MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

Similar documents
S C O P E O F W O R K A P R I L

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND NATIONAL CAPITAL PARK AND PLANNING COMMISSION

master plan of highways bus rapid transit amendment

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND NATIONAL CAPITAL PARK AND PLANNING COMMISSION

Sector Plan Briefing October 16, 2014

Status Report: MD 355 Project

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

DRAFT. October Wheaton. Design Guidelines

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

Description. Summary. MCPB Item No. Date: 01/17/13. Bethesda Crescent, Limited Site Plan Amendment, A, A

Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions

1.0 Purpose of a Secondary Plan for the Masonville Transit Village

master plan of highways

Presentation of the Staff Draft. July 17, 2014 SSRVP Team, Area 3

John M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference

CITY OF VACAVILLE PLANNING COMMISSION Agenda Item No. G.1 STAFF REPORT February 21, 2012 BRIGHTON LANDING SPECIFIC PLAN & DEVELOPMENT PROJECT

THE 355/270 CORRIDOR:

LAND USE AMENDMENT DOWNTOWN COMMERCIAL CORE (WARD 7) MACLEOD TRAIL SE AND 5 AVENUE SE BYLAW 254D2017

WOODMONT TRIANGLE AMENDMENT TO THE SECTOR PLAN FOR THE BETHESDA CBD

Shady Grove Sector Plan

Preliminary Recommendations Tk Takoma/Langley Crossroads Sector Plan

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

University of the District of Columbia Van Ness Campus Master Plan Community Open House 3. December 8, 2010

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND NATIONAL CAPITAL PARK AND PLANNING COMMISSION

Rock Spring Master Plan Community Meeting #6: Land Use + Transportation Forecasts

Wheaton CBD & Vicinity Sector Plan D E S I G N G U I D E L I N E S

Bethesda Downtown Plan

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension

Shift Rapid Transit Public Participation Meeting May 3, 2017

City Council Special Meeting AGENDA ITEM NO. C.

Planning Board Briefing

The transportation system in a community is an

ARLINGTON COUNTY, VIRGINIA

At first Work Session on October 22, At second Work Session on November 19, At third Work Session on December 3, 2015

EXPO LINE COMMUNITY WORKSHOPS NOVEMBER 27 TH & DECEMBER 3 RD Los Angeles Department of City Planning

Public input has been an important part of the plan development process.

ASPEN HILL Minor Master Plan Amendment

Chapter 1.0 Introduction

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND NATIONAL CAPITAL PARK AND PLANNING COMMISSION

Welcome to the Oakridge Centre Open House

ARLINGTON COUNTY, VIRGINIA

A. INTRODUCTION B. PROJECT LOCATION

Town Center (part of the Comprehensive Plan)

MONTGOMERY COUNTY PLANNING DEPARTMENT

Right-of-Way Acquisitions and Relocations Technical Memorandum

Long Branch Sector Plan

CRYSTAL CITY BLOCK PLAN # CCBP- G 1 DRAFT

MONTGOMERY COUNTY PLANNING DEPARTMENT

Stanley Greene District Downsview (80 Carl Hall Road) Zoning By-law Amendment and Draft Plan of Subdivision Applications Request for Direction Report

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JUNE 7, 2016

South of Eastern Strategic Direction Status Update

Introduction. Chapter 1. Purpose of the Comprehensive Plan Plan Organization Planning Process & Community Input 1-1

Establish a network of streetscaped vehicle and pedestrian routes that connect within and outside the Plan area.

Olde Towne Vision Plan

MAIN STREET ECONOMIC DEVELOPMENT STRATEGY

SUBJECT: PREDEVELOPMENT PLAN REVIEW OF PROJECT LOCATED AT 2632 EAST WASHINGTON BOULEVARD ('ST. LUKE MEDICAL CENTER')

Transit-Oriented Mixed Use Zoning in Montgomery County, Maryland

Local Growth Planning in North Central Green Line Communities

Welcome. Community Consultation Meeting November 28, Review and discuss the Bathurst Quay Neighbourhood Plan Framework

Future Proposed Development

JANUARY 19, 2011 CENTRAL AVENUE-METRO BLUE LINE TRANSIT-ORIENTED DEVELOPMENT IMPLEMENTATION PROJECT COMMUNITY FORUM

SPRINGHILL LAKE TRANSIT VILLAGE

Transportation Committee

Seneca Meadows. Block 4 Locate office, technology, and medical development adjacent to I Screen views of garage structures from I-270.

DENVER DESIGN DISTRICT GDP

New York Avenue Streetscape and Trail Project Public Meeting #1 Summary

Joint Public Hearing. Preliminary Subregion 5 Master Plan and Proposed Sectional Map Amendment

Implementation Guide Comprehensive Plan City of Allen

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN

TO: Denver Planning Board FROM: Analiese Hock, Senior City Planner DATE: March 13, 2018 RE:

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND NATIONAL CAPITAL PARK AND PLANNING COMMISSION

APPENDICES DESIGNING PUBLIC SPACES - ENERGIZED PUBLIC SPACES DESIGN GUIDELINES WORKING DRAFT DECEMBER 2018 A1

Midtown Greenway Land Use and Development Plan Executive Summary

Sheridan Boulevard S TAT I O N A R E A P L A N S H E R I D A N B O U L E VA R D S TAT I O N A R E A P L A N

QUEEN-RIVER SECONDARY PLAN

FOUR MILE RUN VALLEY WORKING GROUP AND CHARGE

Planning Districts INTRODUCTION

MONTGOMERY COUNTY PLANNING DEPARTMENT

CITY OF PUYALLUP. Background. Development Services

PRINCE GEORGE S PLAZA TRANSIT DISTRICT DEVELOPMENT PLAN AND TRANSIT DISTRICT OVERLAY ZONE UPDATE

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004

PINE CURVE REZONING. BACKGROUND Purchased as two parcels in 2001 and 2002

Portage Parkway Environmental Assessment Public Information Centre No. 1

Workshop 3. City of Burlington Waterfront Hotel Planning Study. September 14, The Planning Partnership

hermitage town center

City of Toronto. Emery Village Transportation Master Plan

ASPEN HILL Minor Master Plan Amendment

Link Union Station (Link US) Project Open House September 26, 2018

CONTENTS BACKGROUND AND CONTEXT... 3 Plan Area... 3 History... 3 Previous Planning Initiatives... 4 PLANNING FRAMEWORK... 5 Countywide Transit

2.7 ac park. TOTAL 5,403 DU 1,297,900 sf 1,105,450 sf 3.87 ac 5,563 DU 1,121,200 sf 1,105,450 sf 3.87 ac

Rock Spring Master Plan Community Meeting #8: Preliminary Recommendations

Mill Woods Town Centre Proposed Rezoning LDA

Town Center. Block 5 Existing multifamily residential units are expected to remain.

Coliseum Station Area Area Redevelopment Plan. Public Engagement #1 June 12, 2017

Clarksburg Master Plan Concept and the Clarksburg Town Center. Planning Regulating Building

Expo Light Rail Line. Expo Line Community Meeting Phase 2 Design Update November 2011

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

Lehigh Acres Land Development Regulations Community Planning Project

Transcription:

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MCPB Item No. 6 Date: 7.22.13 Bethesda Purple Line Station Minor Master Plan Amendment, Scope of Work Elza Hisel-McCoy, Assoc. AIA, LEED-AP, Planner Coordinator, Area 1, elza.hisel-mccoy@montgomeryplannng.org, 301.495.2115 Valdis Lazdins, Chief, Special Projects, valdis.lazdins@montgomeryplanning.org, 301.495.4506 Tom Autrey, Supervisor, Transportation, Functional Planning & Policy, 301.495.4533 David Anspacher, Planner Coordinator, Transportation, Functional Planning & Policy, 301.495.2191 Completed: 7.15.13 Description Present Scope of Work. Staff recommendation: approve scope of work Summary This memorandum presents the scope of work for the Bethesda Purple Line Station Minor Master Plan Amendment, including background information, planning framework, purpose of the plan, schedule, resources, outreach, and next steps.

Introduction The Purple Line is a planned light rail route in Montgomery County that will be located within the existing Georgetown Branch rail right-of-way, presently the location of the Georgetown Branch Interim Trail. During Purple Line construction, the existing trail will be replaced by the Capital Crescent Trail (CCT). The western terminus of the Purple Line will be located in Bethesda, in the existing tunnel beneath the Apex Building at the intersection of Wisconsin Avenue and Elm Street. Aerial Context Map

The Maryland Transit Administration (MTA) developed preliminary engineering concept designs to accommodate the Bethesda Purple Line Station, the CCT, and associated infrastructure within that existing tunnel. Originally, this design included the train and the trail in the same space. Further study revealed, however, that both the train and the trail could not be accommodated within the existing space without incurring significant unanticipated additional cost and posing a potential structural hazard to the buildings above. As a result, the County Council determined that the Capital Crescent trail would have to be limited to the surface connection on street. Preliminary Engineering Concept Design In the preliminary concept design, the station is built around the existing structure of the building above. This yields a design with a number of challenges: structural columns from the existing building will impede pedestrian movement on the platform; a curved platform that creates gaps between the platform and the train; a single central platform that requires a wider tunnel to accommodate trains; maintenance tail tracks that extend about 100 into Woodmont Plaza, a central public gathering space; a large ventilation tower, 18 x40 x90, located in Woodmont Plaza (as adjacent approved development proceeds, the tower wil need to grow taller still) the planned connection between the Purple Line Station and the forthcoming Bethesda Metro Station south entrance must be accommodated under the Elm Street right-ofway, necessitating elevators on the Elm Street sidewalk.

Alternative Station Concept Design In April 2013, MTA released an alternative station design that would improve upon this design. This alternative design is premised on the timely redevelopment of the Apex Building. There are numerous public benefits to the alternative design: a dedicated tunnel for the Capital Crescent Trail under Wisconsin Avenue; a more efficient dual-platform configuration free of impediments to pedestrian movement on the platform; straight platforms without gaps between the train and platform; maintenance tail tracks that extend only about 30 into Woodmont Plaza; the incorporation of the ventilation tower into the building design; and relocation of the Red Line south entrance from the Elm Street right-of-way into the design for the new building. Implementation of the alternative design would provide an improved user experience for pedestrians, commuters, and cyclists and creates numerous efficiencies that will save the County and State both time and money. Planning Framework The 1990 Approved and Adopted Georgetown Branch Master Plan Amendment identifies the Georgetown Branch right-of-way as the location for both the Silver Spring & Bethesda Trolley and the Capital Crescent Trail, and the Apex Building (nee Embassy Plaza Building ) site as the location of the Bethesda trolley station. The Plan recommends the connection of the Bethesda trolley station and the Bethesda Metro station south entrance, and includes specific design recommendations for the design and function of the various station elements.

The 1994 Approved and Adopted Bethesda CBD Sector Plan includes the Purple Line station within the Metro Core District, with Woodmont and Bethesda Avenues forming the western and southern boundaries of the district. The Sector Plan recommends for this district the highest intensity development, focusing primarily on commercial uses and employment, but not precluding residential development. For the station block, the Sector Plan recommends medium- to high-density office development, with retail and service uses along Woodmont Plaza, and CBD-2 zoning. The Plan recommends optional method employment uses on most CBD-2 sites, at 4 FAR. Optional method residential use is also allowed at 5 FAR. (p.58) The Sector Plan also makes design recommendations for the portion of the block along Woodmont Avenue. The Sector Plan does make specific recommendations regarding development of the eastern portion of the block. The Bethesda CBD Sector Plan highlights the need to integrate the Silver Spring-Bethesda Trolley into the transportation and land use pattern (p. 143) and supports connection of a light rail to the Silver Spring CBD using the Georgetown Branch right-of-way, with a terminal located near the south entrance to Metro in the Bethesda CBD Metro Core. (p. 146). The Sector Plan acknowledges the complexity of the planned connection between the Metro station south entrance and the trolley station and recommends alternative station locations within the Georgetown Branch right-of-way. The 2010 Approved and Adopted Purple Line Functional Plan reconfirms the location of the Bethesda terminal station under the Apex Building and reinforces as key features of the station the pedestrian connections to the Bethesda Metro station south entrance, Elm Street, and Woodmont Plaza. Purpose of the Plan The Bethesda Purple Line Minor Master Plan Amendment will look at options to realize the significant public benefits of the alternative station design. This review will consider existing capacities in the zoning, Bethesda CBD Sector Plan, and the transportation network, and compare those with the economic considerations for the potential redevelopment of the Apex Building and a broader analysis of the station and trail design and use. In placing this Minor Master Plan Amendment into the Planning Department s work program, the County Council limited the specific geographic area for this review to the block where the station will be located bound by Elm Street to the north, Wisconsin Avenue to the east, Bethesda Avenue to the south, and Woodmont Avenue to the east as well as the Elm Street right-of-way between Wisconsin Avenue and Elm Street Park and Elm Street Park itself.

Minor Master Plan Amendment Plan Area For traffic analysis purposes, this review will cover a larger area, shown below, to assess potential traffic impacts.

Traffic Analysis Area

In addition to this Minor Master Plan Amendment, the County Council also placed into the Department s work program the update of the full Bethesda CBD Sector Plan, an effort that staff has recently begun. While the Minor Amendment has a narrower focus and a shorter timeline, as described below, these two distinct but related planning efforts will proceed sideby-side, each to one degree or another informing the other. Project Schedule The MTA has set two deadlines that this Minor Master Plan Amendment is working with: December 31, 2013: written commitment to redevelop the Apex Building; December 31, 2015: demolition of the Apex Building to allow construction of the station to commence with general expected construction of the Purple Line. Staff has presented to the Planning Board its view that the Planning Department is but one member of the larger team necessary to meet MTA s schedule and to realize the great public benefits that would come with an improved Bethesda Purple Line Station design. As part of a larger coordinated effort to meet the deadlines established by MTA and supported by the County Council, this Minor Master Plan Amendment must meet key milestones on the following schedule: July 22, 2013 Present Scope of Work to Planning Board September 16, 2013 Present Staff Draft Minor Master Plan Amendment to Planning Board for approval as Public Hearing Draft November 7, 2013 Planning Board Public Hearing November 21, 2013 Planning Board Worksession December 5, 2013 Approval of Planning Board Draft Minor Master Plan Amendment December 6, 2013 Transmit Planning Board Draft to County Council and County Executive to allow County Council to notice Public Hearing before Winter break. Resources In placing this Minor Master Plan Amendment into the Department s work program, the County Council provided $100,000 to hire consultants to assist staff with the review. Staff has contracted with an economic consultant to determine the minimum amount of redevelopment necessary under current market conditions to profitably redevelop the Apex Building in keeping with the MTA s 2015 deadline. Building on staff analysis of redevelopment potential under the existing zoning, master plan recommendations, and other considerations, these consultants will work with staff to analyze what, if any, additional incentive options are appropriate.

Staff is also working with a consultant to analyze the alternative Bethesda Purple Line Station designs and their impact on the Capital Crescent Trail user experience. This analysis is intended to ensure that the efficiencies, improved services, and function of the station are optimized. Outreach The narrow scope and schedule of this Minor Master Plan Amendment focuses on the function and feasibility of the Bethesda Purple Line Station design. Any potential land use, zoning, or transportation considerations will be made within that limited context. Larger questions as to how the future development of this block fits into the larger Bethesda CBD will be taken up as part of the CBD Sector Plan update. In accordance with the narrow focus of the Minor Master Plan Amendment, and the truncated schedule s associated difficulties with scheduling outreach efforts during the summer months, the Amendment will focus outreach efforts, with an ongoing online component and a face-toface component after school begins. The online component will include the following elements: Regular e-mail, social media, and website updates; Web-based tool to enable the public to provide insights and recommendations about how the station ought to work for users and neighbors alike, including pedestrian and bike circulation, impacts on Woodmont Plaza and Elm Street Park, and other issues. Dedicated website with archival information, resources, and updates. The face-to-face component will include: Staff participation in community and civic meetings and events; An open-house-style preview of the staff recommendations before they go to the Planning Board; Citizen comment at Planning Board worksessions; and Citizen testimony at the Planning Board Public Hearing. Next Steps Staff will initiate the online component of our outreach strategy and continue to work towards the development of the staff draft recommendations for presentation to the public and Planning Board in September.