Installation of Downhole Heaters to Prevent Paraffin Blockages

Similar documents
Tyco Thermal Controls. Oil Field Services. Providing Thermal Technologies to meet your Upstream Flow Assurance Needs Tyco Thermal Controls

Mud Pump (Emsco Type) Diesel Engine

88 Energy Limited Operations Update

Tyco Thermal Controls. Heat Management Solutions for Upstream Sector. Valentin ILIE Tyco Thermal Controls

Design of Sucker Rod Systems

New and Unusual Applications for Plunger Lift System

TEXAS PRODUCTION GAINS MOMENTUM

Environmental Expenditures. by the U.S. Oil and Natural Gas Industry

Use of Electric Downhole Heaters to Prevent Wax Build-up, Offshore, West Africa by Alistair Hill and Rick Newell, Pentair Thermal Management

Sucker Rod System Analyst

Effect of Temperature vs Base Sediment & Water in Waxy Crude Oil

Flowtools Middle East LLC

Hollow Sucker Rods: Development and applications in Beam Pumping

Table of Contents. 55 Foot Mast Trailer Tab 1. A Stops Tab 2. Bailers Tab 3. Bailer Bottoms See Tab 3. Baker Plugs See Tab 24. Broaching Tools Tab 4

FB-310A. Removes Chips, Sludge & Solids with Minimal Downtime

For personal use only

For personal use only

Flow-Thru Plunger Guide

Corrosion Resistant Alloy Running Procedures with Eckel Tongs and Non-Marking Grit Faced Dies

GS OILTOOLS PRESENTATION

Oil and Gas Heaters ZICOM EQUIPMENT PTE LTD

Practical Aspects of CO 2 Flooding EOR, and CO 2 Geosequestration

LIST OF OISD STANDARDS (April 2016)

PRODUCTION WELL SERVICES. Diagnose, Restore, and Rejuvenate Rig-Free

Regulatory Roundup and Automation Scott Jackson Regional Sales Manager Mid Continent OleumTechitle

A NEW LINE IN INTERVENTION

LIST OF STANDARDS S. NO. STANDARD NO. STANDARD NAME. Recommended Practices on Oil Storage and Handling OISD-STD-109

Oil and Water Retort Instruction Manual

WELL ACTIVATION TYPE A & TYPE I AND SAFETY PROTECTION RUPTURE DISCS FEATURES BENEFITS

The pictures shown in this folder are but a few samples that illustrate the variety of locations and ways our products are used.

The Lowest OPEX Producer Wins the Production Game

Shale Oils Designing for Improved Crude Preheat Train Reliability and Performance

Rigless Production Monitoring- Chemical Production Logging Technology

Cased Hole Division. Jimmy Mathis Cased Hole Manager Youngsville, LA. District

ICOTA Roundtable Retrievable Temperature Logging using DTS. October 20, 2011

For personal use only

John M. Karanikas Chief Technology Officer Salamander Solutions. Downhole Heating A New and Robust Re-Creation of a Proven Technology

Icewine 3D Completed: Covering Primary Conventional Targets in Western Margin. Icewine#2

FIBER-OPTIC SYSTEM FOR MONITORING EXTENDED OBJECTS «FOSM»

Sidel Combi-Combi Therm & CO2 Counter Installation Guide

Handling Petroleum Products & Static Ignition Hazards Introduction

For personal use only

4D Passive and Aggressive Monitoring of Air Injection at Telephone Lake, Alberta

Perforating and Pipe Recovery with Digital Slickline First Application in Colombia Ballena Field

Chiller installation, contractor s scope of work:

INCREASING PRODUCTION CAPACITY OF MATURE ASSETS THE CARDAMOM FIELD TIE-BACK TO AUGER TLP

Figure 6- Capillary Installation

(12) United States Patent (10) Patent No.: US 6,955,221 B2

Immersion Heaters. Screw Plug Immersion Heater

For personal use only

Better Oil Tools Africa General presentation

Cr.22 WIRE PROCESSING MACHINE FEATURES. Convenient Tool Cart Solution reduces set-up time and improves throughput

DOWNHOLE CLAMPING SOLUTIONS DESIGNED FOR HARSH-DUTY WELL ENVIRONMENTS

Y006 A VSP Field Trial Using Distributed Acoustic Sensing in a Producing Well in the North Sea

TDU-R Thermal Desorption Unit Technical overview

USING REAL TIME AUTOMATED OPTIMISATION AND DIAGNOSIS TO MANAGE AN ARTIFICALLY LIFTED RESERVOIR Julian Cudmore

FISHING WITH THE AGITATOR SYSTEM

BLACKSTAR ELECTROMAGNETIC MEASUREMENT WHILE DRILLING (MWD) TOOLS

NETZSCH Pumps North America

Celtic Exploration Ltd. Well Servicing Incident: Blowout and Fire August 9, 2005

Downhole video technology

EEI 2018 Edison Award Nomination Submitted

EXAMPLES OF INDIVIDUAL DOWNHOLE HEAT EXCHANGERS SYSTEMS IN KLAMATH FALLS

By Joe Lisenbee, Steve Fulwider and Jeff Knight, Centrilift

McDONALD S 30 ROOF ELEMENT

SPLIT-SYSTEM EVAPORATOR BLOWER (AIR COOLED) INSTALLATION INSTRUCTION Supersedes: Nothing N4C-0500

DOWNHOLE VIDEO DIAGNOSTICS FISHING AND MILLING CHEMICALS AND DISPLACEMENTS WELLBORE CLEANOUT TOOLS DVD.WELL

Drexan Energy Systems Inc.

Double String Pumping Systems *Patent Pending Dennis R. Wilson, Advisor, Artificial Lift Engineering ConocoPhillips, Lower 48, San Juan Business Unit

Oil & Gas Industry. Magnecraft Relay Solutions

HEATEC PRODUCTS AND SERVICES THAT EXCEED YOUR EXPECTATIONS

Oil and Gas Sector one stop solution provider

SECTION SOLAR PHOTOVOLTAIC (PV) POWER GENERATION SYSTEM

INSTALLATION INSTRUCTIONS WALL MOUNT LINER INSERT

LEWA Plunger pumps. For high hydraulic power.

Aqua & Instantaneous Electric Shower Installation Instructions SERVICE POLICY

Cr.22 WIRE PROCESSING MACHINE FEATURES. Convenient Tool Cart Solution reduces set-up time and improves throughput

HAL Hercules Horizontal Pumping System STRONG. VERSATILE. EFFICIENT.

HE120, HE160 Humidifier Installation Kit

Artificial Lift. Integrated lifting solutions for enhanced well production

Modified Everitt-Jennings (MEJ) Method and the Gibbs Method: Downhole Card Comparison

Performance and safety features of a 2 x cbm LPG-import terminal built in China

Data Sheet. Self regulating process heating tapes RS stock numbers ,

2007 KBC Advanced Technologies plc. All Rights Reserved.

Mitigate slug flow to increase the maximum rod pumping rate and allow earlier transition to rod pumping

TECHNICAL PUBLICATION

INSTALLATION, OPERATING & MAINTENANCE INSTRUCTIONS FOR 350 SERIES CIRCULATION HEATERS

United States Oil and Gas Pipeline Leak Detection System (LDS) Market (By Equipment, By Application, By Region) - An Analysis: 2017 Edition

PLUNGER LIFT. Using the Well s Own Energy for Maximum Deliquification

AC6 & AC8 HORIZONTAL SERIES Sealed Metallic Centrifugal Pumps Installation and Maintenance Instructions

DOWNHOLE SOLUTIONS. MOTION CONTROL SOluTIONS TAILORED TO YOUR CRITICAL DOWNHOLE APPLICATIONS WHAT MOVES YOUR WORLD. Rev.

In-Situ Fluid Analysis in the North Sea

South Seas Inspection (S) Pte Ltd

XSTREAM Valve System With A.R.M.E.D. Technology Service & Installation Instructions Page 1

High-Pressure Jet Kerf Drilling Shows Significant Potential To Increase ROP

Casing Gas Separator: A New Gas Separation Technology

Installation, Operation and Maintenance Instructions

SUNOCO Heat Transfer Fluids

Public Services Building 155 N First Avenue Hillsboro, OR March 2012

PLUNGER LIFT. Using the Well s Own Energy for Maximum Deliquification

Transcription:

Installation of Downhole Heaters to Prevent Paraffin Blockages TUBING - ANNULUS HEATER CONTINUOUS HEAT IN THE PRODUCTION TUBING ELIMINATES PARAFFIN SOLIDIFICATION OPERATION INSTALLATION Copyright n-linetools2005 US PAT: 7.509.036 B2 & 8.265.468 B2/ CHINA PAT: ZL200780052309.3/KAZ PAT: 21889/BRAZIL PAT PEND/MEX PAT PEND/ COL PAT PEND/ VENZ PAT PEND TRADEMARKED: MEXICO/VENEZUELA/COLUMBIA

Tubing or Annulus Heaters

Downhole Sensor & Carrier

N- Line Paraffin Heater Treater Test at RMOTC June 2005 PROJECT DESCRIPTION N-Line installed its downhole paraffin heater treater in a producing well at Teapot Dome Field (NPR-3) in Wyoming operated by the Department of Energy. The well was chosen by two petroleum engineers because of its severe problems with paraffin and its low reservoir temperature of about 74 F. Before the test began the well, which was producing from the Shannon Sandstone on rod, pump at less than 800 feet had been in production for over three months. PURPOSE The purpose of the test was to verify the effectiveness of a newer generation of digital downhole heaters designed to reduce or eliminate paraffin buildup in perforations (when placed close to the perforation), downhole production equipment including tubulars and rod string, surface flowlines and production facilities. RESULTS Prior to the installation of the downhole heater device, the well was making less than 15 barrels of fluid per day of which 1.5 to 2.0 barrels was oil. Following the proper installation of the digital downhole heater, and after several days of production, the well had a surface fluid temperature of about 110 F and a downhole temperature of 160 F. This resulted in an over 300% increase of total fluid production, 44.8 BFPD with an oil cut of about 17-18%, or about 4.5 BOPD that is an over 300% increase in oil production.

There was no evidence of paraffin in the flow lines, or on the rods or pump. When used with a rod pump, I would recommend using a pump that can tolerate the higher temperatures generated by the heater which will result in flawless long-term proper operation of the producing well. BENEFITS This equipment should be used in other similar type well and I believe, based on the recorded data that the increase in production was due to at least three factors. 1) continued proper operation of the insert type pump due to no paraffin buildup, 2) the higher down hole temperatures resulted in the clogged perforations being opened to their original aperture, and 3) the heater generated enough heat to prevent paraffin precipitation at some distance from the perforation resulting in a larger productive surface area and higher total production. While the test was being run, I was the project manager for this project at RMOTC. Please feel free to contact telephone or email me if you have any questions. Bryant Mook, B.S., M.E. Petroleum Engineer and Geologist 12926 King Circle, Houston, TX 1-713-623-1158

Tubing Heater

ANNULUS HEATER 10

Circulation tank Heater

PLC

SCR Transformer for Efficient Operation

Buck / Boost Transformer

Heater Specifications Volts 480 3 Phase

Flat Cable

ENERGY CONSUMPTION GUIDE Rate of Flow 30bpd 50bpd 100 bpd 150 bpd 200bpd Power 13.8 kw 22.9kW 47.5kW 68.8kW 91.6kW Amps 16.6 A 27.57 A 57.2 A 82.85 A 110.3 A based on 480V 3 Phase service This is a base guideline for energy consumption. Oil to water ratio and percent of gas production must be considered on an individual well basis for final calculations.

Water As A Test Median

250 F Flow 8GPM

Steam

DOE- RMOTC Test Facility, Wy. USA

Control Panel at DOE Site

Installing N-Line Tubing Heater in DOE Well

Raising Heater In Derrick

Connecting Heater to Tubing String

Heater Connected to Tubing String

Preparing Cable Spool

Making Heater/Cable Wiring Connection

Splicing Power Cable

Crimping Wiring Connection

Heat/Fluid Resistant Seal Tape

Connections Completed/ Running Tubing String

Banding Cable To Production String

Banding Cable to Tubing

Tool Installed/ Control Panel Connected DOE

Fluid Temp 108 F at Surface

Down Hole Fluid Temp 190 F

Annulus Heater at The Department of Energy Well

Annulus Heater at The Department of Energy Well

WELL LOCATION: BAHIA, BRAZIL WELL TYPE: VERTICAL, 3300 FT, 14 API oil, Zone Temperature 62 C / 143 F PRE-INSTALLATION WELL HISTORY: This oil well was drilled in the 1980's. The oil was heavy (14API) and had never been produced in marketable quantities. In addition this oil had a very high paraffin/wax content. N-LINE HEAT TECHNOLOGY APPLIED: N-Line Tools provided an ANNULUS HEATER, COMPUTER CONTROL PANEL for surface control and monitoring, DOWN HOLE SENSOR AND SURFACE SENSOR. The ANNULUS HEATER was installed at 3300ft near the perforations. The downhole fluid temperature was raised to 109 C / 228 F which stabilized the surface fluid temperature at 42 C / 107 F. The heat applied raised the API to 35 and allowed for an initial production rate of 4 BOPH(hour). 100 barrels of oil was produced in the first 18 hours of production. Production rates gradually stabilized at 6 BOPH (144 BOPD).

BRAZIL

BRAZIL

WELL LOCATION: INDIA Essar Oil Limited has stuck oil in its Mehsana onshore exploration block CB ON-3 in Gujarat. This is the second oil discovery in the block by Essar, the first being in March this year. The in-place reserve of the first discovery was an estimated 18 million barrels of oil and oil equivalent with recoverable reserves in the range of 2.8 million barrels of oil equivalent. Essar is producing around of 500 barrels of oil a day from the March discovery. Sources said the new discovery was also of the same magnitude, promising to produce 300-400 barrels of oil a day. Confirming the move, sources in the Directorate General of Hydrocarbons (DGH ) said the recent oil discovery had been notified by Essar on July 12. "Essar has discovered oil in the well, ENM-1, in the Mehsana exploration block, using the N-LINE TOOLS heater treater technology. Oil flowed to the surface last week in the presence of Essar and ONGC executives. The well is expected to produce around 50-60 barrels of oil a day and the plan is to drill another 6-7 prospects shortly to produce around 300-400 barrels of oil a day," said a senior ONGC executive. The crude oil discovered is heavy in consistency, unlike the medium-quality oil produced by Essar from its first discovery in the block. Essar has started selling 500 barrels of oil a day from its first discovery to Indian Oil Corporation's Koyali refinery in Gujarat. The CB-ON3 block was awarded to Essar Oil in 1998 and is located in the petroliferous Cambay Basin in Gujarat. Essar, which is the operator, holds 70% in the block, while ONGC has the remaining 30%. Earlier, Essar Oil was the 100% stakeholder of this block, with ONGC as the licensee. But, soon after Essar announced the first oil discovery in the block, ONGC exercised its right and picked up a 30% equity. The block is spread over an area of 500 sq km. Essar has already carried out 3D seismic surveys over 145 sq km.

India ESSAR Oil

India ESSAR Oil

India ESSAR Oil

India ESSAR Oil

India ESSAR Oil

India ESSAR Oil

India ESSAR Oil

Kazakhstan

Kazakhstan Tubing Heater Installation

Kazakhstan 46 C Surface Temp Production Zone 6700 Heater Placement 2600

Mexico Truck Unload Facility N-Line Tools, Inc USA, under the direction of Mike Carr, installed a 10,000 bpd Surface Heater system for Pemex. PRE-INSTALLATION : Tankers required an average of 8 to 12 hours to unload heavy crude. POST INSTALLATION: Unloading time was drastically reduced to 30 45 minutes. In addition, the heaters supplied continuous heat to the facility tanks, keeping them heated for more efficient flow into the pipeline.

Mexico Truck Unload Facility

Mexico truck Unload Facility

Mexico Automation Center

South Texas Annulus Heater WELL TYPE: Vertical WELL DEPTH: 2250 ft PRE-INSTALLATION: Production zone temperature 92F, surface temperature 80F. Oil gravity: 15-20 API Due to the high viscosity of the oil production was sporadic. POST INSTALLATION: Annulus heater was installed below the pump. Downhole temperature is raised to 230F with surface fluid at 110F. Production has doubled.

South Texas Installation

N-LINE TOOLS INSTALLATION PROCEDURE MANUAL This manual is a general guideline of the procedures to follow for preinstallation prep work and installation of down hole heaters. PREP WORK Work over rig to remove production tubing. Run reamer, to clear all scale and to assure correct I.D. measurement of casing. 3. Place feed-thru well head. 4. Install Power Panel Control, Buck Boost Transformer and run all under ground cables to well head for sensor and electrical supply. 5. Install 150 amp, 480 volt, 3 phase disconnect panel. 6. Service company on site with: spool truck or spoolers, bands and banding equipment, splice kit ( number 4, 3 conductor and 16 awg, 1conductor sensor wire) cable connections. Service company must supply 2 (total), 24 to 36" sheaves for power cable and sensor cable installation.

INSTALLATION Strap tubing in preparation of installing N-LINE tool in correct position. Locate spool truck, place sheave's) in derrick. Install cable's) in sheave s. After cable is run through sheaves, connect 4' pup joint to top of heater tool. Splice cable s with N- LINE Tool heater and sensor. Properly band cable s at the splice location on heater. While splicing, **continuously test power and sensor cable for conductivity. After power splice is completed, using 4' pup joint for tong placement, raise N-Line Heater into derrick, *very carefully making sure tongs do not damage the splice or power connections on top of tool. Lower N-Line Heater into well. Sensor joint should be spliced and conductivity tested. Sensor pup joint can now be connected to heater pup joint and properly banded to avoid any damage to sensor and cable. Continue with normal installation of tubing. Properly banding cable s before and after each collar and 1 band at center of each tubing. Conductivity on power cable and sensor cable should be monitored during lowering of equipment into well. After N-LINE heater is placed down hole and the well head feed-thru is secure connect Power Cable and Sensor Cable to Computer Panel Board. After tool is placed at proper depth, turn power on at very low voltage and check. *** TURN POWER OFF. Run down hole pump and check fluid level before and after fluid has reached the surface. POWER TO TOOL IS OFF.

Turn power on the heater. Power the amps up slowly monitor the rate of fluid flow and the temperature and pressure. Fluid checks should be run every hour for the first 24 hours of production. The temperature process controllers must be set for proper temperature verses rate of flow. All safety features correctly set. After 48 hours the pipe should be heated from bottom hole to surface. Check the temperature.*you may need to lower the power to keep the desired temperature. (For paraffin wells were a tubing heater is installed it may not be necessary to run the heater full time. After well is stable a timer can be installed on the heater panel. ** Example run 3 days off 5 days, *** each well will be unique, but this will reduce energy consumption and be more cost efficient.)