18096 La Trobe University SEMS CISCO LAB ALTERATIONS PHYSICAL SCIENCES 1 BUILDING PS1 - PART LEVEL 2 BUNDOORA CAMPUS JMA Architects 2016. Copyright in this document and the concepts it represents as reserved to JMA Architects 2016. No unauthorized use or copying permitted. All rights reserved. Some of the concepts may be subject to third party copyright and/or moral rights.
EXISTING CONDIONS / DEMO PLAN 1 210 211A 211 212A GENERAL DEMOLION SCOPE: 219 EXISTING FLOOR FINISH AND WINDOW TREATMENTS TO BE DEMOLISHED EXISTING LIGHTING, FANS AND SERVICES TO BE DEMOLISHED EXISTING WALL MOUNTED AIR CONDIONING UNS TO BE RETAINED
2 LAB FOUT NEW GLAZED 920mm DOOR AND ALUMINIUM FRAME. PROVIDE SIDE LIGHT ADJACENT. NEW TEACHER S POINT - A/V CONTROLS. 219 NEW CISCO LABORATORY NEW DIRECT STICK PLASTERBOARD TO NORTH AND EAST WALL. NEW WHE PAINT FINISH THROUGHOUT. NEW ANTI-STATIC VINYL THROUGHOUT WH 150mm HIGH COVING. FEATURE VINYL COLOUR TO ALIGN WH FEATURE ACOUSTIC WALL. NEW 1800 x 900 WORKSTATIONS WH 930 x 70mm SCREENS AND TASK CHAIRS TO MATCH EXISTING LEVEL 1 CISCO LABORATORY 2No. PROJECTORS MOUNTED TO EXISTING BEAMS NEW MOTORIZED TWIN ROLLERBLIND WH SEMI-TRANSPARENT AND BLOCKOUT FABRIC DIRECT STICK PLASTERBOARD TO EXISTING BRICK COLUMNS AND WALL BELOW GLAZING. ABOVE: NEW FURNURE TO MATCH EXISTING LEVEL 1 CISCO LAB WORKSATIONS - LAMINATE ANTI-STATIC VINYL
3 PRECEDENT IMAGES / FURNURE - FOUT ABOVE: NEW ACOUSTIC CEILING GRID + TILE NEW WORKSTATION AND TASK CHAIR NEW CARPET TILE NEW WHEBOARDS AND PINBOARDS BELOW: PROPOSED LINEAR LIGHTING ABOVE: NEW CARPET TILE + LINEAR LIGHTING BELOW: MEETING TABLE & UPHOLSTERED SLED CHAIRS, SUSPENDED RIGHT: SLED BASE VISTOR CHAIR RIGHT FROM TOP: NEW TASK CHAIR, NEW MOBILE PEDESTAL, ACOUSTIC 3D WALL TILES
4 FOUT EXISTING RELOCATED FURNURE (TO 210 ONLY) WH NEW STORAGE 210 NEW WORKSTATIONS WH MOBILE PEDESTAL AND TASK CHAIR TO 211A, 211 AND 212A WH NEW STORAGE 211A NEW OVERHEAD STORAGE TO S 210, 211A AND 211 211 212A EXISTING RELOCATED STORAGE UNS CIRCULAR MEETING TABLE WH UPHOLSTERED SLED BASE CHAIRS GENERAL SCOPE: NEW CARPET TILE THROUGHOUT NEW PAINT FINISH THROUGHOUT NEW ACOUSTIC GRID AND CEILING TILES THROUGHOUT NEW LIGHTING AND SERVICES THROUGHOUT NEW ROLLER BLINDS THROUGHOUT 150mm HIGH MODULINE SKIRTING THROUGHOUT UPHOLSTERY SLED CHAIR GENERAL PAINT FEATURE CARPET TILE GENERAL CARPET TILE JOINERY TIMBER LAMINATE WORKSATIONS - LAMINATE
ELEVATIONS - LAB FOUT ACOUSTIC FELT BAFFLES IN GREY WH LINEAR LIGHTING BETWEEN. SERVICES AND CABLING TO BE CONCEALED ABOUT ACOUSTIC BAFFLES. 120 INCH PULL DOWN PROJECTOR SCREEN WH SPEAKERS WALL MOUNTED ADJACENT. PRECEDENT IMAGE: SUSPENDED ACOUSTIC BAFFLES IN GREY FELT WH LINEAR LIGHTING ACOUSTIC PANEL FEATURE ACOUSTIC PANEL GENERAL PAINT FINISH FEATURE PAINT FINISHES 2No. MAGNETIC GLASS WHEBOARDS ADJACENT TO PROJECTOR SCREEN. GEOMETRIC FEATURE WALL IN PAINT TO NEW DIRECT STICK PLASTERBOARD WALL. GEOMETRICALLY ARRANGED 12mm ACOUSTIC PANELS. NEW GLAZED DOOR. TEACHER S POINT (SHOWN DASHED) WH AV CONTROLS AND POWER AND DATA TO NEW PLASTERBOARD WALL. 5