City of Edmonton. Walterdale Bridge Replacement and Approach Roads Evaluation. Concept Planning Study. Final Report

Similar documents
1.0 INTRODUCTION & BACKGROUND

Mavis Road Class Environmental Assessment

Edmonton s LRT Setting the Stage for Heading Further South

Purpose of Open House #3

Public Meeting #3 May 9, 2009 MVVA Team

City of Toronto. Emery Village Transportation Master Plan

WELCOME 50 street cp rail grade separation + road widening. public information session #1 June 26, pm to 8 pm

Public input has been an important part of the plan development process.

III. PROJECT DESCRIPTION

Victoria Bridge Municipal Class EA Civic Works Committee

Application Number: SD Project Name: Walton Farms Preliminary Subdivision (acting as Master Plan)

Northeast Anthony Henday Drive Manning Freeway to Whitemud Drive Welcome to this Construction Information Session

Burloak Drive Grade Separation

Executive Summary. NY 7 / NY 2 Corridor

WELCOME TO OPEN HOUSE TWO November 28, 2018

Mississippi Skyway Preliminary Engineering Report

Emery Village Road 2A Municipal Class Environmental Assessment Study

Local Growth Planning in North Central Green Line Communities

TIRZ 17/Redevelopment Authority Capital Improvements Plan Projects

Update. What is the Osborne Bridge Rehabilitation project all about and how is it being planned? Neighbourhood Advisory Committee (NAC)

WHAT IS THE PURPOSE OF THE OPEN HOUSE?

Adelaide Street / Canadian Pacific Railway (CPR) Grade Separation Class Environmental Assessment. Public Information Centre 3

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

I-95 Girard Avenue Interchange Near Neighbors Meeting. Project Status

NORTHEAST RIVER CROSSING FUNCTIONAL PLANNING STUDY

Transportation. Strategies for Action

ALTERNATIVES. NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives).

2040 Long Range Transportation Plan

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

Goals for Tonight s Meeting

7.5 Impacts on the Section 4(f) Properties

CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON AUGUST 13, 2018

LAND USE AMENDMENT DOWNTOWN COMMERCIAL CORE (WARD 7) MACLEOD TRAIL SE AND 5 AVENUE SE BYLAW 254D2017

City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01

Shift Rapid Transit Public Participation Meeting May 3, 2017

Commissioners Road West Realignment Environmental Assessment

RE: AMENDMENT C375 GEELONG PLANNING SCHEME 1900 BARWON HEADS ROAD, BARWON HEADS

John M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference

9 North Downtown Master Plan & Saskatchewan Polytechnic

Bridge Type Assessment and Evaluation

Reconnecting New Haven: Downtown Crossing

DESIGN CRITERIA PACKAGE

GUIDELINES EXHIBITION PLACE LOCATION: OBJECTIVES. Structure Plan URBAN DESIGN GUIDELINES

Strachan Ave. Overpass Community Design Update. October 26, 2010 Stephen Lipkus Executive Director Georgetown South Project GO Transit

1.0 Background. 1.1 Study Process

6:00 8:00 PM I-95 FROM EXIT 57 TO EXIT 60 PROJECT

A raised and landscaped median will be constructed in South College Avenue between Trilby Road and Skyway Drive.

Alternatives Development Three conceptual alternatives were developed for the Race Road/Jessup Village Planning Study and are described below:

DESIGN PUBLIC HEARING. Phase II

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

Welcome. Community Consultation Meeting November 28, Review and discuss the Bathurst Quay Neighbourhood Plan Framework

GLEN ROAD PEDESTRIAN BRIDGE ENVIRONMENTAL ASSESSMENT STUDY PUBLIC INFORMATION CENTRE #2 OCTOBER 24, 2017

FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016

DOWNTOWN JACKSONVILLE MASTER PLAN S T R E E T H I E R A R C H Y

Century Park to Ellerslie Road Preliminary Engineering

The purpose of tonight s PIC is to:

4.1 Build Alternative 1 Construction Phasing

I. DESCRIPTION OF PROPOSED ACTION... 1 A. General Description... 1 B. Historical Resume and Project Status... 2 C. Cost Estimates...

Meeting Purpose: Date and Time: Location: Attendance: Handouts:

Pine Island Road Corridor Master Plan

Project Status. Construction is underway for Phase 3. Overall Project Area and Schedule. Schedule of Current Construction Phases.

Mississauga Waterfront. Parks Strategy - Draft

City of London Adelaide Street North - Canadian Pacific Railway Grade Separation Class Environmental Assessment Study Report

REPORT TO: Council FOR: Regular Meeting. PRESENTED: April 1, 2008 FILE: , Byl 1932 & 1936

14 October 10, 2012 Public Hearing APPLICANT: MPB, INC

Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions

NORTH-SOUTH CORRIDOR STUDY EXECUTIVE SUMMARY. Executive Summary

Public Services Department

ROAD CLOSURE AND LAND USE AMENDMENT SILVER SPRINGS (WARD 1) NORTHEAST OF NOSEHILL DRIVE NW AND SILVER SPRINGS ROAD NW BYLAWS 2C2018 AND 29D2018

July 12, Columbus City Council City Hall 90 West Broad Street Columbus, OH RE: I-70/71 Columbus Crossroads Project

B. DESCRIPTION OF THE PROPOSED ACTION

North Commuter Parkway and Traffic Bridge Project Market Sounding

Southern Gateway Project and Public Green

PUBLIC HEARING. Thursday, December 14, 2017 FDOT Urban Office 2198 Edison Avenue Jacksonville, FL 32204

Memorandum CITY OF DALLAS. Riverfront Boulevard Design From Continental Avenue to Cadiz Street

LUNDY S LANE COMMUNITY IMPROVEMENT PLAN STUDY

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

Welcome. Mill Creek Ravine Pedestrian Bridges Rehabilitation. Public Information Session #1. Thursday, October 27, :00 8:00 p.m.

PARAMETERS TRAFFIC ENVIRONMENTAL GEOTECH CIVIL ARCHITECTURAL

We d like to thank you for attending this Wekiva Parkway Section 8 Preliminary Design Update hosted by the Florida Department of Transportation.

City of Edmonton Valley Line Stage 1 Light Rail Transit (LRT) Project Site Location Study Update

Chapter 5: Natural Resources and Environment

Public Workshop: November 12, 2009

Chain Bridge Road Sidewalk Improvements Citizen Council Work Session

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension

INFRASTRUCTURE EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities

Open House RIVER DES PERES GREENWAY: LANSDOWNE SHREWSBURY METROLINK TO FRANCIS R. SLAY PARK

North Macadam Transportation Development Strategy Summary of Past Studies DRAFT

Chesterfield County Project Update

LITTLE ELM CAPTIAL IMPROVEMENT BOND STREET PRESENTATION

Institutional Master Plan The Arnold Arboretum of Harvard University

Municipal Class EA Study Public Information Centre No. 1 December 13, :00 pm 7:00 pm. Please sign in so we can keep you updated on this study

ESTABLISH AN EFFICIENT TOWN CENTER

Citizen Information Meeting

Asbury Chapel Subdivision Sketch Plan

Principal development issues

Issues Requiring Future Study

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

EXECUTIVE SUMMARY. Introduction

Outline Plan in Belvedere (Ward 9) at Street SE, LOC (OP)

Transcription:

City of Edmonton Final Report Walterdale Bridge Replacement and Approach Roads Evaluation April, 2011

Walterdale Bridge Replacement and Approach Roads Evaluation Final Report April 2011 Acknowledgement We were fortunate to have worked with a highly qualified and dedicated Project Team to complete the Walterdale Bridge and Approach Roads Evaluation Concept Planning Study for the City of Edmonton. The Project Team was capably guided and directed by a competent and committed City Team under the direction of Ms. Robin Casavant, P.Eng., General Supervisor, and Ms. Natalie Lazurko, P.Eng., Transportation Engineer. Additional input and guidance was provided by Mr. Adam Laughlin, P.Eng., Director, and Mr. Brian Latte, P.Eng., Manager. We would like to acknowledge the high quality of assistance and input that they brought in meeting the expectations of the Client. Sub-consultants associated with the project are as follows: Gray Scott Consulting in Association with ISL Engineering and Land Services Ltd. Al Parsons, Lorna Stephens, Amanda Gill, Gayleen Froese (Public Involvement). Turtle Island Cultural Resource Management Inc. Gareth Spicer (Historical Resources). Spencer Environmental Management Services Ltd. Richard Spencer, Andra Bismanis (Preliminary Environmental Assessment). Thurber Engineering Ltd. Robin Tweedie, Hassan El-Ramley (Preliminary Geotechnical Investigation). Dialog Donna Clare (Architectural). Carlyle & Associates Doug Carlyle (Landscape Architecture and Urban Design). In addition we would like to acknowledge and thank the Edmonton Arts Council, and particularly Mr. Ken Lum, Artist, who provided valuable input to the Study Team. Page i

Walterdale Bridge Replacement and Approach Roads Evaluation Final Report April 2011 Executive Summary Walterdale Bridge, crossing the North Saskatchewan River near Edmonton s downtown, is approaching 100 years of age and the end of its useful life. The bridge is an important link in the City transportation system, carrying two traffic lanes northbound into downtown from Gateway Boulevard and 109 Street via Queen Elizabeth Park Road (QEPR) (two (2) lanes), and Walterdale Hill Road (WHR) (two (2) lanes and one (1) bus lane). The bridge operates at capacity during peak hours, which results in significant congestion on the south approaches, particularly during the AM Peak. The primary objective of Walterdale Bridge Replacement and Approach Roads Evaluation,, was to define the location and alignment of the new Walterdale bridge, crossing the North Saskatchewan River. The Study Team was requested to consider and evaluate functional signature bridge options for this high profile crossing that provides one of the main gateways to downtown Edmonton. A secondary objective was to develop and evaluate road alignment options for both QEPR and WHR, in conjunction with the new bridge alignment. This objective was to address immediate approach roads in the vicinity of the bridge as well as road improvements on the south bank. Although south bank improvements were ultimately deleted from the scope of the assignments, the current road improvements for Queen Elizabeth Park Road have flexibility to support south bank improvements in the future. Right-of-way should be protected to facilitate future implementation of south bank improvements. The Study was also required to consider the numerous development plans and initiatives that are currently underway or planned for the surrounding area. The Planning Team initially developed twenty-six (26) road alignment options for consideration, which were reduced to four (4) options through a screening process by the Project Team. The four (4) road alignment options and four (4) bridge style options (Girder, Cable Stayed, Extradosed and Arch) were presented to the Public at an Open House in November 2011. In January 2011, the Study Team was requested to refocus its efforts on the bridge replacement and vicinity approach roads only and leave the south bank for a future Study. The Study Team developed and evaluated numerous river crossing alignment options for the bridge and concluded that an alignment that allowed the existing bridge to remain in service while the new bridge was being constructed was not only desirable from a traffic accommodation perspective, but would also be required to facilitate delivery within the schedule. If the numerous utilities which are located on the bridge are to be removed prior to construction, a two (2) year approval timeline may be required. The proposed bridge alignment at fifteen degree (15 o ) skew east of the existing bridge is the recommended alignment, but will require relocation of the Interpretive Belvedere on the north side of the river, which must be treated with sensitivity. Page ES-1

Walterdale Bridge Replacement and Approach Roads Evaluation Final Report April 2011 Our evaluation also concluded that a three (3) lane northbound bridge would meet the traffic demand while a southbound lane serving Kinsmen could not be justified based on demand and cost. Pedestrian facilities on the bridge include a multi-use trail on the east side and a sidewalk on the west side. Opportunities for enhancement of pedestrian facilities on the bridge could be considered in future stages of implementation but have not been included in the cost estimates included in this report. The recommended roadway plan is shown in Exhibit E.S.1 and shows the extent of WHR and QEPR improvements. A reconfigured intersection at QEPR and WHR controlled by a two phase signal will provide enhanced operation and safety at the intersection. The road will generally be raised to meet the new bridge elevation. Walterdale Hill Road will be modified to a two-lane northbound cross-section, to provide enhanced pedestrian facilities along the north side of the roadway between Saskatchewan Drive and Kinsmen Recreation facilities. This section of roadway will no longer provide an exclusive bus lane, but rather a transit queue jump will be implemented on 109 Street northbound at 87 Avenue. The existing Walterdale Bridge and approach roads, QEPR and WHR, can remain open and operable during construction of the new bridge, and only short term closures will be required for reconstruction of QEPR due to grade and alignment adjustments. Reconstruction of WHR is not expected to require any closures. In Phase 1 of the Study, the Team considered the use of girder, extradosed, arch and cable-stayed alternatives for the replacement bridge on a variety of road alignments. From consideration of project constraints, aesthetics, and integration into the urban environment, a through-arch structure is recommended for the new bridge. The arch structure is a functional signature bridge that will form an attractive entrance to downtown Edmonton. The bridge will have an innovative urban design complimenting the West Rossdale Urban Design Plan, and respecting the heritage of the site. The structural details include a bridge approximately 240 m long with rise of approximately 40 m. A significant advantage of the arch bridge is that it can be constructed without permanent piers in the river, which could be a significant advantage in terms of environmental approvals. The south end of the bridge must be raised about 2.5 m to clear the 100 year flood level. The recommended bridge is illustrated on Exhibit E.S.2 and a bridge rendering is shown on Exhibit E.S.3. World renowned Artist Ken Lum retained through the Edmonton Arts Council has been working with the Project Team for the past two months. Ken will continue to work through the next phases of the project in developing his art, either as part of the bridge or as stand alone pieces. The project impacts quality park land and pedestrian facilities south of the river. Landscape enhancements and pedestrian underpasses of QEPR and WHR have been Page ES-2

Walterdale Bridge Replacement and Approach Roads Evaluation Final Report April 2011 included. Further pedestrian facility enhancements on the south and north banks have been identified for consideration, but are not included in the Study Cost Estimate. The bridge is located in an area of significant historical resources importance, including the Fort Edmonton Cemetery and Traditional Burial Ground at the south east corner of Rossdale Road and 105 Street. The bridge project avoids the known cemetery and burial grounds, but impacts a small portion of the 2005 subdivided cemetery parcel, which does not appear to contain any human remains. However, a Historical Resource Impact Assessment as well as additional aboriginal consultation will be required prior to implementation of the bridge project. Relocation of the Interpretive Belvedere and a protocol for internment of human remains, if encountered during construction, must also be developed. Existing Walterdale Bridge is a listed Historic Resource, and therefore approvals for removal must be obtained via appropriate protocols and Council approvals. Environmental approvals including Canadian Environmental Assessment Act (CEA) and City of Edmonton Bylaw 7188 will be required, as will Federal Navigable Water Act and Department of Fisheries and Oceans approvals. Although the new bridge is not expected to require instream work, demolition and removal of the old bridge will require instream work and accordingly the appropriate approvals. Timely approvals are a major risk to implementation of the project, and a diligent and sensitive effort will be required. The approval to change the 2005 subdivision boundary of the Fort Edmonton Cemetery Site and Traditional Burial Ground is also a potential risk to implementation. Estimated cost of the new bridge including approach road modifications and removal of existing bridge is approximately $130 M. Design of the bridge is expected to require ten (10) months, based on an aggressive schedule, while construction is expected to require 24-30 months. The arch bridge would be considered a reasonably complex construction project. As the recommended bridge alignment permits the existing bridge to remain in service during construction, traffic accommodation will require only minimal short term road closures or detours. Page ES-3

OVER THE NORTH SASKATCHEWAN RIVER CONCEPTUAL DESIGN - RECOMMENDED ARCH ALTERNATIVE E.S.2.

OVER THE NORTH SASKATCHEWAN RIVER CONCEPTUAL DESIGN - RECOMMENDED ARCH ALTERNATIVE E.S.3.