Natura 2000 network or a sum of sites

Similar documents
GREEN NETWORK APPLICATIONS IN ESTONIA

Green Infrastructure Enhancing Europe's Natural Capital

Why the workshop, why the cases?

Green Infrastructure. IENE 2012 International Conference

What is green Infrastructure (GI)?

PRESENTATION ON JOHANNESBURG S BIODIVERSITY PROGRAMME

Delivering benefits beyond biodiversity conservation

Good practices in management planning for Natura 2000 sites

Green Infrastructure Case Study Template

Green Infrastructure Enhancing Europe's Natural Capital Marco Fritz DG ENV.B.2, Biodiversity

River Kleine Nete : Creating ecological flooding zones at recreation areas

Landscape Conservation Design April, 2014

NON-TECHNICAL SUMMARY

green infrastructure and biodiversity

Chapter 3: Natural Environment. Proposed Waikato District Plan Stage 1. (Notified version)

Nature & Biodiversity

Annex D: Project Logframe Matrix

GIS to Estimate Archaeological Site Loss and Develop Conservation Strategies

THE SPATIAL PLAN AND THE LANDSCAPE IN CZECH REPUBLIC

SPANISH TOWN, ST. CATHERINE JAMAICA

Surrey Ecosystem Management Study

Biodiversity and Urban Streets

STEWARDSHIP OF LONG ISLAND SOUND S ECOLOGICAL AND RECREATIONAL RESOURCES

Green Infrastructure Enhancing Europe's Natural Capital The European Commission s Green Infrastructure Strategy

Local Action for Biodiversity in the Brussels Capital Region

Road Ecology in Practice: Building Resiliency of Urban Ecosystems through Informed Road Network Planning

Natural Environment White Paper & new partnerships to deliver green infrastructure. Henry Smith, Project and Policy Assistant, TCPA

Biodiversity Conservation

European Commission initiatives for connectivity and landscape scale biodiversity conservation - and their link to Natura 2000

Phase I Ecological Network Report Terms of Reference

KHARTOUM GARDEN CITY. Dietmar Kamphans

Wise use of floodplains - a demonstration of techniques to evaluate and plan floodplain restoration LIFE99 ENV/UK/000203

DEFINITION, SPECIFICATION AND GIS LAYER CREATION OF LANDSCAPE FEATURES IN SLOVAKIA INCLUDING POSSIBLE SAPS CONSEQUENCES

Resolution XII NOTING also that with the increasingly rapid urbanization, wetlands are being threatened in two principle ways:

Town of Vershire Road Erosion Inventory Report

BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 5 IMPERVIOUS SURFACES

Environmental Assessment (Scotland) Act 2005: Clackmannanshire Council Sustainability Strategy Scoping Request

Rooley Moor Neighbourhood Development Plan

Alpine Green Infrastructure Joining forces for nature, people and the economy

Implemented by. Integrated Resource Management in Asian Cities: the Urban NEXUS

Sectoral workshop on Green infrastructure implementation. Multiple benefits of Green Infrastructure

RURAL ZONE - POLICY. Rural Zone Policy. Issue: Rural Environment. Ruapehu District Plan Page 1 of 8

COLORADO S Comprehensive Wildlife Conservation Strategy Linking Conservation and Transportation Planning August 15, 2006

Manor Ponds, Sheffield

Key Elements of Successful Conservation Planning. John Paskus October 17, 2013 Pierce Cedar Creek Institute Michigan Natural Features Inventory

The principle and method of urban ecological restoration planning. Xia Xiaotang

Making Space for Nature A Leicester Case Study. Dr Helen O Brien Leicester City Council

E16: MAINTENANCE OF LANDSCAPED AREAS

If I can be of further assistance, please done hesitate to contact me.

Soil resources in upper Basho Valley.

General Manager of Planning, Urban Design and Sustainability

Draft Resolution XII.10

Hidden Pointe Landscape Master Plan. June, archi terra

Blue Plan Regional Activity Centre

Landscape Guidelines. Landscape type: Valley Pasture Character areas: Frome Valley Pasture Stour Valley Pasture. Landscape change

River Restoration in Urban Areas. Petra Podraza

Step by step, the construction of a coherent overall restoration on the Seine estuary the role of GIP Seine-Aval

Donauauen - Restoration and management of the alluvial flood plain of the River Danube (Alluvial Zone National Park) LIFE98 NAT/A/005422

German ecological network legal base, scientific foundation and international context

On the way to HARMONY. Ewa Kaczmarczyk

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date:

Priority Delivery Areas for Landscape Scale Conservation in the South West ( )

Recognising & encouraging conservation in the areas where we live & work

CREATING GREEN INFRASTRUCTURE FOR IRELAND

LANDSCAPE GUIDELINES. Countryside & Coastal Countryside Environments. Landscape, Natural Character & Amenity Values Guide

Review of the Environmental Impact Assessment (Agriculture) (Wales) Regulations 2007

Brockton. Produced in This report and associated map provide information about important sites for biodiversity conservation in your area.

Balancing Conservation and Development on the Jordan River

Environmental Impact Assessment (EIA) Training Session

Green Infrastructure Enhancing Europe's Natural Capital

ENVIRONMENTAL ISSUES and TEN-T PROJECTS Key elements for a sustainable network development

HRA PLANNING Chartered Town Planning and Environmental Consultants

7. Biodiversity & Conservation Areas

Conservation Plan. I. Property Information. II. Objectives. Natural Resource Objectives. Sustainability in Practice (SIP) Certified

Terra Nova Rural Park Plan

3. Highway Landscaping Assessment

Parks & Landscape Services Section, Municipal Services Department

INTRODUCTION Key Issues and Findings Goals, Objectives, and Policies - Natural Resources - Map M18 - Environmental Resources

Conserving Illinois North Shore Ravines

THE EMERALD NETWORK. A tool for the protection of European natural habitats

Report or technical documentations of the target areas in Siauliai

Policy DM19: Development and Nature Conservation

Opportunistic approaches to incorporating multi-functioning SuDS into housing redevelopments

Demonstration and experimental soil conservation project for municipalities in the Madrid periurban area. LIFE98 ENV/E/000347

Landscape Strategies for Promotion of Urban Biodiversity Involvement of Ecologists Maryann Harris Past-President Irish Landscape Institute

10.0 Open Space and Public Realm

GENERAL LAND USE PLAN ELEMENT

BRE Strategic Ecological Framework LI Technical Information Note 03/2016

Watford Local Plan Part 2 Publication Stage Environmental Report. Appendix 3: Consultation Comments

River Restoration Practices:

Water Vole (Arvicola terrestris)

Mollers Lane, Leopold, Victoria Significant Landscape Overlay Re-assessment

Design, implementation and cost elements of Green Infrastructure projects

South West Nature Map - A Planners Guide

Chapter 5: Natural Resources and Environment

STORMWATER MANAGEMENT PLAN: ERAND GARDENS X70

SUSTAINABILITY PLAN OTTAWA COUNTY PARKS AND RECREATION COMMISSION FALL 2017

systems is available on the Colorado Wetland Information Center (CWIC) website.

3-2 Environmental Systems

Association Europeenne pour le Fleurissement et le Paysage / aisbl. Entente Florale Europe Portfolio PORTFOLIO 2019

Transcription:

Natura 2000 network or a sum of sites Analysis of the connectivity of target zones with other Natura 2000 sites Summary Goal of the analysis Analysis was made within project Restoration and conservation of riparian forests of habitat type *91E0 in Natura 2000 sites and model areas in Bulgaria, LIFE13 NAT/BG/000801. In particular in relation to the implementation of activity A5: Analysis of the connectivity of target sites with other Natura 2000 sites. In order to improve the ecological connectivity of the Natura 2000 sites from the network, the Habitat Directive requires from the member states to encourage management and protection of the characteristics of the landscape that are important for the flora and fauna on the level of special planning. This requirement is also set in the Bulgarian legislation, but the primary expectations before the analysis were that it was currently just left on paper. The implementation of this activity is a test for the future work on the issues of connectivity of Natura 2000 sites. The analysis was made for Maritsa River and its connection to 4 other Natura 2000 sites and namely Chirpanski vazvishenia, Orizisha -Tsalapitsa, Reka Mecka and Chinar Dere. Method of work The work was done in the following sequence: 1. Choosing of 10 focus species of different groups that are to be protected in the Reka Maritsa site. For these species the structural or functional connectivity with other sites is of crucial importance for the migration, resettlement, vulnerability of fragmentation and finding new habitats in the risk of climate change. 2. For the chosen species identification of their specific basic requirements for the landscape (for example types of habitats regarding the level of suitability, types of barrier elements, thresholds of areas, lengths, etc. for the previous two criteria, etc.) that guarantee permeability, functional or structural connectivity between the sites. 3. Mapping through GIS of the main elements related to the structural and functional connectivity of the considered sites. The aim is to determine which territories respond to the requirements of the species for movement between the sites. 1

4. Analysis of the planning documentation that regulate the activities in the relevant territories: Regional plan for development; municipal plans for development; forest management plans; general special plans, etc. The following information is being extracted: land purpose and plans for the territory in the relevant planning document. 5. Identification of the current or potential threats for change of the land purpose of the territories that allow connectivity. 6. Preparation of recommendations for special planning of the territories that guarantee the protection of wildlife corridors. 7. Identification of potential places appropriate for future conservation activities aiming at improvement of the permeability functional or structural connectivity between the sites. Resume of the results The species are: Barbus cyclolepis, Triturus karelinii, Bombina bombina, Elaphe sauromates, Testudo hermanni, Testudo graeca, Emys orbicularis,, Vormela peregrusna, Spermophilus citellus. The connecting elements between the sites are known as wildlife corridors. In the table below are shown the elements of the landscape that are important for each species. Connecting elements Rivers Stagnant water Species Barbus cyclolepis Emys orbicularis Triturus karelinii Emys orbicularis More detailed description / habitat Middle and upper river courses where the water is fast the bottom is covered with sand, gravel or stones. Plain or mountain rivers with vegetation of Ranunculion fluitantis and Callitricho-Batrachion Rivers with muddy banks with Chenopodion rubri and Bidention p.p. Fresh water basins mostly overgrown with dense vegetation or inaccessible rocky shores and adjacent coastal strip with a width of 20-100 meters. Of particular importance are deep rivers, canals. Solid oligotrophic to mesotrophic waters with benthic formations of Chara. 3140 Natural eutrophic lakes with vegetation of the type Magnopotamion or Hydrocharition. Backwater, old river beds and abandoned rubble dams 2

Thinned forests and shrubs Bombina bombina Elaphe sauromates Testudo hermanni, Testudo graeca Natural and artificial lakes, rivers, springs, canals, temporary puddles, etc. Prefers ponds with abundant vegetation. микроязовири Thinned forests and shrubs or steppe vegetation, hollows gorges, headlands. Rarely enters the outskirts of wetlands. West Eurasian deciduous bushes (thickets) of hornbeam, thorn, lilac and others. Hard-leaved bushes Thermophilic and sub-mediterranean oak woods (oak, oak, oak) Thermophilic mixed forests (hornbeam, ash, linden, maple, etc.). Riparian forests Open fields with natural vegetation Testudo hermanni, Testudo graeca, Vormela peregrusna Spermophilus citellus. Grassy steppe grasslands and dry limestone terrains Heaths, rocky places, bushes, vines, gardens, farmyards, meadows, grassland valleys, canyons and more. Open uncultivated areas covered with low grass (meadows, pastures, dry steppes, headlands, along roads, etc.). The analysed planning documents are: Regional plan for development; Regional special scheme, municipal plans for development; general special plans, Plan for management of river basins, etc. The following information was extracted: Information for the land purpose and way of permanent usage of the territories that are important for the connectivity of the protected sites. Planned changes in the land purpose and way of permanent usage of the relevant territories as well as important investment intentions. Measures and mechanisms for protection of the connecting elements of the landscape that are marked in the different planning documents. Conclusions from the analysis of the planning documents The territorial scope and status of protected sites from Natura 2000 is reflected in most of the plans, mainly because of the legal restrictions on territorial development and their potential for ecotourism. Not reported, however, are the connecting elements of the landscape in areas without a special legal status. Good exceptions to this trend are the measures to improve the ecological status of waters in the river basin management plan and the concept of Municipal Environmental Network of Maritsa Municipality. 3

Often the measures in the Regional plans for development related to management activities in riverbeds are measured in very simple and unambiguous indicators like number / km of cleaned riverbeds / gullies. The measures for the development of green systems of settlements in many cases are logically separated from the conservation measures for the biodiversity and protected areas / sites. Some of the plans for the new planning period mention concerns related to the impacts of climate change. Adaptation measures, however, are mostly related to engineering infrastructure. The potential for adaptation on the landscape and ecosystem level is not counted. Plans and strategies for 2014-2020 are much more specific regarding the financial parameters, probably due to the increased capacity of municipalities and regional administrations to handle project financing. At the same time almost can not be found specific financial projections for measures aimed at biodiversity. It can generally be concluded that Art. 30 pararagraph 2 of the Biodiversity Act is not being applied or is applied in limited circumstances. Threats for wildlife corridors Main threats to connecting wildlife corridors are felling of coastal trees, construction of dykes and water power plants, fragmentation from road infrastructure, drainage, burning, change of the land use, urbanization, plowing pastures, meadows, pollution, building of solar parks and quarries in water currents. Specific threats identified in planning documents are: Change of land purpose of terrains that are within or in immediate vicinity of the main wildlife corridors of Reka Maritsa site BG0000578 with the neighbouring protected sites. Examples for this are the new multifunctional areas around E80 main road Plovdiv-Pazardzhik. Measures for flood protection or irrigation measures are not in accordance with the environmental objectives of the territory. These may be for example removal of riparian vegetation or building of rapids along the rivers Martinka, Tekirska, Omurovska, Potoka, Mechka and Chinar dere. Measures for flood protection or irrigation measures are not in accordance with the environmental objectives of the territory. These may be for example removal of riparian vegetation or building of rapids along the rivers Martinka, Tekirska, Omurovska, Potoka, Mechka and Chinar dere. Intensive agricultural or other use of the terrains that are very close to the wildlife crossings under Trakia Highway. 4

Recommendations for spatial planning to ensure the protection of the territories providing connectivity Integration of the provisions of Art. 30 paragraph 2 of the Biodiversity Act in the new general plans and development schemes at municipal and higher spatial level: The specific spatial solutions for the protection and maintenance of the connecting elements of the landscape can be varied and depend primarily on the willingness of the contracting administration and the degree of awareness of the expert teams preparing the relevant projects. Perhaps in many cases it will be necessary to make compromise between the objectives of urban development and the objectives for environmental protection for the territory. The existing landscape elements with natural or semi-natural vegetation shall with priority be related to the areas with functional purpose as forests and green areas in the respective plans. As far as possible, their purpose shall not be converted into residential, industrial or other urban areas, while ensuring their spatial connectivity. This applies to rivers and their banks, watered old riverbeds, wetlands, flood plains, forest shelterbelts and other forest vegetation in the plains. Municipal and regional development plans shall include measures for the maintenance and restoration of protected areas and green connections between them. This will allow easier justification for public funding of restoration projects. The integration of the National Ecological Network as ecosystem measure for adaptation to climate change in planning documents and strategies. Documents 1. Report for the requirements of wildlife corridors between Natura 2000 sites BG0000628 Chirpanski vazvishenia, BG0000436 Reka Mechka, BG0000438 Reka Chnardere and BG0002086 Orizishta Tsalapitsa with BG0000578 Reka Maritsa 2. Maps of the analysed sites general map and separate maps for each one of the four sites with Reka Maritsa site. 3. Analysis of the planning documents that regulate the activities within connecting elements of the landscape between protected sites from Natura 2000 network. 4. Report from the analysis of the forest territories connecting the researched protected sites. 5