BERMAD Fire Protection

Similar documents
Model: 400E-5M. Bermad Hydraulically Controlled Anti-Columning Deluge Valve, with Easylock Manual Reset. Installation Operation Maintenance

TECHNICAL DATA 1. SYSTEM DESCRIPTION 2. SYSTEM OPERATION 3. INSTALLATION. Page 1 of 5

TECHNICAL DATA OBSOLETE

TECHNICAL DATA. Factory Mutual Approval is pending for the system as a whole.

TOTALPAC2 Integrated Fire Protection System

TECHNICAL DATA DOUBLE INTERLOCKED PREACTION SYSTEM WITH ELECTRIC/ PNEUMATIC RELEASE 1. DESCRIPTION 2. LISTINGS AND APPROVALS 3.

TECHNICAL DATA. 319a. January 27, 2012

Advanced Integrated Fire Protection Systems TOTALPAC 2. Owner's Operation and Maintenance Manual FIRECYCLE III. September 2009 FM-086G-0-5E

DELUGE VALVE MODEL: SD-DVH2 TECHNICAL DATA TRIM DESCRIPTION DESCRIPTION VALVE OPERATION. 82 ASTM A 216 WBC.

TECHNICAL DATA DOUBLE INTERLOCKED PREACTION SYSTEM WITH ELECTRIC/ PNEU-LECTRIC RELEASE

TECHNICAL DATA SINGLE INTERLOCKED PREACTION SYSTEM WITH ELECTRIC RELEASE

SINGLE INTERLOCK, SUPERVISED PREACTION SYSTEM WITH ELECTRIC RELEASE

TotalPac X Single interlock SUREFIRE system

DOUBLE INTERLOCK, PREACTION SYSTEM WITH ELECTRIC/PNEUMATIC RELEASE

SINGLE INTERLOCK, SUPERVISED PREACTION SYSTEM WITH WET PILOT ACTUATION

TotalPac X Firecycle III Preaction Double interlock system

Deluge & Preac tion Systems

TECHNICAL DATA DELUGE SYSTEM CONTROLLED BY ELECTRIC RELEASE

Pre-Pack INTEGRATED PRE-ACTION SYSTEM

Instructions for. Care and Maintenance 10 psi (0,7 bar) Pneumatic Supervising Pressure. Single Interlock

TECHNICAL DATA OBSOLETE

TECHNICAL DATA. model c-2

TotalPac 3 Firecyle III Deluge Remote controlled system

Instructions for Installation, Operation, Care and Maintenance

Model DDX Deluge Valve

Not to be distributed outside of FM Approvals and its affiliates except by Customer APPROVAL REPORT

Becoming an Expert on Dry-pipe, Preaction, and Deluge Sprinkler Systems

VSR-M REPLACEMENT Waterflow Switch for Globe Sprinkler Model UMC Manifold

AutoTest VSR (VSR-AT) (EU) Vane Type Waterflow Alarm Switch With Electronic Retard and Auto Test Feature

Operation & Maintenance Manual

SECTION DRY PIPE SPRINKLER SYSTEMS MODEL F SERIES DRY VALVE

TECHNICAL DATA. Notes: For use with Trim Charts on Pages 227b - d

INSTALLATION & MAINTENANCE MANUAL FOR QuickDraw

Deluge Valves. Model 68 DE\ EL. Electrically Actuated Remote-Reset Deluge Valve. Dorot Fire Protection Division. Certification & compliance by design

Nitin Ventures FZE. (A Division of Nitin Fire Protection Industries Ltd.)

Global Property. QUARTERLY FIRE PROTECTION EQUIPMENT INSPECTION REPORT Date of Inspection Location:

Worldwide Contacts.

SECTION DRY PIPE SPRINKLER SYSTEMS MODEL G SERIES DRY VALVE

Global Property. SEMIANNUAL FIRE PROTECTION EQUIPMENT INSPECTION REPORT Date of Inspection Location:

TotalPac 3 Double interlock Preaction, Electric/PneuLectric release Self-contained system

DV-5 Red-E Cabinet Integrated Deluge Fire Protection Package. General Description. Technical Data. Page 1 of 6 AUGUST 2018 TFP1300. Worldwide Contacts

Technical Data. Working Pressure Range 20 to 250 psi (1,4 to 17,2 bar)

2-SUPPRESSION REQUIREMENTS - CODE REQUIRED INSPECTIONS TEST Page 1 of 7

Technical Data TYPE T14 & T14D TEMPERATURE PILOT SPENCE ENGINEERING COMPANY, INC. 150 COLDENHAM ROAD, WALDEN, NY SD 4511A T14 PILOT

Deluge System. Pneumatic Release. Deluge System. Pneumatic Release

OPERATING AND MAINTENANCE MANUAL FOR PLATE HEAT EXCHANGER INDIRECT FIRED WATER HEATER. Electric Heater Company Base Model "BWXP"

Datasheet. Vacuum Double-interlock Preaction System, Electric Release Self contained unit. Features. FIREFLEX VACTEC description

ENGINEERING SPECIFICATIONS FOR FM-200 CLEAN AGENT INDIRECT PRE-ENGINEERED FIRE SUPPRESSION SYSTEMS

ALARM VALVE MODEL: SDH-AVA TECHNICAL DATA : OPERATION DESCRIPTION. Flange X Groove Groove X Groove Bar (250 PSI)* WORKING PRESSURE

Datasheet. Dry-pipe Vacuum Sprinkler System, Electric Release Self contained unit. Features. FIREFLEX VACTEC description

Instructions for Installation, Operation, Care and Maintenance

VIZOR Electronic Dry Pipe Accelerator (EDPA) Quick-Opening Device for Dry Pipe Systems General Description

GREASE INTERCEPTORS. Z1192 GREASE RECOVERY APPLIANCE (GRA) INSTALLATION and OPERATION INSTRUCTIONS

Annual Report of Inspection, Testing & Maintenance of Automatic Sprinkler System

Oil burners fuel unit with solenoid valve

ANSUL ANSUL AUTOMAN II-C RELEASING DEVICE

Wiring Instructions for the 2900 Series FIREGUARD Combination Door Closer-Holder and Releasing Device with Integral Smoke Detector

Backflow Prevention for Fire Sprinkler Systems. State of Illinois Plumbing Code

TECHNICAL DATA. Humidity: 85% Relative Humidity (non-condensing) at 90 F (32 C) maximum.

Self Inspection Program

TEMPERATURE CONTROLLERS

TECHNICAL DATA. Wet 26a. February 22, 2009

Quick Guide for Fire Sprinkler Inspection Requirements Key Deficiencies with NFPA References NFPA & NFPA 13/

Model AV Alarm Valve With and Without Model RC-1 Retard Chamber European Conformity Valve Trim General Description

TotalPac 3 Single interlock Firecyle III Preaction Self-contained system

SECTION ROTARY-SCREW WATER CHILLERS

Single Doors FIREGUARD Series Use one Master Unit each door or one 2409 Support unit each door. Pairs of Doors

Oil burners fuel unit with solenoid valve

B. The sprinkler system shall be designed to meet the more stringent of the requirements of NFPA 13 and FM Global requirements.

HEATEC TEC-NOTE. Operation and maintenance Heatec thermal fl uid heaters industrial series IMPOPRTANT NOTICE! CONTENTS. Publication No.

Niles Steel Tank Hot Water Generator Installation and Operation Manual

System Test Report CLEAN AGENT

INSTALLATION, OPERATING & MAINTENANCE INSTRUCTIONS FOR 350 SERIES CIRCULATION HEATERS

SECTION SPRINKLER SYSTEMS

Inspection of Fire Sprinkler Systems. NFPA 25, Inspection, Testing & Maintenance of Water Based Fire Protection Systems

PHYSICAL FACILITIES Consultant s Handbook Specifications Division 21 Fire Suppression 3000 Fire Pumps

PRESSURE MOTIVE PUMP (PMP) APPLICATIONS

MAINTENANCE AND INPSECTION OF FIRE PROTECTION SYSTEMS AND APPLIANCES

A AD Oil burners fuel unit. deltapumps.com. DE A-AD_en_0709.pdf Page 1/1

University of Houston Master Construction Specifications Insert Project Name SECTION DRY-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL

CRU-S Series Stainless Steel Condensate Recovery Unit

LHE OIL LINE HEATER ELECTRIC TYPE

MAINTENANCE AND TESTING OF FIRE SPRINKLER SYSTEMS

Drainage and Irrigation

Wiring Instructions. Single Doors 99 Checkmate Series Use one or Master Unit each door or one or Support unit each door

Drum Level Instrumentation and. The ASME Boiler Code Requirements. Presented by: Jim Kolbus. Topics

DIVISION 21 FIRE SUPPRESSION

Service Requirements SEMI- ANNUAL ANNUALLY OTHER REF. REQUIREMENT

Technical Data. Approvals The 1-1/2 in. to 8 in. (DN40 to DN200) DV-5 Red-E Cabinets are UL Listed and C-UL Listed with the following system types:

Technical Data. Approvals The 1-1/2 thru 8 inch (DN40 thru DN200) DV-5 Red-E Cabinets are UL Listed and C-UL Listed with the following system types:

Hospitals and Major Medical Centers

N2 BLAST Datasheet Preaction double interlock, Electric/Pneumatic c/w N 2 Blast Nitrogen generating system Self contained unit

Operation & Maintenance Manual

Chapter 4: Fire Protection Systems

! WARNING. McDonnell & Miller Installation & Maintenance Instructions MM-315(C)

TotalPac 3 Deluge, Electric release Self-contained system

MODEL B2 INSTALLATION MANUAL

FM-200 In-Cabinet Series

Gas Station & C Store SECTION CWM Job No

Model DV-5 Red-E Cabinet 1-1/2 thru 8 Inch (DN40 thru DN200), 250 psi (17,2 bar) Integrated Deluge Fire Protection Package General Description

Transcription:

Model: 400E-3M Bermad Electro-Pneumatically Controlled Deluge Valve with Easy Lock Manual Reset Installation Operation Maintenance

Safety First BERMAD believes that the safety of personnel working with and around our equipment is the most important consideration. Please read all safety information below and from any other relevant source before attempting to perform any maintenance function. Comply with all approved and established precautions for working with your type of equipment and/or environment. Authorized personnel should perform all maintenance tasks. Prior to performing a procedure, read it through to the end and understand it. If anything is not clear, ask the appropriate authority. When performing a procedure, follow the steps in succession without omission. 1. Description The Bermad Electro-Pneumatically Controlled Deluge Valve is suitable for automatic water spray or foam systems that include Pneumatic Release and Electric Detection and piping systems with open nozzles. This Deluge Valve is controlled either electrically or through a Dry Pilot Line. It requires a pneumatic pressure supply system, releases and a listed System Control Panel with a compatible electrical fire detection system. The Bermad Deluge Valve is equipped with an EasyLock Manual Reset (M),(EMR) device, which locks it into an open position during activation and operated by an Electric Solenoid Valve (14B) and a pneumatically operated PORV (6B). The PORV is normally held closed by a pneumatic control pressure maintained in the Dry Pilot Line, supplied through the 3-way Solenoid Valve and a closed pneumatic pilot line system. In Fire condition, either in response to opening the pneumatic release, or when the detection system causes the System Control Panel to be activate, the Solenoid Valve is activated, this in turn opens the PORV releasing water pressure from the control-chamber causing the Bermad Deluge Valve to open, and thereby allowing water to enter the system piping. Whenever either the Dry Pilot line, Solenoid Valve or Manual Emergency Release (15B) is activated, the EMR locks the Deluge Valve in its open position. The Bermad Deluge Valve will close again only when the reset button on the EMR is pressed (see Placing in service ). 2. Approvals BERMAD 400E-3M Deluge Valve is UL Listed when installed with specific components & accessories. Refer to the current UL Directory. Consult the manufacturer for any component approval recently to appear in the UL fire protection equipment directory. 3. Installation NOTES: Any deviation in trim size or arrangement may adversely affect the proper operation of the Deluge Valve. All initiating devices (detectors), indicating appliances, releasing devices, pilot line actuation devices (such as thermostatic releases, and/or fixed temperature releases), as well as the system control panel, must be compatible and UL listed for use with the particular Deluge System. Refer to current "UL Listed Fire Protection Equipment Directory". Refer also to NFPA 13 or the applicable installation standards, codes and authorities having jurisdiction. WARNING: The Deluge Valve and trim must be installed only in areas where they will not be subjected to freezing temperatures.

Installation Instructions 3.1. Allow enough room around the valve assembly for any adjustments and future maintenance/disassembly work. 3.2. Before the valve is installed, flush the pipeline to remove any dirt, scale, debris, etc. Not flushing the line may render the valve inoperable. 3.3. Install the valve in the pipeline with the valve flow arrow on the body casting in the proper direction. Ensure that the valve is positioned so that the cover/actuator can be easily removed for future maintenance. 3.4. Ensure that the EMR is Mounted Vertically (with the reset button up), and all other components are positioned correctly as per the appropriate drawing. 3.5. The water supply priming line must be connected to the upstream of the system control valve. 3.6. Subjected to all other instructions, drawings and technical specifications, which describe Bermad Deluge Valve, install in their proper positions the components comprising the Deluge Trim Package, according to the drawing relevant to the specific type, hereby enclosed. 3.7. Install also the additional accessories, which appear in the drawing and which must be installed as shown in the drawing, although they are not packed together with the Bermad Deluge Valve itself. 3.8. Install a pneumatic pressure supply system; see Pneumatic System Pressure Requirements below.

System Components 1 - Main Valve, FP 400E Series 2A - Gauge Valve 3A - Pressure Gauge 4B - Priming Strainer 5A - Drain Valve 6B - Pneumatic Pressure Operated Relief Valve (PORV) 11A - Alarm Shutoff Valve 14A - Check Valve 14B - Solenoid Valve 15B - Manual Emergency Release 18B - Priming Valve 19B - Drip Check M - EasyLock Manual Reset Optional P - Pressure Switch W - Water Motor Assembly S - Valve Position Limit Switch / Switches P 11A 3A 14A 6B M 14B 15B 1 19B 3A 5A 2A 4B 18B Hydraulic UL Listed The BERMAD Model FP 400E-3M is UL-Listed when installed with specific components and accessories. Electric Pneumatic Atmosphere

4. Equivalent Length Deluge Valve Equivalent Length Value (Steel Pipe), for use in hydraulically calculated systems Valve Size Equivalent Length Value Meter (Ft) 2 9.1 (30) of 2 pipe 2½ 12.1 (40) of 2½ pipe 3 13.7 (45) of 3 pipe 4 14 (46) of 4 pipe 6 27.4 (90) of 6 pipe 8 45.7 (150) of 8 pipe 5. Optional Equipment 5.1. If required, provide an Alarm Pressure Switch (P fig.1), to either activate an electric alarm, or shut down desired equipment. Connect it according to manufacturer instructions. 5.2. If required, provide a Water Motor Alarm, it shall be assembled and installed according to instructions within it s package. 5.3. It is recommended practice to provide an «Inspector s Test Connection» on the hydraulic release system. The inspector s Test Connection should be equipped with a ball valve (normally locked closed) capable of being opened to simulate the opening of a release. 6. Placing in Service/Resetting the System 6.1. Place the detector circuit in service. 6.2. Reset the Solenoid Valve (14B fig.1) by resetting the releasing control panel. 6.3. Close all emergency release valves. 6.4. Test supervisory circuits in releasing control panel. 6.5. Open the priming-line valve (18B fig.1). Check that there is no water flow from the Solenoid Valve. 6.6. Push and hold the EMR s reset button, this allows upstream water pressure to fill the Deluge Valve s control chamber. 6.7. When the control chamber pressure gauge (3A fig.1) indicates full upstream pressure and is no longer rising, the release system is reset. 6.8. Slowly Open the supply Isolating Valve and check that no water flows into the system. 6.9. Depress the Drip Check (19B fig.1) and drain any water from the system side of the Deluge Valve. 6.10. The system is now operational and in a standby mode. Ensure that the following Set Conditions are met.

Set Conditions (Normal Conditions) Item All Main Isolating Valves All Manual Releases Alarm Shut-Off Valve (11A) Priming Ball Valve (18B) Control-Chamber Gauge Upstream Pressure Gauge Drip-Check Device (19B) Control Panel & Detections Pneumatic Release System Releasing Devices Status OPEN and sealed with tamperproof seals CLOSE position and sealed OPEN position OPEN OPEN gauge valve, the Pressure Gauge indicates rate of pressure in Control-Chamber OPEN gauge valve, the Pressure Gauge indicates the upstream supply pressure to the Deluge Valve VENTED: Push the knob to confirm that there is no leakage. Are in service and in its stand-by position. 20 to 30 psig (1.4 to 2.0 barg) is maintained, pressure supply system is ON and functioning properly CLOSED with no leaking 7. Removing the System from Service WARNING: Do not shutoff the pressure supply and Do not apply lower pressure than normal for maintenance without closing the Main Isolating Supply Valve first. When taking deluge system out of service, a fire patrol should be established in the system area. If automatic fire-alarm signaling equipment is utilized, the proper authority should be notified that the system is being removed from service. The insuring body and owner representative should also be notified when the system is being taken out of service. 8. Removing Instructions 8.1. Shut off the main supply-isolating valve. 8.2. Close the Priming line valve (18B fig.1) to Deluge Valve Control chamber. 8.3. Open all drain valves. 8.4. Release the water pressure from the control chamber of the Deluge Valve by pulling the Manual emergency release (15B fig.1). 8.5. If auxiliary power is used, disconnect the power supply and batteries. 8.6. Place "Fire Protection System out of Service" signs in the area protected by the system.

9. Operation In the SET position, the line-pressure supplied to the main valve s control chamber via the priming line and through an Easy Lock Manual Reset device (M fig.1) (EMR), is trapped by the EMR s internal check valve, by the closed PORV (6B fig.1), and a closed Manual Emergency Release (15B fig.1). The trapped line-pressure holds the main valve s diaphragm and plug against the valve seat, sealing it drip-tight and keeping the system piping dry. The PORV is held closed by the maintained pneumatic pressure, supplied through the Solenoid Valve (24B fig.1). In FIRE or TEST conditions, an electric detection system, through a control panel, triggers the Solenoid Valve to release the trapped pneumatic-pressure from the PORV, thereby opening it. Line-pressure is then released from the control chamber through the opened PORV or Manual Emergency Release. The EMR prevents line-pressure from entering the control chamber, allowing the main valve to latch open and water to flow into the system piping and to the alarm device. WARNING: Whenever the handle of the Emergency Manual Release (15B fig.1) is pulled, the Deluge Valve opens, and water flows into the system s piping and to the alarm devices, the Deluge Valve will close again only when the handle of the Emergency Manual Release is returned to its original position and the reset button on the EMR is manually pressed. 9.1. Air Supply Troubles Any event of an air supply failure, slow leakage of air from the pneumatic release system, and/or failure to restore air supply to the pneumatic release system, will result in activation of the Pneumatic PORV, causing the Deluge Valve to open. Similarly, if the release system is activated due to mechanical damage or malfunction, the Deluge Valve will open and water to flow into the system piping and to the alarm device. 9.2. Pneumatic System Pressure Requirements A regulated supply of pressurized air or nitrogen is required to maintain a pneumatic pressure supply system, See «Placing in Service» section below prior to connecting the air supply to the system. The Pneumatic system shall use a clean, dependable and continuous (24 hours a day, 7 days a week) compressed-air source using an independent air compressor or an Air Maintenance Device supplied by a dry nitrogen-gas supply or external high Air pressure source. NOTE: Any event of an air supply failure, slow leakage of air from the pneumatic system, will result in activation of the PORV, causing the Deluge Valve to open. Water will then flow from any open sprinklers and/or spray nozzles on the system and the Alarm will operate. 9.3. Electrical & Solenoid Requirements The Solenoid Valve shall be wired to the Releasing Control Panel according to information provided by the control panel manufacturer. Standard Solenoid data (others are optional): 9.4. Voltage: 24VDC 9.5. Normally Position: NO (for Closed Main Deluge Valve when De-Energized) 9.6. Enclosure Type: 1,2,3,3S, 4 and 4X/IP-65 (For Hazardous Locations enclosure, see catalog) 9.7. Electrical Rating: 8 Watts

Figure 2: Operation Drawing Pneumatic Pressure [5] [1] [4] [7] [E] Pneumatic Pressure [6] [3] [2] Valve Closed (set position) 10. Maintenance and Inspection Test [C] Valve Open (operating condition) WARNINGS: Do not shutoff the pressure supply and Do not apply lower pressure than normal for maintenance without closing the Main Isolating Supply Valve first. Do not turn off the water supply to make repairs without placing a roving fire patrol in the area covered by the system. The patrol should continue until the system is back in service. 10.1. Prior to turning off any valves or activating any alarms, notify local security guards and the central alarm station, if used, so that a false alarm will not be signaled. 10.2. In any of the following inspections or testing procedures, if an abnormal condition exists, see Abnormal Conditions for possible cause and corrective action. 10.3. See NFPA Pamphlet No. 25 and also relevant publications by authorities having jurisdiction. 11. Weekly Inspection 11.1. The system should be checked for Set Condition. See above Set Condition (Normal condition) 11.2. Observe the upstream pressure gauge (3A fig.1): it should indicate that the normal supply of water pressure to the Deluge Valve is maintained. 12. Monthly Inspection and Test 12.1. Complete Weekly Inspection. 12.2. Test the water-motor alarm and/or electric alarm, by turning the alarm test valve (1A) to the open position. The alarm should sound. Turn to close position. 12.3. Depress the Drip Check (19B fig.1) to release accumulated water and to check main valve leakage (Significant water accumulation on the system side may indicate a sealing problem). 13. Semi-Annual Inspection 13.1. Complete Weekly and Monthly Inspection and Test. 13.2. Inspect the electric detection system and electric release control panel, as suggested by the release control panel manufacturer.

14. Annual Inspection and Test 14.1. Complete Weekly, Monthly and Semi-Annual inspections. 14.2. Place the system out of service (See Removing the system from service above). 14.3. Trip the release-line system. 14.4. The interior of the Deluge Valve should be cleaned and inspected. 14.5. The interior of the PORV (6B fig.1), including its diaphragm and seal, should be inspected and cleaned 14.6. Place the system back in service. (See instructions «Placing the System in Service»). 14.7. The Deluge Valve must be activated at full flow. 14.8. Note: The system will be flooded! Take all necessary precautions to drain water and prevent damage in the area protected by the system. 14.9. Trip-test the deluge system with an electric release control panel. The release may be tripped by the method suggested by the release control panel manufacturer. 14.10. Trip test the deluge system by decreasing pressure in the pneumatic release system. 14.11. The manual emergency release handle (15B fig.1) is to be pulled. The Deluge Valve should open and discharge water. Observe upstream Pressure Gauge while full flow is on. Inspect all system nozzles. 14.12. Take all additional measures as required by NFPA-25 «Standard for the Inspection Testing and Maintenance of Water-Based Fire Protection Systems.» 14.13. Clean the priming strainer (4B fig.1) prior to resetting the Deluge Valve.

15. Abnormal Conditions 15.1. Alarm Pressure Switch Fails to Sound A. Check for obstructions in the alarm test line. B. Clean the alarm-line strainer (if a water motor alarm is installed). C. Make certain the alarm is free to operate. D. Test the electrical circuit to the electric alarm (if utilized). 15.2. False Trip Check and test the electrical circuit to the Solenoid Valve (14B fig.1) A. Check for Malfunctioning EMR device. B. PORV (6B fig.1) out of order 15.3. Leakage through Deluge Valve Check for any of the following possible causes: A. Check for clogged priming strainer (4B fig.1). B. Inadequate Pneumatic Pressure supply. C. Leaking control trim D. Leaking Dry Pilot release system. E. Damaged deluge valve internal elastomer or seat 15.4. Deluge Valve Will Not Reset Check for any of the following possible causes: A. The EMR Device is clogged or not reset properly B. Inadequate Pneumatic Pressure supply. C. Check for clogged priming strainer (4B fig.1), the screen should be properly cleaned. D. Closed priming valve (18B fig.1). E. Check for Foreign object lodged between seal and valve seat. F. Control Panel is not reset. Check for Faulty circuits, using manufacturer instructions. G. Leak in Dry Pilot Line release system. 15.5. Electric Release System Will Not Reset A. Faulty Detector Circuit B. Faulty circuit to the Solenoid Valve or Release Control Panel. C. Observe if the Pressure Switch Cock Valve is open. 15.6. Difficulty in Performance Where difficulty in performance is experienced, the manufacturer or his authorized representative should be contacted if any field adjustment is to be made.