ADDENDUM NO. 1. PREPARED BY: Justin Scott DATE PREPARED: 05/25/2018. PROJECT: Centerville-Washington Park District Park Operations Facility

Similar documents
RE: Clark East Tower Renovations DATE: November 16, 2015 Ypsilanti, Michigan

NOTICE TO CONTRACTORS

Item No. Description 1. BID PROPOSAL FORM Make the following revisions: a. Replace the BID PROPOSAL FORM with the attached BID PROPOSAL FORM.

Additions & Alterations to Ascension Parish Library Galvez Prairieville, Louisiana Project No. 1401

ADDENDUM NO. 1. for. MARQUETTE HOUSING COMMISSION Pine Ridge Apartments Fire Alarm Replacement Project #A1140. Marquette, Michigan.

Mr. Burke presented the Airport and Boeing s badging process and public safety issues as outlined in the attached meeting agenda.

CITY OF PORTSMOUTH Department of Public Works MUNICIPAL COMPLEX FIRE ALARM. Bid # Addendum #1

HMC ARCHITECTS 2495 Natomas Park Drive, Studio 100 Sacramento, California ADDENDUM NO. 3

DOCUMENT ADVERTISEMENT FOR BIDS

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

Pre-Bid Meeting Minutes 2018 A & E RFP February 6, :00 a.m.

Florida Department of Transportation

ADDENDUM #1: MODIFICATIONS AND ADDITIONS TO CONTRACT DOCUMENTS

Hot Work Policy. Department of Risk Management. 1. Purpose. 2. Authority. 3. Scope

Attachment 5 -- PowerPoint. Item 6C- Attach 5- PPT Presentation Page 1 of 15

ADDENDUM No: 3 JOSEPHINE COUNTY BUILDING OPERATIONS DEPARTMENT. February 29, NO CHANGE: March 8, 2012 / NOT LATER THAN 2:00 PM

COMMERCIAL (IBC) FIRE ALARM SUBMITTAL GUIDE

Addendum # 2 Wicomico County Circuit Court Second Floor Renovations Date of Addendum: 2/6/2017

CITY OF FARMINGTON 800 Municipal Drive Farmington, NM (505) Fax (505)

I.T.S. PLAN ALONG I-95 INSTALL FIBER OPTIC LINE PROJECT SHOWING Tuesday, June 18, 2013, 1:30pm Ashland Residency Conference Room

COUNTY OF ROCKLAND Department of General Services Purchasing Division

Arlington Public Schools Purchasing Office

Air Handler Unit (AHU) Equipment Purchase and Delivery Invitation to Bid

INVITATION TO BID. Allendale Elementary School 3670 Penniman Avenue, Oakland, CA 94619

COMMISSION ORDER. IT IS FURTHER ORDERED that the Request for Bid and Notice to Bidders be displayed on the Franklin County website.

Sidney, Ohio 1204 FORMAL ISSUANCE OF CERTIFICATE OF SUBSTANTIAL COMPLETION... ON OR BEFORE JULY 30, 2015.

C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant.

H BUTCH BROWNING FIRE MARSHAL BUILDING REHABILITATION

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION

DESCRIPTION OF WORK. The bidder shall provide adequate proof of licensure and insurance.

Certificate of Inspection CHECKLIST

DONALD H. BERG, ARCHITECT

Pre-Drywall Property Inspection

2016 California Building Code Adoption OC amendments Summary Title/Subject Justification/Comments Action

I. Scope: II. Environmental Health and Safety Fire Alarm System Impairment Program - Guideline Revision Date: April, 2018

ADDENDUM 1. Southeast High School Auditorium & Gymnasium HVAC Improvements

SMALL WORKS PROJECT REQUEST FOR SEALED BIDS

SECTION INSPECTION AND TESTING OF WORK

1. Delete BID FORM in its entirety and replace with the BID FORM attached to this Addendum.

Replacement of Fire Pump and Generator Upgrade, H Building, Sexton Campus

BID FORM CITY OF BEVERLY HILLS. The undersigned, having carefully examined the site conditions and the Contract Documents for

FIRE ALARM APPLICATION CITY OF MADISON HEIGHTS

APPENDIX H (DESIGN SUBMISSION CRITERIA)

FIRE & LIFE SAFTEY STANDARD

Memphis Housing Authority High Rise Fire Alarm Upgrades. Questions from Contractors (Through Addendum #2) Communications Systems, Inc.

ADDENDUM NO. 3 March 19, 2018

Full Service Central Station Fire Alarm Listing Evaluation

Annual Fire Systems and Backflow Preventers Testing

UNIVERSITY OF TOLEDO

Purpose : Project Manager. Professional. Contractor: devices/system. compatibility

Rancho Cucamonga Fire Protection District Prevention Bureau Standard

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

Princeton Joint Unified School District Invitation for Bid Installation of District-Wide Lighting Occupancy Sensors

Campus Wide Fire Alarm Repairs

FIRE INSPECTORS GUIDELINES FOR PLAN REVIEWS AND INSPECTIONS OF NEW CONSTRUCTION / ADDITIONS AND CHANGE OF OCCUPANCY

ADDENDUM #3 DATE: August 8, 2018 Page 1 of 1. The Curators of the University of Missouri

GREAT LAKES BAY HEALTH CENTERS DOWNTOWN COMMUNITY DENTAL CENTER SAGINAW, MICHIGAN. Refer to drawings C1 and A2.3.

SECTION FIRE ALARM AND SMOKE DETECTION SYSTEMS

SANTA FE COUNTY IFB# PW/KE CONSTRUCTION FOR THE SANTA FE MOUNTAIN CENTER KITCHENETTE AND OFFICE SPACE ADDENDUM #2

BUILDING, FIRE, AND LIFE SAFETY CODE ENFORCEMENT AND CERTIFICATION OF INSPECTORS FOR HEALTH FACILITIES LICENSED BY THE STATE OF COLORADO

CITY OF HEALDSBURG SENIOR CENTER IMPROVEMENT PROJECT

Moreno Valley Fire Department Fire Prevention Bureau. New and Existing Fire Alarm & Signaling Systems Guideline

UNIVERSITY OF MISSOURI Fire Protection System Design 2016 Q1

City of Placentia ADMINISTRATION DEPARTMENT

Instructions for 3m Pergolas (for 4m and 5m pergolas see further sections)

UMC El Paso Far East Clinic and Neighborhood Healthcare Center West Issue for Construction Page Project No and April 13, 2015

BID INFORMATION LIST Crossroads East N. Scottsdale Road, #105 Scottsdale, AZ Rev

SECTION ADDENDUM NO. 1 FIRE SPRINKLER SYSTEM

Bold items are particular to the City of Euless

D. The work addressed in this section consists of a fire protection system, which may include coordination with one or more of the following:

FIRE AND SAFETY PROJECT REVIEW REPORT

Springpoint Architects, pc SECTION Childcare Center Architect s Project No TABLE OF CONTENTS Monroe County Comm. Sch. Corp.

Revitalize Building Mechanical Systems (4619)

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD

M001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings

Fire Permit Application

CONSTRUCTION DOCUMENTS CHECKLIST

WEST VIRGINIA UNIVERSITY

DEPARTMENT OF PUBLIC SAFETY. Division of Fire Prevention and Control 8 CCR

SUBJECT: ADDENDUM NO. 1 RFP# , FIRE ALARM SYSTEM SERVICE (DISTRICTWIDE) REPOST

PIP PCTPA001 Testing of Process Analyzer Systems

Lead Remediation/Abatement at Forest Blvd., Hugo, MN

International Fire Code 2006 Requirements for Construction Plan Reviews of Commercial and Multi-Family Structures

SUWANNEE RIVER WATER MANAGEMENT DISTRICT REQUEST FOR BID NO. 15/16-003AO FIRE ALARM SYSTEM INSTALLATION AND MONITORING.

Installing Exterior Lighting Systems

Architect s Project Number of 12 Fire Alarm/Smoke Detection Systems District Master Specs 2013 Edition

Recommended Amendments to the 2015 International Existing Building Code North Central Texas Council of Governments Region

ONYX FirstVision Specification Interactive Firefighters Display

BUILDING PERMIT FEE SCHEDULE

COMPLYING DEVELOPMENT CERTIFICATE APPLICATION FORM

USD 480 Auxiliary Services Department Robert Burkey, Director

FIRE IMPAIRMENT NOTICE

ADDENDUM #3. Chauncey Wilmore Senior Procurement Officer March 22, 2016 ALL PROSPECTIVE FIRMS

Large Family Daycare Guideline

ADDENDUM NO. 1 BID-CONTRACT DOCUMENTS FOR. RFP No Professional Design Services for CCC Le-Jao Student Resource Center

Procurement Department ADDENDUM # 1

A D D E N D U M N O. 1 To The Contract Documents Date: Project: Facilities Development & Planning Portable Building Relocation

Safe Operating Procedure

Engineering and Design of Fire Alarm Systems

WELDING, CUTTING, AND BRAZING SAFETY PROGRAM

Transcription:

ADDENDUM NO. 1 PREPARED BY: Justin Scott DATE PREPARED: 05/25/2018 PROJECT: Centerville-Washington Park District Park Operations Facility PROJECT NO.: 2017-051 OWNERS REPS: Ken Carter Nick Meyer COPIES TO: Robert Holland Andreas Symeonides Plan Holders List via PlanWell ATTACHMENTS: Prebid Meeting Sign-in Sheet Prebid Meeting Agenda NOTE: The following changes are hereby made to the Contract Documents and insofar as the original Contract Documents are inconsistent therewith, the changes herein shall govern. All bidders shall acknowledge this Addendum by inserting its number and date on their Bid Proposal. Questions: 1. All existing interior gas piping to be removed back to meter. Will new piping to HVAC on roof sit above the roof or penetrate the roof at all locations? The piping will run up the side of the building from the gas meter and penetrate the wall into the building. All the gas piping should then run in the building tight to structure and then penetrate the roof at each RTU location. The gas piping also serves the tube heaters in the building. 2. On sheet A1.1 general note 129 says bolted bollards, but on sheet C5.01 it shows them

Addendum 1 / Centerville-Washington Park District Park Operations Facility / 05/25/2018 / Page 2 embedded in concrete. Also if the interiors need to be galvanized. Exterior bollards to be embedded in concrete, Interior bollards to be bolted. Both exterior and interior will be stainless steel. 3. Confirmed bidding dates: Last day for RFI s in bidding phase = 05/28/2018 Addendum 2=05/31/2018. (Approx.) Bids Due= 06/05/2018 2:00 PM Awarded = 06/11/2018 Substantial Completion = 11/28/2018 4. Specification section GLAZING 088000 (GL-2) (GL-3) references a product that is no longer in production. GL-2 will go from Sungaurd Royal Blue 40 to Neutral 40. GL-3 will go from Sungaurd Royal Blue 40 to Neutral 40. Specification Book will be updated for Addendum 2 to reflect these changes. 5. Comments received from Washington Township/Fire are the following: Concern about no Bollards for protection of the gas meter. Bollards have been placed around the gas meter for protection (was not in the permit set, shown in bidding set). Concern about the amount of Fire Extinguishers in the building. Washington Township requested we have at least 8 fire extinguishers (bidding set shows we have 10) Duct smoke detectors shall be installed in accordance with their listing and NFPA 72 and shall be accessible (M-606.1 and M-606.3). Drawings will be updated for Addendum 2 to reflect these changes. The duct smoke detector system must be connected to the required building fire alarm system and shall report to the supervising station as a supervisory signal and not as a fire alarm. (M-606.4.1). Drawings will be updated for Addendum 2 to reflect these changes. 6. Clarification of demo work: Existing furniture is involved in the demolition scope, owner will remove their equipment. Bushes/Vegetation and lighting along the East façade are included in the demolition scope. 7. Existing fire alarm The building is currently fire alarmed and active. Coordinate with new system and panel. 500 Park Boulevard, Suite 800 Itasca, Illinois 60143 P 630.221.1212 F 630.221.1220 www.williams-architects.com

Addendum 1 / Centerville-Washington Park District Park Operations Facility / 05/25/2018 / Page 3 8. What is the project delivery method? Traditional design, bid, build - Single Prime Contract 9. Tax exempt? Yes 10. Prevailing wage? Yes 11. Who pays for testing? Testing to be paid for by Contractor as specified in section 014000 of the specifications. Inspections to be performed include steel for welds, joists and deck work, concrete for footings & lintels, and vertical masonry for foundations work as prescribed in the OBC. 12. Are there any contaminants? Any contaminates? In the spec book Selective Demolition, 1.9 field conditions part says: D. Hazardous Materials: It is not expected that hazardous materials will be encountered in the work. 1. If suspected hazardous materials are encountered, do not disturb: immediately notify Architect and Owner. Hazardous Materials will be removed by Owner under a separate contract. 13. Drawing PD1.1 note #1 states "retain water meter for re-installation under new work." drawing P0.2 #2 details water distribution but does not show installation of retained water meter. Question: Where is the retained water meter from the demo to be installed under the new work? Reinstall water meter downstream of main shutoff valve and upstream of pressure gauge and check valve. This will be added to the detail in a forthcoming addendum. Final approval per Montgomery County Environmental Services. 14. Drawing AD3.0 demolition of the roof note 34 states remove existing drain bowl piping to remain for new drain bowl. Replacement of the roof drains, I thought, was a job for the plumbing contractor. In the plumbing drawings, schedules or specifications there is no reference to what kind of new roof drains (bowls) to provide. Can you give a specification as to what drain is required to be installed to replace the remove bowl? Provide 6" J.R. Smith # 1015 roof drain or equal. This will be added to the drawings in a forthcoming addendum. End of Meeting Addendum 500 Park Boulevard, Suite 800 Itasca, Illinois 60143 P 630.221.1212 F 630.221.1220 www.williams-architects.com

Addendum 1 / Centerville-Washington Park District Park Operations Facility / 05/25/2018 / Page 4 G:\Master\WAA\WA Forms\Addendum.doc 500 Park Boulevard, Suite 800 Itasca, Illinois 60143 P 630.221.1212 F 630.221.1220 www.williams-architects.com