Russ J. Joffrion, P.E. Whitney Thompson, P.E.

Similar documents
Pontchartrain Coastal Lines of Defense Program Figure 1 Figure 2 Figure 1

Design Guidelines for the Enhancement and Creation of Estuarine Habitats in the Middle Reaches of the Lower Columbia River

Beneficial Use at Deer Island A Decade of Design and Implementation. Mississippi Water Resources Conference Jackson, Mississippi April 3, 2012

BEACH AND INLET PROJECTS UPDATE

Inner Harbor Navigation Canal Lock Replacement General Reevaluation Report and Supplemental Environmental Impact Statement

CITY PLANNING COMMISSION CITY OF NEW ORLEANS MITCHELL J. LANDRIEU ROBERT D. RIVERS EXECUTIVE DIRECTOR. City Planning Commission Staff Report

Dauphin Island s East End Beach and Barrier Island Restoration Project. April 16, :00 PM Dauphin Island Sea Lab, Shelby Hall

Coastal Engineer IV, Mott MacDonald, Morado Circle, Suite 300, Austin, TX 78759, USA, T: ,

There is an ongoing regulatory concern that

CITY PLANNING COMMISSION CITY OF NEW ORLEANS MITCHELL J. LANDRIEU ROBERT D. RIVERS EXECUTIVE DIRECTOR. City Planning Commission Staff Report

Goals and Strategies. Goals. Strategies. Long-term Beach and Shoreline Management Program

NJ Department of Environmental Protection

PLANTING OF LARGE SCALE MARSH PROJECTS. Eddie Seidensticker, biologist, Natural Resources Conservation Service

URBAN FLOODING A GROWING NATIONAL CHALLENGE. Samuel D. Brody, Josh Gunn, Jayton Rainey, Wesley Highfield Texas A&M University

JOINT PUBLIC NOTICE. 26 June United States Army Corps of Engineers State of Louisiana

Coastal Planning in Texas. Tony Williams Senior Director of Planning Coastal Resources Division Texas General Land Office

RIVERFRONT REDEVELOPMENT PLAN

Flood Mitigation Planning Bayou des Allemands St. Charles Parish, Louisiana

NEW ORLEANS LAKEVIEW FLOATING STREETS

Towards a Resilient Stormwater Future: Building Back from Hurricane Irene and Tropical Storm Lee. October 15, 2015 VUSP Symposium

Improvement of the Atlantic Coast of New York City,

Saltmarsh Conference. 8 October in the Suffolk Coast & Heaths Area of Outstanding Natural Beauty

Adaptive Management Strategies for Resilient Coastlines: A Case Study on the Ft. Pierce, FL Breakwater Project

Public Meeting Summary

Project Location. Jay and Patty Baker Park and Gordon River Greenway Connector Bridge. Naples Beach Golf Club. Gordon River. East. Naples.

Middle Mississippi River. Regional Corridor

Memorandum. AECOM Technical Services Inc. Page 1

Draft Rhode Island Stormwater Design and Installation Standards Manual

Scope 9 (or 10) Shoreline Stabilization Approaches

Understanding Drainage Options What s Feasible and Legal. February 2019

VALLEY VIEW POND Q&A. This item will be discussed under the First Reading portion of the agenda at the July 17, 2012 Village Council meeting.

Ashbridges Bay Erosion and Sediment Control Project

DEPARTMENT OF PLANNING JEFFERSON PARISH, LOUISIANA

Poisoned Park? How Exide s Lead Contamination Risks Frisco s Grand Park

Awards American Planning Association Louisiana Chapter

Appendix C Agency Correspondence

Guidance on Preparation of Construction and Maintenance Costs

Interested parties are advised that the following Cease & Desist Orders were issued by the New Orleans District during the month of January.

Texas AgriLife Extension Service

Commercial Launch Site Addendum to Wetland Mitigation Plan. Revision 2. April 25, SpaceX Proprietary

DEPARTMENT OF PLANNING JEFFERSON PARISH, LOUISIANA

Improving an Urban Watershed The Past, Present and Future of Addison Creek

Constructed Stormwater Wetlands

Subject: Sea Level Rise Constraints and Opportunities for India Basin

continues in the watershed, additional flood control and water quality / natural system improvements may be required in the future.

ALTERNATIVE SHORELINE MANAGEMENT IN COASTAL MISSISSIPPI

EROSION CONTROL Professional Development Training. Sean Crimmins, President Brian Barker, Southeastern Consultant

Peoria Riverfront Development (Ecosystem Restoration) Upper Mid-sized Island Critical Restoration Project (September 2011)

After the Storms: Planning for Louisiana s Future. Larry Ardoin Coastal Protection and Restoration Authority Integrated Planning Team

BASS PONDS, MARSH, & WETLAND HABITAT RESTORATION PROJECT

Pontchartrain Coastal Lines of Defense Program. Lake Pontchartrain Basin Foundation Coastal Sustainability Program

Fisher Slough Tidal Marsh Restoration Project Scaling Down the Restoration Planning & Analysis Framework to Evaluate Project Alternatives

Hunts Point Landing, Bronx, New York

Roles, Responsibilities, and Plans for Transportation Systems in Mass Evacuations

GREEN INFRASTRUCTURE DESIGNS RAIN GARDEN

EEA Capital Investment in Green Infrastructure

Wetlands Board Hearing Procedures

Balancing Conservation and Development on the Jordan River

Agenda. NPDES Phase II Program (US EPA, 2003 Pending 2009) Costs of Stormwater Management and How to Structure a Stormwater Utility

RFP DRAINAGE OUTFALL DESIGN AND PERMITTING. Mandatory Meeting for Proposers August 15, 2015

SUMMARY. Support the Southeast Arkansas Regional Intermodal Facility.

The Napa River Flood Protection Project

Funding, Designing, and (eventually) Building Miles of Shoreline and Acres of Wetlands and Oyster Reefs on an Urbanized River!

water resource specialists

Introduction to the Seahurst Park Ecosystem Restoration Project: A Process of Transformation. Presented by Peter Hummel, ASLA, LEED AP

ARTICLE VI: SITE PLAN REVIEW

Natural Resource Adaptation Action Area Addressing Sea Level Rise in Estuarine Ecosystems TO: TOWN OF YANKEETOWN MAY

TAPPING THE INGENUITY OF STUDENTS TO DESIGN A RESILIENT TEXAS COAST

TABLE OF CONTENTS PAGE

Preliminary Sea Level Rise Case Study: Navarre Beach, FL

Final Design Activity Descriptions July, 2017

Lessons Learned from Katrina and Reducing Vulnerability Fall 2011

City of Stoughton Erosion Control Permit Application (effective 2/6/2018)

2017 Canadian Consulting Engineering Awards

Mitigation + Adaptation Strategies for Historic Structures and Sites

DRAFT MAP AMENDMENT FLU 04-4

The Effects of Woody Vegetation on Levees

Public Meeting Summary

INTER-AGENCY COORDINATION MEETING

FRI B04 ASLA 2014 DENVER Dredge Landscapes Dredge Landscapes: Sediment Flows, Earth Moving, and Dredge as Designed Landscape

Part 4: CRS Stormwater Management Activity (450) and Urban Flooding Best Practices

Rt. 29 Solutions Project Delivery Advisory Panel. January 7, 2016

The Flow. Green Infrastructure Taking Root in Cities 3/23/2015. Green Infrastructure Evolution City Plans/Projects Measureable and Holistic Benefits

DRAFT ONONDAGA LAKE CAPPING AND DREDGE AREA AND DEPTH INITIAL DESIGN SUBMITTAL H.3 STATIC SLOPE STABILITY ANALYSES

CONSERVATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

Best Practices Appendix: Waterfront Communities

SR 15 SECTION 088 CSVT SOUTHERN SECTION PUBLIC MEETING JUNE 16, 2015

Synthetic Mudscapes: Human Interventions in Deltaic Land Building

Urban Planning and Land Use

FIRST AMENDMENT WATERSHED MANAGEMENT AREA 16 MASTER PLAN

M-231 and Water Quality. Ottawa County Water Quality Forum November 21, 2016 James Fortney, MDOT

TENNESSEE GAS PIPELINE COMPANY, L.L.C.

Northeast Anthony Henday Drive Manning Freeway to Whitemud Drive Welcome to this Construction Information Session

City of Miami MIAMI RIVER BASIN WATER QUALITY IMPROVEMENT REPORT FOR FIRST AND SECOND QUARTER 2010

SOUTH FOX MEADOW STORMWATER IMPROVEMENT PROJECT

Ottawa County Parks, Recreation & Open Space Plan. February, 2006

Date of Advertisement: January 14, 2019 Deadline for Receipt of Qualification Statements and Priced Proposal: February 12, :00 pm.

Kevin M. Rampe, President -- Lower Manhattan Development Corporation

Prioritizing Tidal Wetlands: A Landscape Approach

ALMONO. Hazelwood, City of Pittsburgh. A riverfront investment opportunity combining residential, office and light industrial uses A L M O N O S I T E

Transcription:

A Case Study and Logistics Review on the Design and Construction of the Bayou Dupont Mississippi River Sediment Marsh Creation Project Jefferson and Plaquemines Parishes, LA Russ J. Joffrion, P.E. Whitney Thompson, P.E. Louisiana Office of Coastal Protection and Restoration 2010 Restore America s Estuary Conference, Galveston, TX

Outline Project background and objectives. Design requirements for a successful marsh creation project. Project Construction Challenges. Lessons Learned.

Project Background Funding Sources: Coastal Wetlands Planning, Protection, and Restoration Act (CWPPRA) and the American Recovery and Reinvestment Act Project Sponsors: Louisiana Office of Coastal Protection and Restoration (OCPR) Environmental Protection Agency (EPA) National Oceanic and Atmospheric Administration (NOAA)

Project Objectives Create and restore approximately 577 acres of intermediate marsh. Utilize the renewable resource of the Mississippi River for the marsh fill material. Provide pipeline corridor infrastructure crossings for future dredging projects.

Project Location NEW ORLEANS PROJECT AREA

Project Location NEW ORLEANS PROJECT AREA

Barataria Basin Landbridge Naomi Lafitte Lake Salvador The Pen BA-41 (Awarded?) BA-39 (II) (Built) BA-39 (Built) BA-39 (III) EPA Myrtle Grove BA-23 (Built) BA-26 (Built) R2-BA-12 NRCS PPL 20 BA-48 BA-48 (II) NOAA PPL 20 BA-27 (Built) 13.3 24.3 BA-36 (Built) 20.1 BARATARIA LANDBRIDGE R2-BA-15 NRCS PPL 20 Little Lake Turtle Bay

Criteria Needed for a Successful Marsh Creation Project Identify Infrastructure & Cultural Resources Identify the Borrow Source Identify Marsh Creation Fill Area(s) Identify Construction Access & Pipeline Corridors Bathymetric and Geotechnical Data Acquisition Determine Target Marsh Fill Elevation Submit Permits

Project Location

Mississippi River Borrow Area Design Criteria USACE Mississippi River Dredging Restrictions and offsets Navigation Concerns Existing Revetment Mississippi River Levee Crossing Requirements River Stage Seasonal Variation Required Volume for Marsh Fill Areas Proposed USACE Saltwater Barrier Sill Location Monitoring Bathymetric Surveys for Infilling

Revised Mississippi River Borrow Area

Revised Mississippi River Borrow Area Material: D50 is approximately 0.35mm & 10% silt. Located on a stable point bar. Revised Mississippi River Borrow Area Template due to navigation concerns; conducted slope stability analyses.

Marsh Creation Design Criteria Existing Marsh Elevation = 0.88 NAVD88 Mean High Water = 0.87 NAVD88 Mean Low Water = 0.50 NAVD88 Target Marsh Fill Elevation = 1.3 NAVD88 Construction Marsh Fill Elevation = 2.0 NAVD88 (based on consolidation estimates)

Marsh Creation Fill Areas

Marsh Creation Area- Increment 2

Dredge Pipeline Corridor

Dredge Pipeline Corridor Highway Crossing Railroad Crossing

Construction Bid Opening November 2008- Great Lake Dredge and Docks Company BA-39: $20,723,015 BA-39 II: $ 4,566,003 Notice to Proceed February 2009 Construction Start April 2009 Dredging Complete March 2010 Demobilization Complete April 2010

Construction Equipment 32 Hydraulic Cutter Suction Dredge Florida. Approximately 2,500,000 cubic yards river sediment placed. Marsh Hoe 1.75 cu. yd. bucket.

Hydraulic Dredge

Dredge Pipeline Corridor

Dredge Pipeline Corridor

Jacking Pit

Receiving Pit

Dewatering Equipment

Marsh Construction

Marsh Construction

Marsh Construction August 2010

August 2010

Construction Issues and Lessons Learned Mississippi River- Barge Oil Spill August 2008 2009 High River Stage No excavation above +11 NGVD at Carrollton Gage (USACE New Orleans) Unclear Army 404 Permit Conditions Navigation Industry Borrow Area Relocation Survey Data

Construction Issues and Lessons Learned River Stage Fall 2009 High Water Stage

Acknowledgements Whitney Thompson, P.E., Coastal Planning & Engineering, Inc. Brad Miller, OCPR Project Manager Peter Hopkins, P.E., OCPR Field Engineer Paul Kaspar, EPA Project Manager Cecilia Linder & Cheryl Brodnax, NOAA Roy Woods, Project Manager, Great Lakes Dredge and Dock Company

Questions?