Elevators Revision 01/04/2019

Similar documents
Standard Specifications for Rice University Traction and Hydraulic Elevator(s) Revision 04/28/2017

The Owner will provide the QEI inspection and certification services.

Consultant shall design elevators to comply with current ASME A117.1, ASME A117.2, UBC and NEC codes.

MAY 2016 Elevator QEI & Maintenance Performance Report

Port of Portland Conveying Equipment Guidelines

MARCH 2008 Elevator QEI / TURNOVER & Performance Report

National Reach. Local Service.

Installation of a new engineered HYDRAULIC elevator complete as described in this standard.

SECTION HYDRAULIC ELEVATORS

ELEVATOR UPGRADE AND MODERNIZATION

Planning Guide. for Residential Elevators ASME A17.1, Part V, Section 5.3. April 18, ThyssenKrupp Access

SECTION ELECTRIC TRACTION ELEVATORS PART 1 GENERAL 1.01 SUMMARY. A. Section Includes: Electric Traction Elevators.

APPENDIX C - ELEVATORS

ELEVATOR MODERNIZATION PROPOSAL

Introduction Limited-Use / Limited-Application

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Eastern Michigan University February 22 nd, 2018 SECTION ELECTRIC TRACTION ELEVATORS

DIVISION 14 - CONVEYING SYSTEMS. 1. Passenger Elevators 2. Vertical Platform and Inclined Wheelchair Lifts.

Interfacing Fire Alarm, Sprinkler and Elevator Systems

rpsa FIRE PROTECTION ENGINEERS

A17 Standards Committee Interpretations Volume 3

University of Toronto Section Technical Design Standards for Division 14 February 2015 DIVISION 14 - ELEVATOR DESIGN STANDARDS

APPENDIX K MODIFIED INDUSTRY STANDARDS FOR ELEVATORS AND CONVEYING SYSTEMS

B. Configuration of system shall be through Schneider Electric in Homewood, Illinois (Jerry Lanfear ).

SECTION INCLINE WHEELCHAIR LIFTS. Display hidden notes to specifier by using Tools / Options / View / Hidden Text.

SECTION HYDRAULIC PASSENGER ELEVATOR

SECTION XPRESS II INCLINED WHEELCHAIR PLATFORM LIFT. Display hidden notes to specifier by using Tools / Options / View / Hidden Text.

SECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL

SECTION CONVEYING EQUIPMENT Indiana University Bloomington and Regional Campuses (except IUPUI)

SECTION AUTOMATIC TRANSFER SWITCHES

SECTION AUTOMATIC TRANSFER SWITCHES

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION ELEVATORS

ELEVATOR HACKING FROM THE PIT TO THE PENTHOUSE. Deviant Ollam & Howard Payne DEFCON /08/03

ASME A17.1/CSA B44 Handbook

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1.

Emergency Power & Fire Service Checklist

A. Section Masonry Assemblies: Anchor placement in masonry.

Elevator Emergency Equipment Instructor s Guide

SECTION DOMESTIC WATER PRESSURE BOOSTING SYSTEMS (VFD) PART 1 - GENERAL 1.1 SUMMARY

ARCHITECTURAL SPECIFICATIONS

Recommended location under the current MasterFormat 2004 is Section Elevator Door Smoke Containment System.

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION A. Section Includes: Portable wheelchair lifts, vertical platform lifts, and inclined wheelchair lifts including necessary accessories.

SECTION ELEVATOR FIRE RATED SMOKE CONTAINMENT SYSTEM

DIVISION FINNED WATER-TUBE WATER HEATERS

IN2 Lighting Control Devices

UNIFIED FACILITIES GUIDE SPECIFICATIONS

TABLE OF CONTENTS GENERAL... 2 A. DEFINITIONS DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM... 2

James Rhoads Elementary School 4901 Parrish Street Philadelphia, Pennsylvania Project Determination Report Major Renovation October 26, 2018

15900 HVAC INSTRUMENTATION AND CONTROLS

SECTION FIRE ALARM STANDARDS REVISED CONSTRUCTION STANDARD

Recommended location under the current MasterFormat 2004 is Section Elevator Door Smoke Containment System.

NFPA 2001: Standard for Clean Agent Fire Extinguishing Systems NFPA 70: National Electrical Code (NEC) NFPA 72: National Fire Alarm Code

traditional signalfi xtures

SECTION NURSE CALL SYSTEM

Presentation Material: The material will be presented in a PowerPoint format and available digitally/ paper.

B. Product Data: Provide manufacturers catalogue information. Indicate valve data and ratings.

DIVISION FINNED WATER-TUBE BOILERS

Recommended location under the current MasterFormat 2004 is Section Elevator Door Smoke Containment System.

2. HVAC and smoke control systems; fire, smoke, and combination fire/smoke dampers. 5. Central control and monitoring system.

DMTF: Specific Building Recommendations

A. AMERICAN ARCHITECTURAL MANUFACTURERS ASSOCIATION (AAMA) 101: Appendix Dissimilar Materials.

CP1-C5 COMPACTOR SPECS 2009

When determining what requires explosion proof protection make sure as many parts of the elevator as possible are covered.

1.2 CODES AND REGULATIONS A. Sprinkler system design, equipment, materials, devices, and installation shall conform to the following:

ELEVATORS. Integration of Codes between Fire Alarm, Sprinklers, and Elevators 12/5/2017

SECTION EXTERIOR LIGHTING

UltraLITE Model ELU Centralized Emergency Lighting Inverter 4.2 KW- 5 KW

HCD DSA OSHPD 1 2 1/AC AC SS SS/CC

SPECIFICATION MICROMIST FIRE SUPPRESSION SYSTEM WITH SHP-PRO CONTROL PANEL

1. Floor above/floor below notification. 2. Private alarm notification. 3. Not Used 4. Voice alarm notification. 5. Not Used.

DIVISION 10 SPECIALTIES

DIVISION FINNED WATER-TUBE WATER HEATERS

SECTION AUTOMATIC TRANSFER SWITCHES

VACUUM BREAKER MEDIUM VOLTAGE AUTOMATIC TRANSFER SWITCHES

SECTION SECURITY TESTING AND COMMISSIONING

SECTION ISOLATED POWER SYSTEMS

SECTION LOW VOLTAGE LIGHTING CONTROLS

MD-DC-VA Automatic Fire Alarm Association, Inc. Interfacing Fire Alarm, Sprinkler and Elevator Systems In Maryland, DC and Virginia

DIVISION FINNED WATER-TUBE BOILERS

SECTION INTRUSION DETECTION SYSTEM

ARCHITECTS & ENGINEERS SPECIFICATIONS ACS INTERCOM BUILDING ENTRY SYSTEM VERSION 6.0 AUGUST 1999

A. Furnish and install luminaires, lamps, ballasts and in-line fuses as herein specified and shown on the Drawings.

Division 28 - Electronic Safety and Security

SECTION C. Section Cable Trays for Electrical Systems: Additional identification requirements for cable tray systems.

DIVISION 21: FIRE SUPPRESSION SYSTEMS SECTION Fire Protection Systems Protecting Cold Storage and Unheated Warehouses

elite Model ELN Centralized Emergency Lighting Inverter Systems 550 W to 1.5 KW Systems

A. This Section includes the following lighting control devices:

M001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings

University of Houston Master Construction Specifications Insert Project Name SECTION DRY-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL

CONTENTS AUTOMATIC TRANSFER SWITCHES

SPECIFICATION: AlarmLine TM INTELLIGENT LINEAR HEAT DETECTION

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

PART 4 ELECTRICAL STANDARDS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

ONYX FirstVision Specification Interactive Firefighters Display

SECTION P01 LIGHTING AND APPLIANCE PANELBOARDS - A-SERIES

SECTION COMMERCIAL DOOR OPERATORS OVERHEAD RSX FIRE DOOR OPERATOR

User s Manual and Warranty Information ThyssenKrupp Access

Transcription:

Revision 01/04/2019 SUMMARY Work of this section includes providing equipment, incidental material and labor required for a new elevator. Where singular reference is made to elevator or elevator components, such references shall apply to the number of elevators or components required to complete the installation. This specification provides a broad outline of required equipment and does not describe the details of design and construction. The Architect and Owner will select either traction or hydraulic elevator(s) based on building requirements. 1. SCOPE of WORK a. List of minimum items required for each elevator: 1. Programmable microprocessor based elevator controller (Motion Control Engineering), with Central Monitoring capability, or Rice approved, non-proprietary equal. 2. AC Vector Flux Drive motor (traction only) 3. AC Hoist motor (traction only) 4. Pumping unit (hydraulic only) 5. Piping (hydraulic only) 6. Door Operation 7. Landing system 8. Governor (traction only) 9. Cable guards (traction only) 10. Main line disconnects 11. Single phase disconnects 12. Machine room lighting 13. ECI Cablite LED car down lighting system or equivalent 14. Car operating panel 15. Traveling lantern and gong 16. Car door restrictor 17. Car door operator 18. Car door safety screen detector 19. Cab hand rails 20. Emergency escape hatch cover latch and electrical contact 21. Car top inspection station 22. Limit switches 23. Car top selector 24. New cables 25. New car wiring including travel cables 26. Counterweight guard (traction only) 27. Pit ladder 28. Pit stop switch 29. Pit light 30. Landing door sight guards 31. Smoke detectors 32. Hall Fixtures 33. Access switches 34. Roller Guides R. Cox,01/04/19, elevator standard spec.doc

2. RELATED WORK THAT MUST BE SPECIFIED ELSEWHERE a. Ballou Fire Systems, or Rice approved Fire Alarm Contractor for fire detection. b. Use Rice telephone system compatible equipment. c. Provide modem for Central Monitoring d. Maintain mechanical room ambient temperature: 32 F to 80 F e. Division 16 electrical work per National Electric Code (NEC) 3. DEFINITIONS a. First Floor: For purposes specified herein, the main floor (second opening in buildings with basements) shall be considering as the Main Floor. The second floor (third opening in buildings with basements) shall be considered as the alternate floor for fireman s operation recall. 4. SUBMITTALS a. Submit controller s schematics for approval. b. Submit shop drawings: 1. Manufacturer s product specification listing and description of control system features, performance and operating characteristics. 2. Include details or catalog cuts of lanterns, position indicators, car buttons and similar items. c. Control systems of proprietary design are not acceptable. Complete information shall be submitted to demonstrate the universal servicing capability of the proposed system. d. Certificates: 3. Submit certificates of elevator performance with contract closeout documents. 4. After adjustments, test, and inspections are performed, forward certificate signed by the elevator installer stating that the equipment and controls provide elevator services as specified. e. Maintenance data: 5. Include elevator controller manufacturer s recommended maintenance procedure for the elevator equipment including recommended spare parts list and three complete sets of final wiring diagrams. 6. Include all diagnostics and/or trouble shooting guides and all block diagrams, including input and output signals. 7. Include all maintenance and installation manuals, drawings and data for mechanical equipment, jack, machine, pumping unit, fixtures, etc. Information shall be of technical level to completely adjust the entire elevator system. 8. Provide Non-proprietary diagnostics by Motion Control Engineering, Inc. (MCE) 916-638- 4011 5. QUALITY ASSURANCE: Acceptable standards: a. American Iron and Steel Institute (ASI), standards as referenced herein. b. American National Standards Institute (ANSI), Specification for Making Building and Facilities Accessible and Usable by Physically Handicapped People, A 17.1-1986 c. American Society of Mechanical Engineers (ASME), Safety Code for Elevators and Escalator ANSI/ASME A17.1 1993 with amendments, except as superseded by local codes and ordinances. R. Cox,01/04/19, elevator standard spec.doc 2

d. American Society of Mechanical Engineers (ASME), American National Standards Institute of National Standards of Canada, Elevator and Escalator Electrical Equipment, ANSI/ASME A17.51991/CAN/CSA-B44.1-M9 1 e. American Society for Testing and Materials (ASTM), standards as referenced herein f. American with Disabilities Act (ADA) of 1992 Federal Regulations 28 CFR Part 36, Accessibility for Building and Facilities. g. National Electric Code (NEC) h. National Electric Manufacturers Association (NEMA), LD 3-1985 i. National Fire Protection Association (NFPA), standards as referenced herein. 6. JOB CONDITIONS a. By submitting pricing for the elevator, the Contractor accepts that the equipment as shown and specified for this project is properly designed and engineered. Should additional design or engineering be required, additional cost shall be borne by the Contractor. 7. WARRANTY a. Elevator installer shall provide product and workmanship warranty for a period of one year, beginning at the date of punch list work completion, as accepted by the owner. Owner will provide punch list. Elevator installer shall provide 24 hour 7 days a week call back service with 1 hour response time, including holidays. 8. ELEVATOR DATA Description: Geared Traction, Gearless Traction and Hydraulic elevator(s) Capacity: Speed: Travel: Number of landings: Number of openings: Car platform dimensions: Car Height: Car doors: by high slide Hoistway doors wide high slide Power Supply: VAC phase cycle. * Dimensions are unmeasured and must be verified by the bidder 9. BASIC MATERIALS a. Steel: 1. Structural shape: Meeting ASTM 36-93a 2. Sheet: Meeting ASTM366-91 (1993), cold rolled carbon steel, commercial quality. b. Finish: 1. Satin Stainless Steel or selected by Architect 10. MACHINE ROOM a. Controller: 1. Furnish and install a new Motion Control Engineering, Inc. Controller (MCE) 916-638- 4011 or Rice approved, non-proprietary equal. 2. Architect to base design on: a. Intelligent Motion Control Motion 4000 Traction Controls (500 FPM for passenger elevators.) R. Cox,01/04/19, elevator standard spec.doc 3

b. Programmable Traction Control icontrol Traction Controls c. Programmable Hydraulic Control Motion 2000 Hydraulic Control 3. Controller to be equipped with Central Monitoring capability. 4. All elevators shall be supplied with PC monitor and keyboard with software Motion 4000 mview ireport. 5. Any non-proprietary elevator controllers are acceptable pending Rice Project Manager approval during Design Development Phase. b. AC Flux Vector Drive: (Traction Elevators) 1. The AC Flux Vector Drive must be manufactured by Magnetek or Rice approved equal. c. AC Hoist Motor: (Traction Elevators) 1. Furnish and install a properly sized low slip elevator duty AC hoist motor. 2. The new hoist motor must be manufactured by Baldor Electric, Imperial, or Rice approved equal. 3. The motor must be compatible with the AC Flux Vector Drive also provided. d. Pumping Unit: (Hydraulic Elevators) 1. Furnish and install a new submersible-type Minnesota pumping unit complete with a single unit valve. i. The valve shall be one properly sized for this project and should be manufactured by either Maxton, ECCO, or Rice approved equal. 2. Also provide new hydraulic fluid for the new machine. 3. Pump motor must be Leroy Summers, US Motors, or Century. e. Piping: (Hydraulic Elevators) 1. The piping, fitting, and valve must comply with ANSI/ ASME A17.1 section 303. f. Governor: (Traction Elevators) 1. Provide and install a new centrifugal type governor complete with electrical shut down switch. The new governor must be compatible with the car safety device and be properly adjusted in all terms including the appropriate pull through pressure to properly activate the car safety device in accordance with ANSI/ASME A17.1. 2. The new governor must be manufactured by Holister-Whitney, Quincy, Illinois, F.S. Payne, Boston, Mass. g. Landing system: 1. Furnish and install a new landing system by Motion Control Engineering, Inc. (MCE) 916-638-4011 or non-proprietary Rice approved equal. h. Signage: 2. Per A17. 1 and ADA i. Zoned Car Door Restrictor: 3. The door restrictor shall be mechanical with collapsible restrictor. j. Cable Guards: (Traction Elevators) 4. Furnish and install hoist cable guards consistent with ANSI/ASME A 17.1 k. Geared machine: (Traction Elevators) by manufacturer and ANSI/ASME A 17.1 l. Geared machine brake: (Traction Elevators) by manufacturer and ANSI/ASME 17.1 m. Machine Drive Sheave: (Traction Elevators) by manufacturer and ANSI/ASME A 17.1 n. Three Phase Power: 1. Provide power per manufacturer and NEC. 2. Furnish and install a properly sized and configured main disconnect in the proper location adjacent to the strike side of the machine room door consistent with the latest NEMA Standards and National Electric Code. R. Cox,01/04/19, elevator standard spec.doc 4

3. Provide shunt tripping. Pipe and wire from the new disconnect to the elevator controller. 4. Install earth ground for Motion Control controller. o. Single Phase Power: Furnish and install a disconnect lockable in the off position and equipped with ground fault protection for the 110 AC for elevator light per National Electric Code. p. Machine Room Lighting: 1. Provide machine room lighting as required to provide a minimum of 10 Foot Candles of illumination per code utilizing fixtures that employ electronic ballast with T-8 energy saving bulbs. 2. Provide new light switch with convenience outlet. q. Door Operator: 1. Furnish and install a new Gal, or Mac Solid State Door Operator, clutch, hall door pick roller assemblies, interlocks, and door closers. 11. CAR ENCLOSURE: To be in compliance with ADA. Finishes selected by the Architect, Provide two-speed fan. a. Car Operating Panel: Furnish and install a new car operating panel selected by Architect utilizing a satin stainless or brass) faceplates with the following features b. All Fixtures are to be fabricated with PTL or Adams Equipment, buttons, and switches. Fixtures manufactured by PTL, EPCO, or Innovation. Internally illuminated buttons with graphics including floor services, functions and amenities per floor. All Braille must be nonadhesive dye cast. 1. Emergency car lighting 2. Emergency alarm button 3. Door open and close button 4. Buttons are to have adjacent tactile symbols 5. Capacity plate 6. Keyed independent service switch 7. Keyed emergency stop button 8. Keyed light fan switch 9. Phase 1, firefighter s service indicator light 10. Phase 2, firefighters call cancel button 11. Phase 2, firefighter s key switch, keyed with Adams WD01 key 12. Firefighter s instructions engraved with red epoxy fill 13. Keyed car top inspection switch 14. Hands-free phone to meet Rice requirements 15. Keyed terminal access, Adams GG101 key c. Car Travel Lantern: Furnish and install a traveling lantern with up and down lights and gong in front return panel facing into the doorway. Connect it into the control system so that the proper light will be illuminated for the direction of intended-travel when the door is fully open the gong should stroke once with the up light and twice with the down light. The finished faceplate must match the rest of the car. d. Car Position Indicator: Furnish and install per ANSI/ASME A17.11 e. Car Door Detector: Use Adams ICU Gatekeeper f. Car Door Restrictor: Furnish and install a mechanical door restrictor with collapsible restrictor as required by ANSI/ASME A17.1 R. Cox,01/04/19, elevator standard spec.doc 5

g. Car Down Lighting: Furnish and install ECI Cablite LED lighting system or equivalent h. Car Handrails: Furnish and install car handrails consistent with ADA. i. Car Emergency Escape Hatch: Secure the existing escape hatch and provide electrical contact required by ANSI/ASME A17.1 j. Car Top Inspection Station: Furnish and install a new car top inspection station with features required by ANSI/ASME A17.1 and manufactured by Adams Mfg., Skokie, Illinois or Quality Elevator Product, Niles, Illinois. 12. PLATFORM AND SLING a. Selected by the Architect, manufacturer s engineering design and ANSI A17.1. 13. HOISTWAY EQUIPMENT a. Guide rails: Furnish and install 8 or 16 lb. T-Rail, per ANSI/ASME A17.1 b. Counterweight: (Traction Elevators) By manufacturer engineering design. Adjust the total counterweights to weight of the total car plus 40% of capacity. c. Slow down, normal, and final stopping devices: Furnish and install new roller switches complete with rail mounts to perform the task of providing positive slow down, normal and final stopping functions at the terminal floors in accordance with ANSI/ASME A17.1. The new switches should be either Quality Elevator Parts LS Switch or Anderson s C3, C8, C9 and CB51 d. Car Top Selector: Furnish and install a new digital car top selector as furnished by Motion Control Engineering. e. Hoist and governor cables: (Traction Elevators) By manufacturer s engineering design and ANSI A17.1. f. Wiring: Install per current requirements of the National Electric Code. 1. Terminal connections for conductors at equipment panels, hoistway, and on the elevator car will be made on terminal blocks or studs having identifying numbers. 2. The conductors shall be copper throughout. 3. Use no splices in wiring except at terminal blocks, control, cabinet, junction boxes or conduit. 4. Provide 10% spare conductors throughout. 5. Run spare wires from car connection points to the elevator controller in the machine room. 6. Tag wire spares so they can be identified at both ends. 7. Provide Earth Ground per Motion Control Inc. or Rice approved equal requirements. g. Counterweight guard: (Traction Elevators) Furnish and install a counterweight guard in the pit consistent with ANSI/ASME A17.1 h. Car and counterweight buffers: (Traction Elevators) Furnish and install per ANSI/ASME A17.1 i. Pit Ladder: Furnish and install a pit ladder configured and positioned in accordance with ANSI/ASME A17.1. j. Pit Stop Switch: Furnish and install a pit stop switch configured and located in accordance with ANSI/ASME A17.1 k. Pit light and convenience outlet: Furnish and install a new pit light switch, convenience outlet. The light and outlet must be complete with ground fault protection, light guard and installed consistent with ANSJ/ASME A17.1 R. Cox,01/04/19, elevator standard spec.doc 6

l. Landing Door Sight Guards: Furnish and install sight guards on the existing landing doors per ANSI/ASME A17.1 and meet ASTM366-91 standard. Finish along with landing door refinishing. m. Smoke Detectors: Smoke and heat detectors devices are to be furnished and installed, as required, in the elevator lobby at each floor, at the top of the hoistway, and in the machine room. The wiring and interconnection with elevator controller is to be with ANSI/ASME A17.1 and NFPA-72E. n. Hall Fixtures: Provide and install flush mount fixtures manufactured by PTL, EPCO, or Innovation. 1. Provide one new landing push-button station at each landing complete. 2. Terminal floor fixtures will have one push-button, and the intermediate floors will have two push buttons, one button for up and one button for down. 3. Include a keyed fire fighter switch in the main floor fixture (second opening for buildings with basements) complete with Firefighter Phase 1 instruction engraved and red epoxy filled Traditional flush mounted per ANSI A17.1. o. Access Switches: Installed at terminal landings p. Hall Door and Frames: selected by the Architect, manufacturer engineering design and ANSI A17.1 q. ACCEPTANCE TESTING: Upon nominal completion of the elevator installation, and before permitting use of the elevator, perform code require testing. 1. Advise the owner of the dates and times that the tests are to be performed. 2. The test shall be a continuous operating test in which the elevator under full rated load is operated continuously for 1 hour over its entire operating range, stopping momentarily at all floors. 3. There shall be no operational failure. The owner reserves the right to engage a third party consultant to perform work progress evaluation and/or final approval evaluations. R. Cox,01/04/19, elevator standard spec.doc 7