of Massachusetts ': '.': 'i: '( C' Massachusetts Historical Commissiori ILtu 'Ihe Commonwealth 'r'!y '1HE

Similar documents
Summary of Other State Archeological Guidelines

/s/ Michael T. Loeffler. Michael T. Loeffler Senior Director, Certificates and External Affairs. Attachment. September 14, 2018.

2.1.8 Cultural Resources Regulatory Setting. Affected Environment, Environmental

Draft Environmental Assessment Appendix A. SHPO Correspondence, January 19, 2017

Pittsburgh District Pittsburgh, PA Notice No Closing Date: May 29, 2015

PURPOSE: The purpose is to provide commercial facilities in the Vancouver and Clark County vicinity.

issy STATE OF WASHINGTON DEPARTMENT OF ECOLOGY

Phase One Archaeological Investigation Results, James Madison Park Master Development Plan Project, City of Madison, Dane County, Wisconsin

PennDOT. single spann lanes and 3- mayy need to be to accommodate. any bridge. addition to III. Date: CRP 07/27/2015 CRP.

December 7, RE: Notice, Preliminary Draft Final Master Plan (West Los Angeles Campus. Dear Director,

National Historic Preservation Act Section 106 Compliance

Commonwealth ofmassachusetts Executive Office of Energy and Environmental Affairs Massachusetts Environmental Policy Act (MEPA) Office

Overview of Southwestern Pennsylvania Commission s (SPC) 2040 Long Range Transportation Plan (LRTP)

Chapter 7 Distribution List

MONITORING STRATEGY. CRM Lab Archaeological Services

Project Description. Dear Ms. Roland-Nawi:

CEQA and Historic Preservation: A 360 Degree Review


September 26, Ms. Elizabeth Hughes State Historic Preservation Officer Maryland Historical Trust 100 Community Place Crownsville MD

Environmental Resources Branch

APPENDIX J SHPO COORDINATION

From: Sent: To: Cc: Harmon, Dan; Erik Dickson RE: South Avenue Bridge Project, Missoula County // Request for comment

DOCKET & STATUS UPDATE

MUCKLESHOOT INDIAN TRIBE Fisheries Division nd Avenue SE. Auburn, Washington

PUBLIC NOTICE. us Anny Corps CENAE-R-A FILE NO. NAE

October 26,2006 CERTIFICATE OF THE SECRETARY OF ENVIRONMENTAL AFFAIRS ON THE ENVIRONMENTAL NOTIFICATION FORM

Development Reviews. An overview of the Commission s review process, primarily in Klickitat County. March 13, 2018

7.0 SECTION 4(F) EVALUATION

6:00 8:00 PM I-95 FROM EXIT 57 TO EXIT 60 PROJECT

Technical Report: Ceremonial Stone Landscape Survey Avoidance Plan Memorandum

Attachment: Historic Property Treatment Plan, Underwood Farmstead (LE-0150) cc: Ms. Susan Pierce, WVDCH

Appendix E Memorandum of Agreement between FHWA and the SHPO

Section 106 Consulting Party Meeting Summary Report March 29, 2018

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF NOVEMBER 15, 2016

Boston Water and Sewer Commission

CITY OF MOBILE MOBILE CITY PLANNING COMMISSION LETTER OF DECISION. November 5, 2012

Commonwealth of Massachusetts Massachusetts Historical Commission 220 Morrissey Boulevard, Boston, Massachusetts

ii

CULTURAL LANDSCAPES: IDENTIFICATION, EVALUATION, IN 106 PROCESS

Chapter 13 Distribution List

Sierra Club Comments on ACOE Public Notice NAE Re: Proposed Town Neck Beach Project at Sandwich, Massachusetts

Decision Notice. Proposed Action

APPENDIX I PUBLIC MEETING AT PROJECT INCEPTION

STATE OF TENNESSEE DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL DIVISION

Metzger, Brian. From: Sent: To: Cc: Subject:

r's number USGS Quad Area(s) Form Number Place (neighborhood or village) Triphammer Condition good Acreage 1 acre

Eastern Band of Cherokee Indians Integrated Geographical Information System (IGIS)

New York State Department of Environmental Conservation

WASHINGTON COUNTY OREGON

A. General Information

The DCR Neponset River Trail Central Avenue to Mattapan Square

FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D.C

Summary of Information and Consultations for National Historic Preservation Act Section 106 Compliance, ANC Millennium Project, 2012

RFP REQUEST FOR PROPOSALS CITY OF PORTSMOUTH, NH. DESIGN ENGINEERING SERVICES North Mill Pond Trail and Greenway

Letter of Notification For East Lima Station Expansion Project

[Docket No. FAA ; Product Identifier 2017-NE-02-AD; Amendment ; AD ]

AN ARCHAEOLOGICAL SURVEY FOR THE RICHARDS, TEXAS FARM-TO-MARKET ROAD 149 FIBER OPTIC CABLE PROJECT IN MONTGOMERY COUNTY, TEXAS

Ci.ty e>f -V--:1rgi.rria Beach

AGENDA ITEM: IOWA. west] that were not FISCAL IMPACT. the City of Clive. STAFF REVIEW. Resolution II. Amendment PREPARED BY: REVIEWED BY:

Rose Kennedy Greenway Ramp Parcels Study

MEMORANDUM HONORABLE MAYOR AND CITY COUNCIL MEMBERS. SHERI REPP LOADSMAN, DEPUTY CITY MANAGER/ PLANNING & BUILDING DIRECTOR /s/

Goal 1 To establish and follow land use patterns for the long-range development of the campus.

Burloak Drive Grade Separation

CHARLES COUNTY GOVERNMENT RFP NO POPES CREEK RAIL TRAIL DESIGN

Open House Public Involvement Meeting Howland High School Cafeteria, 200 Shaffer Drive NE, Warren, Ohio. Informational Handout

TOWN OF BETHLEHEM MEETING SUMMARY LOCAL WATERFRONT REVITALIZATION PROGRAM UPDATE

JOINT PUBLIC NOTICE. 26 June United States Army Corps of Engineers State of Louisiana

Notice of Preparation and Notice of Public Scoping Meeting. At Dublin Project

Oweninny Wind Farm. Oweninny Environmental Impact Statement Appendix 13. Cultural Heritage Correspondence

Town of Whitchurch-Stouffville Cultural Heritage Impact Assessment

SUMMARY. Support the Southeast Arkansas Regional Intermodal Facility.

Appendix G. Archaeological and Paleontological Resources Records Searches

ii

ENVIRONMENTAL REQUIREMENTS FOR FEDERALLY FUNDED PROJECTS: SECTION 106 AND SECTION 4(F)

Cultural Landscape Heritage Impact Statement Terms of Reference

May 4, Via electronic mail

CENTERTON ROAD BRIDGE REPLACEMENT

Subregion I. Proposed Sectional Map Amendment, August Preliminary Master Plan and

Working with Partners to Manage Recreation Sites. Dave Samson California Department of Water Resources

September 14, Ken Cunningham, Chief a I. Conservation Services Division ti9 r< New Mexico Department of Game and Fish. P0 Box

~!VAUGHAN NOV Z November 21, Mr. Denis Kelly, Regional Clerk The Regional Municipality of York Yonge Street Newmarket, ON L3Y 6Z1

Reg. No. 2008/004627/07 VAT No Facsimile: (044) Progress Street, George Web:

THE REGIONAL MUNICIPALITY OF YORK BYLAW NO A bylaw to adopt Amendment No. 6 to the Official Plan for The Regional Municipality of York

Managing Visual Impacts on Historic Sites and Districts

W.H. Bonner Associates

At least 10 calendar days prior to project start date Within the last 30 days of a project that will extend beyond 12 months

TERMS OF REFERENCE MALASPINA COMPLEX COASTAL PLAN

The proposed project will impact a large amount of aquatic resources.

Northeast Corner of Steeles Avenue West and Jane Street, City of Vaughan

TOWN OF AURORA HERITAGE IMPACT ASSESSMENTS AND CONSERVATION PLANS GUIDE

PG Phone: (416) June 2, 2016

1. Call to Order. The meeting was called to order at 1:05 PM. (See Enclosure A [Agenda])

ITS Concept Development Activity Descriptions

Staff will be providing an overview of the project need, purpose and intent for consideration as part of the Amendment cycle.

FOREST SERVICE MANUAL NATIONAL HEADQUARTERS (WO) WASHINGTON, DC

Saranac River Trail Greenway C O N D I T I O N S R E P O R T

Planning and Growth Management Committee

I-290 Eisenhower Expressway

STREAM BUFFERS

STAFF REPORT ACTION REQUIRED

Transcription:

I 11 A ILtu 'r'!y '1HE 'Ihe Commonwealth of Massachusetts 20lll NOV I 3 A II: 52 William Francis Galvin, Secretary of the Comrttuitweeaft1t ': '.': 'i: '( C' Massachusetts Historical Commissiori November 5, 2014 Secretary Kimberly D. Bose Federal Energy Regulatory Commission 888 First St NE Room 1A Washington DC 20426 RE: Tennessee Gas Pipeline Company, LL.C.,a Kinder Morgan Company, Northeast Energy Direct Project, PA, MA, CT, NH. MXC ¹RC,56771.FERC Docket ¹PF14-22-000. Dear Secretary Bose: The Massachusetts Historical Commission (MHC), office of the State Historic Preservation Officer (SHPO), received additional information on October 21, 2014 regarding the project referenced above. After review ofthe materials submitted, the MHC offers the following comments to assist the Federal Energy Regulatory Commission (FERC) in its compliance with 36 CFR 800, the regulations implementing Section 106 of the National Historic Preservation Act. The information submitted includes USGS topographic 'quadrangle locus maps w'ith a "project ar'ea corridor" indicated across the state, a list of the federal and state agency permits anticipated to be required for the project, and a list of the Massachusetts municipalities in which the project is proposed. To assist in avoiding and protecting areas within Massachusetts that are known to have or are sensitive for significant historic and archaeological resource, and to minimize the overall project effects to the Commonwealth's finite cultural resources, especially those on lands previously designated for conservation and preservation, feasible alternatives for routing the proposed project within areas that have been previously impacted, such as existing transportation and infrastructure corridors, should be considered. Additional information is required by the MHC to understand the precise location and areas of potential effects, and the nature of the potential effects of the pipeline project within Massachusetts. A narrative description of the project components and methods of construction should be provided to the MHC, describing where open trench, directional drilling, ground disturbance activities, new construction, etc., are proposed. The location and boundaries of the project, including the new pipeline, new above-ground construction such as meter stations, valves, compressor stations, temporary and permanent construction easements, access ways, staging areas, equipment and materials storage'areas, and all other related project work areas should be clearly indicated on USGS locus maps and on project plans and drawings. Appropriate sections of USGS to'pographic quadrangle locus maps, enlarged as necess'ary, and project plans and drawings, should be prepared which show all aspects of the project clearly identified and labeled with the project components. The lobus maps, project plans and drawings submitted to the MHC should be no larger than 11" x 17." 220 Morrissey Boulevard, Boston, Massachusetts 02125 (617) 727-8470 ~ Fax: (617) 727-5128 www.sec.state.ma.uslmhc

The MHC will advise and assist FERC in canying out its responsibilities to take into consideration the effects of the projert on historic and archaeological resources and to provide consulting parties the opportunity to comment on its findings and determinations (36 CFR 800.2(c)(1)). The MHC advises FERC that potential consulting parties may include, among others: (a) the local government historical commissions of the municipalities in which the project is proposed; (b) local historic district commissions of any local historic district (Mass. Gen. Laws [MGL] c. 9, s. 40C) in which the project is proposed; (c) Tribal Historic preservation Officers of the Stockbridge-Munsee Community, the Wampanoag Tribe of Gay Head (Aquinnah), and the Mashpee Wampanoag Tribe; and (d) the hdassachusetts Board of Underwater Archaeological Resources (BUAR) for any submerged lands of the Commonwealth in which the project is located (36 CFR 800.2(cd), (3), dt (5)). The MHC advises that. FERC should commence notification to these potential consulting parties to learn of their interest in participating in the Section 106 consultation process. The MHC advises that FERC should contact the Advisory Council on Historic Preservation (ACHP) to learn if the ACHP will participate because of the multi-state project location and its potential to meet the criteria for ACHP involvement (see 36 CFR 800, Appendix A). The MHC advises that FERC should develop a plan for public comment (36 CFR 800.2(d)). The MHC looks forward to consultation with FERC on FERC's determination and documentation of the project's areas of potential effects (APE) for historical architectural and for archaeological resources (36 CFR 800.4(a)(1)). The MHC looks forward to consulting with FERC in the development of an adequate scope for identification and evaluation efforts for historic and archaeological msources that may be affected by the project (36 CFR 800.4(b) to (c)) The MHC requests that a reconnaissance-level cultural resources survey for historic architectural and archaeological resources within the project areas of potential effects be conducted by a qualified cultural resources consulting firm with previous relevant experience in Massachusetts. The survey should be conducted in accordance with the Secretary of the Interior's Standards and Guidelines for Archeology and Historic Preservation (48 Fed. Reg. 190 (1983))and the Massachusetts State Archaeologist's field investigation regulations (950 CMR 70). The research design and methodology of the survey should consider and evaluate previous cultural resources survey methods and results for linear project corridors located within the regions in Massachusetts in which the project is proposed. The research design and methodology should describe explicitly how relevant previous research findings, including locations and results of previous survey efforts and reported historical and archaeological resources within the project areas of potential effects, will be considered, evaluated, and reported. The MHC's numbering systems for historic and archaeological properties and areas, and survey reports should be referenced. As part of the reconnaissance-level identification effort in the areas of potential effects for historic architectural resources, a suitable and explicit survey methodology should be developed. The project's professional cultural resources consultants should produce new or updated MHC Historic Properties inventory Forms prepared in accordance with the MHC's Historic Properties Survey Manual. The archaeological reconnaissance survey should evaluate the locations of proposed project impacts and document archaeologically sensitive locations within the project areas of potential effects for archaeological resources. The archaeological sensitivity assessment models should be developed to consider ancient and historical period environmental attributes, the ancient and historical cultural

archaeological resources. The archaeological sensitivity assessment models should be developed to consider ancient and historical period environmental attributes, the ancient and historical cultural geography of the Massachusetts regions in which the project is proposed, and any previous impacts of the project impact areas. The MHC requests that FERC inform other involved federal, state, and municipal agencies, the project proponent, and consultants that the locations of archaeological resources should not be disclosed in documents prepared for public review (see 36 CFR 800.11(c)and MGL c. 9, s. 26A(1) & (5)). A draft scope for the reconnaissance-level cultural resources survey should be submitted to MHC, and other interested consulting parties such as Tribal Historic Preservation Officers and the Massachusetts BUAR, for review and comment. These comments are offered to assist in compliance with Section 106 of the National Historic Preservation Act of 1966 as amended (36 CFR 800), the Secretary of the Interior's Standards and Guidelines for Archeology and Historic Preservation (48 Fed. Reg. 190 (1983), and MGL c. 9, ss. 26-27C (950 CMR 70-71). If you have any questions, please contact Edward L. Bell, Deputy State Historic Preservation Officer at the MHC. Sincerely Brona Simon State Historic Preservation Officer Executive Director State Archaeologist Massachusetts Historical Commission xc: see attached

xc; Eric Tomasi, FERC Charlene Dwin Vaughan, ACHP John Eddins, ACHP Karen Kirk Adams, US Army Corps of Engineers Kathleen Atwood, US Army Corps of Engineers Tim Timmerman, USEPA Region I Lois K, Adams, USEPA Region I Mike Stover, USEPA Region I Sherry White, Stockbridge-Munsee Community Bettina Washington, Wampanoag Tribe of Gay Head (Aquinnah) Ramona Peters, Mashpee Wampanoag Tribe James A. Peters, Jr. Massachusetts Commission on Indian Affairs Elizabeth H. Muzzey, NH SHPO Ruth Pierpoint, NY DSHPO Dan Forrest, CT SHPO Serena Bellew, PA DSHPO Secretary Maeve Vallely Bartlett, Massachusetts David W. Cash, Massachusetts DEP Lealdon Langley, Massachusetts DEP-Bureau of Resource Protection Ben Lynch, Massachusetts DEP-Bureau of Resource Protection Mary Griffin, Massachusetts Dept. of Fish & Game Executive Office of Energy & Jack Murray, Massachusetts Dept, of Conservation & Recreation Patrice Kish, Massachusetts Dept. of Conservation & Recreation Bruce K. Carlisle, Massachusetts Coastal Zone Management Victor T. Mastone, Massachusetts BUAR Deirdre Buckley, Massachusetts EEA/MEPA Mark Sylvia, Attn. Meg Lusardi, Massachusetts Dept. of Energy Resources Andy Green, Massachusetts Energy Facilities Siting Board Ann G. Berwick, Attn. Andrew Greene, Massachusetts Dept, of Public Utilitie Mike Letson, Tennessee Gas Pipeline Co. LLC, a Kinder Morgan Co. Eileen Banach, AECOM, Providence, AECOM, Chelmsford, MA Hope Luhman, Louis Berger Rl Environmental s-siting Division Affairs

Document Content(s) 13683888.tif...1-4