Master Plan. Centre for Addiction and Mental Health. Executive Summary. for the Queen Street West Toronto, Ontario

Similar documents
URBAN DESIGN BRIEF. 2136&2148 Trafalgar Road. Town of Oakville

Welcome. Walk Around. Talk to Us. Write Down Your Comments

Clairtrell Area Context Plan

[PLANNING RATIONALE] For Site Plan Control and Lifting of Holding Zone By-Law 101 Champagne Avenue. May 23, 2014

WQW Study Community Meeting June 26, 2017

13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154

The Master Plan Framework

Workshop 3. City of Burlington Waterfront Hotel Planning Study. September 14, The Planning Partnership

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN

QUEEN-RIVER SECONDARY PLAN

38 Queen s University Campus Master Plan Part 1

1.0 Purpose of a Secondary Plan for the Masonville Transit Village

K. SMART ASSOCIATES LIMITED

178 Carruthers Properties Inc.

4.1.3 LAND USE CATEGORIES

Official Plan Review: Draft Built Form Policies

Uptown Rideau Street Secondary Plan [Amendment #166, January 12, 2016]

Queen Street West - Zoning Amendment Application - Preliminary Report

523, 525 and 525A Adelaide Street West - Zoning Amendment Application - Preliminary Report

GUIDELINES BAYVIEW INSTITUTIONS CONTEXT PLAN LOCATION PLAN COMPONENTS URBAN DESIGN GUIDELINES

King-Spadina Secondary Plan Community Consultation Meeting. Michelle Knieriem, City Planner October 11, 2017

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004

GO Station Mobility Hubs: Draft Precinct Plans. Committee of the Whole July 12, 2018

150 Eighth Street Zoning By-law Amendment Application Preliminary Report

Director, Community Planning, Toronto and East York District

AMENDMENT NO. 42 TO THE OFFICIAL PLAN OF THE TOWN OF GRIMSBY

16. KING-SPADINA SECONDARY PLAN

Urban Design Manual PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction. Station Study Areas

1296 Kennedy Road - Zoning Amendment Application - Preliminary Report

S A C R A M E N T O C O U N T Y JACKSON HIGHWAY & GRANT LINE EAST VISIONING STUDY

Former Rockcliffe Airbase Community Design Plan Guiding Design Vision and Principles December 4, 2013

John M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference

URBAN DESIGN BRIEF 181 Burloak Drive, Oakville

CDAC. Update: Downtown Dartmouth Update: CDAC July 25 th Motion

DRAFT DRAFT DRAFT DRAFT

Welcome to the Oakridge Centre Open House

PORT WHITBY COMMUNITY

141 GEORGE STREET PLANNING RATIONALE

DAVENPORT VILLAGE SECONDARY PLAN

KANATA CENTRUM 255 KANATA AVENUE OFFICIAL PLAN AMENDMENT ZONING BY-LAW AMENDMENT

Wellington Street West - Zoning Amendment Application - Preliminary Report

The West Vaughan Employment Area Secondary Plan Policies

Town of Cobourg Heritage Master Plan. Statutory Public Meeting

URBAN DESIGN BRIEF REPORT

Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS. A New Garden Neighbourhood Matford Barton 17

PUBLIC OPEN HOUSE HURONTARIO-MAIN CORRIDOR SECONDARY PLAN

CHAPTER 5: GUIDING PRINCIPLES

FORMER CANADIAN FORCES BASE (CFB) ROCKCLIFFE SECONDARY PLAN. Official Plan Amendment XX to the Official Plan for the City of Ottawa

Mid-Rise Buildings on Toronto s Avenues Responding to the Public Realm Andrea Oppedisano, City of Toronto

McCowan Precinct Plan Study Background & Deliverables

Vision for East Cowes

Queen Street East/Ashbridge Precinct Planning Study- City-Initiated Official Plan Amendment and Urban Design Guidelines Final Report

30 and 44 Zorra Street - Zoning By-law Amendment Application - Preliminary Report

Director, Community Planning, Etobicoke York District

North Fair Oaks Community Plan Summary and Information

Bloor St. W. Rezoning - Preliminary Report

Bel-Air Lexus Automobile Service Station

7437, 7439 and 7441 Kingston Road - Zoning By-law Amendment and Site Plan Control Applications - Preliminary Report

240 and 242 Finch Avenue West Zoning By-law Amendment Application Preliminary Report

New-Cast Mixed-use Development Proposal King Street West, Newcastle, Ontario

GUIDELINES WESTON LOCATION: URBAN DESIGN GUIDELINES

5 TOWN OF MARKHAM OFFICIAL PLAN AMENDMENT NO. 144 MILLIKEN MAIN STREET SECONDARY PLAN

Edward R. Sajecki Commissioner of Planning and Building

City of Toronto Official Plan Indicators

Derry Green Corporate Business Park

Midtown Greenway Land Use and Development Plan Executive Summary

ELK GROVE GENERAL PLAN VISION

V. Vision and Guiding Principles

Wide asphalt driveway abutting school property. garage built with incompatible materials, too close to park. incompatible fencing materials

and Richmond Street West - Official Plan Amendment Application - Preliminary Report

Keystone Business Park Precinct Structure Plan North East Industrial Precinct. Part 2 Design Principles

POLICY AMENDMENT AND LAND USE AMENDMENT TUXEDO PARK (WARD 9) CENTRE STREET N AND 26 AVENUE NE BYLAWS 36P2017 AND 234D2017

*** DRAFT 2 FOR PUBLIC REVIEW ***

Regency Developments. Urban Design Brief. Holyrood DC2 Rezoning

DOWNTOWN GEORGETOWN PLANNING STUDY

Old East Village Dundas Street Corridor Secondary Plan

SUBJECT: GO Station Mobility Hubs Preferred Concepts: Aldershot GO, Burlington GO and Appleby GO. Planning and Development Committee - Public Meeting

2900 Steeles Avenue East at Don Mills Road in the Town of Markham

(DC1) Direct Development Control Provision DC1 Area 4

NORTH CIRCULAR ROAD - REGENERATION IN ACTION

6. REGIONAL AND COMMUNITY FACILITIES DESIGNATIONS 6.1. OBJECTIVES FOR REGIONAL AND COMMUNITY FACILITIES LAND USE DESIGNATIONS

LUNDY S LANE COMMUNITY IMPROVEMENT PLAN STUDY

Urban Design Brief. Watson Parkway North & Watson Road North Guelph, Ontario. Prepared by Coletara Development

burlington mobility hubs study Downtown Burlington Mobility Hub

REGIONAL ACTIVITY CENTER

WELCOME. The Yonge-Eglinton area has experienced significant growth and change in the last decade.

4780 Eglinton Avenue West - Zoning By-law Amendment and Draft Plan of Subdivision Applications - Preliminary Report

Chairman and Members of the Planning and Development Committee. Thomas S. Mokrzycki, Commissioner of Planning and Building

South of Eastern Strategic Direction Status Update

CONTENTS 8.0 LAND USE 8.1 GENERAL LAND USE 8.2 RESIDENTIAL 8.3 MIXED USE 8.4 COMMERCIAL 8.5 EMPLOYMENT LANDS

Mark-up of the effect of the proposed Bronte Village Growth Area OPA No.18 on the text of section 24, Bronte Village, of the Livable Oakville Plan

Agenda. 7 Wright Crescent Urban Design Study. Public Meeting and Urban Design Workshop. 1 INTRODUCTION AND BACKGROUND (City of Kingston)

Planning Board Briefing

Welcome. Community Consultation Meeting November 28, Review and discuss the Bathurst Quay Neighbourhood Plan Framework

Figure 3-1: Public Realm Plan

Economic Development & Housing Council Committee Comprehensive Plan Update September 20, 2005

Figure 1- Site Plan Concept

Getting and Giving the Most

Pearl Street and 15 Duncan Street - Zoning Amendment Application - Request for Direction Report

Historic Yonge Street HCD Plan Community Consultation October 14, 2015

Transcription:

Master Plan Executive Summary for the Centre for Addiction and Mental Health 1001 Queen Street West Toronto, Ontario August 2002

INTRODUCTION The redevelopment of 1001 Queen Street West in Toronto provides an opportunity to celebrate a world class mental health and addictions institution and integrate it into the fabric of a vibrant and dynamic city. CAMH is proposing to redevelop its Queen Street site as a hub for its programs and services. Evidence shows that people with mental illnesses and addictions respond best to treatment in normalized, home-like and familiar environments. Therefore, the plan is to replace the existing institutional character of the site with a real community setting for client/patient care by creating an urban village that extends the neighbourhood streets and creates a series of blocks with various open spaces and buildings located throughout. Queen Street Shaw Street The planning for the Queen Street property has involved over 200 people from the surrounding neighbourhood; as well as CAMH staff, physicians and volunteers, CAMH Board of Trustees; current and former CAMH clients/patients and their families and supporters; partner hospitals and service agencies; representatives from the University of Toronto; Ministry of Health and Long-Term Care staff; City of Toronto staff; and local politicians. THE CENTRE FOR ADDICTION AND MENTAL HEALTH An aerial view of the property, an isolated parcel within an established residential community, showing the existing buildings and their layout on the site. By combining the strengths of its four founding partners, CAMH has created a multi-faceted organization focused on care, research, education, and health promotion and prevention. The 1998 merger that created the Centre for Addiction and Mental Health brought together the treatment of addictions and mental illnesses under the umbrella of a single organization. In 1999, CAMH completed an important study as it established strategic directions for its physical space needs. The study recommended that CAMH integrate its main functions of client/patient care, research, education, and health promotion and prevention, on one site to maintain and enhance existing services. Master Plan Report - Executive Summary Urban Strategies Inc. 1

The concept of Hub and Satellites was articulated at this time to emphasize that the move to one site was not about centralizing all functions. Rather, it was about integrating key CAMH functions - the provision of care, research, education and health promotion and prevention - at one location. This would link programs and services, and support community-based satellite services throughout the province. It was determined that the best location for a central hub was at the Queen Street site. Its size provides the physical space flexibility needed to respond to changing health care needs in the future, and its redevelopment provides an opportunity to contribute to the ongoing revitalization of the surrounding neighbourhood and address decades of stigma around mental health and addictions, particularly given the site's former identity as 999 Queen. The hub will be integrated with CAMH's satellite locations throughout Ontario, to provide care close to where clients/ patients live. The plans to redevelop the Queen Street property into a hub for CAMH were accompanied by a parallel process involving reconsideration of the way that CAMH s programs and services are delivered. These two planning processes provided an important opportunity for CAMH to address long-standing problems that prevent people from getting proper mental health and addiction care: fragmentation of services; access to care; quality of care; and stigma. Today, many programs in CAMH and within the health care system as a whole are unconnected and do not offer the range of services that many clients need (top of image to left). CAMH is restructuring its programs to provide better integration and break down barriers to care (bottom of image to left). Master Plan Report - Executive Summary Urban Strategies Inc. 2

THE QUEEN STREET PROPERTY The Queen Street site, approximately 27 acres in size, is located on the south side of Queen Street West between Shaw Street and Dovercourt Road, at the western end of Toronto's downtown. It is situated between the residential neighbourhoods of Niagara to the east, Trinity- Bellwoods to the north, Parkdale to the west and King West Village to the south. The site is laid out as a campus. Its current gross floor area totals 76,223 square metres or 820,484 square feet. The existing buildings cover approximately 20% of the lot area. There are approximately 500 parking spaces in large surface parking lots covering approximately 20% of the property. The remainder of the property (approximately 60%) consists of internal private roads, driveways and open spaces. Portions of the original brick wall that was built in 1851 around the original Toronto Lunatic Asylum building remain along the perimeter of the property. Large portions of the walls have been removed over the years. The remaining brick walls are historically designated by City of Toronto By-Law 1997-0085. The condition of the trees on the property, and the location of significant groups of mature and healthy trees, were important drivers of the Master Plan for the Queen Street site. Top: The south wall, with portions missing; historic brick storage building. Bottom: The east wall along Shaw Street; the west wall abutting a rear lane on Dovercourt. Master Plan Report - Executive Summary Urban Strategies Inc. 3

The area surrounding the Queen Street site consists of a stable residential area to the north and a mixed use area undergoing a significant amount of new development to the east, west and south. Queen Street West is a typical Toronto main street with mixed-use buildings with retail uses on the ground floor and residential apartments on upper floors. Throughout most of its length, Queen Street is an active concentration of shopping, restaurant, and other commercial uses. This main street nature of Queen Street is interrupted along the length of the CAMH site. The neighbourhood context around the Queen Street site. THE VISION FOR THE QUEEN STREET SITE The Vision for the Queen Street site is a series of principles, statements and illustrations intended to guide redevelopment of the Queen Street property. The Vision policies provide criteria by which to evaluate the Master Plan and any development proposals for the site. It is the yardstick by which CAMH can measure whether it is reaching its stated goals for the site s redevelopment. The Vision for the Queen Street site is based on three premises: creating a hub, designing the hub as an urban village, and respecting the landscape. Master Plan Report - Executive Summary Urban Strategies Inc. 4

A series of stakeholder workshops and consultations led to the creation of a Draft Vision which was distributed to over 17,000 stakeholders. While a few issues elicited debate and differing opinions, the response to the Draft Vision was overwhelmingly positive and enthusiastic. The Draft Vision policies were refined based on stakeholder comments and were posted on the CAMH website for broad public review. These revised policies were adopted by CAMH's Board of Trustees in December 2000. The Draft Vision and the Vision Policies as adopted in December 2000 can be reviewed on the CAMH website: www.camh.net/vision. The Vision represented a starting point for planning the Queen Street property, and was used to shape thinking about the Master Plan, by outlining the aspirations of CAMH. The policies are propositions that state intent, and are guidelines for evaluating whether the Master Plan is achieving CAMH s goals for the property; they are not meant to be strictly interpreted. Some of the propositions have evolved and changed during the process of developing the Master Plan for the property. THE MASTER PLAN Stakeholders were asked what kind of place the Queen Street site should be: an institutional model (top); a campus model (centre); or an urban village model (bottom). Stakeholders generally preferred the urban village. The Master Plan for the Queen Street site provides an overall concept for site redevelopment, including street layouts, paths for pedestrians, open spaces, development blocks and general building heights. The Queen Street property will be a new precinct containing the organizational hub for CAMH. It will be designed as an urban village containing a mix of CAMH and non-camh uses and activities, a network of public streets and sidewalks, public and private open spaces and a series of blocks containing buildings each with their own street address. Casual mixing between staff, clients/patients and visitors of CAMH with the surrounding community will occur naturally on public sidewalks, parks, shared community facilities and the cafes, restaurants and shops that will occupy the street level of buildings. CAMH uses will be integrated with other uses to create a safe, comfortable and welcoming place where the stigma of the institution can disappear into the rhythm of normal daily activities associated with city living. Master Plan Report - Executive Summary Urban Strategies Inc. 5

An important goal is to ensure that the new development contributes to an attractive, inviting, comfortable and safe public realm. A high standard of urban design will be encouraged to ensure that the precinct integrates well with the surrounding neighbourhood. Approximately 4.8 acres (18% of the land) are reserved for open space. Almost 29% (7.8 acres) will be comprised of street rights-of-way, which include paving for vehicles and bicycles, sidewalk spaces, and spaces for street trees and landscaping. The remainder (approximately 53% or 14.2 acres) will be for the development of buildings. The proposed building envelopes (building footprints, maximum heights and minimum setbacks) represent the maximum building area that would be permitted. Often, architecture, additional setbacks and stepbacks result in buildings that do not fill the maximum envelope. The maximum building envelopes represent approximately 2.7 million square feet. Of this area, approximately 1.4 million square feet will comprise the CAMH facilities, and approximately 1.3 million square feet will be available for the various non-camh developments. At the same time that the Master Plan was being developed, a Functional Program outlining CAMH s space requirements was being prepared. It describes the services that will be provided at the Queen Street site; how these services will be delivered; the staff required; the spaces required; and how the spaces should be organized in relation to each other. A summary can be viewed on CAMH's website: www.camh.net/http://www.camh.net/vision/openhouse_oct2002.html and follow the links on the right. A full copy is available at the CAMH library. Streets and Pedestrian Connections Neighbourhood streets will be extended into the site, creating a number of routes for pedestrians, cyclists, transit, and cars, and a series of new city blocks. The extensions of Ossington Avenue and Adelaide Street east of Ossington will be collector streets, providing a potential new route for the Ossington Bus. The extensions of Fennings, Brookfield and Givins Streets, and Adelaide Street west of Ossington will be local streets. New Street will also function as a local street. At the north end of the precinct, the extension of Givins Street will become a narrow mews framing a public open space at Queen and Shaw Streets. The streets will be lined up with their extensions north of Queen Street. A mix of uses, including CAMH facilities, community facilities, retail, restaurants, offices, educational facilities, laboratories and residential uses will be located on the site. This will help create an urban village integrated with the surrounding neighbourhood and help remove the stigma associated with the Queen Street site. Master Plan Report - Executive Summary Urban Strategies Inc. 6

Proposed streets, pedestrian connections and development blocks. Open Spaces The Master Plan identifies three sites for public open space: Shaw Park, Adelaide Common East, and Fennings Park, in addition to private open spaces throughout the site. CAMH is also intending to create private open spaces to protect significant stands of mature trees, and to provide some programmed open spaces for CAMH use, including gardens and a greenhouse. Artist s Impressions: Left: The Queen Street frontage, looking east, will include typical main street buildings and uses. Centre: Buildings along Fennings Street will provide an appropriate transition to the adjacent neighbourhood to the west. Right: Open space and a public park along Shaw Street will protect mature trees and create a linear green space. Artist s Impression: Shaw Park, a 2-acre park at the corner of Queen and Shaw Streets, will be a gateway linking the new precinct to the existing neighbourhood. Master Plan Report - Executive Summary Urban Strategies Inc. 7

Proposed public and private open spaces. Land Uses CAMH requires a number of different types of spaces. The long term goal is to locate 479 beds on the Queen Street site, along with support spaces, administration functions, offices, meeting rooms and classrooms, and various other types of spaces for CAMH use. In addition to the various CAMH uses, a variety of non-camh uses will be encouraged to locate on the site. All land uses will be permitted on all blocks, including institutional facilities, laboratories, offices, community facilities, commercial uses, light industrial uses, or residential uses. Active and publicly oriented uses will be encouraged at the grade level of buildings to activate key streets and open spaces. The CAMH site will also include non- CAMH facilities. This diagram illustrates the development parcels currently set aside for CAMH and non-camh use, however these are subject to change as detailed building designs for the CAMH facilities are refined. Master Plan Report - Executive Summary Urban Strategies Inc. 8

Permitted uses will be dispersed throughout the precinct to promote diversity, variety and an active street life. Allowing all land uses in all parts of the precinct also provides the flexibility to respond to changing health care needs over time. Buildings Three existing buildings will be retained for the longer term: the two historic brick storage buildings along the south wall; and Unit 3, which contains the Law and Mental Health program. Only the two storage buildings are considered permanent. Unit 3 will continue its current function but in the long term will be removed, allowing the full extension of Brookfield to Adelaide. Buildings will reflect a range of urban styles, with the lowest heights adjacent to neighbouring houses, a "main street" scale along Queen Street, and the tallest buildings within the centre of the precinct. Some buildings will be stepped back to ensure that heights are compatible with surrounding buildings. There will be a 7.5 m setback from the western property boundary to provide rear yards along Block E and to provide a transition to the houses along the east side of Dovercourt Rd. Proposed building envelopes (maximum heights in metres, also shown in storeys, and minimum setbacks) for the site. Master Plan Report - Executive Summary Urban Strategies Inc. 9

The Wall It has become clear through stakeholder comments that the brick walls are important historical elements that should be retained. However, there are strongly divergent views for the east wall's future. The key is to balance preserving history with the ability to create an urban village that provides eyes on the park from Shaw Street to enhance a sense of security, provides access to the site, and creates an environment that is welcoming and open. CAMH proposes to hold an ideas competition for the wall along Shaw Street. A jury selected from a range of interested parties would choose a winning concept, and the idea would be further refined with input from CAMH. Any proposed changes to the wall will be carefully reviewed with all the interest groups including Friends of the Archives, the City of Toronto Planning Department and the City's Heritage Preservation staff. The wall surrounding the Queen Street site will remain largely intact. There will be minor changes to permit pedestrian connections in the south wall. The east wall will be the subject of an open ideas competition. Traffic, Access and Parking The proposed new network of streets will provide a number of potential routes into and through the new precinct for vehicles, cyclists, pedestrians and the TTC. It will be important to provide enough parking to address the needs of CAMH and other uses, and ensure neighbouring streets are not affected. At the same time, it is important to not oversupply parking, which may discourage transit use, carpooling, cycling or walking, or Master Plan Report - Executive Summary Urban Strategies Inc. 10

other non-auto modes of travel. Minimum and maximum parking standards will be developed to meet the needs of essential drivers employed or seeking health care in the precinct as well as other essential drivers related to the non-camh blocks. Parking will be provided below grade, in small areas of surface parking near buildings, street parking, and in parking structures. Phasing The full creation of the urban village will require a long-term phased program. The phasing is critical, as CAMH will need to maintain its programs and services during construction. Minimum disruption for clients/patients and staff is a priority. The phasing would begin with a filling in of vacant land. Subsequent phases would strive to move people and programs only once, into their permanent locations. Master Plan Report - Executive Summary Urban Strategies Inc. 11

BENEFITS OF SITE REDEVELOPMENT There are a number of community benefits accruing from the redevelopment of the Queen Street property. Integrating a large site into the city fabric. Supporting the City's employment land base. The redevelopment will provide a balance of commercial and institutional space for employment. Supporting new job growth in the City of Toronto. CAMH, non- CAMH uses, spin-off commercial development in the surrounding area, and site construction will create many jobs in the area. Increasing the tax base. The introduction of non-camh uses will create the opportunity for taxable development. Increasing the commercial tax base in the surrounding area. Spinoff activity will increase the health and assessed value of commercial uses in the neighbourhood. Building Permit revenues. The proposed development will produce one-time revenue generated from building permits. Efficient use of existing City services. Encouraging development in infill locations makes efficient use of existing City infrastructure (e.g., sewers, transit, roads, etc.). Potential for improved service levels in the surrounding neighbourhood. The development will assist in increasing use of the Ossington bus and Queen streetcar, the Exhibition Place GO station and will help create demand for a long-planned new GO station in the area. Improvements to the City street grid. A street system that connects with existing City streets and improves the overall functioning of the City grid will be created in this area. Improvements to the Ossington Bus Route. The development will eliminate the need to use Queen Street for this bus route. Master Plan Report - Executive Summary Urban Strategies Inc. 12

Parkland dedication. The proposed development provides for parkland dedication well beyond the City's requirements. A daycare centre. CAMH proposes to expand the on-site daycare facility and relocate it to a more visible and accessible location. OFFICIAL PLAN AND ZONING BY-LAW AMENDMENT The Master Plan will form the basis for an Official Plan Amendment and Zoning By-law Amendment for the property, detailed policies and regulations that will cover all aspects of the redevelopment, including major objectives of the redevelopment; land use; urban structure (streets, blocks, and open spaces); building heights, setbacks and stepbacks; heritage; transportation; parking; and servicing. The permissions provided by the Official Plan and Zoning By-Law Amendments will regenerate the property, contribute to the revitalization of the surrounding neighbourhood and create a centre for care, research, education, health promotion and prevention that carries a national and international reputation for its focus on client/patient needs. This document is a summary of a much longer Master Plan Report that outlines the full process of planning for the Queen Street site, the existing City planning regulations for the property, proposed new planning regulations as well as more details on the Master Plan itself. The full document is available at the CAMH library, at 1001 Queen Street West and at 33 Russell Street. Questions or comments about the redevelopment of 1001 Queen Street West should be directed to: The Centre for Addiction and Mental Health Queen Street Site Master Plan 1001 Queen Street West, Toronto Ontario M6J 1H4 T 416-535-8501 x.1650 F 416-583-1299 E vision_feedback@camh.net Master Plan Report - Executive Summary Urban Strategies Inc. 13