Improvement of the Atlantic Coast of New York City,

Similar documents
Dauphin Island s East End Beach and Barrier Island Restoration Project. April 16, :00 PM Dauphin Island Sea Lab, Shelby Hall

BEACH AND INLET PROJECTS UPDATE

Broward County Shore Protection Project Segment II. Physical Monitoring Plan

Empowering Local Action for Coastal Resilience in Massachusetts. Bruce K. Carlisle MA Office of Coastal Zone Management

Adaptive Management Strategies for Resilient Coastlines: A Case Study on the Ft. Pierce, FL Breakwater Project

Coastal Planning in Texas. Tony Williams Senior Director of Planning Coastal Resources Division Texas General Land Office

NC Division of Coastal Management

Beneficial Use at Deer Island A Decade of Design and Implementation. Mississippi Water Resources Conference Jackson, Mississippi April 3, 2012

Appendix to Amicus Curiae Brief: Selected Provisions of the South Carolina Beachfront Management Act

.MANAGED RETREAT. Need for managed retreat

NC Coastal Management Program Update. Mike Lopazanski Policy & Planning Section Chief April 3, 2015

Green or Grey Solutions? Why not both? Lessons from the Mid-Atlantic on Hybrid Living Shorelines

Sierra Club Comments on ACOE Public Notice NAE Re: Proposed Town Neck Beach Project at Sandwich, Massachusetts

CHAPTER Committee Substitute for Senate Bill No. 1472

A. INTRODUCTION B. CUMULATIVE EFFECTS ANALYSIS

JAMAICA BAY TASK FORCE MEETING

2013 Summer Recap. Rockaway Beach

State of the State New Jersey. Steve Jacobus NJDEP 06/10/15

Welcome. Tannery and Waterworks Parks Shoreline Improvements Environmental Assessment. Public Information Centre #1 November 27, pm to 8 pm

Rhode Island Shoreline Change Special Area Management Plan

Preliminary Sea Level Rise Case Study: Navarre Beach, FL

Kevin M. Rampe, President -- Lower Manhattan Development Corporation

Goals and Strategies. Goals. Strategies. Long-term Beach and Shoreline Management Program

jmt.com MARINE Part of a diversified family of solutions

City of Rockingham. Local Management Practices, Costs and Strategic Coastal Planning

Peoria Riverfront Development (Ecosystem Restoration) Upper Mid-sized Island Critical Restoration Project (September 2011)

Options for Managing Coastal Erosion. Presentation by: Ashley Sprague

Ashbridges Bay Erosion and Sediment Control Project

Coastal Erosion Protection Strategies Private Works on Public Land

ALTERNATIVE SHORELINE MANAGEMENT IN COASTAL MISSISSIPPI

Funding, Designing, and (eventually) Building Miles of Shoreline and Acres of Wetlands and Oyster Reefs on an Urbanized River!

There is an ongoing regulatory concern that

Memorandum. AECOM Technical Services Inc. Page 1

March, 2016 Wetlands Board Applications

NJ Department of Environmental Protection

SHORE PROTECTION ACT STAFF S FINDINGS & RECOMMENDATIONS

New York City, 19 th c.

Broward County Coastal Engineering Consultant Services For Segment III Shore Protection T P1 R. Harvey Sasso, P.E. Danielle Irwin, CFM

Brooklyn Bridge Park: Storm Resilience through Design

RFP DRAINAGE OUTFALL DESIGN AND PERMITTING. Mandatory Meeting for Proposers August 15, 2015

Sconset Geotextile Tube Update Sconset Bluff, Nantucket. Maria Hartnett, Associate

EEA Capital Investment in Green Infrastructure

30% Design Technical Report

An Integrated Approach for Water Management Examples from The Netherlands. Addressing Climate Change and Sea Level Rise

Virginia Beach and Sea Level Rise: Where Do We Go From Here?

New York City, 17 th c.

Living Shorelines in Virginia: What s Happened Since the 2006 Living Shorelines Summit?

PURPOSE: The purpose is to provide commercial facilities in the Vancouver and Clark County vicinity.

Engineering of Dunes. Protection Benefits of Coastal Sand Dunes. FEMA Dune Standards

Improving quality of life in. New York City ARCADIS NEW YORK CITY

Planning for Historic/Cultural Resources Coastal Resiliency in Connecticut. Presented to CAFM s 3 rd Annual Conference

Joint Public Notice. Public Notice Date: February 9, 2015 Expiration Date: March 11, 2015

North Carolina Coastal Federation

Policy for management and protection of the coast

Coastal Engineer IV, Mott MacDonald, Morado Circle, Suite 300, Austin, TX 78759, USA, T: ,

Sunshine Coast Council Coastal Management Overview. January 2016 edition

Karyn M. Erickson, PE, D.CE, F.ASCE

ORDINANCE NO

Coastal and River Erosion Control. Erosion

Lessons Learned from Katrina and Reducing Vulnerability Fall 2011

SOUTHWEST BROOKLYN WATERFRONT STUDY

SHORE PROTECTION ACT STAFF S FINDINGS & RECOMMENDATIONS

Coastal Erosion Commission: context, examples, and next steps

Folly Beach Planning Commission

Towards a Resilient Stormwater Future: Building Back from Hurricane Irene and Tropical Storm Lee. October 15, 2015 VUSP Symposium

Monitoring and Maintenance Permit Process

Jack Creek Park Capital Improvement Project

HUDSON RIVER WATERFRONT. Hudson River Waterfront Walkway

Risk Analysis Tools to Support Resilient Design

TABLE OF CONTENTS PAGE

Living Shoreline Professionals Advanced Training. August 24 & 31, 2017 Hosted by Virginia Institute of Marine Science College of William & Mary

Coastal hazard assessments in Victoria

COASTAL MANAGEMENT ELEMENT. Last amended December 6, 2016 as part of the 2016 EAR

WEATHER IT TOGETHER Building Resilience. The Annapolis Model for Cultural Resource Hazard Mitigation Planning

Karen A. Duhring Marine Advisory Scientist Center for Coastal Resources Management Virginia Institute of Marine Science College of William & Mary

VÄRDESKAPANDE ARKITEKTUR MED UTGÅNSPUNKT I EKOSYSTEMTJÄNSTER. NEW YORK, KÖPENHAMN OCH KIRUNA - NIELS DE BRUIN, PARTNER - WHITE ARKITEKTER

GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE

Introducing Green Infrastructure for Coastal Resilience

Governors Island Board of Directors Presidents Report

SURREY COASTAL FLOOD ADAPTATION STRATEGY (CFAS) Phase 1 Open House

Baylands Segment J. Bay between the Golden Gate and Segment J. Coyote Point. of For managed ponds. included habitat enhancement.

HARVARD PROJECT ON SOUTHWEST FLORIDA AND SEA LEVEL: THE CASE OF COLLIER COUNTY (INCLUDING NAPLES, MARCO ISLAND & EVERGLADES CITY)

the future of existing conditions A Multidisciplinary Approach to Resilient Coastal Design

Russ J. Joffrion, P.E. Whitney Thompson, P.E.

Flooding Hearing: Long and Short Term Strategies

5 TH ANNUAL CAPE COASTAL CONFERENCE COONAMESSETT RIVER RESTORATION PROJECT. Elizabeth H. Gladfelter, Ph.D. Conservation Commission Town of Falmouth

NORTH KINGSTOWN PILOT PROJECT May 9, 2016 North Kingstown Town Council

C O A S T A L M A N A G E M E N T E L E M E N T

THE PROTECTION OF CHATHAM COUNTY S NATURAL RESOURCES - THE POLICY SIDE

RESILIENCY, ADAPTATION, & SUSTAINABILITY AT THE CITY OF ST. AUGUSTINE

CHATHAM COUNTY S PATH TO SUSTAINABILITY - THE NATURAL RESOURCES SIDE

Local Planning to Advance Implementation of Living Shorelines at Municipal Properties

Preparing New Hampshire for Projected Storm Surge, Sea-Level Rise, and Extreme Precipitation

Fulfilling the Promise of Parks to People in a Changing Environment: The Gateway National Recreation Area Experience

TAPPING THE INGENUITY OF STUDENTS TO DESIGN A RESILIENT TEXAS COAST

CAMA LAND USE PLAN TOWN OF KITTY HAWK IMPLEMENTATION STATUS REPORT 2013

Design Guidelines for the Enhancement and Creation of Estuarine Habitats in the Middle Reaches of the Lower Columbia River

Use of sand-filled geotextile tubes for sustainable coastal protection-case studies in Indian scenario

Ci.ty e>f -V--:1rgi.rria Beach

Fact Sheet Regulating Oceanfront Accessory Structures Updated June 10, 2013

Transcription:

Improvement of the Atlantic Coast of New York City, Rockaway Inlet to Norton Point Project at Sea Gate Meeting Purpose The U.S. Army Corps of Engineers, the New York State Department of Environmental Conservation, and the New York City Department of Parks and Recreation invite you to learn about the upcoming project at Sea Gate. The project will improve the functioning of the existing Coney Island Project, which was constructed to reduce property damages due to storm surges and waves from the Atlantic Ocean. 7:00 7:15 Welcome and Poster Board Viewing 7:15 9:00 Informational Poster Board Session

The Coney Island Project Features: Beachfill on approximately 3 miles of public beachfront from Corbin Place to W 37 th Street Extension of the Terminal Groin at W 37 th Street Placement of a sand fillet to the west of the W 37 th Street Terminal Groin in Sea Gate Periodic beach nourishment from 1995 to present Extension of three outfall pipes Constructed 1994 1995 Gravesend Bay Norton Point Sea Gate W 37 th St. Groin Atlantic Ocean Corbin Place

Project History 1986: Project authorized for construction by the Water Resources Development Act of 1986. Subsequent reauthorization was provided by the Surface Transportation Act of 1991. 1995: Initial construction of Coney Island Project. Project included widening and elevating beach from Corbin Place to the W 37 th Street Terminal Groin. Project also included placement of sand west of the W 37 th Street Terminal Groin (Sea Gate community). 2000: As sand placed west of the W 37 th Street Terminal Groin eroded and drifted to the Gravesend Bay side of Sea Gate, the USACE obtained authorization for the Sea Gate Project to improve project performance (WRDA 2000). This authorization included the placement of sand west of the W 37 th Street Terminal Groin, as well as the construction of T groins. This work will serve to protect the W 37 th Street Terminal Groin from flanking and will reduce rapid erosion of fill on the Atlantic coast of Coney Island/Sea Gate that occurs from the groin westward to Norton Point. 2004: USACE New York District completes Limited Reevaluation Report for the Sea Gate Project and designs project. 2012: Hurricane Sandy hits the northeast, significantly impacting coastal communities. The Disaster Relief Appropriations Act of 2013 (Public Law 113 2), often referred to as the Sandy Relief Bill, is later signed into law. Provides funding (100% Federal) to construct the Sea Gate project. 2014: USACE New York District completes Limited Reevaluation Report for the Sea Gate Project by updating it to post Sandy conditions. Construction contract slated to be awarded Fall 2014.

The Disaster Relief Appropriations Act of 2013 The Disaster Relief Appropriations Act of 2013 was passed by Congress and signed into law by the President on January 29, 2013 as Public Law 113 2 (P.L. 113 2). The legislation provides funding to construct projects in areas impacted dby Hurricane Sandy, and to reduce future flood risk ikin ways that will support long term resiliency. Provides $5.08 billion to the U.S. Army Corps of Engineers to address areas impacted by Hurricane Sandy. Requires projects to be: Updated to current engineering standards Economically justified Environmentally acceptable Support long term sustainability and resiliency

The Problem Rapid sand erosion in Sea Gt Gate west of W 37 th Street t Terminal lgroin. Accretion of sand along Gravesend Bay. Flanking: water breaking around the landward end of a groin Flanking will result in scouring landward of the groin and will compromise its stability. Risk of flanking the W 37 th Street Terminal Groin, which the landward end of a groin. may lead to groin failure and significant impact to the Coney Island Public Beach. Repeated beachfill events were needed to mitigate the erosion at Sea Gt Gate. Date Action Quantity of Fill (CY) October 1994 January 1995 May 1996 July 1996 July 1997 April May 2000 May 2000 October 2000 March 2001 March May 2004 July Sep 2013 Initial construction Removal: Project offshore borrow area Placement: e Corbin Place to B42nd Street Bypassing from updrift of W37th St. groin to Sea Gate side Removal: W23rd Street to W37th Street Placement: W37th Street to B38th Street Removal of accumulated sand at Sea Gate Gravesend shoreline Removal: Bay View Avenue area, Gravesend Bay Placement: W37th Street to B38th Street Navigation dredging of Anchorage Area #25 north of Gravesend Bay Removal: Anchorage Area #25 Placement: W37th Street to B42nd Street Removal of accumulated sand Sea Gate Gravesend shoreline Removal: Sea Gate Avenue to B51st Street Placement: W37th Street to B38th Street Sand placement using backpassed sand material accumulated offshore of Gravesend Bay. Construction of stone flanking revetment, landward end W37th Street groin. Removal: offshore deposition basin NW corner of Coney Island Placement: W37th Street to B42nd Street Backpassing accumulated sand. Removal: B51st Street to Bay View Ave Placement: W37th Street to B40th Street Sea Gate Atlantic Shore FCCE construction Post Hurricane Sandy. Reconstruct Beachfill to initial construction template. Removal: Jamaica Bay Inlet Channel (Rockaway Inlet) Placement: W37th Street to Corbin Place 2,317,513 30,000 1,200 60,000 20,000 110,000 22,000 679,000 HOW DO WE KEEP SAND ON THE BEACH?

Finding a Solution Since the late 1990s, the USACE has studied ways to reduce sand erosion in Sea Gate west of W 37th Street Terminal Groin and accretion of sand along Gravesend Bay. Many alternative solutions investigated: Deposition Basin Spur Groin with Terminal Groin Groin Field Offshore Breakwaters T groins Revetment Gravel Beaches and Perched Beaches Alternatives evaluated for cost effectiveness, efficiency, engineering performance, and environmental acceptability.

The Solution T Groins T groins help with sand retention and maintaining the shoreline position. T groins are found in many coastal environments with erosion problems. Royal Marco Point, FL Port Everglades Broward County, FL

Physical Model of the T Groins 1 2 3 4 5 6

T Groins at Sea Gate Gravesend Bay Gravesend Bay Borrow Area (Partial Borrow Source) Norton Point Dike (Rehabilitation) T-groins and Spur (Construction) 37th Street Terminal Groin (Rehabilitation)

What Will It Look Like? Pre construction Post construction View from the shore at mean high water one year post construction One year post construction

Project Schedule Project Completion Fall 2014 Contract Award Fall 2014 Winter 2016 T groin Construction Spring 2016 Sand Placement Spring/Summer 2016 Completion Construction Stone for T groins likely transported by barge. Construction activities will be coordinated over the 2015 beach season to minimize disruption. 150,000 000 cubic yards of sand from the Jamaica Bay Federal Navigation i Channel and Gravesend Bay will be hydraulically placed within T groins. Operation and Maintenance Responsibility of the NYS Department of Environmental Conservation, NYC Department of Parks and Recreation, and the Sea Gate Association.