WestConnex PLAN. Note : This sub-plan is currently not approved by Department of Planning and Environment APPENDIX D

Similar documents
6 BRIDGES. 6.1 Design philosophy. Proposed bridges

5.7.6 St Peters Interchange Portal

(blank page) WestConnex New M Roads and Maritime Services Environmental impact statement

GREENVALE CENTRAL PRECINCT STRUCTURE PLAN

Appendix H: Easement cross sections

09 LANDSCAPE DESIGN. 9.1 Design philosophy. 9.3 Plants, planting and mulching. 9.2 Soil preparation. Safe. Integration with local setting

I539. Smales 2 Precinct

M4-M5 Link Rozelle Interchange factsheet 2017

Urban Design and Landscape Plan Stage 1B

GREENBANK DEVELOPMENT MASTERPLAN

FORMER CANADIAN FORCES BASE (CFB) ROCKCLIFFE SECONDARY PLAN. Official Plan Amendment XX to the Official Plan for the City of Ottawa

Next Steps / Development Process. Structure Plan. June submitted to City of Fremantle. Structure Plan. July supported for advertising

Draft Eastern District Plan

Draft Ada Street Cardiff Area Plan

West Gate Tunnel Project. Incorporated Document May Incorporated document pursuant to section 6(2)(j) of the Planning and Environment Act 1987.

Section C Bridges and retaining walls

Subdivision Design Criteria. Penihana North GUIDELINES TO THE RULES

7.2.9 Eudlo local plan code

MASTER PLAN N0. 76 (SITE DEVELOPMENT PLAN DETAILED PLANNING AREA 12 PRECINCT 13) 2013

I615. Westgate Precinct

Great Lakes North Central South Central FAX: (718) CONTACT PERSON: ADDRESS: Daniel Hom, PE, Engineer-in-Charge

Private Tennis Courts

ST PETERS INTERCHANGE - AERIAL VIEW WEST OVER TUNNEL PORTAL AND MOC4 FACILITY (Artist's impression only subject to change during design development)

As will be detailed, our site plays a strategic role in providing these opportunities.

SCHEDULE THREE TO THE DEVELOPMENT PLAN OVERLAY EASTERN GOLF COURSE KEY REDEVELOPMENT SITE

WestConnex Stage 2: New M5 King Georges Road Interchange Upgrade Urban Design and Landscape Plan Part 1: Construction. Doc No. WCX2-REP-2100-UD-033A

Authority. any changes required as a result of the approved CHMP.

APPLICATION BRIEFING Prepared For: Submitted by: Date: Subject:

Highland Village Green Design Guidelines

4 RESIDENTIAL ZONE. 4.1 Background

VEHICULAR AND PEDESTRIAN CIRCULATION

Development Control Plan

SCHEDULE 12 TO THE DESIGN AND DEVELOPMENT OVERLAY GLEN WAVERLEY ACTIVITY CENTRE STRUCTURE PLAN

Welcome. Walk Around. Talk to Us. Write Down Your Comments

MASTER PLAN NO. 62 (SITE DEVELOPMENT PLAN BIRTINYA VILLAGE CENTRE) 2009

Victoria Bridge Municipal Class EA Civic Works Committee

Section 4 - Public Realm & Landscape proposals Landscape Masterplan. Section 4 52

Section Three, Appendix 16C Medium Density Housing, Design Assessment Criteria (Residential 8A zone)

Wide asphalt driveway abutting school property. garage built with incompatible materials, too close to park. incompatible fencing materials

Public Consultation. Land at Monks Farm, North Grove. Welcome

Planning Board Briefing

Sub-committee on Harbour Plan Review of Harbour-front Enhancement Committee. Ninth Meeting

Review of Environmental Factors Addendum. Green Square Stormwater Drain Shea s Creek Channel Corridor Restoration

Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS. A New Garden Neighbourhood Matford Barton 17

Development Control Plan

East Panorama Ridge Concept Plan Amendment

MVRC ARCHITECTURAL DESIGN STATEMENT

Chapter 27 Route Window SE7 Church Manorway Bridge. Transport for London

Derry Green Corporate Business Park

doyle + o troithigh landscape - architecture

QUEENSTOWN LAKES DISTRICT COUNCIL SUBDIVISION DESIGN GUIDELINES

C176. Amendment C176 Riverdale Precinct Structure Plan List of Document Changes for Planning Panels Victoria. Version th November 2013

LOW DENSITY RESIDENTIAL

Memorial Business Park Site. Proposed Future Development. Design guidelines. August

The West Vaughan Employment Area Secondary Plan Policies

Outcomes. Cross Section (Exhibition) Appendix (Exhibition) Requirement (Exhibition) Guideline (Exhibition) Table (Exhibition) Objective (Exhibition)

M i s s i o n B a y W a t e r f r o n t

WINDSOR GLEN DESIGN GUIDELINES

URBAN DESIGN BRIEF. 2136&2148 Trafalgar Road. Town of Oakville

Bylaw A Bylaw to amend Bylaw 12800, as amended, The Edmonton Zoning Bylaw Amendment No. 2239

Whitchurch Bridge Approach Road

DESIGN OF FOOTBRIDGES

King-Spadina Secondary Plan Community Consultation Meeting. Michelle Knieriem, City Planner October 11, 2017

Stage 2: WestConnex M5 King Georges Road Interchange Upgrade. Appendix B5 Construction Heritage Management Plan

NORTH CIRCULAR ROAD - REGENERATION IN ACTION

FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016

ROAD CLOSURE AND LAND USE AMENDMENT SILVER SPRINGS (WARD 1) NORTHEAST OF NOSEHILL DRIVE NW AND SILVER SPRINGS ROAD NW BYLAWS 2C2018 AND 29D2018

CENTERS AND CORRIDORS

Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA. Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA

UNIVERSITY TOWN NEIGHBOURHOODS 5.5 HOUSING MELBOURNE CAMPUS MASTER PLAN 2014

Design Guidelines - 1 -

Cape Cabarita (Formerly known as the Wellcome Site) Development Control Plan. Date of Adoption: 4 September 2007 Effective Date: 7 March 2008

Zoning Ordinance Chapter 10

SECTION ONE North East Industrial Zone Design Guide Palmerston North City Council June 2004

edge of gas line corridor setback edge of gas line corridor aligned with Schlumberger building 37.0 m AOD 33.0 m AOD max

Establish a network of streetscaped vehicle and pedestrian routes that connect within and outside the Plan area.

Glenn Highway MP DSR. Landscape Narrative

The principal elements of the NTC Strategic Vision plan are as follows.

Request for Decision. Recommendation. Presented: Monday, Jul 07, Report Date Friday, Jun 20, Type: Public Hearings

4.0 Zones and Overlays

What progress have we made so far? NEWSLETTER PROPOSED IONA RESIDENTIAL DEVELOPMENT UPDATE

ARTICLE 6: Special and Planned Development Districts

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC

OP Council Resolution June 16, Planning and Development Services

Stanley Greene District Downsview (80 Carl Hall Road) Zoning By-law Amendment and Draft Plan of Subdivision Applications Request for Direction Report

URBAN DESIGN BRIEF 305, 309, & 315 SOUTHDALE ROAD WEST LONDON ONTARIO

AMENDMENTS. Date Effective. Amendment No. Council. DCP 14 Davidson St, Greenacre Page 2

4.3 Dudley Area Plan. Introduction. History and Existing Character. Desired Future Character for Dudley

9.4.2 Landscape code 9

Western Sydney Parklands Australia s Largest Urban Park

AGINCOURT SECONDARY PLAN

Division 13 Local Business and Industry Buffer Zone: Assessment Criteria and Assessment Tables

DAREBIN PLANNING SCHEME AMENDMENT C137

THREE KINGS RENEWAL DESCRIPTION OF URBAN DESIGN / ARCHITECTURAL ELEMENTS AND PROCESS. prepared by dko Architecture

Part 4.25 Pasminco Area Plan

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of June 16, 2018

RECREATION AND OPEN SPACE ELEMENT GOALS, OBJECTIVES, AND POLICIES

GLEN ROAD PEDESTRIAN BRIDGE ENVIRONMENTAL ASSESSMENT STUDY PUBLIC INFORMATION CENTRE #2 OCTOBER 24, 2017

Chapter 13 Residential Areas: Appendices APPENDIX 1 Residential Areas

Urban and Landscape Design Frameworks Highways and Network Operations Guideline

Transcription:

ARNOTTS RESERVE URBAN DESIGN AND LANDSCAPE SUB- PLAN WestConnex Note : This sub-plan is currently not approved by Department of Planning and Environment 407

TABLE OF CONTENTS D1 INTRODUCTION 410 D1.1 Ministers Condition of Approval................................410 D1.2 Revised Environmental Management Measures................................ 411 D2 STAKEHOLDER CONSULTATION 412 D2.1 Consultation with Strathfield Council................................412 D3 CONTEXT 413 D3.1 Arnotts Reserve (Powells Creek Precinct)................................413 D4 STRATHFIELD COUNCIL OPEN SPACE GUIDELINES 414 D5 POWELLS CREEK MASTER PLAN 415 D6 WESTBOUND ON-RAMP TO M4 MOTORWAY IMPACT ON MASTER PLANS 417 D7 DRAFT PARRAMATTA ROAD URBAN TRANSFORMATION STRATEGY 418 D7.1 Homebush Structure Plan................................418 D7.2 Homebush Access and Movement Plan................................419 D7.3 Homebush Built Form................................420 D8 VEGETATION REMOVAL 421 D9 SYDNEY WATER STORMWATER NATURALISATION PROJECT 422 D10 DILAPIDATION SURVEYS OF ARNOTTS RESERVE 422 D11 WESTBOUND ON-RAMP TO M4 MOTORWAY BRIDGE 423 D12 LANDSCAPE DESIGN 425 D13 PLANTING STRATEGY AND PLANT SELECTION 425 D13.1 Planting mix................................425 D14 LANDSCAPE PLANS 426 408 WESTCONNEX M4 EAST Urban Design and Landscape Plan

List of figures Figure D-1 - Westbound on-ramp to M4 Motorway - Location plan 410 Figure D-2 - Strathfield Local Environmental Plan - Land Zoning Map (2012) 414 Figure D-3 - Parks in Strathfield Municipality (Strathfield Council, 2008) 414 Figure D-4 - Powells Creek Master Plan - Arnotts Reserve section (Strathfield Council, 2008) 415 Figure D-5 - Overall Powells Creek Master Plan (Strathfield Council, 2008) 416 Figure D-6 - Westbound on-ramp to M4 Motorway - Landscape plan and Powells Creek Master Plan overlay 417 Figure D-7 - Parramatta Road Urban Transformation Strategy - Homebush Structure Plan (UrbanGrowth 2015) 418 Figure D-8 - Parramatta Road Urban Transformation Strategy - Homebush Access and Movement Plan (UrbanGrowth 2015) 419 Figure D-9 - Parramatta Road Urban Transformation Strategy - Homebush Access and Movement Plan (UrbanGrowth 2015) 420 Figure D-10 - Construction Footprint Boundary Map (April 2016) 421 Figure D-11 - Westbound On-Ramp to M4 Motorway Bridge - Plan 423 Figure D-12 - Westbound On-Ramp to M4 Motorway Bridge - Section and Elevation 424 Figure D-13 - Westbound on-ramp to M4 Motorway - Landscape plans - Key plan 426 Figure D-14 - Westbound on-ramp to M4 Motorway - Landscape Design - Sheet 01 of 03-1:1000 427 Figure D-15 - Westbound on-ramp to M4 Motorway - Landscape Design - Sheet 02 of 03-1:1000 428 Figure D-16 - Substation at Ismay Avenue - Landscape Design - Sheet 03 of 03-1:500 429 List of tables Table 01 - Revised Environmental Management Measures 411 Table 02 - Stakeholder consultation meetings 412 409

D1 Introduction This Urban Design and Landscape Plan Sub-Plan has been prepared to satisfy the Ministers Condition of Approval B46(d) (SSI6307). Any work in Arnotts Reserve will be carried out in consultation with Strathfield Council and approved by the Secretary. Arnotts Reserve The design within Arnotts Reserve includes a Westbound Onramp Bridge from Parramatta Road that rises on retaining walls from Parramatta Road, sweeping left and joining with the M4 Motorway. The area includes screen planting to Powell Street, and maintains connections for proposed future Powells Creek master plan. D1.1 Ministers Condition of Approval The sub-plan provides details of the Project works within the area of Arnotts Reserve impacted by the SSI, and how the design outcomes are aligned with Strathfield Council s Powells Creek Master Plan (August, 2008), where feasible and reasonable, and how the visual bulk of any permanent infrastructure will be minimised. The Arnotts Reserve Urban Design and Landscape Sub-plan also takes into consideration Sydney Water s naturalisation project for Powells Creek. Figure D-1 - Westbound on-ramp to M4 Motorway - Location plan 410 WESTCONNEX M4 EAST Urban Design and Landscape Plan

D1.2 Revised Environmental Management Measures This section of the sub-plan addresses relevant Revised Environmental Management Measures (REMM) from the M4 East Submission Report in the table following. Ref # REMM Response Ref # REMM Response Landscape Character Zone 2 M4 Motorway Landscape Character Zone 6 Concord Road Precinct V49 V50 V51 Maximise opportunities for tree planting within the road corridor, where this is feasible and appropriate. Provide a visually compelling, beautiful urban design overlay for the corridor that includes vegetation as one component. Minimise tall tree planting between Powells Creek and the Northern Line to maintain district views from the M4. This is illustrated in Landscape Design Plans in Section 9 This is illustrated in the Urban Design Concept Plans in Section 2.5 and also in greater detail in the Landscape Design Plans in Section 9. No new tree planting is provided between Powells Creek and the Northern Line. V70 Minimise the landscaping required between the carriageway and noise barrier (between Parramatta Road and the pedestrian bridge over the tunnel onand off-ramps), which could be difficult to maintain. Instead, retain sufficient room to provide screen planting along the edge of the M4. This is illustrated in Landscape Design Plans in Section 9 Table 01 Revised Environmental Management Measures Landscape Character Zone 3 Parramatta Road (east) precinct V56 Explore opportunities with Strathfield Council to provide landscape screening and tree planting between the project corridor and the Park Road/ Powell Street precinct Landscape treatments in this area are illustrated in Section 9.5.2 Landscape Character Zone 5 Powells Creek Precinct V63 V64 V65 Powells Creek V63 During pre-construction of the M4 on-ramp at Powells Creek, consider incorporating design features that maximise the height of the opening, and facilitate views and pedestrian/cycle access under the structure to the northern end of the park. On completion of construction, the portion of land comprising Arnotts Reserve utilised by the project, will be re-instated in sympathy with elements of Council s master plan for the site. Consider ways to increase the level of screening between the apartment block at the eastern end of Powell Street and the project. The design of this on-ramp is governed by functional geometric rquirements of road alignment design. A bridge is provided across Arnotts Reserve to maintain pedestrian and cycleway connectivity through Arnotts Reserve consistent with Strathfield Councils master plan for this area. Details of the proposed works at this location are provided in Section D14 of this sub-plan. Screen planting is provided within the project boundary. Refer Section D14. 411

D2 Stakeholder consultation Date Table 02 Stakeholder Stakeholder consultation meetings D2.1 Consultation with Strathfield Council Refer Appendix G for consultation records. 21.04.16 Strathfield Council Briefing 26.06.16 Strathfield Council Briefing 412 WESTCONNEX M4 EAST Urban Design and Landscape Plan

D3 Context The Environmental Impact Statement (EIS) referred to the Powells Creek Precinct, Parramatta Road Precinct and M4 Motorway Precinct within the Arnotts Reserve area, as outlined on Figure D-1. These precincts and a brief description of potential impacts to the precincts as a result of the Project are described below. D3.1 Arnotts Reserve (Powells Creek Precinct) Arnotts Reserve extends from Parramatta Road as an open corridor from south to north under the M4 Motorway with an adjacent concrete lined channel to the eastern edge of the Reserve, and an electricity transmission easement to the western edge. The Reserve is a passive recreational open space, with the area between Allen Street and the M4 having been recently developed and opened by Council as part of the Powells Creek Master Plan. The area south of the M4 Motorway to Parramatta Road is inaccessible to the public, with established vegetation to the western and southern borders. Arnotts Reserve previously formed part of the Arnotts Biscuit Factory site when it was based in Homebush, operating from the early 1900 s until its closure and relocation to Western Sydney in 1997. Following the closure of the factory, the site was acquired in 2001 by the State Government with former factory buildings being transformed into the Bakehouse Quarter and the former Arnotts recreation area being identified as future open space. 01 01 View over Powells Creek and Powells Creek Reserve towards M4 Motorway from Parramatta Road 02 View of Powells Creek Reserve towards Parramatta Road from within M4 Motorway corridor 03 View west from above Parramatta Road and M4 Motorway with Arnotts Reserve in the mid ground view 04 View looking south along Powells Creek towards the M4 Motorway from Allen Street (Source: WestConnex M4 East EIS). 02 03 04 413

D4 Strathfield Council open space guidelines This sub-plan is relevant to the Strathfield Council local open space design guidelines, policies and programs. The main guidelines and plans relevant to the proposed works are as follows: Recommended Tree List - Species for Planting in the Strathfield Municipality (April 2007) Powells Creek Master Plan (2008) Strathfield Development Control Plan No 20 - Parramatta Rd Corridor Area (September 2005) Strathfield Local Environmental Plan - Land Zoning Map (2012). The Strathfield Council street tree program commenced in the 1880's and is responsible for the distinctive streetscape appearance, which characterises the Strathfield Municipality Approximately 50% of the total street trees in Strathfield Council are Brush Box plantings. Other major street trees species include water gums (12%), Melaleuca (4%), Sapium sebiferum (4%) and Eucalyptus (4%). Proposed landscape plantings including tree species related to this sub-plan are discussed further in Section D10. Details regarding Powells Creek master plan and related impacts are covered in Section D5 of this sub-plan. Figure D-3 - Parks in Strathfield Municipality (Strathfield Council, 2008) Figure D-2 - Strathfield Local Environmental Plan - Land Zoning Map (2012) 414 WESTCONNEX M4 EAST Urban Design and Landscape Plan

D5 Powells Creek master plan Strathfield Council s Powells Creek master plan (August, 2008) is a plan to provide public amenity improvements along the Powells Creek Corridor. The master plan includes a collection of linear open space areas adjoining Powells Creek from Parramatta Road to Pomeroy Street, Homebush. It includes a number of existing and future open space areas including Arnotts Reserve, Allen Street Reserve and Ismay Reserve. The master plan proposes a shared pathway through the open space corridor to link with the existing Bay to Bay path north of Pomeroy Street. The Plan would include passive open space areas, two multi-use hard courts, seating, shelters, picnic settings, minor playgrounds and vegetation works. Strathfield Council has recently installed the Strathfield Channel shared path bridge, and some sections of the shared pedestrian cycleway in a portion of the park north of Allen Street, as well as a section of informal recreational open space south of Allen Street with turf and garden beds. The Arnotts Reserve section of the plan is outlined on this page (Figure D-4), whilst the overall master plan is outlined on the following page (Figure D-5). Figure D-4 - Powells Creek Master Plan - Arnotts Reserve section (Strathfield Council, 2008) 415

Figure D-5 - Overall Powells Creek Master Plan (Strathfield Council, 2008) 416 WESTCONNEX M4 EAST Urban Design and Landscape Plan

D6 Westbound on-ramp to M4 Motorway impact on master plans ALLEN STREET Powells Creek master plan The master plan includes passive open space areas, two multi-use hard courts, seating, shelters, picnic settings, minor playgrounds and vegetation works. NORTHE The proposed Westbound on-ramp to M4 Motorway, associated structure and drainage basin would impact on the informal recreation area on the southern entrance from Parramatta Road, which would require a change to the entrance design and path layout connecting beneath the M4 Motorway. The proposed works would not prohibit the proposed location of hard courts. Overall, the Project will impact the proposed master plan, but would not prohibit the overall design or intent for Arnotts Reserve. ARNOTTS RESERVE AREAS OF ARNOTTS RESERVE IMPACTED ON BY THE PROJECT POWELLS CREEK MASTER PLAN - PROPOSED GEORGE STREET Council noted a preference for a blank canvas in terms of landscape works on completion of the Project and prefer minimal landscape embellishments. Tree preference was for Spotted gum within the parkland, and adjacent to Parramatta Road. M4 MOTORWAY POWELL STREET POWELLS CREEK MASTER PLAN - PROPOSED WESTBOUND ON-RAMP BRIDGE FROM PARRAMATTA ROAD STATION STREET 20 PARRAMATTA ROAD PUBLIC PARK - PROPOSED Figure D-6 - Westbound on-ramp to M4 Motorway - Landscape plan and Powells Creek Master Plan overlay 417

D7 Draft Parramatta Road Urban Transformation Strategy The draft Parramatta Road Urban Transformation Strategy (UrbanGrowth 2015) is a long term vision strategy for the transformation of the Parramatta Road Corridor, including eight potential growth precincts. This section of the sub-plan reviews the section of the Homebush precinct that may be impacted on by the proposed works, with reference to the Structure, Access and Movement and Built Form plans. The works at Concord Road Interchange do not impact on the Urban Transformation Strategy for Homebush Precinct. Homebush Precinct The Homebush Precinct notes that Powells Creek will act as a green corridor, winding through the Precinct as the dense network of streets to the west and north create safe links to medium-density residential neighbourhoods. D7.1 Homebush Structure Plan The proposed works would impact on the available open space associated with the Homebush Structure Plan, but would not impact on the intent for Arnotts Reserve to be maintained as open space with proposed active transport connections such as those nominated on the Powells Creek Master Plan. Refer to Figure D-7 opposite which has an overlay of the Project boundary with the Homebush Structure Plan. Figure D-7 - Parramatta Road Urban Transformation Strategy - Homebush Structure Plan (UrbanGrowth 2015) 418 WESTCONNEX M4 EAST Urban Design and Landscape Plan

D7.2 Homebush Access and Movement Plan The proposed works would not impact on the intent for Arnotts Reserve to be maintained as open space with access and connection through Arnotts Reserve, but would potentially impact on the indicative future light rail connection alignment noted on the plan. Refer to Figure D-8 opposite which has an overlay of the Project boundary with the Homebush Access and Movement Plan. Figure D-8 - Parramatta Road Urban Transformation Strategy - Homebush Access and Movement Plan (UrbanGrowth 2015) 419

D7.3 Homebush Built Form The proposed works would not impact on the Homebush Structure Plan, which notes open space and surrounding residential built form. Refer to Figure D-9 opposite which has an overlay of the Project boundary with the Homebush Built Form diagram from the Parramatta Road Urban Transformation Strategy. Figure D-9 - Parramatta Road Urban Transformation Strategy - Homebush Access and Movement Plan (UrbanGrowth 2015) 420 WESTCONNEX M4 EAST Urban Design and Landscape Plan

D8 Vegetation removal The indicative extent of vegetation clearing within Arnotts Reserve is indicated in the adjacent Figure D-10. Vegetation clearing is permitted within the Construction Footprint boundary ADJOINS SITE ANALYSIS PLAN SHEET 3 Figure D-10 - Construction Footprint Boundary Map (April 2016) 421

D9 Sydney Water Stormwater naturalisation project The proposed works within Arnotts Reserve will not inhibit Sydney Water s naturalisation project for Powells Creek. After contacting Sydney Water in regards to the potential naturalisation project and considerations that the Project may need to consider, advice from Sydney Water was as follows: "As per our meeting earlier, our works is at Pomeroy Street, which is quite far away from your works site. Hence there will be no duplication." D10 Dilapidation surveys of Arnotts Reserve In-line with MCoA B46(d), CSJ have prepared a preconstruction dilapidation survey, which was sent to Strathfield Council for review and agreement. A post-construction dilapidation survey will be provided to Strathfield Council for review and agreement. The cost of any required rehabilitation as identified in the dilapidation survey will be borne by the Project. Within six months of the completion of construction, the Project will ensure that the portion of Arnotts Reserve, temporarily acquired for the purposes of the project, is returned to Strathfield Council in at least a pre-construction condition that contributes to the progression of works required under the Powells Creek Master Plan. 422 WESTCONNEX M4 EAST Urban Design and Landscape Plan

REFER TO DESIGN LOT 30-560-660-321 M4 WEST MOTORWAY EASTBOUND M4 WEST MOTORWAY WESTBOUND 02 365 D11 Westbound on-ramp to M4 Motorway Bridge The westbound on-ramp bridge from Parramatta Road consists of a single structure, containing three simply supported spans of 750 deep RMS standard precast concrete super-t girders. The bridge consists of a single traffic lane that varies in width from 4.5 metres to 3.5 metres, and varying width nearside and offside shoulders providing a constant overall width of 7.5 metres between barriers. The form of the bridge has been designed to maximise visibility and pedestrian access opportunities beneath it. The bridge location and level is constrained by the existing site conditions and required road geometry, particularly in terms of the proximity to Parramatta Road, Powell s Creek and the existing M4. The visual bulk of the bridge, when viewed in elevation, is minimised by adopting a minimal depth (750mm) super-t girder arrangement which also contributes to maximising available head clearance and visibility beneath the bridge. The level of the on-ramp is relatively low in relation to the existing ground levels in the reserve as it governed by the required longitudinal grade of the on-ramp as it leaves Parramatta Road, so the consideration of maximising space and visibility beneath the bridge is important one. The use of the cantilevered headstock and single circular pier arrangement to support the super structure also provides a solution with the least amount physical structure beneath the bridge in order to maximise visibility. Abutments The abutments are supported on cast in place bored piles behind wrap around reinforced soil walls (RSWs). Piers Piers 1 and 2 are cantilevered headstock piers with a 1.8m circular column supported by a single 2.1m diameter cast in place pile. Parapets Precast concrete barrier with twin railings and an in-situ stitch pour. Safety (throw screens) Not required. Superstructure 750mm deep precast concrete super-t girders have been adopted to minimise the superstructure depth. The deck slab has a minimum thickness of 180mm on the low side of the carriageway, allowing sufficient space for the reinforcement and concrete placement and increases to approximately 330mm on the high side of the carriageway to account for the varying cross fall. 01 01 N N PLAN 1:500 PLAN 1:500 MASSED PLANTING RETAINING WALL RW268 REFER TO DESIGN LOT 30-560-660-321 MASSED PLANTING RETAINING WALL RW268 REFER TO DESIGN LOT 30-560-660-321 TURF TURF 03 365 03 365 M4 WEST MOTORWAY EASTBOUND M4 WEST MOTORWAY EASTBOUND M4 WEST MOTORWAY WESTBOUND M4 WEST MOTORWAY WESTBOUND LOGIN NAME: ENRIQUE CASTILLO LOCATION: c:\pwworking\aecom_au\enrique.castillo\d0119376\m4e-hsl-dg-30-560-660365.dwg A3 ORIGINAL 0 10 20 30 40 50 60 70 80 - C_00 REV 01 03 02 365 02 365 RETAINING WALL RW267 REFER TO DESIGN LOT 30-560-660-321 RETAINING WALL RW267 REFER TO DESIGN LOT - SDD ISSUE PLAN 1:500 ELEVATION 1:250 30-560-660-321 GEORGE STREET GEORGE STREET AMENDMENT / REVISION DESCRIPTION POWELS CREEK RETAINING WALL RW-268 REFER TO SHEET DG-30-560-660-321 M310 M310-28/06/2015 APPROVAL GRAVEL PAVING WESTBOUND ON-RAMP BRIDGE GRAVEL PAVING FROM PARRAMATTA ROAD WESTBOUND ON-RAMP BRIDGE MASSED PLANTING FROM PARRAMATTA ROAD MASSED PLANTING Figure D-11 - Westbound On-Ramp to M4 Motorway Bridge - Plan DATE TURF - MG 03 365 SCALES AT A3 SIZE DRAWING 0.5 0 0.5 1 1.5 2m 1 : 100 FULL SIZE A3 1.25 0 1.25 1 : 250 FULL SIZE A3 2.5 0 2.5 5 7.5m BRIDGE ABUTMENT PAVING 2.5 3.75m 1 : 500 FULL SIZE A3 RETAINING WALL RW2 REFER TO DESIGN LO 30-560-660-321 02 02 CLIENT: ELE 1:10 ELE 1:10 RETAINING WALL RW-268 REFER TO SHEET DG-30-560-660-321 BRIDGE ABUTMENT PAVING GRAVEL PAVING BRIDGE DECK RETAINING WALL RW-268 REFER TO SHEET DG-30-560-660-321 BRIDGE ABUTMENT PAVING GRAVEL PAVING BRIDGE DECK 423

N MASSED PLANTING RETAINING WALL RW268 REFER TO DESIGN LOT 30-560-660-321 M4 WEST MOTORWAY EASTBOUND N MASSED PLANTING RETAINING WALL RW268 REFER TO DESIGN LOT 30-560-660-321 M4 WEST MOTORWAY EASTBOUND M4 WEST MOTORWAY WESTBOUND GEORGE STREET M4 WEST MOTORWAY WESTBOUND 02 365 WESTBOUND ON-RAMP BRIDGE FROM PARRAMATTA ROAD 02 365 WESTBOUND ON-RAMP BRIDGE FROM PARRAMATTA ROAD GRAVEL PAVING N-RAMP BRIDGE ATTA ROAD WESTBOUND ON-RAMP BRIDGE FROM PARRAMATTA ROAD 03 365 G 03 365 MASSED PLANTING GRAVEL PAVING M310 GRAVEL PAVING TURF RETAINING WALL RW267 REFER TO DESIGN LOT 30-560-660-321 TURF RETAINING WALL RW267 REFER TO DESIGN LOT 30-560-660-321 01 PLAN 1:500 ELEVATION 02 PLAN 01 1:100 1:500 02 ELEVATION 1:100 RETAINING WALL RW-268 REFER TO SHEET DG-30-560-660-321 BRIDGE ABUTMENT PAVING CK LOGIN NAME: ENRIQUE CASTILLO LOCATION: c:\pwworking\aecom_au\enrique.castillo\d0119376\m4e-hsl-dg-30-560-660365.dwg A3 ORIGINAL 0 10 20 30 40 50 60 70 80 DRAWN BY: E.CASTILLO DESIGNED BY: J.SMALL CHECKED BY: M.GRAHAM DATE PRINTED: - 03 - ELEVATION 1:250 NTIAL DETAILED DESIGN OT FOR CONSTRUCTION 29 Jun 2016-05:31PM C_00 SDD ISSUE 28/06/2015 424 WESTCONNEX M4 EAST Urban Design and Landscape Plan REV AMENDMENT / REVISION DESCRIPTION DATE RETAINING WALL RW-267 REFER TO SHEET DG-30-560-660-321 RETAINING WALL RW-268 REFER TO SHEET DG-30-560-660-321 BRIDGE ABUTMENT PAVING - - MG APPROVAL SCALES AT A3 SIZE DRAWING 0.5 0 0.5 1 1.5 2m CLIENT: GRAVEL PAVING 1 : 100 FULL SIZE A3 WESTBOUND 1.25 0 1.25 ON-RAMP 2.5 3.75m BRIDGE FROM PARRAMATTA ROAD 1 : 250 FULL SIZE A3 PROJECT 2.5 0COMPANY 2.5 5 DOCUMENT 7.5m ZONE DISCIPLINE LOT NO. DOC. No. REV M4E HSL 1 : 500 FULL SIZE A3 - WESTCONNEX M4 EAST CONCORD ROAD INTERCHANGE URBAN AND LANDSCAPE DESIGN PLAN, ELEVATION AND SECTION DG 30 560 660 365 C_00 STATUS: ORIGINAL SIZE: A3 CO-ORDINATE SYSTEM: MGA ZONE 56 HEIGHT DATUM: A.H.D. BRIDGE DECK SUBSTANTIAL DETAILED DESIGN NOT FOR CONSTRUCTION DRAWN BY: E.CASTILLO DESIGNED BY: J.SMALL CHECKED BY: M.GRAHAM DATE PRINTED: 29 Jun 2016-05:31PM LOGIN NAME: ENRIQUE CASTILLO LOCATION: c:\pwworking\aecom_au\enrique.castillo\d0119376\m4e-hsl-dg-30-560-660365.dwg A3 ORIGINAL 0 10 20 30 40 50 60 70 80 - RETAINING WALL RW-267 REFER TO SHEET DG-30-560-660-321 - 28/06/2015 MG CONCORD DATE APPROVAL ROAD INTERCHANGE URBAN AND LANDSCAPE DESIGN WESTBOUND ON-RAMP BRIDGE FROM PARRAMATTA ROAD PLAN, ELEVATION AND SECTION PROJECT COMPANY ZONE DISCIPLINE DOCUMENT LOT NO. DOC. No. REV M4E HSL 2.5 WESTCONNEX - - M4 EAST C_00 SDD ISSUE Figure D-12 - Westbound On-Ramp to M4 Motorway Bridge - Section and Elevation REV 03 - ELEVATION 1:250 AMENDMENT / REVISION DESCRIPTION SCALES AT A3 SIZE DRAWING 0.5 0 0.5 1 1.5 2m DG 30 560 1 : 100 FULL SIZE A3 1.25 0 1.25 2.5 3.75m 1 : 250 FULL SIZE A3 2.5 0 5 7.5m 1 : 500 FULL SIZE A3 660 365 CLIENT: C_00

D12 Landscape design General Design Approach The primary design objective is to maximise opportunities for landscape areas that will accommodate large scale tree planting opportunities that will allow the development of 'green volume' that can compete with the scale of infrastructure being constructed. In relation to tunnel portals and approaches the main consideration has been to avoid unnecessary embellishment allowing the various elements to fit within the local character and context, emphasising simple, uncomplicated and consistent detailing throughout. Landform & Drainage New cut and fill embankments in this section will be no steeper than 1 in 3 in accordance with EIS requirements and will be trimmed and profiled to blend with the existing landform. At the Westbound On-ramp Bridge from Parramatta Road one stormwater detention basin is required at the north east corner of Underwood Road and Powell Street. Landscape Works As a result of the safety in design process the following changes were incorporated into the Arnotts Reserve urban and landscape design: the provision of safe access beneath the westbound on-ramp bridge and to all landscape areas for maintenance personnel and equipment, clear safety setbacks for non-frangible plant species, include landscaping in front of new walls to prevent access and deter vandalism. D13 Planting strategy and plant selection The following typical planting typologies will be utilised on this section of the Project: Turf areas Massed planting Grasses Small tree General tree planting D13.1 Planting mix Turf areas Nara Zoysia Zoysia Grasses Lomandra longifolia Spiny-headed Mat-rush Lomandra hystrix Creek Mat-Rush Small trees Elaeocarpus reticulatus Blueberry Ash Pittosporum undulatum Australian Cheesewood Syzygium leuhmanni Riberry Trees Table 03 Planting mix species Corymbia maculata Spotted Gum Eucalyptus paniculata Grey Ironbark Eucalyptus saligna Sydney Blue Gum Zoysia japonica Lomandra longifolia Lomandra hystrix Syzygium leuhmanni Soft landscape areas are basically a combination of turfed and massed planting areas. In this zone the intention is to maximise opportunities for large scale tree planting within the Concord Road Interchange to compete with the scale of infrastructure. Street tree planting An outline of the plant species and a planting palette are provided in the following tables. Elaeocarpus reticulatus Pittosporum undulatum Most landscape areas will be on natural ground. Specifications for all soil mixes have been developed by a specialist soil scientist, for all of the various site conditions. Safety in Design When developing the Arnotts Reserve urban and landscape design, the M4 East Project 'Safety in Design' process was adopted, based on the NSW WorkCover Safe design of structures code of practice process (July 2014). Corymbia maculata A safety in design workshop was undertaken for each design package, including those packages relating to urban design and landscaping, to identify potential safety issues, hazards and resulting risks. These workshops included representatives from relevant design teams, the construction delivery team, suitably experienced O&M personnel, the Safety Manager, Roads and Maritime and Asset Trustee. Eucalyptus saligna Eucalyptus paniculata 425

D14 Landscape plans The following section includes two detailed landscape plans at 1:1000 scale for landscape works related to the Westbound onramp to M4 Motorway, and a detailed landscape plan at 1:500 scale for landscape works related to the substation at Ismay Avenue. The drawings show extent and scope of landscape works within the project boundary in relation to the project road alignment, existing street network, new service facilities, existing vegetation, existing adjoining properties, existing vegetation and existing features in general. Figure D-13 - Westbound on-ramp to M4 Motorway - Landscape plans - Key plan 426 WESTCONNEX M4 EAST Urban Design and Landscape Plan

2.5 0 2.5 5 7.5m 1 : 500 FULL SIZE A3 Figure D-14 - Westbound on-ramp to M4 Motorway - Landscape Design - Sheet 01 of 03-1:1000 427

2.5 0 2.5 5 7.5m 1 : 500 FULL SIZE A3 Figure D-15 - Westbound on-ramp to M4 Motorway - Landscape Design - Sheet 02 of 03-1:1000 428 WESTCONNEX M4 EAST Urban Design and Landscape Plan

LEGEND BOUNDARIES SITE BOUNDARY EXISTING CADASTRAL EXISTING FEATURES FROM PARRAMATTA 11.0 TO SYDNEY 10.0 CONTOURS (1m INTERVAL) 9.0 EXISTING TREES TO BE RETAINED N EXISTING VEGETATION TO BE RETAINED GROUND TREATMENT FLUSH CONCRETE EDGING E1 GRAVEL PAVING PLANTING AND SOIL PREPARATION AREAS PLANTING AREA BOUNDARY PLANTING JOIN LINE. REFER TO PLANTING PLAN 407 FOR PLANT SPECIES AND QUANTITIES 150 Dietes bicolor 150 Lomandra longifolia @ 6/m2 ISMAY AVENUE E1 600 600 600 600 Dianella revoluta Dianella caerulea Lomandra longifolia Lomandra hystrix @ 6/m2 P1 MASSED PLANTING P2 MASSED PLANTING ON STRUCTURE T1 TURF T2 TURF ON STRUCTURE B1 WQCP / BIO RETENTION BASIN PLANTING RESIDUAL LAND 30 TREE PLANTING Melaleuca quinquenervia GENERAL TREE PLANTING 500 Ficinia nodosa @ 6/m2 14 STREET TREE PLANTING (75 LITRE) Melaleuca quinquenervia STREET TREE PLANTING (200 LITRE) ALLEN STREET RESERVE 300 300 300 300 ROAD GEOMETRY (REFER DESIGN LOT 20-200-100) Dianella revoluta Dianella caerulea Lomandra longifolia Lomandra hystrix @ 6/m2 TUNNEL FILL EMBANKMENT / CUT EMBANKMENT CYCLEWAY/PATH DRIVEWAY/PARKING BAY ROAD FURNITURE (REFER DESIGN LOT 20-200-105) / / / 500 Lomandra longifolia @ 2/m2 / 480 480 480 480 / Melaleuca quinquenervia / 6 POST AND RAIL SAFETY BARRIER 530 Lomandra longifolia @ 2/m2 VEHICLE ACCESS AND HARDSTAND BOUNDARY FENCE SECURITY FENCE PEDESTRIAN FENCE Dianella revoluta Dianella caerulea Lomandra longifolia Lomandra hystrix @ 6/m2 RETAINING WALL NW NOISE WALL NW EXISTING NOISE WALL GATE FIRE PUMPS AND TANKS AND 33KV SUBSTATION. REFER DESIGN LOT 20-560-600 BOLLARDS DRAINAGE (REFER DESIGN LOT 20-360-400) E1 WATER QUALITY BASIN PROPOSED STORMWATER PIT E1 PROPOSED HEADWALL & SCOUR PROTECTION ROCK-LINED SWALE. NO PLANTING. GIN NAME: ENRIQUE CASTILLO CATION: c:\pwworking\aecom_au\enrique.castillo\d0119375\m4e-hsl-dg-20-560-660435.dwg 3 ORIGINAL 10 20 30 40 50 60 70 80 E1 2 Eucalyptus saligna 10 30 Pittosporum undulatum Elaeocarpus reticulatus @ 2m cts Dianella caerulea Lomandra longifolia Lomandra hystrix @ 0.75m cts 70 70 70 7.0 8.0 9.0 10.0 11.0 1800 Lomandra longifolia 12.0 @ 6/m2 13.0 14.0 75L 29 Melaleuca quinquenervia 800 Ficinia nodosa @ 6/m2 15.0 CLIENT: SCALES AT A3 SIZE DRAWING STATUS: FINAL DESIGN NOT FOR CONSTRUCTION ORIGINAL SIZE: A3 CO-ORDINATE SYSTEM: 2.5 0 1 : 500 D_00 ISSUED FOR FINAL DESIGN 30/09/16 MG 2.5 5 7.5m FULL SIZE A3 MGA ZONE 56 HEIGHT DATUM: A.H.D. DRAWN BY: WESTCONNEX M4 EAST Figure D-16 - Substation at Ismay Avenue - Landscape Design - Sheet 03 of 03-1:500 HOMEBUSH BAY DRIVE INTERCHANGE URBAN AND LANDSCAPE DESIGN SUBSTATION AT ISMAY AVENUE E.CASTILLO DESIGNED BY: E.CASTILLO CHECKED BY: D.ONG DATE PRINTED: PROJECT COMPANY DOCUMENT ZONE DISCIPLINE LOT NO. DOC. No. 429 REV D_00