Green Line North Centre City Alignment

Similar documents
Welcome. Green Line LRT. Beltline Alignment Options. Stay engaged! Follow the Green Line story at calgary.ca/greenline

Evaluation Criteria. Detailed Evaluation Criteria

WHAT WE HEARD REPORT - Summary Bonnie Doon Mall Redevelopment Application (LDA )

Northwest LRT Downtown to. Northwest Edmonton Study. Public Workshops

Midtown Corridor Alternatives Analysis. Appendix A - Initially Considered Alternatives Screening

Key Themes and Responses May 2016

Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions

Urban Planning and Land Use

Introduction. Chapter 1. Purpose of the Comprehensive Plan Plan Organization Planning Process & Community Input 1-1

Bus Rapid Transit Backgrounder. December 2016

SOUTHWEST TRANSITWAY (STAGE 2) PUBLIC OPEN HOUSE

New Westminster Downtown Parking Strategy Public Open House #1 September 13, 2012

Local Growth Planning in North Central Green Line Communities

Regency Developments. Urban Design Brief. Holyrood DC2 Rezoning

SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building. Recommendation: Purpose:

The Cambie Corridor 2015 Fall workshop series. What we heard WORKSHOP OUTLINE

City of Toronto. Emery Village Transportation Master Plan

Mount Dennis Mobility Hub Study Public Meeting December 12 th, :30pm 9:30pm York Memorial Collegiate, Cafeteria 2690 Eglinton Avenue West

LAND USE AMENDMENT DOWNTOWN COMMERCIAL CORE (WARD 7) MACLEOD TRAIL SE AND 5 AVENUE SE BYLAW 254D2017

New York Avenue Streetscape and Trail Project Public Meeting #1 Summary

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004

Downtown North Las Vegas Demonstration Site Project. Project Update

Johnson Street Bridge Public Realm Update

PLANNING ADVISORY BOARD AGENDA OCTOBER

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

Preliminary Design of Major Rehabilitation Works for the Bridge Structure on PTH 1A Over Assiniboine River and CP Rail (Bridge Site No.

History: a Grand Urban Boulevard

Port Credit Local Advisory Panel October 20 th Meeting

1.3 TRANSIT VISION 2040 FROM VISION TO ACTION THEME 1: PUTTING TRANSIT AT THE CENTRE OF COMMUNITIES. Fully integrate transit with community planning

Public input has been an important part of the plan development process.

Introduction. Community Outreach Approach. Sacramento Valley Station Master Plan. Online Questionnaire Summary of Feedback.

PART 1. Background to the Study. Avenue Study. The Danforth

Southeast Extension to RidgeGate Parkway Scoping Booklet

MOBILITY HUB GUIDELINES 2012 TAC Sustainable Urban Transportation Award Submission BACKGROUND MOBILITY HUB GUIDELINES

U Boulevard Area, 2018 Update. U Boulevard Area Update. Public Consultation Summary Report

Shift Rapid Transit Public Participation Meeting May 3, 2017

PLAN ELEMENTS WORKSHOP. April 5, 2016

3. Endorse the LRT vision in transforming Surrey into Connected-Complete-Livable communities, and more specifically, the official vision statement:

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

1.4 TRANSIT VISION 2040 FROM VISION TO ACTION THEME 1: PUTTING TRANSIT AT THE CENTRE OF COMMUNITIES. Fully integrate transit with community design

MEMORIAL DRIVE DESIGN DEVELOPMENT PLAN

WELCOME and introduction

1 INTRODUCTION Purpose Project Background PROJECT CONTEXT Background The Capital City Downtown Plan...

1 October Dear Citizens of Charlotte and Mecklenburg County,

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

Welcome. Walk Around. Talk to Us. Write Down Your Comments

1.0 Purpose of a Secondary Plan for the Masonville Transit Village

Ashland BRT Environmental Assessment: logos of CTA, CDOT, Chicago Department of Housing and Economic Development

Community Meeting #2.1

Streets, Connectivity & Built Environment Working Group August 2, 2017

Welcome. Community Consultation Meeting November 28, Review and discuss the Bathurst Quay Neighbourhood Plan Framework

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN

Welcome! MILLENNIUM LINE BROADWAY EXTENSION. Over the next 30 years, Metro Vancouver will welcome 1 million new residents and 600,000 new jobs.

Welcome to the Oakridge Centre Open House

SUBJECT: GO Station Mobility Hubs Preferred Concepts: Aldershot GO, Burlington GO and Appleby GO. Planning and Development Committee - Public Meeting

4- PA - LD - LIVELY DOWNTOWN. LD - Background

Sustainability, Health, Safety, Recreation & Open Space Working Group August 3, 2017

Laird in Focus Community Information Session

Guiding Principles for the SR 520 Replacement Project

Rapid Transit Implementation Working Group

GO Station Mobility Hubs: Draft Precinct Plans. Committee of the Whole July 12, 2018


St. Clair Avenue West Area Transportation Master Plan

WESTERN ILLINOIS UNIVERSITY

Executive Summary. NY 7 / NY 2 Corridor

38 Queen s University Campus Master Plan Part 1

South of Eastern Strategic Direction Status Update

REVIEW AND EVALUATION OF REGIONAL LAND USE

Dallas CBD Second Light Rail Alignment (D2)

This Review Is Divided Into Two Phases:

The University District envisions, in its neighborhood

Report to: Development Services Committee Report Date: April 24, 2017

SUBJECT: Proposed Downtown Mobility Hub Precinct Plan and Proposed Official Plan Policies

Clair-Maltby Community visioning

California Environmental Quality Act (CEQA) Environmental Review Process

FACT SHEET: COMMUNITY INPUT S IMPACT ON THE DESIGN FOR THE OBAMA PRESIDENTIAL CENTER

Concord Community Reuse Project Goals and Guiding Principles. Overarching Goals (OG)

WELCOME TO OPEN HOUSE TWO November 28, 2018

South Davis County COMMUNITY SPOTLIGHT

East Central Area Plan

WARM SPRINGS PARK MASTER PLAN

Create Policy Options Draft Plan Plan Approval. Public Consultation Events. Phase 2

Plan Framework Report. Attachment A

Transit Oriented Development From Both Sides of the Tracks: How the City is Promoting It and How Developers are Building It

Coordinated Transit Planning in Toronto SmartTrack GO RER Scarborough Relief Line Waterfront Transit

Equitable Growth Through TOD Planning

178 Carruthers Properties Inc.

Workshop 3. City of Burlington Waterfront Hotel Planning Study. September 14, The Planning Partnership

CITY COUNCIL AGENDA REPORT

Aldershot GO Draft Mobility Hub Concepts. East Plains United Church September 13, :30 8:30 pm

Transportation. Strategies for Action

Early in the scoping process, several groups submitted a letter that reflected our collective values for Sound Transit 3. These values include:

ELK GROVE GENERAL PLAN VISION

Dallas CBD Second Light Rail Alignment (D2)

hermitage town center

Promoting Economic Development Through Upfront SEPA Review: Lessons from South Downtown Tacoma

Further input invited as Colchester Growth Strategy nears final phase

TOWN COUNCIL / PLANNING COMMISSION

D2 Subway Project Development. Public Meeting September 12, 2018

Transcription:

Project overview The Green Line will be an important piece of Calgary's transit network, adding 40 kilometres of track to the existing 59 kilometre LRT system. End-to-end, the line will connect North Pointe and Seton to downtown, and is estimated to serve 41 million passengers annually. The Green Line is a top infrastructure priority in Calgary. It will form the spine of multiple neighbourhoods across Calgary and connect the downtown with residential communities in north and southeast Calgary. Additionally, the Green Line will provide direct connections to key community destinations like the new South Health Campus, new recreation centres, major employment centres, the new $168 million National Music Centre, the new $245 million Central Library, Stampede Park, and several business revitalization zones. The Green Line will also integrate with future rail connection to the Calgary International Airport, which is in the midst of a $2 billion expansion. The Green Line will not only bring transit into communities, but will connect neighbourhoods where Calgarians can live, work and play close to transit. Engagement overview The City held a series of engagement events to solicit input on the community s expectations, issues, concerns and interests regarding alignment options for the Centre City portion of the Green Line. Businesses, community leaders, area residents, and the public were invited to participate. Engagement activities included: Community engagement events and meetings: November 2015 April 2016 Community leaders working session: December 8, 2015 Five open house style information sessions: February 2-16, 2016 Four station area workshops and related online engagement: March 16 April 27, 2016 Highest-ranked option community leaders working session: April 18, 2016 Highest-ranked option public outdoor display in Olympic Plaza, supported by nine related pop-up events, and online engagement: April 19-May 2, 2016 For a comprehensive list of engagement events, please see Appendix A. 1/12

Flow of engagement events Gather input on community priorities and preferences for Centre City alignment and stations 1. Community events and meetings 2. Community leaders working session 3. Open houses and online engagement 4. Station area workshops Present highest-ranked alignment option and gather feedback 1. Community leaders working session 2. Public outdoor display in Olympic Plaza 3. Pop-up events and online engagement Community leaders working session In December, the project team met with community leaders including councilors, community organizations, and business leaders to gather input on Centre City alignment options and community needs. What we asked Community leaders were asked to provide input on: Potential opportunities for the Green Line in the Centre City for elevated, at-grade, and tunnel configurations The important factors that need to be considered in evaluating and comparing the five different Centre City options For a detailed summary of the input that was provided, please see the Summary of Input section. Open house information sessions From February 2-20, 2016 the public was invited to attend six open house sessions held in locations along the Centre City and North leg of the Green Line. Approximately 920 people attended these events. The open house provided participants with an opportunity to learn about the project and to provide input on community preferences and priorities at several interactive stations through questionnaires, maps, and face-to-face conversations with staff. 2/12

What we asked Open house participants were asked to provide input on: How they would use the Green Line Preferences and priorities for the Green Line in the Centre City for elevated, at-grade, and tunnel configurations Benefits and challenges of integrating the Green Line with surrounding communities Preferences and opportunities for transit-oriented development Preferred station locations For a detailed summary of the input that was provided, please see the Summary of Input section. Community engagement events and meetings Between November 2015 and April 2016 the project team held multiple meetings to engage with different stakeholders including the Chinatown community and nearby community associations. They also attended events like Baconfest and the Supertrain Model Railway Show in an effort to reach a variety of stakeholders. These activities reached approximately 900 people. Events provided stakeholders with information about the project and an opportunity to provide input on preferences, interests, and community concerns. What we asked Meeting attendees and event participants were asked to provide input on: Community expectations, interests, and issues Preferences and priorities for the Green Line in the Centre City for elevated, at-grade, and tunnel configurations For a detailed summary of the input that was provided, please see the Summary of Input section. Station area workshops Between March and April 2016 the project team held four workshops in communities surrounding the proposed Green Line station locations. These events drew approximately 370 people. Online engagement activities supplemented these events for those who were unable to attend or for those wanting to provide additional input. Workshops were designed to gather input about the concerns and desires of residents close to the proposed station locations. What we asked Workshop participants were asked to provide input on: Preferred modes of transportation to and from the station (walk, bike, vehicle) 3/12

Key community destinations and features Key intersections to consider when addressing congestion Opportunities and constraints for the proposed stations For a detailed summary of the input that was provided, please see the Summary of Input section. Highest-ranked option community leaders working session In follow up to the December community leaders working session, another meeting was held in April to present the public input that was gathered on the alignment options and the preferred alignment option that was chosen as a result. This meeting coincided with the launch of the Olympic Plaza public display and provided leaders with a chance to ask questions, voice concerns, and share ideas about the highest rank alignment option. Community leaders were asked to provide input on: Concerns or questions related to the highest ranked option for their community The evaluation process the project team followed to arrive at the highest ranked option For a detailed summary of the input that was provided, please see the Summary of Input section. Highest-ranked option public outdoor display and pop-up events Over the month of April the project team hosted a public display in Olympic Plaza and several pop-up events in locations in the Beltline, Centre City, and in some communities north of the Bow River to present the highest ranked alignment option to the public. Online engagement activities supplemented these events for those who were unable to attend or for those wanting to provide additional input. These events provided stakeholders with information regarding the project team s evaluation process and introduced the highest ranked alignment option. They also provided stakeholders with an opportunity to ask questions, voice concerns, or share ideas about the preferred alignment option. What we asked Visitors to the public display, pop-up events, and related online engagement activities were asked to provide input on: Comments, questions or concerns related to the highest ranked option for their community The decision-making process for the highest ranked option For a detailed summary of the input that was provided, please see the Summary of Input section. 4/12

Next steps Further consultations will take place to gather additional input on the option evaluations and to identify any additional community considerations. A preliminary cost estimate on the Centre City portion of the Green Line will be shared with stakeholders and further input will be collected later this spring/summer. 5/12

Summary of Input A wide variety of input was gathered during the Centre City Alignment engagement events noted above. This input is summarized below including: Input on community expectations, interests, issues, preferences and priorities as they relate to the Green Line Centre City alignment Input on Centre City alignment options Initial input on Beltline alignment options Feedback on current and desired modes of travel in the Centre City area Input on the highest-ranked Centre City alignment option, Option D Community expectations, interests, issues, preferences and priorities Traffic Traffic was a top consideration for stakeholders. In particular, there was a desire to keep traffic flowing along major routes. Reducing the number of lanes available for vehicle travel was a potential concern for some who felt this would create more congestion along an already busy corridor. Others noted that providing better transit options could result in less traffic along heavily travelled routes. Integrating LRT with the existing roadway was also of interest to stakeholders. Considerations included ensuring the line did not create major delays at intersections, and ensuring pedestrians and cyclists could still move safely and efficiently through the area. Stakeholders also noted that any changes to the road network could create cut-through traffic in other communities and the full impact of traffic pattern changes and construction activities should be understood and mitigated. Transit user experience Stakeholders noted an opportunity to improve the transit experience in the City, including increasing the capacity of transit services and options, and improving the convenience and available connections to travel between communities, to downtown, and to key destinations. Stakeholders also noted the need to consider how the Green Line would connect to other transit options including existing and future bus and LRT lines, and active transit options like walking and cycling. They suggested considering the creation of transit hubs and noted the need to consider how park and rides and drop-off zones would be handled to support ridership. Station design was also an important consideration with the desire to make stations accessible to the community, integrated with community character, and aesthetically pleasing. Proximity to established vehicle and pedestrian traffic routes, transit stops, and amenities was noted as an important consideration for station locations. Stakeholders also noted that stations provided an opportunity to incorporate public art displays into the community. Underground stations were mentioned as being more comfortable for users in bad weather, but were also seen as needing proper security to ensure riders felt safe. 6/12

Travel times were another transit user consideration for stakeholders. Poor weather was noted as potentially impacting travel times as was the need to move vehicles along the same roadways as LRT trains. Stakeholders noted a need to balance competing priorities in a way that allowed the train to move faster than cars and buses so that the LRT was an appealing option when compared to other modes of travel. Community impacts Maintaining and/or enhancing community character was the top consideration for stakeholders in the construction of the Centre City alignment of the Green Line. Stakeholders wished to maintain existing community vibrancy by carefully considering how the placement of the line would divide and/or connect communities. The streetscape was likewise noted as a primary consideration and stakeholders felt that the line and stations should enhance the streetscape and community vibrancy by taking care not to create visual impacts like shadowing and dead zones. Stakeholders noted the desire to minimize noise, vibration, and visual impacts of the line both during and after construction. Consideration for the unique needs of adjacent communities was noted. Specifically, stakeholders were interested in how different community characteristics and transit needs would be addressed. Revitalization of the Centre Street area and surrounding communities was seen as a desirable outcome of the new alignment by attracting new development and amenities, improved pedestrian environments, and potential increases in property values. The impact on businesses in the area was another key consideration mentioned by stakeholders. Some stakeholders noted that the alignment had the potential to attract more businesses and improve the economy in the area through job creation and increased investment. Others voiced concern over the risk to existing businesses both during and after construction, particularly the impact to the smaller businesses in the area. Property values were likewise a consideration for stakeholders with some stakeholders noting a potential decrease in value related to the construction and operation of the line. Planning for the future was noted also several times as an important consideration. This included taking into account the future needs of the City, and not choosing an option based on cost if it would mean less capacity to support transportation needs over the long-term. Transit-oriented development Stakeholders noted that transit-oriented development had the potential to revitalize the area through increased development and amenities. The need to engage in transit-oriented development sensitively was noted as being particularly important. This included ensuring adequate amounts of public space in relation to commercial and residential development, respecting community character and property values, careful and considerate rezoning procedures, and ensuring in the inclusion of active transportation networks. Parking Ensuring that residents in surrounding communities would not be negatively impacted by commuter parking related the LRT was a significant consideration for many stakeholders. Many noted the need to accommodate parking and drop-off facilities in the project plans to prevent congestion, inconvenience, and safety issues for adjacent communities. Permit and pay parking were noted as possible solutions. 7/12

Safety and accessibility Personal safety at stations and within surrounding communities was an important consideration for stakeholders. Security measures such as cameras and lighting were noted as being important. Stakeholders also noted a need to consider how emergency situations would be handled. Flooding was a particular consideration for underground alignment options. Pedestrian and cyclist safety and access were also noted as being important considerations for stakeholders. In particular, many noted the importance of improving the safety of pedestrian crossings at intersections, installing adequate lighting, and providing dedicated multi-use pathways that are maintained all year long. The safety of children, those with disabilities, and the elderly was a concern particularly in areas near schools and community centres. Accommodations for cyclists in the form of cycle tracks/bike lanes, tunnels/overpasses, and sheltered secure bike storage were also noted as key safety and accessibility considerations. Stakeholders also noted the need to consider safety and access in all weather conditions including ice and snow. Environmental considerations The preservation of Prince s Island Park, the Bow River, and the surrounding green space was a primary environmental consideration for stakeholders. The need to preserve the ecological and visual integrity of these community spaces was seen as important as was a thorough assessment of the environmental impact of alignment options. Stakeholders also felt that the LRT line represented an opportunity to reduce reliance on vehicles within the City but noted the need for public education to support this transition and encourage use of the line. Project considerations Project cost and timing were considered important by stakeholders. The desire to spend wisely was a commonly noted consideration, with the underground options being noted as more expensive but potentially better long-term options. There was a desire to see the project undertaken in a timely manner with continued stakeholder consultation activities throughout. Centre City alignments Option A At-grade with existing bridge Stakeholders noted the impact of an at-grade option on the community and vehicle traffic as a primary consideration for this option. Dividing the community with the LRT line was mentioned by many stakeholders who felt this option would make it difficult for vehicle, pedestrian, and cycling traffic to get around. Safety was a primary concern with stakeholders mentioning the high potential for conflicts between different modes of transportation, and concern over the speed of trains. Travel times were also a consideration for this option with stakeholders noting potential traffic disruptions, train crossings, the removal of travel lanes, and the need to slow vehicle speeds to accommodate LRT movement. 8/12

Options B and C Shallow tunnel with new bridge and Elevated structure with new bridge Stakeholders noted that a visible LRT line could be desirable with the potential to add to the vibrancy of the City. Many stakeholders noted that bridges may be problematic for traffic and environmental reasons. Traffic concerns included increased congestion and the impact on travel times through the City. Environmental considerations revolved around the impact to Prince s Island Park and the desire to maintain the integrity of this landmark. The elevated structure in Option C lead some stakeholders to note the negative visual impact this option may have on the surrounding communities. Option D Tunnel There was wide support for Option D with stakeholders noting advantages to traffic movement, community character, and the long-term growth of transit in the City. Stakeholders felt that going underground would allow vehicle traffic to continue to move freely on roadways and would help to preserve the character of surrounding communities. Stakeholders also felt this option addressed some of the environmental concerns surrounding Prince s Island Park and other community space in the area. Being able to maintain access, comfort, and efficient travel times in all weather conditions was also felt to be a consideration for this option. Stakeholders noted the need to consider flooding if going underground, and asked that safety and security of underground stations be considered. Budget was also a consideration with stakeholders noting this option as potentially being the most expensive. Option E Hybrid with new bridge Some stakeholders noted that the aesthetics and up-down nature of the alignment of this option were not as attractive as other options. As with options B and C the potential traffic, visual, and environmental impacts associated with a bridge were mentioned as considerations for this option. Beltline alignments Stakeholders noted similar considerations for underground alignments in the Beltline area as they did for Centre City alignments, namely preserving traffic movement, community character, and the surrounding environment. Stakeholders noted an opportunity to revitalize 10th avenue with an alignment as well as the availability of right of way for an LRT along this road. Some stakeholders noted that an elevated option may be desirable for this alignment. The impact on traffic along 11th and 12th avenue was noted as a consideration with stakeholders mentioning the importance of these streets for commuters currently. 12th avenue in particular was noted as being closer for people wishing to access LRT. Current and desired modes of travel in the Centre City area Stakeholders noted that driving was currently their main method of transportation through the Centre City area. Transit and walking were also popular methods of getting around. Many stakeholders reported that they would like to walk to Green Line stations and that they would drive less once the Green Line was in operation. Stakeholders also reported that they enjoyed walking and biking and that they would actively commute to stations more if additional 9/12

accommodations for pedestrians and cyclists were in place including lighting, secure bike storage, and designated pathways. Key destinations Stakeholders noted that they would use the Green Line to access locations in the downtown core as well as surrounding businesses like grocery stores and shopping malls. Community facilities like libraries, hospitals, community centres, and schools were also mentioned as important destinations for commuters. Some stakeholders expressed a desire to incorporate airport access into LRT plans. Important intersections for consideration Several intersections were noted for consideration in addressing congestion concerns in the Centre City area with stakeholders pointing to congestion at the intersections of Centre Street and 16th Avenue, McKnight Boulevard, 20th Avenue and 40th Avenue. Input on highest-ranked option Stakeholders generally expressed support for the highest-ranked option, Option D: Tunnel through Centre City, noting that this option appeared to be the most harmonious to maintain traffic flow, community character, and environmental integrity. Stakeholders also felt this option would support future growth of the transportation network in the City. Stakeholders did express some concern over the cost of this option and indicated a desire to know more about the financial requirements and technical details of tunneling, including how the risk of flooding would be managed. There was also a desire for more details on the ranking and weighting process that led to the choice of the highest-ranked option. 10/12

Appendix A List of Engagement Events Date Event 2015 September 30 Tuxedo Park Walkabout 2015 September 30 LRT on the Green Conference 2015 Sep-Dec U of C - UBST 461 2015 Nov 16 Urban LRT with Cllr Farrell (evening) 2015 Nov 18 Beddington CA AGM 2015 November 24 Crescent Heights/Chinatown/Eau Claire CA reps 2015 December 02 Urban LRT with Cllr Farrell (lunch) 2015 December 08 Centre City Business/Community Leaders 2015 December 08 Ward 4 CA Presidents' Dinner 2016 January 06 Hillhurst-Sunnyside/Crescent Hts/Eau Claire 2016 January 20 Baconfest (co-present w/farrell) 2016 February 02 Open House #1 - Telus Convention Centre 2016 February 03 Open House #2 - St. Henry School 2016 February 08 Developers Advisory Group 2016 February 09 Open House #3 - Rosedale School 2016 February 10 Open House #4 - Mount View School 2016 February 16 Open House # 5 - Thorncliffe School 2016 February 20 Chinatown community engagement event 2016 March 03 Calgary Regional Partnership presentation 2016 March 08 Presentation at U of C Faculty of Environmental Design 2016 March 10 Tuxedo Park AGM 2016 March 16 Station Area Workshop #1 for the 28th Avenue and 40th Avenue station 2016 March 30 Public Safety + Enforcement presentation 2016 March 30 Green Line North Communities 2016 April 04 Developers Advisory Group 2016 April 06 Station Area Workshop #2 for the McKnight Boulevard and 64th Avenue station 2016 April 07 Transportation Planning - Managers Meeting Station Area Workshop #3 for the 64th Avenue / 72nd Avenue / Beddington 2016 April 12 Boulevard station 2016 April 17 Supertrain Model Railway Show 2016 April 18 Centre City Business/Community Leaders 2016 April 18 - April 28 Olympic Plaza Centre City MAE public display + lunch hour events 2016 April 18 - May 02 Beltline and Centre City MAE pop-up events 2016 April 18 - May 11 Centre City MAE online engagment via Hive 11/12

2016 April 18 - May 11 Beltline MAE online engagment via Hive 2016 April 18 TOD Charrette #1 - Session 1 2016 April 19 TOD Charrette #1 - Session 2 2016 April 21 TOD Charrette #1 - Session 3 2016 April 23 TOD Charrette #1 - Session 4 2016 April 27 Station Area Workshop #4 for the 96th Avenue and North Pointe station 2016 April - May Centre City MAE brochures distributed by Calgary Transit 2016 April - May Beltline MAE brochures distributed by Calgary Transit 12/12