

Green Water Systems OWNERS MANUAL. Includes: Installation Procedures, Warranties, Service & Operation Guidelines.

Heat Link MECHANICAL ROOM IN A BOX. SSP Series. SS Manifold Pump Panel Installation, Operation, and Maintenance Manual. L6SSPxx000x-BMS SSPLR106T

Heat Link MECHANICAL ROOM IN A BOX. SSP Series SS Manifold Pump Panel Installation, Operation, and Maintenance Manual. L6SSPxx000x SSPLR106T SSPSS106B

Basic Radiant Panel Model RHP-3

Installation Operating Maintenance

INSTALLATION, OPERATION AND MAINTENANCE

- Essay Control Functions and Benefits

Model R060 Installation - Operation Manual

- Data Brochure Mixing Control 360

Installation & Operation Manual Models: SSS031, SSS041, SSS051, SSS081, & SSS119

- Application A Boiler Control 262 & One Stage Setpoint Control 150. Mechanical Remote Display Module (D1) 040 MODE 1

WIRING MODEL 20 Low Water Cut-Off and Pump Control MAXIMUM PRESSURE: 20 PSI INTERNAL WIRING BLUE WHITE UPPER PROBE (FEED OFF) FEED PROBE (FEED ON) ALL

READ THESE INSTRUCTIONS CAREFULLY AND COMPLETELY BEFORE PROCEEDING WITH THE INSTALLATION.

Standard and CELDEK Evaporative Cooler Modules Installation, Operation, and Maintenance Manual

Desiccant Tank Retrofit Kit for CD100/CS101 dehumidifying dryers

AA-480-XX OUTDOOR THERMOELECTRIC COOLER ASSEMBLY USER S MANUAL

- Data Brochure Boiler Control 264

MCD. Corona Discharge Ozone Generators MANUFACTURED BY Bullock Lane San Luis Obispo, CA

Product Instructions. Hydronic Mixing Block Version Wiring Terminal Block Pressure/Temperature Sensor Delivery Fitting (3) Display Screen

Installation and Operation Manual. ACF-18 Automatic Chlorinating Feeder

INSTALLATION 125 PSI (8.6 BAR) MAXIMUM OPERATING PRESSURE

Taco 00 Series Cartridge Circulators

Instruction Sheet. Variable Speed - Solar (00-VT) 00 and Load Match Cartridge Circulators

- Data Brochure Universal Reset Module 423

- Data Brochure Universal Reset Module 422

Radiant Thermostat 519

Installation and Service Manual. In-Floor Warming Module external desuperheater for 3rd party air source heat pumps

MODEL REO-1620SE ELECTRIC RETHERMALIZER OPERATING INSTRUCTIONS

120 VAC SYSTEM CONTROL KIT

INSTALLATION ADJUSTMENT SERVICE

COMPASS HIGH-EFFICIENCY WET-ROTOR CIRCULATORS

Installation Manual. Expansion Module 0100 Version 1.0 EXP HBX Control Systems Inc.

POLAR TEMP FARM MORTALITY UNIT OPERATION MANUAL

OPERATION & INSTALLATION MANUAL IR-30, IR-234, IR-245, IR-260, IR-288, IR-14K220, IR-18K220. Electric Tankless Hot Water Heater

BB3000 Series. Application. Features. Injection Pump Control General Instructions

Note: Please provide valve serial number (stamped on cover of valve) when ordering parts. Thermometer. Hot Water Inlet. Cold Water Inlet G3600LF

OPERATION AND INSTALLATION UTILISATION ET INSTALLATION

INSTALLATION ADJUSTMENT SERVICE THERMOSTATIC WATER MIXING VALVE SERIES LV-981 & LV-982

INSTALLATION ADJUSTMENT SERVICE HIGHLOW THERMOSTATIC WATER MIXING VALVE SERIES XL-32, XL-82

92831 TEL: (714) FAX:

Auto Opening with Pressure Readout 15 x15 & 16 x20 Heat Transfer Machines

B-40/B-41 Modulating Temperature Controller

Transcription:

Series 600 LFI / CFI Series 700 HFS Zone Control Stations Heating and Radiant Floor Zone Control Stations Installation Instructions Thank you for purchasing the finest in heating and radiant floor Control Stations. We are confident that you will enjoy years of trouble free service from this Station. As with any product requiring specific installation guidelines, a good understanding of ALL the system components and final product is necessary to achieve the optimum results. This manual has been kept as short and uncomplicated as possible. Please read the ENTIRE manual before beginning your installation as this will help avoid costly mistakes.

Page 1 of 17 Table of Contents Page Applications & Features...2 Zone Control Stations...2 High Temperature Zones...2 Low Temperature Zones...2 Circuit Board Technology...2 Zone Control Station Installation...3 Important...3 Installation Instructions...3 Wiring a Panel...4 Main Power Supply...4 Thermostats...4 Dry Contact for Boiler...4 Low Water Cutoff...5 Boiler Protection Sensor Series 700...5 Boiler Protection Sensor Series 600...6 Timer Settings...6 Zone Priorities...7 Purge Delay...7 Printed Circuit Board Caution...7 System / Station Purging...8 Removing Air from the System...8 If using a Floor Drain...8 Cold Weather Startup Caution...8 Injection Control, CV Valve & Pump Settings...9 Injection Pump...9 Setting Globe Valves CV Value (Valve V3)...9 Injection Control, CV Valve & Pump Settings, Continued...10 Setting Speed of Zone Circulators...10 Powering up the Station...11 Powering up the Station...11 Diagram A (Generic Hydronic Heating Schematic)...12 Diagram B (4-Zone Hydronic Controller)...13 Diagram C (6-Zone Hydronic Controller)...14 Diagram D [Combo Temp. Injection (Flagged)]...15 Grundfos Pump Curves...16 Warranty...17

Page 2 of 17 Applications & Features Zone Control Stations Consist of a pre-piped and pre-wired unit to be used with Primary/Secondary piped hydronic systems. Available with multiple High and Low temperature zones, and is supplied with up to four circulator pumps. Each circulator pump is able to operate a specific zone each independent of each other. High Temperature Zones Used for: Fancoils Indirect Hot Water Tanks Base Board heating Low Temperature Zones Used for: In-Floor Heating The LFI / CFI series 600 Stations are supplied with a variable speed injection pump to optimize the efficiency and temperature control of the low temperature zones. Circuit Board Technology New circuit board technology enables the optimum in complete boiler system control, and simplifies wiring of the system. Features within the circuit board include: boiler control contacts various timer settings for pump exercise low water cut off contacts with indicator zone one priority setting post purge feature

Page 3 of 17 Zone Control Station Installation Important All local code requirements must be followed. Contact your Local Plumbing Inspection Department for requirements necessary for your area. Installation Instructions Refer to your shipping list and confirm that all of the components have been received and are undamaged. If you received damaged material, please notify the freight forwarder and the supplier immediately. 1. The Zone Control Station should be installed close to the heating appliance to simplify the piping installation. Fasten the Station to the wall using a minimum of eight #10 size screws. When possible fasten a wood backing of either 2x4 or plywood in place to support the Station. Attach a 2x4 to the wall for resting the station from underneath to hold the station when mounting. Remove after mounting. 2. The Main Supply and Main Return lines to the Zone Control Station are 1 ¼ copper. 1 ¼ ball valves must be installed on the main supply and return line to isolate it from the boilers primary loop. This will assist in purging of the system. The secondary supply and return pipes to the Station should be installed no more than 4 (Primary loop) pipe diameters apart when leaving and returning to the Primary loop. The individual zone supply and return lines are 1 copper and come with attached ball valves on each supply and return. 3. Measure the tube or copper pipe length required for both the supply and return lines from the station to the manifolds and install. Measure each zone separately. 4. If using Pex pipe, cut tubing longer (4" to 6"). Trim before the final connection. Caution The main supply and main return connections on the station are designed to be piped into the boiler system as the SECONDARY piping. The whole operation of the Zone Control Station is designed around Primary/Secondary piping. If the Zone Control Station is installed in any other manner, the panel may not operate properly and this will void any warranty. Refer to Diagram A which shows an example of a Zone Control Station installed in a Primary/Secondary manner.

Page 4 of 17 Wiring a Panel Refer to Diagrams B and C for illustrated circuit boards. Main Power Supply Each Zone Control Station comes complete with a: Printed Circuit Board Main Disconnect Switch Both are located in the top left hand corner of the Station. The Zone Control Station is designed to use 110V/60HZ/1PH power supply. The power should be connected to the factory installed black and white line voltage wires, and ground wire attached to the green wire Thermostats The thermostats(24v) are wired directly to the circuit board. On the larger stations, there is a total of six thermostat connections on the board, each corresponding to a specific zone. When the connections are closed between terminals R and W1, pump number 1 will be energized. The same applies for zones 2 thru 6 if equipped. An 18-2 LVT thermostat wire be installed. Thermostats that require 24 volts AC, terminal connections R and C must be used. An 18-3 LVT thermostat wire must be installed. Within the building, locate the thermostats in the desired location of the zone on an inside wall. The thermostat must be located where it will not be affected by heat sources such as a fireplace, TV, sun, or heat/ventilation duct. Note: Check that the thermostat heat anticipator is set for 0.40 amps. Dry Contact for Boiler The Boiler terminals can be used in series with the Boiler Control Circuit to turn on the boiler when only a need for heat arises. This can save on costly standby losses from the boiler firing for no reason. These contacts should be wired to the boiler thermostat terminals. Some boilers may not be equipped with thermostat terminals. If this is the case, the dry contact terminals can be wired in series with the control circuitry of the boiler (i.e. gas valve). While any pump is activated, the Dry Contacts to Boiler terminals on the Circuit Board will close. This in turn will send a signal to the boiler that there is a demand for heat, and the boiler should fire according to the temperature setting on the boiler aquastat or outdoor reset control.

Page 5 of 17 Wiring a Panel, Continued Low Water Cutoff Note: This connection on the circuit board is optional and does not have to be wired in. If a sensor is not going to be wired to the board, the jumper next to the Low Water Level connection terminals must remain in place. A Low Water Level Sensor is commonly installed on Boiler piping, and can be wired directly into the circuit board. The circuit board is also equipped to provide a 24V HOT connection to the Low Water sensor if required. The Switch mechanism within the sensor should be wired to the connections labelled WAT LVL and 24V COM. In the event of a Low water situation, the sensor will open and in turn, open the dry contact to boiler shutting the boiler down The board is also equipped with an LED light that will turn off, if a low water situation should arise. Caution: Do not apply any power source to the water sensor switch mechanism other than that from the circuit board Boiler Protection Sensor Series 700 Note: This connection on the circuit board is also optional and does not have to be wired in. If a sensor is not going to be wired to the board, the jumper must remain in place. If a sensor is desired, it must be a specific sensor only supplied by HPS Controls Ltd. This sensor is beneficial when used with cast iron boilers. It prevents cool fluid from returning to the boiler, which reduces the risk of any condensation forming on the boiler heat exchanger. If the sensor is used, the sensor itself should be installed on the primary loop return line to the boiler. The boiler protection temperature can be adjusted between 125 and 175 F. To set, adjust the setscrew labelled R26 on the circuit board. If the boiler return sensor reads a temperature below the dialled setting, it will not allow any of the circulating zone pumps to come on until the minimum temperature setting is reached from the sensor.

Page 6 of 17 Wiring a Panel, Continued Boiler Protection Sensor Series 600 The injection pump comes with 3 sensors: zone supply sensor boiler return sensor outdoor sensor The supply sensor is already mounted inside the Station at the factory. The return and outdoor sensor have to be mounted after the piping and station are installed in the field. Refer to the enclosed installation instructions on the injection pump for mounting/wiring suggestions. Other features of the Circuit Board that do not have to be field wired Timer Settings To prolong the life of the circulators within the Station, it is equipped with pump exercise timers. There are four different timer settings that can be chosen depending on preference. The various timing settings are set by adding or removing H8 on the circuit board (bottom right corner of the board). Refer to Circuit Board Diagrams B and C for the different timer settings available. When the timer is activated, it will cycle all pumps within the station. Jumpered AB BC CD DE Time Cycle OFF 5 min every 24 hours 3 min every 10 days 3 minutes every 24 hours

Page 7 of 17 Wiring a Panel, Continued Zone Priorities Located on peg terminal H9. When Zone 1 priority is jumpered, it will shut down Zones 2 thru 6 if there is a demand on Zone 1. This feature would be used if Zone 1 was being used as a high temperature zone with an indirect hot water heater. This would direct all of the boilers capacity into heating the domestic water, which in turn would result in a higher recovery rate. Note: The Zone 1 priority feature does have a Priority Safe control that will only allow Zone 1 to prioritise for 1 hour. Purge Delay Also located on peg terminal H9. When jumpered, it allows the last zone circulator running to cycle for 2 minutes after the zone is satisfied. The purpose of this is to extract all the heat from the boiler system rather than letting it sit in the boiler itself and become wasted energy. Printed Circuit Board Caution The Printed Circuit Board is protected by a 2 Amp fuse. A multimeter is to be used for all testing required. Do not short contacts for testing as this may burn the fuse or damage the Printed Circuit Board.

Page 8 of 17 System / Station Purging Refer to Diagrams D for illustrated Zone Stations. Removing Air from the System All the air in the system must be removed during the filling of the system, by purging each circuit of each zone independently in turn. The Zone Control Station comes equipped with 2 hose bib purge valves. One for the Hi temperature zones (V1), and one for the low temperature zones (V2). 1. Place a garden hose on the purge valve (V1 or V2) within the Station, run to a convenient drain, and open the purge valve (V1 or V2). 2. The globe valve between the low and high temperature manifolds within the Station (V3) must be closed for purging. Also close valve (V4) to isolate the main supply from the main return headers within the Station. 3. Ensure that the ball valve is closed on the main return to the boiler primary loop. 4. Close all ball valves on all zone supplies and returns. 5. Open Zone #1 supply and return ball valves. Allow the water to flow through Zone #1 until the water coming out from the hose has no air showing. Continue this for each circuit, purging one zone at a time. Note: Close all the circuits after purging so that only one circuit flows at a time. In some instances, if running a zone supply to a distribution manifold for infloor piping, purge each individual floor loop before purging back to the panel. When all zones have been filled and purged: With all of the manifold valves closed, open valve V3 and the main return valve to the boiler primary loop Purge the boiler return piping After the piping to the boiler has been filled and purged, open all valves. Caution: Do not forget to open the valves at the Zone Control Station supply and returns, and all valves at the zone manifolds. If using a Floor Drain Place the hose into the floor drain approximately 3" to 4" below the water line to allow for the bubbles to be seen as they rise to the surface. Doing the purging procedure twice will reduce the chance of air in the system Cold Weather Startup Caution When doing cold weather start up, it is possible that areas of the slab may be below freezing even with temporary heat being provided. The system should not be filled and purged until it is ready to have the system circulating with the boiler in operation applying heat to the slab. Depending on the starting temperature of the slab, it may take hours to days for the slab to reach radiant floor operational temperature due to the large thermal mass.

Page 9 of 17 Injection Control, CV Valve & Pump Settings Once all the piping, wiring, and purging has been done, the injection control curve and globe valve must be set properly (only applicable to Series 600 Stations). Pump settings should be set for both 600, and 700 series Stations. Injection Pump The injection control curve is located on the side of the injection pump. This should be set on the system as it allows varied amounts of injection depending upon climate location. Refer to the enclosed installation instructions on the injection pump for information on setting the heating curve dial. Setting Globe Valves CV Value (Valve V3) The globe valve should be set in order to create a balance between the amount of fluid being injected and the amount of fluid being returned from the zone. To calculate the CV Setting: Fi: gpm Ti: temp of injection water Tr: temp of water returning from zone Load: required heat transfer to distribution circuit at design conditions 490: constant for water (use 470 for 30% glycol, 450 for 50% glycol) Fi = Load divided by 490 (Ti-Tr) Example: The injection flow rate of 180 degrees F water required to transfer 140,000 Btu/hr into the secondary circuit that operates with a return water temperature of 100 degrees F would be Fi=140,000 divided by 490 (180-90) = 3.17 gpm. CV = Total design gpm divided by square root of system pressure drop (PSI) Example: (Fi)gpm=3.17, system head loss=6.93 fthd (3psi), therefore CV=3.17 gpm divided by the square root of 3 psi (1.732)=1.83. Set the globe valve CV setting at 2

Page 10 of 17 Injection Control, CV Valve & Pump Settings, Continued Setting Speed of Zone Circulators Once all the piping, wiring, and purging has been done, the pumps within the Station have an adjustable speed setting that needs to be set. Zone Circulators provided within the Station are Grundfos UPS 15-58FC. These pumps are very flexible due to the option of setting 3 different operating speeds to match the head loss / g.p.m. of the specific zone. Adjust the Circulator by turning the set screw (located on the side of the circulator housing) to required setting 1, 2, or 3. To determine the speed setting, refer to Grundfos Pump Curves diagram. Find the curve which best matches your zone head loss and flow rate up best, and set the speed accordingly.

Page 11 of 17 Powering up the Station Powering up the Station To power up the station follow these instructions: 1. Turn on the power from the main electrical disconnect. 2. Turn on the ON/OFF switch located on the Zone Control Station. 3. Be sure the power indicator light is ON, showing power to the Zone Control Station. Note: Any time power is applied to the Zone Control Station the timer system will activate if the jumper on the circuit board is in the ON position. 4. Check that the Timer-LED light on the circuit board is flashing. This is the Normal Condition. If light is ON continuously, this is an Abnormal Condition. Circuit Board may need to be replaced. If light is OFF, this is also an Abnormal Condition. Check 2AMP Fuse on the Circuit Board. 5. Wait for the pump timer override period to finish. Turn up the thermostat for each zone in turn. Confirm that each zone is operating properly. On a demand from the thermostat, the circulator will start, giving flow to the specified zone. The LED light for each zone will light up on the Circuit Board. Note: To troubleshoot possible problems, check operating temperature of pumps. If a pump seems to be running much hotter than any of the others, there may be too much head pressure within that zone or the zone may be air locked.

Page 12 of 17 Diagram A (Generic Hydronic Heating Schematic) O R O R SPARE BASEBOARD HEATER ELEC Supply and Return Ball Valves are Field Installed SPARE AIR ELIMINATOR FANCOIL HIGH LIMIT AQUASTAT Maximum of 4 Pipe Diameters Of Secondary Piping (Example: Pipe x 4 = 4") Minimum of 6 Pipe Diameters Of Primary Piping (Example: 1¼" Pipe x 6 = 7½") BOILER PUMP BACKFLOW PREVENTER PRESSURE REDUCING VALVE LOW WATER CUT OFF SUPPLY RETURN BASEMENT MANIFOLD BOILER PROTECTION SENSOR RETURN BOILER SUPPLY EXPANSION TANK BOILER CONTROL INDIRECT WATER HEATER GENERIC HYDRONIC HEATING SCHEMATIC

Page 13 of 17 Diagram B (4-Zone Hydronic Controller) C US DO NOT SCALE DRAWING Drawn by: Type: LP/BR 4 Channel Hydronic Controller Part Number: Project: RP500004N L438A0

Page 14 of 17 Diagram C (6-Zone Hydronic Controller) C US DO NOT SCALE DRAWING Drawn by: Type: LP/BR 6 Channel Hydronic Controller Part Number: Project: RP500030 L424A2

Page 15 of 17 Diagram D [Combo Temp. Injection (Flagged)] 8" 46" 5 1/4" ELEC SIDE VIEW ZONE 1 ZONE 2 ZONE 3 ZONE 4 ZONE 5 ZONE 6 SUPPLY SUPPLY SUPPLY SUPPLY SUPPLY SUPPLY 32" 1 1/4" 1 1/4" 1/2" 1/2" 1 1/4" 1 1/4" 1 1/4" MAIN SUPPLY 1 1/4" MAIN RET. ZONE 1 RET. ZONE 2 RET. ZONE 3 RET. ZONE 4 RET. ZONE 5 RET. ZONE 6 RET. Legend 3 SPD. CIRCULATOR WITH SPRING CHECK VALVE 4 3/4" INJECTION PUMP WITH SPRING CHECK VALVE GLOBE VALVE DO NOT SCALE DRAWING, DIMENSIONS ARE IN INCHES PURGE VALVE ISOLATION VALVE THERMOMETER C US Drawn by: Type: MTA Combo. Temp. Injection(Flanged) Part Number: Model Number: HP600633 CFI-633

Grundfos Pump Curves HPS Controls Ltd. Page 16 of 17

Page 17 of 17 Warranty Hydronic Zone Control Stations LIMITED MANUFACTURER S WARRANTY We warrant products manufactured by HPS Controls to be free from defects in material and workmanship for a period of two years from the date of manufacture or one year from the date of installation, which ever occurs first. In the event of any claim under this warranty or otherwise with respect to our products which is made within such period, we will at our options, repair or replace such products or refund the purchase price paid to us by you for such products. In no event shall HPS Controls be liable for any other loss or damage, whether direct, indirect, incidental, or consequential. This warranty is your exclusive remedy and shall be in place of any other warranty or guarantee, express or implied, including, without limitation, any warranty of merchantability or fitness for a particular purpose. This warranty may not be assigned or transferred and any unauthorized transfer or assignment thereof shall be void and of no force or effect. CONDITIONS OF SALE TERMS: Net 30 days. Invoice date is the date of shipment. Subject to credit approval. Past due invoices are subject to 2% per month (24% per annum) late charge. RETURNS: Factory authorization is required prior to any return, the return must be made within (60) days of such authorization. Product to be returned must be shipped freight prepaid, and is subject to a 25% handling charge. RGA form required with serial number, purchase date and a detailed description of problem. CLAIMS: Claims for shortage or error in shipment must be made within (5) days of receipt. Claims for damage or loss in transit must be made directly to the delivering carrier. 10683 214 Street EDMONTON, ALBERTA, CANADA T5S 2A2 Phone: 780-482-1051 780-800-1051 Fax: 780-482-3143 e-mail hpsc@telus.net Website: www.hpscontrols.com