Francis M McKay Elementary School

Similar documents
Genevieve Melody Elementary School

Agustin Lara Elementary Academy

Edward Jenner Elementary Academy of the Arts

Washington Irving Elementary School

Richard Henry Lee Elementary School

Joseph Brennemann Elementary School

Josefa Ortiz De Dominguez Elementary School

DeWitt Clinton Elementary School

Charles W Earle Elementary School

Sidney Sawyer Elementary School

Oscar DePriest Elementary School

George B Swift Elementary Specialty School

Calmeca Academy of Fine Arts and Dual Language

John Palmer Elementary School

Alessandro Volta Elementary School

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance

MUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

SITE SYSTEMS: FANNIE MAE EXPECTED USEFUL LIFE TABLES (FMEUL)

DOCUMENT TABLE OF CONTENTS

MARY CRAPO CENTER Miller Road, Swartz Creek, Michigan

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000

PLAN REVIEW SUBMITTAL GUIDE

Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15)

MUKWONAGO SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

2014 Bond Project Guide

Cook - Wissahickon Elementary School

Mechanical Inspection Plumbing

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District

SECTION HVAC TABLE OF CONTENTS PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS FILED SUB BID PROJECT OVERVIEW...

Briar Crest Elementary

GARCIA GALUSKA DESOUSA Consulting Engineers

RECAPP Facility Evaluation Report

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT

PLATTEVILLE MIDDLE SCHOOL

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building

NYC Department of Education

NYC Department of Education

Master Facility Planning Update School Board Meeting May 26, 2016

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect

New High School Concept

Evaluation. ems. Prepared By: Martha. a s Vineyard. Box P.O. Box June 2015

Kerrville ISD has called for a bond election in the amount of $88,960,000 for November 6, 2018

NYC Department of Education

Florence High School / Middle School Page 1 of 3 Florence, WI

Madeira City Schools Madeira, Ohio. HVAC Assessment. December 2011 (Revised February 2012)

NYC Department of Education

NYC Department of Education

4. OVERVIEW OF MECHANICAL SYSTEM

RECAPP Facility Evaluation Report

NYC Department of Education

NYC Department of Education

NYC Department of Education

1354 CHECKLIST for Project Closeout

$ Each additional variance per petition. $ All Other Zoning Districts: One variance per petition

Appendix B. Facilities Assessment Report

Estimated Repair, Replacement, and Upgrade Costs

Ashland School District Facility & Capacity Assessment Report 2005

NYC Department of Education

CLEVELAND HEIGHTS UNIVERSITY HEIGHTS CITY SCHOOL DISTRICT MONTICELLO & ROXBORO MIDDLE SCHOOLS INTERIOR DESIGN

Ichabod Crane Central School District 2018 Capital Project Preliminary Estimate

SCO # 1 & 2 PUNCLH LIST Project Name: VANCLEAVE UPPER ELEMENTARY CLA#: 13003

MID MICHIGAN COMMUNITY COLLEGE HARRISON CAMPUS Harrison, Michigan 2015 MASTER PLAN

MOUNT PLEASANT MIDDLE SCHOOL HVAC. M-01 Heating Plant: M-02 Heating & Ventilating Systems: Livingston School District Mount Pleasant Middle School

Mechanical System Description

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

Dates of Construction Construction Start 2/28/1999 Date of Completion 4/2000 Occupancy 5/2000

Forest Hills Facilities Plan

State College Area School District High School North Building EXISTING CONDITIONS ASSESSMENT

FORT ERIE SECONDARY SCHOOL FACILITY INFORMATION. Lake Erie Corridor Secondary Schools Accommodation Review

Submitted to. Texas A&M University-Corpus Christi The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge

DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students

NYC Department of Education

Residential Construction and Remodeling Estimates. compliments of. pillartopost.com

S AGE E NGINEERING A SSOCIATES, LLP

Appendix E: Photo Documentation

Master Project List Report

NYC Department of Education

Existing Conditions Assessment November 14, 2006 NORTH MIDDLESEX REGIONAL HIGH SCHOOL Townsend, MA L21366/ /Page 1

NYC Department of Education

RECAPP Facility Evaluation Report

2 Existing Mechanical System

Massachusetts School Building Authority

SCHEDULE OF FEES. Penalty Fees. Building Fee Schedule FEE

Beaufort County Community College. Maintenance and House Keeping Plan

NYC Department of Education

Submitted to. Texas A&M University at Galveston The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge

NYC Department of Education

First Floor. Historic Hall of Waters Assessment and Feasibility Study

REPAIR ESTIMATE GUIDE

NYC Department of Education

CHAPTER 7 ALTERATIONS LEVEL

NYC Department of Education

TUFTS FACILITIES SERVICES BASELINE MAINTENANCE VS. CHARGEABLE SERVICES

NYC Department of Education

August 15, 2013 Page 1 of 19

Transcription:

Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual observation only; they do not test operability or perform destructive testing inside walls, ceilings or floors. The rankings below reflect the assessors visual evaluations of the property condition as of that date. For additional information, you may review the detailed assessment report linked on this school s profile page and visit the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/about_cps/policies_and_guidelines/pages/facilitystandards.aspx. Condition ings and Descriptions : The item/system is new or in good condition and no work is required. : The item/system requires general cleaning and/or routine maintenance. : The item/system requires repairs and has not reached the end of its serviceable life. : The item/system has reached its expected useful life, but is still fully operational. CPS will maintain until replacement occurs. : The item/system has surpassed its expected useful life and has limited operability. CPS will maintain until replacement occurs. : The item/system has surpassed its expected useful life and has low operability. CPS will maintain until replacement occurs. : The item s/system s failure leads to an immediate life safety condition for occupants or to the potential of an uninhabitable facility.¹ Definitions means, for each item, the total number (or amount) of that item that exists and was evaluated. Within that, different portions may have different rankings. means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). means a basic estimate for each item needing some level of repair or replacement. does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Campus Need listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Need also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. EXTERIOR CHIMNEY Brick Chimney - Concrete/ Mortar Liner BLU 5 70 70 LF $125,125 $125,125 CORNICE Cornice - Masonry Projecting/Limestone GRE 6 950 950 LF $29,140 $29,140 Assessment Date: 6/18/2012 Page 1 of 17

DOORS Exterior FRP Door Transom Lite ENTRANCE GRE 6 28 GRE 6 8 28 EA $15,592 8 EA $2,265 $17,857 Concrete Exterior Stairs Entrance Controls - Audio and Video Power Door Operator and Controls Ramp Handrails Stair Handrails GRE 6 55 GRE 7 4 GRE 7 4 15 GRE 6 70 55 LF $5,899 4 EA 4 EA 115 LF 70 LF $5,899 FOUNDATION Concrete Foundation GRE 6 120 1,900 2,020 LF $53,570 $53,570 LIGHTING Exterior Lights - Wall Mounted GRE 7 26 26 EA LINTELS Lintels - Steel Lintels - Stone GRE 7 944 GRE 6 16 944 LF 16 LF Assessment Date: 6/18/2012 Page 2 of 17

PARAPET Coping - Stone Parapet < 16" Height Parapet > 30" Height GRE 6 2,170,120 GRE 6 1,050 2,170 LF 1,120 LF 1,050 LF $272,522 $272,522 ROOF SYSTEM Asphalt Gravel Ballast Roof Exterior Downspouts Interior Downspouts Modified Bitumen Roof Roof Structure: Steel with Clay Tile Arch Roof Structure: Steel/Metal Deck/Concrete Topping YEL 4 3,000 18,350 GRE 6 250 GRE 6 350 GRE 6 200 24,480 GRE 7 21,230 GRE 7 24,480 21,350 SF $544,054 250 LF $4,648 350 LF 24,680 SF $178,001 21,230 SF 24,480 SF $726,702 SUPERSTRUCTURE Metal Deck/Concrete Topping Steel with Clay Tile Arch GRE 7 GRE 7 55,088 SF 55,088 SF WALLS Brick Stone - Cast WINDOWS GRE 6 57,390 GRE 6 6,010 57,390 SF $379,153 6,010 SF $85,943 $465,096 Clerestory - Glass Single-Pane ORA 2 600 600 SF $84,942 Assessment Date: 6/18/2012 Page 3 of 17

Window - Guards perforated Window - Guards wire guard Windows - Sash Aluminum EXTERIOR ELECTRICAL EMERGENCY SYSTEM GRE 7 4,384,040 GRE 6 18 11,000 4,384 SF 1,040 SF 11,018 SF $96,775 $181,717 $1,877,627 Automatic Transfer switch Emergency A/C power - Auditorium and aisle lighting Emergency A/C power - Corridors and Stairs Emergency A/C power - Gym and Lunch rooms Emergency Battery Packs - Corridors and Stairs Emergency Battery Packs - Lunchroom and Gym Emergency Battery Packs - Toilets Emergency generator below 60 KW natural gas - Outdoor Exit Signs - Auditorium Exit Signs - Corridors and Stairs Exit Signs - Lunchroom - Gym - multipurpose rooms Public Announcement System Security System - Intrusion detection System 1 emergency service configuration GRE 6 1 3 ORA 2 3,140 GRE 6 8,604 GRE 6 3,021 GRE 7 21 GRE 6 3 BLU 5 1 YEL 4 6 BLU 5 12 24 GRE 6 16 BLU 5 128,128 GRE 6 128,128 BLU 5 4 EA $1,430 3,140 SF $21,777 8,604 SF $3,691 3,021 SF $1,598 2 3 EA $322 $343 6 EA $5,577 36 EA $16,748 16 EA $3,729 128,128 SF $183,223 128,128 SF $119,095 SF $73,113 $430,648 MAIN SERVICE Main Electrical service 1600 A 120/208/3PH Main Electrical service above 3000 A 277/480/3PH Assessment Date: 6/18/2012 Page 4 of 17

POWER DISTRIBUTION Lighting and power panels Main distribution panels 400-600 amp Main distribution panels above 600 amp Main distribution panels less than 400 amp Transformers 120/240-120/208 ELECTRICAL GRE 6 21 23 GRE 7 6 44 EA $15,015 6 EA $15,015 $445,663 FIRE PROTECTION FIRE ALARM Fire Alarm Strobe Lights Fire Alarm System Fire Pump Controller PUMP ROOM ASSEMBLY Fire Pump 25-50hp Jockey Pump SPRINKLER SYSTEM GRE 6 YEL 4 55,088 BLU 5 1 BLU 5 1 GRE 6 1 SF $26,112 128,128 SF $283,356 $9,295 $318,763 $15,015 $744 $15,759 Sprinkler Heads Sprinkler Piping FIRE PROTECTION GRE 7 GRE 7 SF SF $334,522 Assessment Date: 6/18/2012 Page 5 of 17

MECHANICAL AIR CONDITIONING Chillers - Air Cooled - Rotary/Screw type - Roof Mounted 201 to 300 tons BLU 5 1 $210,210 Window A/C BLU 5 3 23 26 EA $31,103 $241,313 AIR HANDLING SYSTEMS Air Handling Package - Single Zone - Hot Water 12,001 to 20,000 cfm Air Handling Package - Single Zone - Hot Water 8,001 to 12,000 cfm Air Intake - Built Up Air Handling Air intake for all Air Handling s except built up AHU Fan Power Box With Hot Water Coil Make Up Air - Indoor Mounted - Gas-Heating 10,001 to 20,000 cfm Make Up Air - Indoor Mounted - Gas-Heating less than 6,000 cfm Make Up Air - Roof Mounted - Electric less than 6,000 cfm Multi Zone Built Up Air Handling - Steam 15,001 to 25,000 cfm Multi Zone Built Up Air Handling - Steam 8,000 to 15,000 cfm Multi Zone Built Up Air Handling Auxiliaries - Steam 15,001 to 25,000 cfm Multi Zone Built Up Air Handling Auxiliaries - Steam 8,000 to 15,000 cfm Reheat Boxes With Steam Coils Return Duct Work - Indoor - Vertical Shaft and Ducts Return Duct Work - Masonry and Ducts - Existing or Missing Exterior Shaft Return Fans - Indoor 10,001 to 20,000 CFM Return Fans - Indoor 5,000 to 10,000 CFM Return Fans - Indoor greater than 20,000 CFM Return Fans - Outdoor 5,000 to 10,000 CFM Single Zone Built Up Air Handling - Steam 4,000 to 8,000 cfm Single Zone Built Up Air Handling Auxiliaries - Steam 4,000 to 8,000 cfm Variable Air Volume (VAV) Box With Hot Water Coil GRE 6 4 GRE 6 2 GRE 7 2 GRE 6 2 BLU 5 38 GRE 6 1 GRE 6 2 GRE 6 1 YEL 4 1 YEL 4 1 YEL 4 1 YEL 4 1 BLU 5 10 GRE 6 180 1,500 GRE 7 80 GRE 6 1 GRE 6 1 GRE 6 1 GRE 6 4 YEL 4 2 YEL 4 2 BLU 5 17 4 EA $30,316 2 EA $12,584 2 EA 2 EA $2,860 38 EA $73,359 $4,719 2 EA $4,004 $2,288 $92,950 $57,200 $32,890 $21,450 10 EA $55,770 1,680 LF $11,326 80 LF $2,431 $1,716 $3,289 4 EA $20,020 2 EA $51,480 2 EA $14,300 17 EA $27,957 $522,908 Assessment Date: 6/18/2012 Page 6 of 17

BOILER SYSTEMS Boiler Assembly - Non-Condensing Flexible Tube Hot Water Boiler 2,001MBH-3,000 MBH Boiler Assembly - Steam - Low Pressure Scotch Marine Boiler 101-150 HP Boiler Auxiliary - Steam Boiler 101-150 HP Chemical Feed System (Steam Boilers) Chemical Pot Feeder - Hot Water Combustion Dampers Feed Water Pumps and Tank - Steam Boilers Glycol Feed System ORA 3 1 2 YEL 4 2 YEL 4 2 GRE 7 2 GRE 6 3 YEL 4 1 GRE 6 2 3 EA $308,880 2 EA $294,580 2 EA $45,760 2 EA 3 EA $858 $31,460 2 EA $2,174 $683,712 HEATING DEVICES Cabinet Heaters With Hot Water Coils Fin Tube Hot Water Radiators - Steam Heater - Electric Heater - Gas Wall Heater - Electric MECHANICAL PLUMBING Condensate Assembly - Pumps and Tank Piping - Condensate - Steel or Galvanized Piping - Hydronic Supply and Return - Steel or Galvanized Piping - Steam - Steel or Galvanized Pumps - Chilled Water 10 to 20 HP Pumps - Hot Water 11 to 20 HP GRE 6 6 GRE 6 120 YEL 4 21 YEL 4 1 GRE 6 3 BLU 5 11 16 YEL 4 2 YEL 4 1,200 GRE 6 2,400 YEL 4 1,200 GRE 6 2 GRE 6 6 6 EA $3,003 120 LF $2,059 2 $29,429 $5,720 3 EA $6,435 27 EA $12,973 $59,620 2 EA $57,200 1,200 LF $117,546 2,400 LF $21,278 1,200 LF $143,715 2 EA $5,148 6 EA $15,444 $360,331 Assessment Date: 6/18/2012 Page 7 of 17

TEMPERATURE CONTROL Direct Digital Control (DDC) System Thermostats - Direct Digital Control (DDC) Zone Dampers GRE 6 128,128 GRE 6 34 75 BLU 5 34 128,128 SF $128,256 109 EA $4,862 34 EA $12,641 $145,759 VENTILATION Exhaust Fan - Indoor Exhaust Fans - Roof Mounted 1,501 to 8,000 cfm Exhaust Fans - Roof Mounted 500 to 1,500 cfm Exhaust Fans - Roof mounted less than 500 CFM Type I Exhaust Hood - Kitchen or Culinary Arts MECHANICAL PLUMBING HOT WATER Hot Water Heater - Gas 150,000-300,000 BTU/HR Hot Water Heater - Gas more than 300,000 BTU/HR PIPING Domestic Piping - Cold Water from Risers to Fixtures Domestic Piping - Cold Water Risers Domestic Piping - Hot Water from Riser to fixtures Domestic Piping - Hot Water Return Risers Domestic Piping - Hot Water Risers GRE 6 1 GRE 6 3 GRE 6 2 GRE 6 4 GRE 6 1 BLU 5 1 1 YEL 4 1 1 YEL 4 55,088 $501 3 EA $1,287 2 EA $458 4 EA $629 $1,716 $4,590 $2,018,233 2 EA $27,027 2 EA $49,192 $76,219 128,128 SF $26,474 128,128 SF $46,938 128,128 SF $23,306 128,128 SF $36,697 55,088 SF $29,935 Assessment Date: 6/18/2012 Page 8 of 17

Domestic Piping Cold Water Horizontal lines Domestic Piping Hot Water Horizontal lines Domestic Piping Hot Water Return Lines Sanitary Piping Storm Piping Vent Piping PUMPS 128,128 SF $148,267 128,128 SF $123,333 128,128 SF $74,510 128,128 SF $82,025 128,128 SF $55,055 128,128 SF $43,000 $689,540 Domestic Booster Pump duplex Sump Pump PLUMBING GRE 6 2 2 BLU 5 2 1 4 EA $6,292 3 EA $25,097 $31,389 $797,148 INTERIOR ADMINISTRATIVE SUITES Flooring Tile/ Sheet Lighting - Lay-In Paint Power Distribution GRE 6 868 1,800 GRE 6 1,800 868 GRE 6 10,116 GRE 7 26 2,668 SF $7,489 2,668 SF $1,287 10,116 SF 26 EA $8,776 AUDITORIUM - DEDICATED Balcony Seating Lighting - Pendant/ Surface Main Floor Seating Paint, ceilings Paint, walls Sound System GRE 6 101 GRE 6 2,740 GRE 6 282 GRE 6 100 3,140 BLU 5 5,642 10 $3,718 2,740 SF $1,959 282 EA $10,380 3,240 SF $12,574 5,642 SF $31,950 Assessment Date: 6/18/2012 Page 9 of 17

Stage Curtains Stage Lighting System Stage Platform CLASSROOMS GRE 7 2 YEL 4 400 2 EA 400 SF $33,977 $94,557 Flooring Tile/ Sheet CORRIDOR GRE 6 1,418 1,418 SF Ceiling - Lay-In Flooring Terrazzo Flooring Tile/ Sheet Lighting - Lay-In Lighting - Pendant/ Surface Stair Handrails Stairs - Terrazzo Walls - Plaster/Drywall Walls - Structural Glazed Tile GRE 6 18,600 GRE 6 50 12,400 6,000 BLU 5 8,604 GRE 6 21,982 GRE 6 6,297 GRE 6 432 432 GRE 6 216 216 GRE 6 13,781 ORA 3 200 18,600 SF $39,897 18,450 SF $73,050 8,604 SF $48,723 21,982 SF $15,717 6,297 SF $4,502 864 LF 432 LF $2,446 13,781 SF $32,516 200 SF $18,876 $235,728 DOORS Interior Steel Doors incl hw Interior Wood Doors incl hw Side-lite Transom Window GRE 6 70 6 BLU 5 120 52 GRE 7 253 GRE 6 423 76 EA $19,820 172 EA $71,351 253 SF 423 SF $7,864 $99,035 Assessment Date: 6/18/2012 Page 10 of 17

GYMNASIUM - STANDARD DEDICATED Lighting - Pendant/ Surface Paint Wood Flooring KITCHEN Flooring Tile/ Sheet Lighting - Lay-In Paint Splined Ceiling (moisture resistant) LIBRARY Flooring Tile/ Sheet Lighting - Lay-In Lighting - Pendant/ Surface Walls - Plaster/Drywall MDF/IDF Finishes Ventilation and Cooling MECHANICAL/SERVICE ROOMS Boiler Room GRE 6 3,020 GRE 6 350 7,124 GRE 6 150 2,871 GRE 6 3,420 GRE 6 3,420 GRE 6 4,800 GRE 6 4,800 GRE 6 1,550 2,816 GRE 6 2,816 GRE 6 1,550 GRE 6 3,180 GRE 6 350 ORA 3 1 GRE 6 2,736 3,020 EA $280,709 7,474 SF 3,021 SF $26,349 $307,058 3,420 SF $4,891 3,420 SF $2,445 4,800 SF 4,800 SF $13,728 $21,064 4,366 SF $12,804 2,816 SF $2,013 1,550 SF $1,108 3,180 SF $7,503 $23,429 350 SF $1,191 $14,014 $15,205 2,736 SF $12,911 Assessment Date: 6/18/2012 Page 11 of 17

Mechanical/Service Rooms MULTI-PURPOSE ROOM Flooring Tile/ Sheet Lighting - Pendant/ Surface Paint PRE-KINDERGARTEN GRE 6 5,293 GRE 6 3,990 GRE 6 3,990 GRE 6 12,118 5,293 SF $24,978 $37,889 3,990 SF $5,706 3,990 SF $2,853 12,118 SF $8,559 Casework Flooring Tile/ Sheet Instructional Surface Lighting - Lay-In Paint Splined Ceiling Work Sink GRE 6 28 GRE 6 1,200 YEL 4 12,200 GRE 6 1,328,200 GRE 7 3 28 LF $1,001 1,200 SF $1,716 12 LF $1,459 1,200 SF 1,328 SF 1,200 SF 3 EA $4,176 STAFF RESTROOM Accessories Floor and Wall Tile Ceramic/ Porcelain Floor Drain Flooring Tile/Sheet Lavatory Lighting - Pendant/ Surface Paint Partitions Water Closet BLU 5 264 143 BLU 5 264 108 GRE 6 5 GRE 6 35 GRE 6 6 GRE 6 407 BLU 5 1,092 995 BLU 5 2 GRE 6 1 5 407 SF $7,832 372 SF $4,428 5 EA $1,502 35 SF $50 6 EA $2,231 407 SF $291 2,087 SF 2 EA $1,144 6 EA $3,718 $21,195 Assessment Date: 6/18/2012 Page 12 of 17

STUDENT RESTROOMS - CHILDREN'S STANDARD Accessories Floor Drain Flooring Terrazzo Flooring Tile/Sheet Lavatory Lighting - Pendant/ Surface Paint Partitions Urinals Wall and Floor Tile Ceramic/ Porcelain Water Closet GRE 6 348 3,048 40 GRE 6 13 1 GRE 6 1,386 GRE 6 120 GRE 6 3 26 GRE 6 2,124 1,272 BLU 5 4,164 2,908 GRE 6 30 GRE 6 9 BLU 5 1,890 GRE 6 4 26 23 40 3,436 SF $32,405 14 EA $3,904 1,386 SF $7,849 120 SF $172 29 EA $15,244 3,396 SF $1,519 7,072 SF 30 EA $5,380 9 EA $3,346 1,890 SF $29,730 93 EA $71,757 $171,304 STUDENT RESTROOMS - EARLY CHILDHOOD Accessories Floor Drain Flooring Terrazzo Lavatory Lighting - Pendant/ Surface Paint Water Closet GRE 7 200 GRE 7 5 GRE 7 240 GRE 7 6 GRE 7 434 GRE 6 1,170 GRE 7 5 200 SF 5 EA 240 SF 6 EA 434 SF 1,170 SF 5 EA VERTICAL CONVEYANCE Elevator - Roped Holeless Hydraulic INTERIOR $1,047,974 Assessment Date: 6/18/2012 Page 13 of 17

ROOM CASEWORK Casework CEILING GRE 6 38 1,320 1,358 LF $53,983 $53,983 Ceiling Lay-In/Drop Plaster/Drywall GRE 6 730 GRE 6 36,874 6,540 GRE 6 1,468 730 SF $2,067 43,414 SF $79,095 1,468 SF $4,156 $85,318 CHALK BOARD Chalk Board YEL 4 1,722 1,722 LF $209,309 $209,309 FLOOR Tile/Sheet Wood GRE 6 1,148 29,666 2,700 GRE 6 12,098 33,514 SF $58,675 12,098 SF $91,345 $150,019 LIGHTING Lay-In Lighting Pendant/Surface BLU 5 284 150 185 GRE 7 48 YEL 4 12 619 EA $116,316 48 EA 12 EA $4,719 $121,035 Assessment Date: 6/18/2012 Page 14 of 17

MARKER BOARD Marker Board WALL Wall ROOM SITE CIVIL/DRAINAGE Catch Basin Site Manhole FENCING GRE 6 48 GRE 6 52,907 GRE 6 9 GRE 6 12 48 LF $1,373 $1,373 52,907 SF $124,834 $124,834 $745,871 9 EA $4,891 12 EA $8,752 $13,642 Chain Link Ornamental Iron GRE 7 264 GRE 6 50 1,568 264 LF 1,618 LF $3,115 $3,115 LANDSCAPE Asphalt Play Area/Hardscape Grass Parkway trees BLU 5 5,796 GRE 6 29,000 GRE 6 62 5,796 SF $16,411 29,000 SF $11,612 62 EA $17,732 $45,754 Assessment Date: 6/18/2012 Page 15 of 17

PARKING LOT Asphalt Concrete Curbs Lighting Parking lot interior plantings Trash Compactor Vehicular Screening BLU 5 24,350 GRE 6 704 GRE 6 8 GRE 6 70 GRE 6 578 24,350 SF $68,945 704 LF $4,248 8 EA $114,400 70 LF 578 LF $187,593 PLAYGROUND Playground Equipment - School Age 5-12 Playground Surfacing - Square Rubber Mats SIDEWALKS Internal Walks Perimeter Sidewalks SIGNAGE GRE 6 5 BLU 5 4,104 GRE 6 994 GRE 6 1,662 5 EA 4,104 SF $29,344 $29,344 994 LF $9,381 1,662 SF $3,137 $12,519 Flag Pole Marquee - Free Standing Back Lighted Monument Sign - Lighted SITE GRE 7 2 2 EA $291,966 Assessment Date: 6/18/2012 Page 16 of 17

Campus Need ² ³ $7,559,004 ¹ It is very rare for an assessor to find a feature in this condition. If they do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked 1 in summary reports; by the time the report is compiled, they have been resolved. ² As stated above, Assessed Campus Need does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Assessed Campus Need includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. Assessment Date: 6/18/2012 Page 17 of 17