HMWH Education Lab. Houston Methodist West Hospital S. Sam Houston Parkway W. Suite 200 Houston, Texas (832)

Similar documents
PATTERN CEILING DIFFUSERS

SOLAR FEATURES TANK FEATURES

MECHANICAL LINETYPE LEGEND MINIMUM MISC MISCELLANEOUS MEDIUM PRESSURE STEAM RETURN MEDIUM PRESSURE STEAM SUPPLY NOT TO SCALE OUTSIDE AIR

SPACE TYPE: JUDICIAL CHAMBER

AGORA PALM UNIT TYPE A2, A2A, A2B, A2C, A2D, A2F, A2G, A2H, A2J UNIT TYPE A1 & A1-A UNIT TYPE A3-A, A3B, A3C, A3E, A3F, A3H UNIT TYPE A4, A4A

Work to be performed Subcontractor Name, City, State. Mechanical Contractor: Electrical Contractor: Temperature Controls Contractor:

PLAN REVIEW SUBMITTAL GUIDE

Wireless keypad RKB1. Data sheet. Device identification number:

BUILDER S PRE-INSPECTION CHECKLIST

The effect of the fire detectors on gas turbine reliability

DESIGN AND CONSTRUCTION STANDARDS SPECIFICATION GUIDELINES

EXHAUST FAN SCHEDULE

Appendix B. Symbols for Drawings. Table B.1. Air moving devices and ductwork symbols. Air Movement. Fans. Axial flow fan.

DIVISION 10 SPECIALTIES

1.1 This section applies to air handling units for HVAC Systems.

B. Product Data: Provide manufacturers catalogue information. Indicate valve data and ratings.

Exercises in causal loop diagrams (CLD s)

DOCUMENT TABLE OF CONTENTS

Town of Cicero Local Code Amendments

Plot # R019A ± 74' ± 74' ± 65' Plot # R019A LEASE OUTLINE DRAWING GROSS LEASABLE AREA ± 4,631 S.F. DEMISING FRONT WIDTH DEPTH ± 13' ± 32' Lease Line

BUILDER S PRE-INSPECTION CHECKLIST

Unit # 1038 ± 900 SF Width ± 15' Depth ± 60'

Library stacks and records storage 150 LB/SF live load

Vanilla Box Design Criteria

Calmeca Academy of Fine Arts and Dual Language

APPLICABLE CODES NFPA NFPA (NEC) NFPA (NATIONAL FIRE ALARM CODE) 2015 INTERNATIONAL BUILDING CODE

RONALD G. BILLY JR. THIS ADDENDUM CONSISTS OF THREE (3) PAGES AND ATTACHMENTS:

Building Division 201 SE 3 rd STREET (Second Floor) OCALA, FL Phone: (352) BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS

CONNECTICUT. Downloaded

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect

Unit # E ± 1,200 SF Width ± 20' Depth ± 60'

FIRE ALARM: BY OTHERS, IF REQUIRED.

SECTION AIR DUCT ACCESSORIES

Steam Trap. Assist Trap Radiator Trap Radiator Valve

REFRIGERANT PIPING SYSTEM

Unit HH Gregg. ± 30,000 SF Width ±26' Lakeland Retail Center. Lease Outline Drawing. Unit HH Gregg. Depth ± 145' HVAC Units & Information

FIRE ALARM: BY OTHERS, IF REQUIRED.

Brown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION AIR HANDLING UNITS

CORRALES INTERNATIONAL SCHOOL TENANT IMPROVEMENT 5500 WILSHIRE AVE NE ALBUQUERQUE, NM 87113

Willoughby Industries - Security Products

SECTION DUCTWORK

Level I Chapter 1 Worksheet

Electrical Information

C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant.

SECTION INSPECTION AND TESTING OF WORK

NFPA 101, 2012 EDITION IMPACT ON NEW AND EXISTING HEALTH CARE FACILITIES

Memorial Plastic Surgery

Unit # H ± 2,000 SF Width ± 25' Depth ± 80'

PROJECT NO. CWA SEPTEMBER 24, 2014 ADDENDUM NO. 6 BESSEMER RECREATION & WELLNESS CENTER

FIREYE EPD260, EPD261, EPD270 PROGRAMMER MODULES

M001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings

Agustin Lara Elementary Academy

R8182D,E,F,H,J Combination Protectorelay Primary Control and Aquastat Controller

HVAC LEGEND HVAC ABBREVIATIONS PLUMBING LEGEND PLUMBING ABBREVIATIONS PRELIMINARY NOT FOR CONSTRUCTION

Automatic Burner Controls IFS 110 IM

O-6. Mechanical 008 REFER TO ENLARGED MECHANICAL ROOM PLAN. Electrical. Basement Storage. Hallway 009. Theater Storage 010 TYPICAL CEILING MOUNTED

University of Houston Master Construction Specifications Insert Project Name SECTION DRY-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL

An Owner s Guide to Maintaining a Mobile / Manufactured Home August 2010

L7224A,C; L7248A,C,L Oil Electronic Aquastat Controllers

UNIVERSITY OF MISSOURI Fire Protection System Design 2016 Q1

CHAPTER 7 ALTERATIONS LEVEL

UNIFIED FACILITIES GUIDE SPECIFICATIONS

REAR. Exit 5'-9" 6'-1" 8'-3" 6'-1" Freezer Entrance Stall

Changes to the 2018 Joint Commission Comprehensive Accreditation Manual for Hospitals (CAMH)

CLEVELAND HEIGHTS UNIVERSITY HEIGHTS CITY SCHOOL DISTRICT MONTICELLO & ROXBORO MIDDLE SCHOOLS INTERIOR DESIGN

Due to possibility of personal injury or property damage, always contact an authorized technician for servicing or repair of this unit.!

A. Hydraulic calculations shall be prepared in accordance with Chapter 23 of NFPA 13 with the following exceptions:

Paradise Marketplace. Unit # AOP +/- 1,600 SF +/- 12' +/- 11' +/- 8' 11'-7" +/- 85' +/- 74' +/- 20' MAIN FLOOR +/- 20' +/- 85' Width.

H BUTCH BROWNING FIRE MARSHAL BUILDING REHABILITATION

CHAPTER 56 EXPLOSIVES AND FIREWORKS SECTION FIREWORKS 1.4G RETAIL STORAGE, DISPLAY, AND SALE

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building

DACC Health Sciences Building Air Handler Assessment/Study

PENNSYLVANIA. Downloaded

Josefa Ortiz De Dominguez Elementary School

TOKISTAR LIGHTING INSTRUCTION MANUAL. Advantage Series. Xenon Lamp. Socket. Side View. 2.4 O.C. (60 mm) 3 O.C. (75 mm) 4 O.C. (100 mm) 6 O.C.

THE 2012 EDITION OF THE LIFE SAFETY CODE NURSING HOME EDITION SESSION #4

DIVISION 15 MECHANICAL

B. Galvanized-Steel-Sheet Sleeves: inch minimum thickness; round tube closed with welded longitudinal joint.

A. Furnish and install luminaires, lamps, ballasts and in-line fuses as herein specified and shown on the Drawings.

SECTION BIOLOGICAL SAFETY CABINETS AND LAMINAR AIRFLOW WORK STATIONS

First Aspen Federal Regulation Set: K LSC 2000 Health Existing

Montgomery County Government Building and Codes Department 350 Pageant Lane, Suite 309 Clarksville, TN 37040

Oscar DePriest Elementary School

SECTION WET PIPE FIRE PROTECTION SPRINKLER SYSTEM

EC EP 14 All other electrical K-920 equipment in patient care vicinity NFPA , Chapter 10

Element Z General Design Requirements Existing Facilities Information

ELECTRICAL Seminar. B A L A Consulting Engineers, Inc. Edward J. Lynch, PE Vice President, Electrical Department Manager.

SECTION (15530) - REFRIGERANT PIPING

LAV FCO WCO NOTES: CONTRACTOR SHALL REFER TO ARCHITECTURAL DRAWINGS FOR MOUNT HEIGHTS AND SPECIAL MOUNTING INSTRUCTION AND LIMITATIONS.

INSTALLATION OF ACCESS FLOOR SYSTEMS IN GENERAL OFFICE AREA AND COMPUTER ROOM

INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

NORTH CAROLINA. Downloaded (l) For each nursing unit, or fraction thereof on each floor, the following shall be provided:

Edward Jenner Elementary Academy of the Arts

Please call for current pricing, additional information, or with any questions.

NFPA 101 and NFPA 99, 2012 Editions Code Update. where art meets engineering

Richard Henry Lee Elementary School

Q7100A,C Thermostat Subbases

DIVISION 21 - FIRE SUPPRESSION

Agency for Health Care Administration

FAQ. (Frequently Asked Questions) What is required to convert my unfinished basement to finished space?

Transcription:

Lab 0/8/9 Issued for Construction Lab EP Engineer 0 W Sam Houston Pkwy. S., Houston, 7 (7)-9-86 PWP.

ELISSAJAESEWARS REGISEREARCHIEC 8" min clear EQ EQ ' - 0" to highest operable part Countertop 8" ' - " uno ' - 0" to highest operable part E E ' - 0" min ' - 0" max to bottom of text ' - 6" ' - 0" 7' - 6" ' - 6" typ. uno 6"6"6" 7' - 0" miles elephon e Fire extinguish er Circuit breaker box Security hermostat alarm Fire controls pull Intercom Electrica l switch Electrical, data and telephone outlets rash receptac le Paper towel Sanitary dispenser/trashnapkin receptacle dispenser Hand dryer Paper towel Soap dispenser dispenser Shelf Cup Clothes dispenser hook Restroom door and signage Elevator ypical door and outlets Address: 800 Katy Freeway Houston,. 79 Address: 800 Katy Freeway Houston,. 79 SA E 80 OF E 0/8/09 AS ' - 6" at 6x6 shower Location ap N..S. 0 Vicinity ap N..S. C:\Users\jarruti\ocuments\ Lab(Central)_jarruti.rvt A/C Air Conditioning A/W Air/Water ACOUS Acoustical AJ Adjustable AFF Above Finish Floor ALU Aluminum AP Ampers AS Automated ANO Anodized AN Attenuation, Attention AU Auxiliary BLG Building BLK Black BU British hermal Units BUH Btu Per Hour C Celsius C.I. Cast Iron C.O. Clean Out CF Cubic Feet Per inute CJ Construction Joint CK Circuit CLOS Closet CLR Clear CU Concrete asonry Unit COL Column CONC Concrete CON Condensing, Condition CONN Connection CON Continuous CR Center CW Cold Water epth ESCR escription E etail IA iameter I imension L ead Load N own oor ype WG rawing E.C. Electrical Contractor EA Each EF Electronic rinking Fountain EF Exhaust Fan EL Elevation, Elevator ELEC Electrical EER Emergency EQ Equal EQUIP Equipment E Exterior F Fahrenheit FACP Fire Alarm Control Panel F Floor rain FEC Fire Extinguisher Cabinet FIN Finish FLUOR Fluorescent FURN Furnish, Furniture G.C. General Contractor GA L Galvanized etal GALV Galvanized GFI Ground Fault Interrupter GN Ground GYP B Gypsum Board H H.. Hollow etal HARW Hardwood HW Hardware HPL High Pressure ecorative Laminate HORIZ Horizontal H HVAC Heating, Ventilation, and A/C HW Hot Water HZ Hertz IG IN Isolated Ground Inch INSUL Insulation IPS Inside Pipe Size Standard Abbreviations N..S. 6 J(S) KSI KW Joint(s) Kips Per Square Inch Kilowatt LA Laminate LL Live Load LS Lights LPL Low Pressure ecorative Laminate.O. asonry Opening ANUF anufacturer A aximum ECH echanical E edium, edical IN inimum ISC iscellaneous G ounting, eeting L etal, aterial N.C. N.O. N/A NO rmally Closed rmally Opened t Applicable Number O.C. On Center O.. Overflow rain, Outside imension O/A Outside Air PAR Partition PB Push Button PLAS LA Plastic Laminate PLBG Plumbing PLYW Plywood PSF Pounds Per Square Foot PSI Pounds Per Square Inch P Painted PVC Poly Vinyl Chloride R.. Roof rain R/A Return Air RE Refer o REF Reference REINF Reinforced REQ' Required RH Relative Humidity RO Rough Opening RP Revolutions Per inute RU Roof op Unit S/A Supply Air SC W Solid-core Wood SCHE Schedule Similar SPS Single Pole, Single hrow S Standard SL Steel SOR Storage SRUC Structure, Structural SYS System B o be etermined EP empered, emperature HK hick B elephone erminal Board YP ypical UNO VAC VC VR Unless ted Otherwise Volt Alternative Current Volt irect Current Vent hrough Roof W Width W/ With WB Wet Bulb W Wood WWF Welded Wire Fabric WW Welded Wire esh te: Refer to the Specifications for abbreviations of trade association names. Symbol J FAS FAP PB CR NCAP S ' - 0" Accessible bi-level electric drinking fountain S S Elevations escription Reflected Ceiling Plan S Floorplans FE C FE ZV ' - " S Above counter mirror ' - " to reflective surface Surface mounted incandescent, compact fluorescent or LE downlight Recessed incandescent, compact fluorescent or LE downlight Recessed wall washer - shading indicates direction Lay-in or recessed fluorescent light troffers - prismatic lense Lay-in or recessed fluorescent light troffers - parabolic lense Lay-in or recessed direct and indirect fluorescent light Suspended fluorescent strip fixture Suspended architectural fluorescent strip fixture Wall mounted architectural fixture Under cabinet fluorescent light fixture Speaker ' - 7" oilet tissue dispenser Smoke detector Supply air grille Return/exhaust air grille Sprinkler head Ceiling/wall mtd. exit sign - arrow/line indicates direction 0V, 0A duplex outlet ( indicated if not standard) 0V, 0A duplex dedicated outlet ( indicated if not standard) 0V, 0A duplex outlet ( indicated if not standard) 0V, 0A quadplex outlet ( indicated if not standard) 0V, 0A flush floor mounted duplex outlet Flush floor mounted telephone outlet elephone outlet (RJ) ( indicated if not standard) Computer data outlet (RJ) ( indicated if not standard) Combined telephone/computer data outlet ( indicated if not standard) Electrical/communications junction box Fire Alarm Strobe Fire Alarm Pull hermostat oor operator push button Card reader Nurse call alarm panel Single pole switch -way switch immer switch Fire extinguisher cabinet Fire extinguisher on bracket Zone valve Electrical, voice, data, voice/data outlets in elevation edical gases/lab gas outlets (Air, Vacuum, Oxygen, Waste Anes Vac, Nitrogen, Slide tes:. See the individual drawings for additional symbol, legends for symbols not shown.. Refer to the Construction Specifications Institute's (CSI) publication --6, Standard Reference Symbols, 0/9 Edition, for additional building element symbols not shown here or elsewhere in the rawings.. See additional legends located in the specific discipline drawings (Structural, EP, etc.) for building element symbols used on those discipline drawings. ' - 6" Sanitary napkin disposal Grab bar ' - " ' - 9" 6' - 8" Fire Handrail alarm horn, visual/audi o alarm Standard Building Element Symbols N..S. ' - 0" to top of rail Control wall of shower ' - 0" clear ' - " at 0x60 shower Section ' - 0" to top of control area Acoustical Ceiling Board Aluminum Brick Carpet Ceramic ile Concrete Concrete asonry Unit Earth Exterior Insulation and Finishing System Insulation - batt or blanket Finished Wood, Hardwood Glass ' - 6" Accessible toilet Gravel, Coarse Porous Fill Gypsum Board Gypsum Sheathing Oriented Strand Board (OSB) Ornamental etal, Bronze, Brass Particle Board Standard toilet ' - " Elevation Plaster with Expanded etal Lath Plastic Glazing Plastic Laminate (Large Scale) Plywood Precast Concrete, Cast Stone Resilient Flooring, Pre- olded Joint Filler Rigid Insulation Board Sand, Grout Steel Ceramic ile Concrete, Plaster, Limestone, Synthetic Stone Glass, irrors etal, Plastic Laminate Reflected Ceiling Plan Gypsum Board or Plaster Pre-finished etal Suspension Grid with Lay-in Panels te: Refer to the Construction Specifications Institute's (CSI) publication --6 Standard Reference Symbols, 0/9 Edition, for additional material indications not shown. ' - " Accessible urinal Standard urinal ' - 0" Lavatory he project consists of the construction/build-out of a new education lab of approximately 68 square feet. he project is located on the third floor of the Houston ethodist West Hospital, a six (6) story I- Healthcare occupancy together with related utilities. ' - 0" ' - 0" ' - 0" oilet/urinal partition Standard aterial Indications 7 escription N..S. 6 escription Benchmark Building Section Control Elevation Column Line or Grid etail (Enlarged etail) etail (Section) Wall Section oor ag Exterior Elevation/View Interior Elevation/View Equipment Identifier Face imension Finish Grade (New) Finish Grade (Existing) Finish ype Identifiers Cabinet type Identifiers Countertop ype Identifiers oilet Accessory Identifier tes: Glass ype/opening Identifier Graphic Scale Keyed te rth Partition ype Revision Room Identifier Room and Finish ype Identifier. All mounting heights shown are typical. s shown in elevations and details take precedence over the typical heights given here.. ounting heights for many common elements are shown. t all elements occur in this project. ypical ounting s Name Elevation wg wg Symbol F.F. EL = B wg HS a wg 0 A-0 QP I Name Name im F wg te:. Refer to the Construction Specifications Institute's (CSI) publication --6 standard Reference Symbols, 0/9 Edition, for additional material indications not shown.. Where only oor ypes and Hardware Sets are indicated on the rawings, identify each door using the Room Number of the room it swings into followed by a single lower-case letter, starting with "a" at the north west most door and proceeding clockwise around the room for additional doors. For doors that swing to the exterior, or sliding doors on the exterior wall, identify each door with the letter "" in place of the Room number followed by a sequential number starting from "" at the north west most door, and proceeding clockwise around the perimeter of the building. 0 ' 8' 6' Elev Elev esignators B = Coordinate, Elevation, or Station Sequence esignation = etail Number wg = = Alphanumeric Grid esignation = etail Number wg = = etail Number wg = = etail Number wg = = oor ype HS = Hardware Set a = oor Identifier oor = Room + oor Identifier, See te. = etail Number wg = = etail Number wg = = Equipment esignation im = istance, Face of Finish to Face of Finish Elev = Finish Grade Elevation Elev = Finish Grade Elevation = Finish esignation =Cabinet ype Identifier =Countertop ype Identifier, See A-60 for legend = Glass ype or Opening esignation = te esignation = Plan rth = rue rth = Partition ype esignation = Revision esignation Name = Name of Space = Room esignation Name = Name of Space = Room esignation F = Room Finish ype esignator = Accessory esignation Standard Reference Symbols N..S. Applicable Codes and Standards. City of Houston Building Code, based on International Building Code (IBC) 0. Life Safety Code, NFPA 0, 0 Edition, I- Occupancy, Chapter 9. exas epartment of Health (SHS), Health Facility Licensure and Certification ivision - Hospital Licensing Standards (Effective August, 998). exas epartment of Licensing and Regulation (LR) -exas Accessibility Standards of the Architectural Barriers Act, 0. Joint Commission on the Accreditation of Healthcare Organizations (JCAHO) 6. NFPA 8, 99 Standard on Incinerators and Waste and Linen Handling Systems and Equipment (Referenced by SHS) 7. Fire Protection for Laboratories Using Chemicals, NFPA, 000 Edition 8. City of Houston: Signage Ordinance, epartment of Planning & evelopment Parking Ordinance, epartment of Planning & evelopment 9. NFPA 0 - Fire Extinguishers (Referenced by IBC) 0. NFPA - Installation of Sprinkler Systems (Referenced by IBC). NFPA - National Electrical Code 07 (Referenced by IBC). NFPA 7 -National Fire Alarm Code (Referenced by IBC). NFPA 80 -Fire oors and Fire Windows (Referenced by IBC). NFPA 0 - Standard for Emergency and Standby Power Systems. NFPA 0 - Standard on ypes of Building Construction (Referenced by NFPA 0) Occupancy Classification Institutional, Group I- (0. IBC) Healthcare (-. NFPA) Construction Classification ype IB (IBC) Existing building ype II () (NFPA 0) Existing building Allowable Area/ Based on Occupancy and Construction Classification (IBC able 0). Basic Allowable : 60 Ft.. Actual : 0 Ft.. Allowable Number of Stories: One (). Actual Number of Stories: hree (). Basic Allowable Area per floor: Unlimited 6. Actual Area: Level,68 Sq. Ft. otal,68 Sq. Ft. 7. he shall be divided into smoke compartments not exceeding (in. per floor):,00 Sq. Ft. 8. Actual Number of Smoke Compartments Provided: N/A Existing building Fire Resistance Ratings (IBC able 60). Party Walls: N/A. Fire Wall: N/A. Occupancy Separations: N/A. Interior Bearing Walls: N/A. Corridor Walls (00...): n-rated, Smoke Resistant 6. Smoke Barrier Walls: -Hour, 0-in. oors 7. Hazardous Area Protection (Only Applicable Areas / ost Restrictive Requirements Shown): Storage > 00 Sq.Ft. (IBC, NFPA): -Hour Storage <00 > 0 Sq.Ft. (NFPA): n-rated Separation 8. Structural Frame Supporting Roof Only -Hour 9. Structural Frame (See G-0): -Hours 0. Floor Construction (See 9 G-0): -Hours. Roof Construction (Including Beams and Joists See G-0): -Hour. Exterior Bearing Walls: N/A. Exterior n-bearing Walls: n-combustible. Unprotected Exterior Openings: Permitted (yard>0 Ft.). Interior n-bearing Walls: n-combustible 6. Shaft and Vertical Exit Enclosure Walls (7.): -Hours, 90 min. doors 7. hrough penetrations in fire-resistive walls and floors are protected with an approved firestop system installed as tested in accordance with AS E8. 8. Joints in and between fire-resistance-rated walls and floor/roof assemblies are protected with fire-resistant joint systems tested in accordance with the requirements of UL 079. Fire Protection. A sprinkler system installed in conformance to NFPA is required. (IBC, SHS). All sprinkler heads in the smoke compartment containing patient sleeping rooms shall be quick-response type. (IBC, NFPA). A manual fire alarm system and automatic fire detection system is required. An electrically supervised, automatic smoke detection system is required in corridors, and waiting areas that are open to corridors.. anual fire alarm boxes in patient sleeping areas are not required at exits if located at all nurse's control stations. (907..6 IBC). Fire extinguishers are required to be located no more than 7 ft. travel distance from any point. (NFPA 0) 6. All fire extinguishers shall have a U/L rating of A-60BC. (NFPA 0) 7. aximum allowable area per fire extinguisher:, 0 Sq.Ft. 8. Fire extinguishers provided per floor: Level : Occupant Load and Egress (IBC able 00..). inimum two exits required from each smoke compartment.. Occupant Load (IBC, NFPA): Business Areas/Outpatient (68 Sq.Ft./00 Sq.Ft. per Person) 7 otal: 7. Exit Width: Exit Width Required (0. In./Person) (NFPA): inches Exit Width Provided: inches. Arrangement of Exits: inimum Number of Exits Required (IBC): Number of Exits Provided: inimum Separation Permitted (/ iagonal imension of Building): 6 feet Actual Separation Provided: feet. aximum Exit ravel istance (NFPA, IBC): 00 Ft., Any Point to Exit 0 Ft., Any Exit Access oor to Exit 0 Ft., Any Point in Sleeping Room to Room oor 00 Ft., Any Point in Sleeping Room to Suite Access oor Finishes. Walls and Ceilings: AS E 8 Class A or B (NFPA, IBC) Exception: ay be Class C in rooms with capacity less than. (NFPA, IBC) Exception: Class C wainscot less than,000 sq. ft. permitted in lobby. Building Code Information Cover Sheet Cover Sheet GENERAL G-00 General Information G-0 Fire Resistive Assemblies esign Reference G-0 Fire Resistive Assemblies esign Reference G-0 Fire Safety Plan ARCHIECURAL A-0 emolition Plan and RCP/ Floor plan and RCP A-0 Equipment and Finish Plan A-0 Interior Elevations A-0 Partition ypes and Interior Construction etails A- Interior Construction etails A-0 oor and Window etails A-60 Casework etails A-6 Casework etails PLUBING P-000 Plumbing Index, Schedules, tes, etails and Risers P-0 hird Floor Plumbing -000 echanical Index, Schedules and tes -00 echanical Schedules -0 hird Floor echanical emolition Plans -0 hird Floor echanical Renovation Plans -0 echanical etails and Controls ELECRICAL E0-00 Electrical Index, Schedules and tes E-0 Electrical etails EL-0 hird Floor Electrical Lighting EP-0 hird Floor Electrical Power rawing Index N..S. EP Engineer 0 W Sam Houston Pkwy. S., Suite 00 Houston, 7 (7)-9-86. ate escription 0//09 9% Construction ocuments 0/8/09 Construction Lab rawing Name General Information his document and the information herein is the property of PhiloWilke Print ate / ime: /8/09 ::8 P G-00

V SYBOL F S FS S F FS V LEGEN UCWORK (NO ALL SYBOLS AY BE USE) ABB. ESCRIPION SYBOL ABB. ESCRIPION F S FS RECANGULAR SUPPLY UC - UP RECANGULAR SUPPLY UC - OWN RECANGULAR REURN / EHAUS UC - UP RECANGULAR REURN / EHAUS UC - OWN ROUN SUPPLY UC - UP ROUN SUPPLY UC - OWN ROUN REURN / EHAUS UC - UP ROUN REURN / EHAUS UC - OWN OVAL SUPPLY UC - UP OVAL SUPPLY UC - OWN OVAL REURN / EHAUS UC - UP OVAL REURN / EHAUS UC - OWN FIRE APER SOKE APER COBINAION FIRE/SOKE APER ANUAL VOLUE APER "" FACE 00S A-- AU-- AU-- CB-- CF "" FACE 00 00S 00 S R E A AFF AC B BO BOP CB CC CS C SUPPLY IFFUSER AN AIR QUANIY. BLANK OUS INICAE HROW IN HIS IRECION. (S ENOES YPE. SEE NOE OF AIR ISRIBUION EVICE SCHEULE) REURN GRILLE AN AIR QUANIY ( ENOES YPE) EHAUS GRILLE AN AIR QUANIY ( ENOES YPE) LAINAR FLOW SUPPLY IFFUSER AN AIR FLOW QUANIY ( ENOES YPE) LINEAR SLO IFFUSER AN AIR FLOW QUANIY SCREENE OPENING AN AIR FLOW QUANIY SOUN AENUAOR HEAING COIL WIH IEN. ELECRIC HEAING COIL WIH IEN. AIR ERINAL UNI WIH IEN. & A CF AIR ERINAL UNI WIH IEN., IN AN A CF CHILLE BEA WIH IEN. & CF AIRFLOW RANSFER RAE A OOR ACCESS OOR ABOVE FINISHE FLOOR AUOAIC EPERAURE CONROL PANEL BACKRAF APER BOO OF UC BOO OF PIPE CIRCUI BREAKER CONROL CIRCUI RANSFORER COL ECK SUPPLY IREC IGIAL CONROL CHR CHS PCHR PCHS C CWR CWS HPS HPR PS PR LPS LPR PCR FSHRR FSHRS GCHS GCHR G G GS GR HPWS HPWR FOR FOS FOV R RL SYBOL CHR C LEGEN CHILLE WAER REURN PIPING ABB. ESCRIPION SYBOL ABB. ESCRIPION CHS CHS CHILLE WAER SUPPLY PCHR PCHS CWR CWS HPS HPR PS PR LPS LPR PCR FSHRR FSHRS GCHS GCHR G G GS GR HPWS HPWR FOR FOS FOV R RL CHR PCHR C CWR CWS HPS HPR PS PR LPS LPR PCR FSHRR FSHRS GS GR FOR FOS FOV R RL PRIARY CHILLE WAER REURN PCHS PRIARY CHILLE WAER SUPPLY GCHS GCHR G G HPWS HPWR CONENSAE RAIN CONENSER WAER REURN CONENSER WAER SUPPLY HEAING WAER REURN HEAING WAER SUPPLY RAIN LINE HIGH PRESSURE SEA HIGH PRESSURE CONENSAE REURN EIU PRESSURE SEA E. PRESSURE CONENSAE REURN LOW PRESSURE SEA LOW PRESSURE CONENSAE REURN PUPE CONENSAE REURN FOO SERVICE HEA REJECION REURN FOO SERVICE HEA REJECION SUPPLY GLYCOL CHILL WAER SUPPLY GLYCOL CHILL WAER REURN GLYCOL HEAING WAER SUPPLY GLYCOL HEAING WAER REURN GEOHERAL SUPPLY GEOHERAL REURN HEA PUP WAER SUPPLY HEA PUP WAER REURN FUEL OIL REURN FUEL OIL SUCION FUEL OIL VEN REFRIGERAN ISCHARGE REFRIGERAN LIQUI P EO PRV PR EO PRS GAE VALVE BALL VALVE BUERFLY VALVE CHECK VALVE SRAINER (NO ALL SYBOLS AY BE USE) CONROL VALVE, WAY CONROL VALVE, WAY SRAINER & BLOWOWN VALVE BALANCING VALVE PRESSURE REUCING VALVE OS & Y VALVE PRESSURE RELIEF VALVE COPANION FLANGE UNION PIPE GUIE PIPE ANCHOR FLEIBLE CONNECOR HEROEER WELL PEE'S PLUG VALVE WIH BLIN FLANGE CAP/PLUG SEA RAP EN OF AIN RIP PRESSURE REUCING SAION PRESSURE GAUGE HEROEER SHEE INE NUBER SHEE NAE -000 INE, SCHEULES AN NOES -00 SCHEULES -0 HIR FLOOR EOLIION PLANS -0 HIR FLOOR RENOVAION PLANS -0 EAILS AN CONROLS GENERAL NOES A. CONRACOR SHALL VISI HE SIE AN BECOE FAILIAR WIH HE PROJEC SCOPE, UILIY CONNECIONS, AN ALL BUILING SERVICES. B. PROVIE HOUSEKEEPING PAS UNER ALL FLOOR OUNE EQUIPEN. HOUSEKEEPING PA AN FLOOR RAIN LOCAIONS SHALL BE COORINAE WIH HE AN LOCAION OF EAC EQUIPEN O BE INSALLE. C. SANAR EAILS ILLUSRAE ON HE RAWINGS SHALL BE APPLIE IN ALL CASES WHERE HE FEAURE OCCURS IN HE SYSE ESIGN.. ALL UCWORK S SHOWN ARE CLEAR INSIE IENSIONS IN INCHES. REFER O SPECIFICAION SECION 00 FOR UC INSULAION REQUIREENS. E. AJOR EQUIPEN SHOWN ON HE PLANS AN ELEVAIONS ILLUSRAE HE GENERAL ARRANGEEN AN SPACE ALLOCAIONS. HE CONRACOR SHALL VERIFY HE SPACE REQUIREENS FOR EACH SYSE COPONEN USING ANUFACURER CERIFIE SHOP RAWINGS AN AKE HE NECESSARY AJUSENS IN EQUIPEN PLACEEN AN CONNECION IN ORER O ACCOOAE HE EAC EQUIPEN O BE INSALLE. F. SUPPORS, ANCHOR BOLS, AN HANGERS FOR ALL EQUIPEN SPECIFIE IN IVISION SHALL CONFOR O HE SPECIFICAIONS. ISCELLANEOUS SEEL BRACING SUPPORS AN REINFORCING SEEL NEEE O SUPPOR EQUIPEN SPECIFIE IN IVISION SHALL BE PAR OF HE SCOPE OF WORK OF IVISION. G. IFFUSERS, REGISERS, AN GRILLES SHOWN ON HE RAWINGS SHALL BE IN ACCORANCE WIH HE AIR ISRIBUION EVICE SCHEULE AN SPECIFICAIONS. BRANCH UCS O AIR EVICES SHALL BE IN ACCORANCE WIH HE SCHEULE UNLESS NOE OHERWISE. H. FIRE/SOKE APERS SHALL BE INSALLE IN UCWORK PENERAIONS HROUGH RAE PARIIONS, WALLS, BARRIERS, FLOORS, AN SHAFS IN ACCORANCE WIH HE PROJEC APPLICABLE BUILING COES. APERS SHALL EE HE REQUIREENS OF HE FIRE/SOKE RAING AN BE "U.L." LABELE. REFER O ARCHIECURAL RAWINGS FOR HE LOCAIONS AN RAINGS OF ALL WALLS AN FLOORS. I. PENERAIONS HROUGH RAE WALLS AN FLOORS SHALL BE SLEEVE, SEALE AN FIRESAFE O AINAIN HE INEGRIY OF HE WALL AN FLOOR UL FIRE RESISANCE RAING. J. UCWORK AN PIPING AN LARGER ROUE PARALLEL O A RAE WALL SHALL BE INSALLE WIH A INIU 6 CLEARANCE O ALLOW FOR INSPECION OF WALL PENERAIONS. K. UCWORK SORE ON-SIE AWAIING INSALLAION SHALL REAIN PROPERLY SEALE AN PROECE. OPEN ENS OF UCWORK SHALL BE CAPPE AN SEALE AFER INSALLAION. L. SOKE EECORS SHALL BE LOCAE AS INICAE ON HE PLANS AN IN CONFORANCE WIH NFPA 90A AN LOCAL COES.. CEILING IFFUSER LOCAIONS SHALL BE AS SHOWN ON HE ARCHIECURAL REFLECE CEILING PLANS. N. CEILING IFFUSERS, REGISERS AN GRILLES SHALL BE FURNISHE WIH OUNING FRAES AN FEAURES IN ACCORANCE WIH HE CEILING YPE. O. PIPING CONNECIONS O AIR HANLING UNI COILS AN AJOR EQUIPEN O BE FABRICAE WIH ISOLAION VALVES, FLANGES, AN/OR UNIONS POSIIONE O ALLOW REOVAL AN SERVICE OF HE COPONEN PARS. Houston, 7 SSR #: 9000 P P SP SP S S CO CO CO CO O O H- H HU H- OORIZE APER AIR FLOW ONIORING SAION IFFERENIAL PRESSURE SENSOR SAIC PRESSURE SENSOR SOKE EECOR CARBON IOIE EECOR CARBON ONOIE EECOR UC SENSOR RAVERSE UC ES AN BALANCE HUIIFIER WIH IENIFICAION EA EHAUS AIR HS HO ECK SUPPLY IE ISOLAION EHAUS LE LAB EHAUS L ARINE LIGH V ANUAL VOLUE APER OA OUSIE AIR OB OPPOSE BLAE APER RA REURN AIR SA SUPPLY AIR SWR SIEWALL REGISER SWG SIEWALL GRILLE UNO UNLESS NOE OHERWISE VF VARIABLE FREQUENCY RIVE WALL OUNE CONROL EVICES HEROSA OR EP SENSOR H HUIISA OR HUIIY SENSOR P PRESSURE ONIOR CO₂ CARBON IOIE SENSOR CO CARBON ONOIE SENSOR P- ULI-POIN ONIOR RS RV EE RS RV AKEOFF RS RV REFRIGERAN SUCION RELIEF VEN IRECION OF FLOW REUCER SLOPE PIPE OWN IN HIS IRECION ELBOW UP ELBOW OWN BRANCH PIPE CONNECION EE - OULE OWN EE - OULE UP AIR OVING EQUIPEN OPERAION URING CONSRUCION HE USE OF NEW OR EISING AIR HANLING UNIS, FANS, OR OHER PERANEN AIR OVING EQUIPEN URING CONSRUCION IS PROHIBIE UNLESS APPROVE BY HE OWNER. IF APPROVE FOR USE URING CONSRUCION, HE FOLLOWING PROCEURES SHALL BE FOLLOWE: A. HE CONRACOR SHALL PROEC HE INERIOR OF ALL UCWORK, AIR HANLING UNIS, AN OHER EQUIPEN FRO HE ACCUULAION OF IR AN US AN OHER CONAINANS. IF HE PERANEN EQUIPEN CANNO BE AEQUAELY PROECE, EPORARY AIR OVING/ CONIIONING EQUIPEN AN ISRIBUION SYSES SHALL BE UILIZE AS REQUIRE FOR FINISHING RAES. B. PROVIE EPORARY FILERS ON ALL REURN AN EHAUS AIR GRILLES, OPEN UCWORK, AN RANSFER OPENINGS IN HE WORK AREA. P. HEROEER WELLS AN PRESSURE GAUGES SHALL BE INSALLE ON HE OP OR SIE OF HORIZONAL PIPING IN ORER O REAIN GAUGE FLUI AN BE EASILY REA FRO HE FLOOR. Q. PROVIE EPANSION JOIN A EACH PIPE AN UC CROSSING AN INERIOR BUILING EPANSION JOIN. R. PROVIE ANUAL BALANCING/VOLUE APERS A ALL LOW PRESSURE BRANCH AKE-OFFS O IFFUSERS AN GRILLES FRO SUPPLY, REURN AN EHAUS AINS AN SUB-AINS, AN A ALL LOW PRESSURE UC SPLIS OR SUB-AIN AKE-OFFS. APERS SHALL BE INSALLE ABOVE AN ACCESSIBLE CEILING OR ACCESS PANEL. S. RAWINGS ARE SCHEAIC IN NAURE AN SHALL NO BE SCALE. HE CONRACOR IS RESPONSIBLE FOR COORINAING EAC ROUING OF ALL SERVICES WIH EISING CONIIONS AN WIH ALL OHER RAES. REFER O SPECIFICAIONS FOR COORINAION RAWING REQUIREENS.. AINAIN ACCESSIBILIY OF ALL EQUIPEN, APERS, CONROL PANELS, VALVES, AN OHER EVICES. PROVIE ACCESS PANELS AS REQUIRE. COORINAE PLACEEN WIH HE ARCHIEC PRIOR O INSALLAION. U. CONRACOR SHALL COORINAE WIH HE ARCHIEC PRIOR O CUING ANY OPENING IN HE SRUCURE. V. WHERE WORK IN RENOVAE AREAS AFFECS SYSES IN OHER AREAS OF HE BUILING, HE CONRACOR SHALL COORINAE HIS WORK WIH HE OWNER. HIS WORK SHALL BE ONE O FI HE BUILING OPERAIONAL SCHEULE AN INIIZE ISRUPION/ ISCOFOR O OCCUPIE AREAS. PROVIE INIU 8 HOURS WRIEN NOICE WIH ANICIPAE URAION OF OUAGE. W. COORINAE WIH ALL RAES FOR REQUIRE CEILING REOVAL IN EISING BUILING. NOIFY HE ARCHIEC AN OWNER PRIOR O COENCING REOVAL. REOVE ONLY HA PORION OF CEILING NECESSARY O ACCESS AN COPLEE HE NEW WORK. UPON COPLEION OF HE ABOVE CEILING WORK, CEILING IS O BE REINSALLE. REPLACE ANY AAGE CEILING ILES WIH NEW ILES O ACH EISING.. UNLESS OHERWISE NOE ON PLANS, LOW REURN AIR AN LOW EHAUS AIR GRILLES/REGISERS SHALL BE OUNE 8" ABOVE FINISHE FLOOR O HE BOO OF HE FRAE. Y. CONRACOR SHALL COPLY WIH HE ARCHIEC AN/OR OWNER PROVIE INFECION CONROL RISK ASSESSEN PLAN AN OHER CONSRUCION RELAE PROCESSES. Z. OUSIE AIR INAKES SHALL BE A INIU OF FEE AWAY FRO PLUBING VENS, EHAUS VENS, AN OHER SOURCES OF NOIOUS FUES AN/OR OORS. INAKES SHALL BE A INIU OF 6 ABOVE FINISHE ROOF AN 7 ABOVE FINISHE GRAE.. ate escription 0/8/09 CONSRUCION C:\Users\nmaddox\ocuments\SSR ECH_ Lab-R9_nmaddox.rvt R/ R/ RANSIION RAIUS ELBOW SQUARE HROA ELBOW WIH URNING VANES BRANCH UC CONNECION RECANGULAR OR ROUN BRANCH. RECANGULAR RUNK. V REQUIRE O AIR EVICES RISE/ROP IN ELEVAION SPLIER WIH SPLI SHOWN SPLIER WIH SPLI S SHOWN BRANCH UC CONNECION CONICAL EE AN AP ROUN RUNK. BRANCH UC CONNECION BEVELE EE. ROUN RUNK. V REQUIRE O AIR EVICES. C. HE CONRACOR SHALL REOVE ALL FILERS USE URING CONSRUCION AN REPLACE HE WIH NEW FILERS PRIOR O ES AN BALANCE WORK AN PRIOR O SUBSANIAL COPLEION.. IF HE UCWORK AN/OR EQUIPEN IS FOUN O BE CONAINAE A ANY POIN URING CONSRUCION, AN INEPENEN NACA CERIFIE CONRACOR SHALL BE REAINE O CLEAN HE UCWORK AN/OR EQUIPEN A HE CONRACORS EPENSE. E. SYSE OPERAING EPERAURES SHALL BE AINAINE O AVOI CONENSAION ON UCWORK AN EQUIPEN SURFACES. NEW OR EISING INSULAION FOUN AAGE SHALL BE REPLACE. F. COORINAE USE OF AIR HANLING EQUIPEN WIH ICRA PLAN, IF APPLICABLE. AINAIN REQUIRE PRESSURE RELAIONSHIPS IN CONSRUCION AREAS AJACEN O OCCUPIE AREAS. G. REFER O SPECIFICAIONS FOR AIIONAL REQUIREENS. INFECION CONROL RISK ASSESSEN NOES A. CONRACOR SHALL OBAIN FRO HE OWNER A COPY OF HE INFECION CONROL RISK ASSESSEN (ICRA) PREPARE FOR HIS PROJEC. CONRACOR SHALL REVIEW HE REQUIREENS IN HE REPOR AN PERFOR ALL WORK IN ACCORANCE WIH HOSE REQUIREENS. CONRACOR SHALL SRICLY AHERE O HE LIIS OF HE CONSRUCION AREA, AN WHERE PHASING APPLIES SHALL AHERE O HE PHASING PLAN. ANY WORK OUSIE HE CONSRUCION AREA SHALL BE COORINAE WIH HE OWNER AN PERFORE IN ACCORANCE WIH HE ICRA REPOR, UNER HE SUPERVISION OF HE OWNER'S REPRESENAIVE OR OHER ESIGNAE ICRA COIEE OFFICER. B. O HE EEN HA I IS REQUIRE BY HE ICRA, HE CONRACOR SHALL ENEAVOR O AINAIN EISING LEVELS OF INOOR AIR QUALIY IN AREAS SURROUNING AN AJACEN O HE CONSRUCION WORK ZONE AN ELSEWHERE IN HE FACILIY. I SHOUL BE ANICIPAE HA HE ICRA REPOR WILL REQUIRE EASURES O HIS EFFEC INCLUING ERECION OF CONSRUCION ZONE BARRIERS AN PROVISION OF NEGAIVE AIR PRESSURE IN HE CONSRUCION ZONE RELAIVE O OHER AREAS OF HE FACILIY. C. IN AIION O HE EEING HE REQUIREENS OF HE ICRA REPOR, HE CONRACOR A A INIU SHALL PROVIE EQUIPEN AN COPONENS NECESSARY O CREAE A NEGAIVE PRESSURE IN HE CONSRUCION WORK ZONE RELAIVE O AJACEN AREA. EISING HVAC SYSES AN COPONENS SHALL NO BE USE FOR HIS FUNCION, UNLESS SPECIFICALLY APPROVE BY HE OWNER'S INFECION CONROL OFFICER. HE CONCEP AN ALL ASPECS OF HIS WORK SHALL BE ONE IN ACCORANCE WIH HE ICRA REQUIREENS AN A A INIU AS FOLLOWS:. VERIFY ALL EISING UCWORK WHICH PASSES HROUGH HE CONSRUCION ZONE, AN IS O REAIN, IS SEALE AN PROECE URING HE CONSRUCION URAION.. AIR REOVE FRO HE CONSRUCION ZONE SHALL BE FILERE AN/OR ISCHARGE AS IRECE BY HE ICRA REPOR.. PRESEN HE NEGAIVE AIR PRESSURE PLAN O HE OWNER FOR APPROVAL BY HE INFECION CONROL COIEE.. PROVIE EANS O ONIOR AN VERIFY NEGAIVE PRESSURE IS BEING AINAINE IN ACCORANCE WIH HE ICRA REPOR, AN PROVIE OCUENAION O HE OWNER AS REQUIRE.. COORINAE IN AVANCE ANY REQUIRE EQUIPEN SHUOWN WIH HE OWNER, AN VERIFY BEFORE SHUOWN HA EISING OR ESIRE AIR PRESSURE RELAIONSHIPS WILL NO BE AVERSELY AFFECE. AA. IN REURN AIR PLENU APPLICAIONS, CONRACOR SHALL PROVIE INIU 6 ACOUSICALLY LINE AIR RANSFER OPENING WIH OP OF OPENING IGH O PLENU ECK ABOVE ROO ENRY OOR IN FULL- HEIGH WALLS. PROVIE FIRE AN/OR SOKE APERS A PENERAIONS OF ALL FIRE AN SOKE RAE WALLS AS REQUIRE O EE WALL RAING. PROVIE SOKE EECORS A INLE OF EACH OPENING IN RAE SOKE WALLS. CONRACOR IS IRECLY RESPONSIBLE FOR HIS COORINAION AN INSALLAION OF AIR RANSFER OPENINGS IN FULL-HEIGH WALLS. EOLIION NOES A. PRIOR O ANY EOLIION WORK, CONRACOR SHALL AKE AIR FLOW AN SAIC PRESSURE REAINGS ON EISING EQUIPEN AS FOLLOWS: AHU-0-7. RECOR AN SUBI O ARCHIEC/ENGINEER. B. PRIOR O EOLIION WORK, CONRACOR SHALL AKE AIRFLOW REAINGS OF ALL GRILLES, REGISERS, AN IFFUSERS IN PROJEC AREAS. RECOR AN SUBI O ARCHIEC/ENGINEER. C. I SHALL BE HE CONRACOR'S RESPONSIBILIY O VERIFY HE CONIION OF ALL EISING EQUIPEN, EAC S OF EISING UC AN PIPING, EC. BEFORE EOLIION WORK IS BEGUN. REPOR ANY ISCREPANCIES BEWEEN PLANS AN ACUAL FIEL CONIIONS O ARCHIEC AN ENGINEER PRIOR O HE COENCEEN OF EOLIION WORK.. REOVE HE INICAE HVAC IES AS SHOWN ON PLANS. HIS INCLUES ALL HANGERS, SRAPS AN RELAE AERIAL. IF HE OWNER WISHES O UILIZE HE EISING EQUIPEN, CONRACOR SHALL OVE HE EQUIPEN O AN ON-SIE LOCAION ESIGNAE BY HE OWNER. ALL EQUIPEN REFUSE BY OWNER SHALL BE ISPOSE OF IN A ANNER ACCEPABLE BY LOCAL JURISICION. IES SHOWN O BE REOVE SHALL NO BE ABANONE IN PLACE. E. CAP AN SEAL AIR IGH ALL POINS A WHICH UCWORK IS REOVE FRO UCWORK HA WILL REAIN. RE-INSULAE REAINING UCWORK O AINAIN VAPOR BARRIER. F. CAP AN SEAL WAER IGH ALL POINS WHICH PIPING IS REOVE. RE-INSULAE REAINING PIPING O AINAIN VAPOR BARRIER. G. PACH OPENINGS IN WALLS WIH LIKE AERIALS O AINAIN HE INEGRIY OF HE WALL WHERE AIR EVICES, UCS, PIPING, EC. HAVE BEEN REOVE. H. CONRACOR SHALL VERIFY CLEARANCE REQUIREENS AN INICAE ROUING OF NEW UCWORK BEFORE FABRICAION BEGINS AS RISES AN ROPS AY BE NECESSARY UE O EISING FIEL CONIIONS. I. CONRACOR SHALL VERIFY ALL EISING O REAIN FIRE, SOKE, AN COBINAION FIRE/SOKE APERS AN UC SOKE EECORS IN HE PROJEC AREA ARE IN PROPER WORKING CONIION. CONRACOR O NOIFY ENGINEER AN OWNER OF ANY EISING EQUIPEN FOUN INOPERABLE. J. CONRACOR O VERIFY ALL OORS, ANUAL AN OORIZE APERS, EPERAURE AN HUIIY SENSORS, AIR ERINAL UNIS, AN CONROLS IN HE PROJEC AREA SHOWN AS EISING O REAIN ARE IN PROPER WORKING CONIION. CONRACOR O NOIFY ENGINEER AN OWNER OF ANY EISING EQUIPEN FOUN INOPERABLE. K. GENERAL CONRACOR SHALL COORINAE WIH HE AN ELECRICAL CONRACOR ALL CEILING REOVAL WHICH IS REQUIRE O ACCESS HEIR WORK AN IS NO ESIGNAE FOR REOVAL. NOIFY ARCHIEC AN OWNER PRIOR O COENCING REOVAL. IF EISING CEILING IS EERINE O REQUIRE REOVAL, REOVE ONLY HA PORION NECESSARY O ACCESS AN COPLEE EOLIION AN NEW WORK. UPON COPLEION OF HE ABOVE CEILING WORK, CEILING IS O BE REPLACE O ACH EISING CEILING. rawing Name INE, SCHEULES AN NOES his document and the information herein is the property of PhiloWilke Print ate / ime: /7/09 :9:8 P -000

AIR ERINAL UNIS SCHEULE GENERAL NOES:. AIU INLE VELOCIY = 00 FP.. RANSIION A BO FRO UC RUNOU SHOWN O BO INLE (REFER O EAIL).. IF UC RUNOU ECEES FEE IN LENGH, INCREASE RUNOU IAEER ".. INLE SAIC PRESSURE REQUIRE O OPERAE AU AN HEAING COIL SHALL NO ECEE 0.7" W.C. AIU COIL VELOCIY SHALL NO ECEE 0 FP.. IF HEAING CAPACIY CANNO BE E, ELIINAE COIL FRO AU AN PROVIE SEPARAE UC OUNE HEAING COIL O EE SCHEULE CAPACIY. INEPENENLY INSALL COIL AN INSULAE UC AN COIL. COPLY WIH AIU AIR PRESSURE ROP AN WAER PRESSURE ROP AIR VALVE HEAING COIL ASSEBLY. 6. CONROL VALVE SHALL BE FRO GP LISE ON HE APPROVE AIR ERINAL UNI SUBIAL. CONROL VALVES SHALL BE OULAING -WAY UNLESS NOE OHERWISE. 7. REFER O SPECIFICAIONS FOR AIIONAL INFORAION. ESIGNAION AHU OCC. COOLING OCC. HEAING OCC. IN. UNOCC. INLE UC RUNOU AIR P EA LA PIPE RUNOU EW LW WAER WAER P CONROL NOISE CRIERIA EP. BUH ROWS GP SOUN A. A (CF) A (CF) (CF) (CF) (IN.) (IN.) (IN. W.C.) ( F) ( F) (IN.) ( F) ( F) ( F) (F. H.) YPE ISCHARGE RAIAE SENSOR YPE AU-- AHU-0-07 600 800 800 800 6 0.0 8 660.7 /ʺ 0. -WAY VALVE 9 7 AU-- AHU-0-07 97 90 90 90 0 0. 9 0.9 /ʺ 0. -WAY VALVE 6 7 AU-- AHU-0-07 8 0 0.6 8 698.7 0. /ʺ 8. -WAY VALVE 6 6 AU-- AHU-0-07 0 6 0.08 8 087. 0. /ʺ 0. -WAY VALVE 6 6 REARKS OUSIE AIR CALCULAIONS PER 0 UC, ABLE 0. (Vbz=RP+RA) AREA, SQ.F. IN OA, CF/PERSON IN OA, CF/SQ.F. IN OA CF REQUIRE PER PERSON (RP) IN OA CF REQUIRE PER SQ.F. (RA) PROVIE OUSIE AIR SYSE / SPACE PEOPLE OFFICE 9 7 0.06 8 BREAK ROO 77 0. 0 9 CORRIOR/UILIY 7 * * 0.06 * 0 CLASS 80 0 9 0. 90 96 OALS AHU- Vbz= 78 OUSIE AIR PROVIE O A/C UNIS ECEES INUU REQUIREENS *CF/SQ.F. ONLY IENIY S CF RANGE IN A AIR ISRIBUION EVICE SCHEULE FR OEL YPE SERVICE S R E LOCAION 0 90 IUS ONI SQ. PLAQUE FACE - - CEILING "" 6" IA. 9 90 IUS ONI SQ. PLAQUE FACE - - CEILING "" 8" IA. 9 0 IUS ONI SQ. PLAQUE FACE - - CEILING "" 0" IA. 0 IUS ONI SQ. PLAQUE FACE - - CEILING "" " IA. 60 IUS ONI SQ. PLAQUE FACE - - CEILING "" " IA. 0 90 IUS ONI SQ. PLAQUE FACE - CEILING "" 6" IA. 9 90 IUS ONI SQ. PLAQUE FACE - CEILING "" 8" IA. FACE NECK RUNOU 6" IA. / 8"x" 8" IA. / 0"x6" 0" IA. / "x8" " IA. / "x0" " IA. / 6"x0" 6" IA. / 8"x" 8" IA. / 0"x6" PANEL REARKS "" - "" - "" - "" - "" - "" - "" - Houston, 7 SSR #: 9000 R/E 9 0 IUS ONI SQ. PLAQUE FACE - CEILING "" 0" IA. 0" IA. / "x8" "" - 0 IUS ONI SQ. PLAQUE FACE - CEILING "" " IA. " IA. / "x0" "" - 60 IUS ONI SQ. PLAQUE FACE - CEILING "" " IA. " IA. / 6"x0" "" - GENERAL NOES:. IFFUSERS AN GRILLES SHOWN ON FLOOR PLANS ARE YPE S, AN R/E UNLESS NOE OHERWISE.. PROVIE OUNING SYLE BASE ON CEILING YPE INICAE ON HE REFLECE CEILING PLANS.. ALL AIR ISRIBUION EVICES SHALL HAVE A AIU NC RAING OF.. IN AREAS WIH LAY-IN CEILINGS, PROVIE LISE PANEL. IN AREAS WIH HAR CEILINGS, PROVIE SURFACE OUNE YPE AIR ISRIBUION EVICE A LISE FACE WIHOU PANEL.. ALL AIR EVICES LOCAE IN INACCESSIBLE HAR CEILINGS SHALL BE PROVIE WIH VOLUE APERS (OPPOSE BLAE WHEN AVAILABLE). 6. CONRACOR SHALL PAIN HE INERIOR OF REURN / EHAUS SQUARE O ROUN RANSIIONS AN PLENUS FLA BLACK. 7. PROVIE RANSIION AS REQUIRE FOR UC AN EVICE CONNECION. 8. LOW SIEWALL REURN / EHAUS GRILLES A AIU CORE FACE VELOCIY OF 00 FP. 9. RUNOU UCS FOR REURN / EHAUS GRILLES A AIU VELOCIY OF 600 FP. 0. CEILING IFFUSERS ARE -WAY HROW UNLESS NOE OHERWISE. INCREASE NECK ONE SEP FOR -WAY HROW AN PROVIE BLANK OFF PLAES AS REQ.. REFER O SPECIFICAION SECION 0 FOR AIIONAL REQUIREENS.. FACE, NECK, AN RUNOU S FOR SIEWALL GRILLES ARE HE NOINAL UC.. ate escription 0/8/09 CONSRUCION REARKS: A - BLAES PARALLEL O HE SHOR IENSION B - BLAES PARALLEL O HE LONG IENSION C - FIEL EERNALLY INSULAE PLENU / BACKPAN - ANUFACURER PROVIE EERNAL INSULAION E - FACORY LEAK ESE F - ANUFACURER PROVIE BACK PLENU WIH NECK OPENING S INICAE G - PROVIE WIH KNIFE EGE FOR HEPA GEL SEAL H - COLOR SELECE BY ARCHIEC I - PROVIE BLANK OFF PLAES FOR UNUSE PORIONS OF CONINUOUS SLO J - HEAVY UY CONSRUCION K - PROVIE WIH HINGE FRAE L - FACE OPERAE (VIA SLO) OPPOSE BLAE APER - REAR OPERAE (VIA SLO) OPPOSE BLAE APER rawing Name C:\Users\nmaddox\ocuments\SSR ECH_ Lab-R9_nmaddox.rvt SCHEULES his document and the information herein is the property of PhiloWilke Print ate / ime: /7/09 :9: P -00

SHEE KEYE NOES REOVE EISING AIR ERINAL BO AN ALL ASSOCIAE UCWORK AN FIRE/SOKE APER. CONRACOR O REUSE BO WHERE ACCEPABLE. REOVE EISING CONROLS WIH AIR ERINAL BO. Houston, 7 SSR #: 9000 HIR FLOOR UCWORK - EOLIION /" = '-0". ate escription 0/8/09 CONSRUCION C:\Users\nmaddox\ocuments\SSR ECH_ Lab-R9_nmaddox.rvt HIR FLOOR PIPING - EOLIION /" = '-0" rawing Name HIR FLOOR EOLIION PLANS his document and the information herein is the property of PhiloWilke Print ate / ime: /7/09 :9:0 P -0

7 89 0"x" 6"x" 7R irector 8 7 Kitchen 9 90R Copy Area 9 Reception 8 86 87 88 00 0"x0" "ø "ø Lab R 76 R Classroom 7 R 8"x6" 80 6 6 "x" 0"x0" 6 "x" 6 AU-- Storage 77 AU-- FS R 6 SHEE KEYE NOES PROVIE NEW HO WAER AIR ERINAL BO. SEE SCHEULE AN EAILS. PROVIE NEW 'x' SUPPLY IFFUSER. BALANCE O CF INICAE ON PLANS. SEE SCHEULE AN EAILS. PROVIE NEW 'x' REURN GRILLE. BALANCE O CF INICAE ON PLANS. SEE SCHEULE AN EAILS. PROVIE NEW FIRE/SOKE APER IN LOCAION SHOWN. CONRACOR O AINIAN EISING HR WALL RAING. SEE EAILS. PROVIE NEW EPERAURE SENSOR. CONRACOR O CONFIR SENSOR IS COPAIBLE WIH EISING BAS. PROVIE NEW HO WAER SUPPLY AN REURN PIPING O SERVICE NEW AIR ERINAL UNIS. Houston, 7 SSR #: 9000 FS 9R FS FS AU-- AU--. ate escription 0/8/09 CONSRUCION HIR FLOOR UCWORK - RENOVAION /" = '-0" Copy Area 9 89 86 Lab 76 Storage 77 AU-- Kitchen 9 87 irector 8 88 Classroom 7 /" /" C:\Users\nmaddox\ocuments\SSR ECH_ Lab-R9_nmaddox.rvt AU-- Reception 8 /" /" AU-- " " 6 AU-- /" /" HIR FLOOR PIPING - RENOVAION /" = '-0" 6 rawing Name HIR FLOOR RENOVAION PLANS his document and the information herein is the property of PhiloWilke Print ate / ime: /7/09 :9: P -0

APER OPERAOR, SIE OR BOO OUNE, NO ON OP UC RANSIION CONNEC SLEEVE O UC WIH SLIP-JOIN UC SOKE EECOR SEE INSALLAION EAIL ACCESS OOR ON SAE SIE AS OPERAOR. REFER O SPEC'S FOR OOR YPE AN VOIS BEWEEN WALL AN APER SLEEVE SHALL BE LEF OPEN SO AS NO O INERFERE WIH EPANSION. / " O / " EPANSION CLEARANCE. SEE NOE UL LISE FUSIBLE LINK RAE WALL OR PARIION OPENING IN SU WALL FOR UC PENERAION SHALL HAVE A SU FRAE ON ALL SIES. REAINING ANGLE SHALL BEAR ON SU FRAE RANSIION SLEEVE SHALL EEN A A. 6" BEYON WALL. EACH SIE UC REAINING ANGLE SEE NOE APERS SHALL BE -/ HOUR RAE UNER U.L. SANAR AN QUALIFIE UNER U.L. S AS A CLASS LEAKAGE RAE SOKE APER. SEE SPECIFICAIONS. NOES:. PROVIE U.L. LISE APER, SLEEVE & OPERAOR ASSEBLY IN ACCORANCE WIH U.L. S.. INSALL APER AN SLEEVE IN ACCORANCE WIH ANUFACURER'S INSRUCIONS NO O VOI U.L. LISING.. EEN SLEEVE BEYON WALL A A. 6 INCHES AN OUN OPERAOR ON SLEEVE.. PROVIE EPANSION SPACE PER ANUFACURER'S INSRUCION, BU NO LESS HAN /8 " PER LINEAR FOO.. PROVIE INIU / " x / " x 6 GA. REAINING ANGLE ON OP,BOO & SIES. AACH ANGLES O SLEEVE IN ACCORANCE WIH ANUFACURER'S INSRUCIONS. APER SHALL BE SELF SUPPORING, INEPENEN OF UCWORK, ANGLES SHALL OVERLAP WALL A INIU OF ONE INCH. "AP-OU" EIHER SIE OR BOO OF UC. OP "AP-OU" IS NO ACCEPABLE FLEIBLE UC. IN. R-6 INSULAE. A. -90, -/ IAEER RAIUS BEN. A. LENGH 6 FEE. 6" IN. ACCESSIBLE CEILING NOE: FOLLOW FR'S INSRUCIONS FOR INSALLAION OF SUPPLY IFFUSER IN CEILING SUPPLY UC SPIN-IN FIING WIH ANUAL VOLUE APER (NO ERACOR USE) SECURING SRAP PANUI (OR EQUAL) SHEE EAL SCREW (YPICAL) SUPPLY IFFUSER WIH INSULAE BACK PANEL UNION (YPICAL) BALL VALVE (YPICAL) PRESSURE COPENSAING FLOW CONROL VALVE SRAINER PEE'S PLUG (YPICAL) ⅜" BALL VALVE AIR VEN UNION & REOVABLE SECIONS FOR EPORARY FLUSHING BYPASS. INSALL PRIOR O CONNECING O EQUIPEN. REOVE AFER SYSE IS PROVEN CLEAN FRO FLUSHING. N O E PIPING SAE FOR HEAING COIL IN HO WAER REHEA ERINAL BOES AN FOR UC OUNE HO WAER HEAING COILS. -WAY CONROL VALVE (-WAY CONROL VALVE WHERE SHOWN ON PLANS). REFER O BO SCHEULE FOR RUNOU PIPE S. BALL VALVE(YPICAL) Houston, 7 SSR #: 9000 COBINAION FIRE / SOKE APER A RAE WALL 07 UCWORK CONNECION O SUPPLY IFFUSER (FLE UC) 0 PIPING A ERINAL REHEA (BO OR COIL) 0 SPLI RING YPE HANGER (SEE SPEC'S) HANGER RO CLEVIS YPE PIPE HANGER SEE SPEC'S URN BUCKLE (AS REQUIRE) "AP-OU" EIHER SIE OR BOO OF UC. OP "AP-OU" IS NO ACCEPABLE R-6 OR HIGHER INSULAE FLEIBLE UC (A. F) RECANGULAR EIU PRESSURE RUNK UC CONICAL AP FIING RANSIION FRO BO CONNECION O UC INICAE ON RAWINGS OR BO SCHEULE '-0" A. LENGH FLEIBLE UC. R-6 INSULAION IN.. ate escription 0/8/09 CONSRUCION INSULAION SA, RA, EH. UC LOW PRESSURE UC PIPE SHEE EAL SALE FOLLOW FR'S INSRUCIONS FOR INSALLAION OF SUPPLY IFFUSER IN CEILING LAY-IN CEILING IFFUSER NOE: FLEIBLE UC SHALL BE INSALLE WIHOU KINKS OR ELBOWS HAVING LESS HAN A -/ UC IAEER CENERLINE URNING RAIUS. SPIN-IN FIING WIH ANUAL VOLUE APER (NO ERACOR USE) SECURING SRAP INSULAE OP OF IFFUSER WIH /" WRAP INSULAION ROUN UC AN FLE. REFER O BO SCHEULE FOR RUNOU UC N O E S : ROUN O ROUN REUCER SEE PIPING EAIL FOR CONNECION O HEAING COILS. PROVIE CLEAR ACCESS FOR INSPECION & AINENANCE. HIS EAIL REFERS O VAV AN CONSAN VOLUE HO WAER REHEA BOES AN VAV BOES WIHOU REHEA.. FLE UC O ALLOW ONE BEN WIH CENERLINE RAIUS NO LESS HAN / UC IAEERS.. AP FIING O RECANGULAR EIU PRESSURE UC AY ALSO BE RECANGULAR ENRY, PER SACNA RECOENAIONS, AN HEN RANSIIONING O ROUN.. EIU PRESSURE ROUN RUNK UC O HAVE CONICAL EE FIING, WIH OHER REQUIREENS AS SHOWN.. BOES,00 CF OR LESS O BE SUPPORE WIH "x8 GA. GALVANIZE BAN IRON ON FOUR CORNERS. BOES GREAER HAN,00 CF SHALL HAVE RAPEZE SUPPOR OF REINFORCING ANGLE WIH /8" GALVANIZE ALL HREA RO HANGERS. 6. COORINAE REQUIREEN FOR CEILING ACCESS PANELS WIH IVISION 8. PIPE HANGER SUPPORS 08 UCWORK CONNECION O SQUARE FACE SUPPLY REURN, EHAUS CONNECION 0 AIR ERINAL UNI (HO WAER REHEA BO) 0 C:\Users\nmaddox\ocuments\SSR ECH_ Lab-R9_nmaddox.rvt CONSAN OR VARIABLE VOLUE ERINAL HO WAER REHEA BO O C NEWORK C S.A. -WAY OR -WAY HO WAER VALVE (N.C.) ROO ZONE SENSOR/ RANSIER O OHER ERINAL UNI CONROLLERS SEQUENCE OF OPERAION. GENERAL REQUIRENS A. B. C.. E. F.. OFF OE: A.. OCCUPIE OE OPERAIONS: A. FOR VARIABLE VOLUE ERINAL UNIS: UPON A ECREASE IN HE NEE FOR COOLING HE ERINAL UNI CONROL APER SHALL OULAE FRO IS AIU POSIION OWARS INIU POSIION AS REQUIRE O AINAIN SPACE EPERAURE SEPOIN. UPON A FURHER ECREASE IN HE NEE FOR COOLING HE REHEA COIL CONROL VALVE SHALL BE PROPORIONALLY OULAE OPEN O AINAIN SPACE EPERAURE. UPON AN INCREASE IN HE NEE FOR COOLING, HE REHEA COIL CONROL VALVE SHALL BE PROPORIONALLY OULAE CLOSE AN WHEN FULLY CLOSE HE ERINAL UNI CONROL APER SHALL BE OULAE OPEN. B. C. HE SPACE EPERAURE SEPOIN SHALL BE 7 F FOR COOLING AN 7 F FOR HEAING. A SEPARAE AJUSABLE SEPOIN SHALL BE AINAINE FOR BOH HEAING AN COOLING.. UNOCCUPIE OE OPERAIONS: A. ERINAL UNIS SHALL BE CONROLLE, AN ONIORE VIA A ERINAL UNI CONROLLER FOR EACH ERINAL UNI. ERINAL UNI CONROLLERS SHALL ONIOR HE SAUS OF HE ASSOCIAE AIR HANLING UNI O EERINE IS OPERAING OE. HE ERINAL UNI CONROLLER SHALL ONIOR AN REPOR OVER HE NEWORK HE FOLLOWING IES AS A INIU: SPACE EPERAURE, SPACE EPERAURE SEPOIN, SEPOIN AS SE A HE HEROSA, CONROL APER CONROL AN REHEA COIL CONROL. SPACE HEROSAS SHALL BE INIVIUALLY AJUSABLE A HE HEROSA UNLESS NOE OHERWISE. PROVIE LOCAL LC ISPLAY OF SPACE EPERAURE FOR ERINAL UNIS WHICH SERVE O.R.'S. HE SPACE EPERAURE SEPOIN SHALL BE AJUSABLE OVER HE HVAC CONROL NEWORK AN HE CONROLLER SHALL BE CAPABLE OF OVERRIING HE HEROSA SEPOIN. HEROSAS SHALL HAVE A AJUSABLE SEPOIN A HE HEROSA. WHEN HE ASSOCIAE AHU IS IN SOP OE, HE VAV CONROL APER SHALL BE IN IS FULLY OPEN POSIION. FOR CONSAN VOLUE ERINAL UNIS: HE ERINAL UNI CONROL APER SHALL BE OULAE O AINAIN A CONSAN AIR FLOW RAE. HE REHEA COIL CONROL VALVE SHALL BE PROPORIONALLY OULAE OPEN OR CLOSE AS REQUIRE O AINAIN SPACE EPERAURE. IN UNOCCUPIE OE HE VAV AN CONSAN VOLUE ERINAL UNIS SHALL CONINUE O OPERAE AS FOR OCCUPIE OE OPERAIONS ECEP HA SEPARAE UNOCCUPIE OE EPERAURE SEPOINS SHALL BE AINAINE. B. HE UNOCCUPIE OE EPERAURE SEPOIN FOR COOLING SHALL BE 76 F. (AJUSABLE). HE SPACE EPERAURE SEPOIN FOR HEAING SHALL BE 68 F. (AJUSABLE). ERINAL UNI CONROL SCHEAIC 09 YPICAL ANUAL VOLUE APER ** W USE HIS WIH RECANGULAR UC AKEOFF -SACNA ENRY FIING: L= / W, (" IN.) (AY ALSO BE PARALLEL FLOW FIING) * ** AIN SUPPLY REURN OR EHAUS UC = BRANCH O INIVIUAL IFFUSER OR GRILLE = SUBAIN, BRANCHAIN, OR BRANCH. L ** SPIN-IN FIING WIH ANUAL VOLUE APER USE HIS WIH ROUN UC AKEOFF'S LOW PRESSURE UC VOLUE APER REQUIREENS * 06 "AP-OU" EIHER SIE OR BOO OF UC. OP "AP-OU" IS NO ACCEPABLE INSULAE SHEE EAL RIGI ELBOW (NO FLEIBLE UC WILL BE ALLOWE) FOLLOW FR'S INSRUCIONS FOR INSALLAION OF SUPPLY IFFUSER IN CEILING INACCESSIBLE CEILING SUPPLY IFFUSER WIH INSULAE BACK PANEL UCWORK CONNECION O SUPPLY IFFUSER (ALL RIGI UC) SHEE EAL SCREW (YPICAL) SUPPLY UC SPIN-IN FIING WIH ANUAL VOLUE APER (NO ERACOR USE) 0 rawing Name EAILS AN CONROLS his document and the information herein is the property of PhiloWilke Print ate / ime: /7/09 :9: P -0