Branch Capital Improvement Feasibility Update Ocean View Mission Chinatown
Work to date - Conducted a Survey Monkey Design charrettes for each branch Issue charrette findings Conceptual feasibility analysis for each branch early 207 2
Ocean View Branch [Built in 2000] June 2000 Present day 3
Ocean View Branch Present day Info Desk Present day Reading Room 4
Second Floor First Floor 5
Mission Branch [Built in 95, Seismic Retrofit 999] Built 95, picture 940 s Original Main Entry on 24 th Street Present day Present Main Entry 6
Mission Branch Interior 95 Interior present day 7
Second Floor (Main Reading) 8
Chinatown Branch [Built in 92, Seismic Retrofit 996] Built 92, picture 960 s Original First Floor Entry Present First Floor Entry Present day 9
Chinatown Branch Built 92 (*Photo is Sunset Branch, similar plan) Interior present day 0
Mezzanine Above Mezzanine Above Second Floor (Main Reading)
Survey Findings 2
Ocean View Branch Library staff survey Need more space for sitting and shelving Create a more flexible Community Room Storage rooms on 2 nd floor using up valuable space Interior spaces need to be more flexibility Exterior needs secure seating and equipment close by Better space allocation: children s area; defined teen areas; study room More functional circulation Technology hubs for group learning & creative projects Privacy in the staff room; comfortable break room The Exterior needs refreshing & vegetation maintenance 3
Mission Branch Library staff survey Need more space Relocate Entry to 24 th street people don t know it s a library We need More bathrooms and computers We need a Program Room/Makers Space Stairs to children's area are difficult with strollers Lounge Area and study space needed A Separate Teen Area is needed Better Circulation and use of existing space Outdoor Play Area for children Staff Area not adequate Develop a Garden Area on the side or roof 4
Chinatown Branch Library staff survey The space is OUTDATED It is NOISYwith the open walls from the top floor; voices echo We need NEW ELEVATORS, constant issues causes problems for seniors We need MORE RESTROOMS, complaints of cleanliness The LIGHTING is not great in the library Bad HVAC system A dedicated TEEN AREA is needed More ELECTRICAL OUTLETS for laptops and personal devices We need to CONCEAL SEISMIC UPGRADES 5
Charrettes with Library 6
Why a charrette with the Library? Branch staff represent their community well Branch staff know their facility best Managers and branch staff have open discussions about branch facility 7
Charrette Takeaways What are the challenges? Ideas for improvement? 8
Ocean View Branch Library challenges Very small building Second Floor too separate hard to oversee Floor plans too chopped up, poor sight lines Entry & building function hard to discern from street Insufficient staff work areas in many locations Computer Lab difficult to monitor Underutilized Program Room Not designed for two language collections 9
Ocean View Branch Library ideas Improve entry more visible and better location Improve site lines across floor plan Create flexible Program Room, open to street Visually connect Second Floor, open up the stair Consolidate Staff Work Areas near service points Possibly add service point on 2 nd floor Add computers with laptop lending kiosk Enlarge rest rooms 2 0
Mission Branch Library - challenges Very heavily used by diverse community No Meeting Room or Children s Program Room 00 kids at storytime shuts down Children s Room Large collection but lacks program and engagement space Insufficient teen area Many pinch points in floor plan, underutilized nooks Poor stair location, wayfinding, and sight lines Flooding at Building Entry when it rains Only one public toilet, none at 2 nd floor 2
Mission Branch Library - ideas Restore historical building entrance? Restore historical central staircase? Create flexible use Program Room Rotate seasonal collections, utilize compact storage Improve efficiency of floor plan Add rest rooms - public and staff Improve access to Children s Room, stroller parking Improve Info Desk at 2 nd floor too monumental Provide dedicated Teen Area Improve and connect fenced outdoor area 2 2
Chinatown Branch Library challenges Very heavily used branch community living room Many shelves, not enough seating Large Chinese language reference collection Program Room - not suitable for after hours use Children s Storytime Room - too small, no windows Poor connection between floors Underused Mezzanine and Roof Terrace Inefficient staff area layout Seismic bracing disregards historic architecture Entry to First Floor is unattractive 2 3
Chinatown Branch Library ideas Restore historic Reading Room, could be quiet room Remove Mezzanine from historic Reading Rm Single flexible use Program Room at First Floor Consolidate with Children s Storytime Add Program Room at 2 nd Floor For classes, teens, acoustical separation Consolidate staff work areas Info/Circ Improve First Floor entrance and lobby Consider moving scholarly collections to archival facility 2 4
Next steps - Conceptual feasibility analysis Community engagement and feedback Establish priorities and options 2 5