HYDRONIC SPECIALTIES TACO AC(F)-PAX 05/15/2008

Similar documents
HYDRONIC SPECIALTIES TACO AC(F)-CA 05/08/2008

HYDRONIC SPECIALTIES TACO MPT Tank(s) 05/30/2012. A. Multi-Purpose Tank buffer tank, air separator, and hydraulic decoupler

Peerless Pump Company

A. This Section includes the following domestic water piping specialties:

In-Line Air Separators

TECHNICAL. Series 18. Pump Packages

.2 Section Waste Management and Disposal..5 Section Performance Verification of Mechanical Piping Systems.

Commercial, Residential & Institutional Pumps, Tanks, & Accessories

C. ASSE 1013: Performance Requirements for Reduced Pressure Principle Backflow Preventers.

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION PUMPS

Essex County College - West Essex Campus Addition And Renovations dib # / SECTION HYDRONIC PIPING SPECIALTIES PART 1- GENERAL

SECTION HYDRONIC PIPING

SECTION HEATING BOILER FEEDWATER EQUIPMENT

SECTION HYDRONIC PIPING AND SPECIALTIES

B. Shop Drawings: Detail fabrication of pipe anchors, hangers, special pipe support assemblies, alignment guides, expansion joints and loops,

SECTION PLUMBING EQUIPMENT

PhiloWilke Partnership Addendum No. 2 A/E Project No April 2016

Division 23 - HVAC Switzerland Beallsville K-12. Section HYDRONIC PIPING SECTION HYDRONIC PIPING PART 1 - GENERAL

University of Delaware

SECTION DOMESTIC WATER PIPING SPECIALTIES

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

B. HI Compliance: Design, manufacture, and install pumps in accordance with HI "Hydraulic Institute Standards."

Main Steam Vents. Hoffman Specialty Regulators. How to Select Steam Vents

PROJECT NAME: DPW Idaho State University Liberal Arts Building Chiller Replacement

SECTION DOMESTIC WATER PUMPS

A. Operation and Maintenance Data: For pumps to include in emergency, operation, and maintenance manuals.

DIVISION 23 HVAC Hydronic Piping Systems

SECTION PUMPS. 6. Section Steam and Condensate Piping and Specialties.

D-11 OUTLINE SPECIFICATION FOR HTHW (ABOVE GRADE) HYDRONIC PIPING

HORIZONTAL FIRE TUBE BOILERS Piping (HVAC) Pumping Equipment (HVAC).

SECTION COMPRESSED AIR SYSTEM. A. Pipe and pipe fittings, including valves, unions and couplings.

1.2 CODES AND REGULATIONS A. Sprinkler system design, equipment, materials, devices, and installation shall conform to the following:

Design and Construction Standards SECTION PLUMBING EQUIPMENT

B. Product Data: Provide manufacturers catalogue information. Indicate valve data and ratings.

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING

SECTION (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS

SECTION PLUMBING EQUIPMENT

STEAM AND CONDENSATE PIPING AND PUMPS DESIGN AND CONSTRUCTION STANDARD

SECTION FUEL-FIRED, DOMESTIC WATER HEATERS

Mercy Hospital of Buffalo Catholic Health System 2 nd Floor Patient Holding Center 3 rd Floor Locker Rooms Shaflucas Architects, PC Project No.

PROJ. NO SECTION REFRIGERANT PIPING

D. NEMA Compliance: Provide electric motors and components which comply with NEMA standards.

VENTS. Main Steam Vents. How to Select Steam Vents. For Steam Vent selection information, please refer to Selection Guidelines on page 133.

SECTION FIRE PROTECTION. A. Examine all conditions as they exist at the project, prior to submitting a bid for the work of this section

UNIVERSITY OF MISSOURI Building Hydronic Piping and Pump Systems 2017 Q3

SECTION GENERAL-SERVICE COMPRESSED-AIR SYSTEMS

SECTION ELECTRIC WATER HEATERS

PROJ. NO SECTION HYDRONIC PIPING

D-8 OUTLINE SPECIFICATION FOR HTHW HEAT EXCHANGERS

A. ASME Compliance: Fabricate and install hydronic piping in accordance with ASME B31.9 "Building Services Piping.

YALE Site Specifications AIR VENT SCHEDULE

Wayne State University WSU Project No Chatsworth Tower Apts. Misc. Bldg. Upgrades DSD Project No

Refrigerant Valves/Accessories

BuildingName The Description of the Project P DOCUMENTS

SECTION STEAM AND STEAM CONDENSATE SPECIALTIES

FIRE SUPPRESSION SPRINKLER SYSTEM

REFRIGERANT PIPING SYSTEM

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: HVAC Standards

4. Provide brass valve tags marked for the service. See pertinent service specification for valve type.

Appendix B. Symbols for Drawings. Table B.1. Air moving devices and ductwork symbols. Air Movement. Fans. Axial flow fan.

COHASSET, MA March 6, The following is the HVAC outline specifications, which defines the scope of work of the HVAC system.

A. Section includes wet-pipe sprinkler system, system design, installation, and certification.

High Capacity Instantaneous Steam Fired Water Heater

Series 1140 and 1141 Temperature Regulators

THE JAMES RUSHTON EARLY LEARNING AND FAMILY SUCCESS CENTER #2616 ISSUE FOR CONSTRUCTION

A. ASHRAE Handbook HVAC Applications, Snow Melting and Freeze Protection

RESEARCH AND TECHNOLOGY BUILDING RENOVATION 05/18/09 SECTION REFRIGERANT PIPING AND SPECIALITIES

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING. A. This Section includes the following sanitary drainage piping specialties:

EXTROL EXPANSION TANKS

UNDP / PAPP OFFICE BUILDING RAMALLAH HVAC WORKS

SECTION LABORATORY and DE-IONIZED WATER SYSTEMS STANDARD CONSTRUCTION STANDARD

DARTMOUTH COLLEGE DESIGN November 15, 2007 & CONSTRUCTION GUIDELINES

SECTION SPRINKLER SYSTEMS

SECTION PLUMBING EQUIPMENT Piping (Plumbing). 2. Division 16 - Electrical Wiring and Connections.

SECTION WET-PIPE SPRINKLER SYSTEMS EASY RISER CHECK VALVE

VALVES SECTION 15100

HVAC BASIC MATERIAL AND METHODS 1.01 RELATED CORNELL DESIGN AND CONSTRUCTION STANDARDS

DOCUMENT TABLE OF CONTENTS

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1.

SECTION ROTARY-SCREW WATER CHILLERS

DIVISION 21 FIRE SUPPRESSION SECTION FIRE PROTECTION SPECIALTIES

SECTION SECTION DESIGN REQUIREMENTS

University of Houston Master Construction Specifications Insert Project Name SECTION FIRE PROTECTION PUMPS PART 1 - GENERAL

Packaged Semi-Instantaneous Steam Fired Water Heater

SECTION DRY-PIPE SPRINKLER SYSTEMS

C. Shop Drawings: For boilers, boiler trim, and accessories. Include plans, elevations, sections, details, and attachments to other work.

B. Galvanized-Steel-Sheet Sleeves: inch minimum thickness; round tube closed with welded longitudinal joint.

C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant.

LOCAL INVENTORY FOR QUICK SHIPMENT

Division 15 LIQUID HEAT TRANSFER Section 15600

Domestic Pump Condensate Transfer Equipment

B. Related Sections: The following Sections contain requirements that relate to this Section.

SECTION METERS AND GAGES FOR PLUMBING PIPING

MLA Architects Pierz Public Schools ISD #484 Healy High School Multi-Purpose & Choir Additions Pioneer Elementary School Class Room Addition Pierz, MN

Series 1156F, 1450F ( 1 2") Feed Water Pressure Regulators and Dual Controls for Hot Water Boilers

.2 Section Waste Management and Disposal..5 Section Motors, Drives and Guards for Mechanical Systems.

Update In Progress. Division 23 Heating, Ventilation, and Air Conditioning Page Section FLUID SYSTEMS EQUIPMENT PART 1 GENERAL

REFRIGERANT PIPING

FM 517 San Leon, TX Toll Free: Office: (281) Fax: (281)

CubeSmart Gulf Breeze Storage AUTOMATIC FIRE SPRINKLER SYSTEM

Transcription:

SECTION 15181 - HYDRONIC SPECIALTIES PART 1 - GENERAL 1.1 SECTION INCLUDES A. Air separators B. Expansion tanks C. Pump accessories 1.2 RELATED SECTIONS A. Section - Plumbing Piping Specialties B. Section - Hydronic Piping. 1.3 REFERENCES A. ASME (BPV VIII, 1) - Boiler and Pressure Vessel Code, Section VIII, Division 1 - Rules for Construction of Pressure Vessels; The American Society of Mechanical Engineers; 2006. 1.4 SUBMITTALS A. See Section 01300 - Administrative Requirements, for submittal procedures. B. Product Data: Provide product data for manufactured products and assemblies required for this project. Include component sizes, rough-in requirements, service sizes, and finishes. Include product description, model and dimensions. C. Certificates: Inspection certificates for pressure vessels from authority having jurisdiction. D. Manufacturer's Installation Instructions: Indicate hanging and support methods, joining procedures. E. Project Record Documents: Record actual locations of flow controls. F. Maintenance Data: Include installation instructions, assembly views, lubrication instructions, and replacement parts list. 1.5 QUALITY ASSURANCE A. Manufacturer Qualifications: Company specializing in manufacturing the type of products specified in this section, with minimum five years of documented experience. HYDRONIC SPECIALTIES TACO AC(F)-PAX 15181-1

1.6 DELIVERY, STORAGE, AND HANDLING A. Accept equipment on site in shipping containers with labeling in place. Inspect for damage. B. Provide temporary end caps and closures on piping and fittings. Maintain in place until installation. C. Protect piping components from entry of foreign materials by temporary covers, completing sections of the work, and isolating parts of completed system. 1.7 MAINTENANCE SERVICE A. Contractor to furnish service and maintenance for one year from date of substantial completion. 1.8 EXTRA MATERIALS A. See Section 01400 - Project Requirements, for additional provisions. PART 2 - PRODUCTS 2.1 ASME Partial Bladder Type EXPANSION TANKS A. Manufacturers: 1. Taco, Inc; Model PAX : www.taco-hvac.com 2. ITT Bell & Gossett 3. Amtrol Inc 4. Substitutions: See Section 01600 - Product Requirements. B. Construction: Welded steel, designed, tested and stamped in accordance with ASME (BPV code sec VIII, div 1); supplied with National Board Form U-1, rated for working pressure of 125 psi, with flexible seamless heavy duty butyl rubber bladder. (optional 150 psi ) All wetted components to be fabricated of FDA approved materials. Bladder shall be able to accept the partial volume of the expansion tank and shall be removable and replaceable. The bladder shall be fabricated with special fluting that allows the bag to more easily collapse and facilitate replacement. The bladder shall be connected to the top of the tank via a hose/tube that with distribution holes that facilitate even expansion of the bladder. C. System connection will be via a ½ inch 304 stainless steel NPT connection on the top of the tank. A Schrader valve fitting shall be installed at the top of the tank to allow external pressurization of the bladder. Valve shall be protected by a 1½ coupling welded to the tank. D. Accessories: Pressure gage(field installed in adjacent piping by others) and air-charging fitting ; precharge to psi. E. Automatic Cold Water Fill Assembly (field installed by others): Pressure reducing valve, reduced pressure double check back flow preventer, test cocks, strainer, vacuum breaker, and valved by-pass. HYDRONIC SPECIALTIES TACO AC(F)-PAX 15181-2

F. Size: 1. HW Tank Capacity:., acceptance volume. 2. CW Tank Capacity:., acceptance volume. G. Hot Water Heating System: 1. Select expansion tank pressure relief valve at psi maximum. 2. Set pressure reducing valve at psi. H. Chilled Water System: 1. Select expansion tank pressure relief valve at psi maximum. 2. Set pressure reducing valve at psi. 2.2 AIR SEPARATORS. A. Manufacturers: 1. Taco, Inc; AC or ACF (strainer) (size and capacity as called for on plans) 2. Spirotherm. 3. Flamco 4. Substitutions: See Section 01600 - Product Requirements. B. Air removal device shall be constructed of steel. It shall be designed, fabricated and stamped per ASME Section VIII Division 1 with a maximum working pressure of 150 psi at 270 F. Manufacturer shall be holder of ASME U stamp. Manufacturer to have optional 250 psi and 125 psi ASME units available. Units 3 inch and larger shall be provided with flanged system connections as standard. 2 inch and 2½ inch models to be provided with NPT connections. These connections shall be inline with the mechanical room piping. The unit shall be painted with one coat of red oxide primer. C. The unit shall have a top NPT connection to allow for the tie in of automatic air vent, make up water, and compression tank (air control system). This fitting shall be at the upper most point on the chamber. There shall be a bottom connection for blowdown cleaning. D. (OPTIONAL) The unit shall be provided with a removable stainless steel strainer with 3/16 perforations and a free area of not less than five times the cross sectional area of the connecting pipe. The unit shall come with an inline connection that will allow for strainer removal. This additional fitting shall allow the installing contractor the option of installing the unit with inlet and outlet on the same side of the unit or on opposite sides. 2.3 PUMP ACCESSORIES A. Pump discharge multi-purpose valves: All pumps shall be fitted with a discharge multi-purpose balancing valve or other means of providing system balance, isolation, and check feature for reverse flow. The valve shall be straight or angle pattern and shall be field convertible between the two. The valve shall be ductile iron and rated for 250 psi working pressure for all jobs. The valve flanges shall be matched to suit the working pressure of the piping components on the job; HYDRONIC SPECIALTIES TACO AC(F)-PAX 15181-3

with either ANSI class 125 flanges or ANSI class 250 Flanges. The valve shall include the following components; non-slam check valve with spring-loaded bronze disc and seat, stainless steel stem, and calibrated adjustment permitting flow regulation. Valve shall be serviceable under full system pressure. The valve shall be a Taco model MPV Plus Two multi-purpose valve or equivalent. B. Pump inlet guide fitting: All pump suctions to be fitted with a multifunction inlet suction diffuser equal to that as manufactured by Taco, Inc. The suction diffuser body and cover plate shall be ductile iron and be rated for 250 psi for all jobs. The guide flanges shall be matched to suit the working pressure of the piping components on the job; with either ANSI class 125 flanges or ANSI class 250 flanges. The suction guide shall include the following components; full length S.S. straightening vanes, permanent S.S. strainer, disposable 16 mesh bronze start up strainer, blow down ports, and metering ports. For those pumps where an inlet guide fitting is not installed, there should be five pipe diameters of straight undisturbed flow going into the pump suction. The fitting shall be a Taco model SD inlet suction elbow or equivalent. PART 3 - EXECUTION 3.1 INSTALLATION A. Install specialties in accordance with manufacturer's instructions. B. Where large air quantities can accumulate, provide enlarged air collection standpipes. C. Provide manual air vents at system high points and as indicated. D. For automatic air vents in ceiling spaces or other concealed locations, provide vent tubing to nearest drain. E. Air separator and expansion tank to be installed on the suction side of the system pumps. Expansion tank to be tied into system piping in close proximity to air separator and system fill line. F. Provide valved drain and hose connection on strainer blow down connection. G. Provide pump suction fitting on suction side of base mounted centrifugal pumps where indicated. Remove temporary strainers after cleaning systems. H. Provide combination pump discharge valve on discharge side of base mounted centrifugal pumps where indicated. I. Support pump fittings with floor mounted pipe and flange supports. J. Provide radiator valves on water inlet to terminal heating units such as radiation, unit heaters, and fan coil units. K. Provide radiator balancing valves on water outlet from terminal heating units such as radiation, unit heaters, and fan coil units. HYDRONIC SPECIALTIES TACO AC(F)-PAX 15181-4

L. Provide relief valves on pressure tanks, low pressure side of reducing valves, heat exchangers, and expansion tanks. M. Select system relief valve capacity so that it is greater than make-up pressure reducing valve capacity. Select equipment relief valve capacity to exceed rating of connected equipment. N. Pipe relief valve outlet to nearest floor drain. O. Where one line vents several relief valves, make cross sectional area equal to sum of individual vent areas. P. Clean and flush glycol system before adding glycol solution. Refer to Section 15189. Q. Feed glycol solution to system through make-up line with pressure regulator, venting system high points. R. Feed glycol solution to system through make-up line with pressure regulator, venting system high points. Set to fill at psi. S. Feed glycol solution to system through make-up line with pressure regulator, venting system high points. T. Perform tests determining strength of glycol and water solution and submit written test results. END OF SECTION 15181 HYDRONIC SPECIALTIES TACO AC(F)-PAX 15181-5