STRATEGIC DIRECTIONS 2 AND 3

Similar documents
PUBLIC SPACES MASTER PLAN UPDATE (POPS) Crystal City Citizen s Review Council October 24, 2018

DRAFT VISION/ STRATEGIC DIRECTIONS

PUBLIC SPACES MASTER PLAN UPDATE (POPS) Joint Facilities Advisory Commission (JFAC) November 28, 2018

POPS Advisory Committee Meeting May 31, 2018

Arlington, Virginia is a worldclass

Toronto Parks Renaissance Strategy

10.0 Open Space and Public Realm

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) ; TDD (651)

This page intentionally blank.

Executive Summary. Parks and Recreation Plan. Executive Summary

Mendota-Lebanon Hills Greenway Master Plan Executive Summary. August draft for more information visit

Whitemarsh Comprehensive Plan Update: Housing & Land Use. Public Workshop #3: September 20, 2018

Potential Green Infrastructure Strategies May 6, 2015 Workshop

3. VISION AND GOALS. Vision Statement. Goals, Objectives and Policies

Animating the Rideau Canal December 2013

City of Nogales General Plan

Streets for People, Place-Making and Prosperity. #TOcompletestreets

A larger version of this map is located on the last page of this PDF.

Silverdale Regional Center

University of Saskatchewan CAMPUS MASTER PLAN. Senate Meeting Preliminary Presentation. April 21, 2018 DIALOG ECS DA WATT

Mendota Heights 2040 Comprehensive Plan Draft Vers

TOWN OF BETHLEHEM MEETING SUMMARY LOCAL WATERFRONT REVITALIZATION PROGRAM UPDATE

PARK AND RECREATION MASTER PLAN UPDATE

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) ; TDD (651)

Please read the entire document

INTRODUCING THE BALTIMORE CITY GREEN NETWORK VISION PLAN

The Palisades Interstate Parkway and Henry Hudson Drive designated a New Jersey State Scenic Byway, 2005

W&OD PARK MASTER PLAN. The City s Greenest Street. DRAFT W&OD Trail Master Plan v4.docx Page 1

FUNDING CORRIDOR REVITALIZATION

A 10-Year Strategic Plan for Recreation, Parks, Arenas and Culture City of Peterborough

Summary of Action Strategies

Chapter 1: Introduction

Working together to leverage limited Funds

CITY OF BEACON NOTICE TO LANDSCAPE ARCHITECTS GENERAL INFORMATION AND REQUEST FOR PROPOSALS

CHAPTER VIII Implementation

SALISBURY TOMORROW Our Vision

CAL POLY MASTER PLAN UPDATE, March 2015

RIDGES TO RIVERS OPEN SPACE NETWORI< OF THE MID-COLUMBIA DRAFT ACTION PLAN

PARKS AND RECREATION

Objectives and Strategies for the Integration of Recreation, Parks and Open Space in Regional Plans

Rosemount Greenway Master Plan Executive Summary. draft. Spring for more information visit

Metropolitan Parks and Open Space Commission

City of Tacoma Planning and Development Services

Plano Tomorrow Vision and Policies

Courthouse Planning Area

Trail Feasibility and Planning Project for Northern Dutchess County, New York

Urban Greening Plan Proposed Policies and Programs Matrix Existing City Plans and Goals Programs Policies Notes/Comments

RECREATION AND OPEN SPACE ELEMENT GOALS, OBJECTIVES, AND POLICIES

M E M O R A N D U M. DATE: July 19, Patrick D. O Keeffe, City Manager. Economic Development & Housing

The Five Components of the McLoughlin Area Plan

East Bench Master Plan Update

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT-2

Report to: Development Services Committee Report Date: April 24, 2017

The John Bartram Association Action Plan to advance the 10 year Strategic Plan

CHAPTER 8 ISSUES, CONCERNS, CONSTRAINTS AND OPPORTUNITIES

Oroville Area Urban Greening Plan. Joint Meeting of the Oroville Planning, Park, and Arts Commissions October 12, 2015

A BLUEPRINT FOR BROCKTON A CITY-WIDE COMPREHENSIVE PLAN

STAFF RECOMMENDATION: Adopt the Parks and Recreation Master Plan 2013, or take other action as deemed appropriate.

Comprehensive Plan ADOPTED APRIL 2014

Regional Open Space Conservation Plan. Regional Staff Committee January 18, 2018

Planning Board Briefing

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

HILLSBOROUGH COUNTY Greenways and Trails Plan Update. Executive Summary. Date

Downtown Whitby Action Plan

Corridor Vision. 1Pursue Minnehaha-Hiawatha Community Works Project. Mission of Hennepin County Community Works Program

Preliminary Plan Framework: Vision and Goals

Office of Greenways & Trails Providing Statewide Leadership and Coordination. Southeast Greenways and Trails Summit October 1-3, 2017

Oroville Area Urban Greening Plan. Second Communitywide Workshop

TOWN OF NEW CASTLE - Master Plan Update

CHAPTER 8: PARKS, RECREATION, TRAILS, AND OPEN SPACE

ALLEN CREEK GREENWAY. Citizens Advisory Committee Meeting #5 July 19, Allen Creek Greenway Master Plan. July 2017

Community Design Guidelines. Port Wallace DRAFT

Noblesville Alternative Transportation Plan 2015

DRAFT FOR PUBLIC REVIEW. Game Plan for a Healthy City

Town of Peru Comprehensive Plan Executive Summary

Preface. Erie. Scranton. Allentown. Pittsburgh. Harrisburg. Philadelphia

2011 ASLA Design Awards. Westside Creeks Restoration Plan Merit Award AECOM, Fort Collins. Planning & Urban Design

ELK GROVE GENERAL PLAN VISION

1 Introduction. Chapter. In this chapter:

The Value Proposition of New Urban Parks in Small Cities: Exploring Newburgh, New York as a Prototypical Case Study

CAMPUS PLACEMAKING: CAC WORK SESSION. August 23, 2018

WORKSHOP PURPOSE PERRY COMPREHENSIVE PLAN COMMUNITY WORKSHOP APRIL 4 TH, 2013 WHAT IS A COMPREHENSIVE PLAN? AGENDA

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT

CHOUTEAU GREENWAY INTENDED OUTCOMES AND GOALS

Smart Growth for Dallas

Rich Valley Greenway Master Plan. Central Greenway Connectivity Study

The following principles guide the development of goals and strategies to protect and promote these amenities:

FOSTER COMPREHENSIVE PLAN UPDATE CIRCULATION

Sustaining Historic Public Landscapes Preservation & Sustainability for Our Shared Heritage To Enhance Quality of Life & Experience of Place

8implementation. strategies

City of Hermosa Beach Administrative Policy #

Secrest Short Cut and Monroe Expressway Small Area Plan AUGUST 29, 2018

Blue/Green Infrastructure Study Accomack County, VA

Pittsfield Action Plan (West Branch of the Housatonic River)

Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions

Statewide Greenways Vision

The River Future. San Gabriel River Confluence with Cattle Canyon Creek Improvements Project (the Cattle Canyon Project)

Provide and maintain sufficient public parks, recreation facilities, and open space to meet the recreational needs of County residents and visitors.

2030 Comprehensive Plan VISION STATEMENT

Phase 1 : Understanding the Campus Context. Phase 2 : APPROACHES - Alternates & Preferred Plan

Transcription:

STRATEGIC DIRECTIONS 2 AND 3

AGENDA Process Review (5 minutes) Strategic Direction 2: Trails (45 minutes) Break (10 minutes) Strategic Direction 3: Natural and Cultural Resources (45 minutes) Level of Service Sample/Preview (5 minutes) 2

ADVISORY COMMITTEE AND PUBLIC MEETING TIMELINE JUL-AUG 16 definitions, strategic direction prioritization TBD present draft formatted plan document options for classification + LOS standards 2 POP-UP EVENTS strategic directions, actions, action steps,+ implementation strategy (responsibilities, partnerships, funding, timeframes, etc.) physical representation of actions, applied LOS standards 4 PUBLIC MEETING SERIES 3 LOS 4 VISION / STRAT. DIR. ACTION STEPS 5 ACTION STEPS 6 ACTION STEPS 7 ACTION STEPS 5 ACTION STEPS 6 ACTION STEPS 7 8 LOS / PHYS. VISION DRAFT PLAN 9 FINAL PLAN FOCUS GROUP MEETINGS aspirational / inspirational vision statement + strategic directions draft formatted plan document FALL 16 present full set of plan recommendations PUBLIC MEETING SERIES 3 WE ARE HERE 3

PLANNING PROCESS Site Evaluations Benchmarking Analysis Best Practices Input Public Meeting Series 1 Stakeholder Interviews Statistically Valid Survey Review Background Materials Community Needs Assessment Master Plan Recommendations Final Plan WE ARE HERE 4

ANALYSIS & INPUT Benchmarking Site Evaluations Public Meeting Series 1 Stakeholder Interviews Statistically Valid Survey Alexandria, VA Bellevue, WA Berkeley, CA St. Paul, MN Bluemont Junction Penrose Park Donaldson Run Gunston CC & Park Long Bridge Park Penrose Square Upton Hills Virginia Highlands Walter Reed CC Welburn Square Langston-Brown CC Courthouse Whitlow s on Wilson Arlington Mill CC Advisory Committee APS Aquatics BIDs & Partners Bike/Ped Dog Parks Gymnastics Natural Resources Urban Forestry Sports Goal: 800 Actual: 1470 5

ADDITIONAL INPUT POPS Popping Up 07-04 July 4th Celebration @ Long Bridge Park 07-09 Central Library 07-10 Fairlington Farmers Market 07-14 Clarendon Farmers Market 07-16 Arlington Farmers Market 07-17 Columbia Pike Farmers Market 07-24 Westover Farmers Market 07-28 Ballston Farmers Market 6

ADDITIONAL INPUT Focus Groups 06-20 Millennials 06-21 Seniors 06-29 Teens 07-19 Gen Xers 7

PLAN ORGANIZATION Introduction Vision Statement Planning Context Previous Planning Efforts Relation to Ongoing Efforts Demographic Trends Recreation Trends Summary of Engagement Existing Conditions Parks Trails Focus Groups Analysis and Standards Benchmarking Access / Level of Service Standards Applied Standards Strategic Directions Policy Recommendations + Rationale Action Plan Implementation Responsibilities Partners Potential Funding Sources Timeframes Vision Plan Physical Manifestation of Action Plan 8

ACTION PLAN Parties responsible for implementation Potential implementation partners Potential funding sources Performance measures for gauging success Time frame for implementation 9

STRATEGIC DIRECTIONS SD1: PUBLIC SPACES SD2: TRAILS SD3: NATURAL AND CULTURAL RESOURCES SD4: PARTNERSHIPS SD5: RECREATION PROGRAMS SD6: MARKETING & COMMUNICATION SD7: FISCAL SUSTAINABILITY SD8: OPERATIONS & MAINTENANCE 10

Strategic Direction 2 TRAILS What We ve Learned Multi-use and hiking trails are among most in demand amenities High usage has caused conflicts between types of users Users need a better understanding of trail etiquette I-395, Fort Myer/the Cemetery, Army Navy Club are barriers Directions difficult due to poor naming and signage Various entities responsible for bike/ped routes is confusing Trail repairs are not addressed quickly analysis/site evaluation public survey/meetings stakeholder/staff interviews 11

Strategic Direction 2 TRAILS Improve the network of trails to, within, and between public spaces to increase access and enhance connectivity. 12

Strategic Direction 2 TRAILS 2.1. Complete an Arlington Circuit of connected, protected multi-use trails. 2.1.1. Complete an inner loop of protected routes that connects the Custis, Four Mile Run, Arlington Boulevard, and Mount Vernon Trails. 2.1.2. Complete an outer loop of protected routes that connects the Four Mile Run, Mount Vernon, Potomac Heritage National Scenic Trails, and the Zachary Taylor Trail or a trail along Williamsburg Boulevard. 13

ARLINGTON LOOP (EXISTING) INNER AND OUTER LOOPS (PROPOSED) Inner Loop 14

Strategic Direction 2 TRAILS 2.1. Complete an Arlington Circuit of connected, protected multi-use trails. (continued) 2.1.3. Evaluate opportunities to create better connections across or around current barriers, including the George Washington Memorial Parkway, I-395, Joint Base Myer-Henderson Hall, Arlington National Cemetery, and the Army Navy Country Club. 15

BARRIERS 16

Strategic Direction 2 TRAILS 2.1. Complete an Arlington Circuit of connected, protected multi-use trails. (continued) 2.1.4. Connect Long Bridge Park to the Mount Vernon Trail. 2.1.5. Fill gaps in sidewalks and on- and off-street trails that connect public spaces to neighborhoods, schools, transit stations, and other County facilities. 2.1.6. Improve and add connections to adjacent trail systems beyond the county. 2.1.7. Expand trail use monitoring to track usage across all major trails by mode, and use gathered data to help guide the trail planning process. 17

Strategic Direction 2 TRAILS 2.2. Ensure trails function for a range of users. 2.2.1. Compile and clarify design standards for all types of trails. 2.2.2. Use striping on paved trails to separate traffic moving in opposite directions. 2.2.3. Ensure paved, multi-use trails are wide enough for passing and that there is sufficient space alongside trails for pulling over. 2.2.4. Educate users about trail etiquette. 18

MODE SEPARATION Trail Etiquette Bicycle Coalition of Greater Philadelphia 19

Strategic Direction 2 TRAILS 2.2. Ensure trails function for a range of users. (continued) 2.2.5. Consider mode separation where feasible on high traffic corridors such as the Custis Trail. 2.2.6. Develop learn to ride areas that provide protected spaces for novice users to learn to bicycle. 2.2.7. Use Wi-Fi to provide public internet access at trailheads. 20

MODE SEPARATION Hudson River Greenway New York, NY 21

Strategic Direction 2 TRAILS 2.3. Provide or make better connections to hiking trails. 2.3.1. Improve the quality of and increase access to Four Mile Run and Potomac tributary trails. 2.3.2. Weigh the benefits of adding hiking trails to protected natural areas against the impacts to natural resources. 2.3.3. Show connections to hiking trails in neighboring jurisdictions on signage and in other communication materials. 22

Strategic Direction 2 TRAILS 2.4. Develop and implement a consistent signage and wayfinding system. 2.4.1. Name all trail segments using descriptive names. 2.4.2. Work with trail owners within Arlington County and neighboring counties and municipalities to develop common trail signage and wayfinding standards for major connective trails. 2.4.3. Develop a County design standard for trail signage and wayfinding that addresses hierarchy, connections, destinations, and identity. 2.4.4. Add location identifiers, potentially integrated into wayfinding signage, at regular intervals along trails for issues/emergencies. 2.4.5. Improve wayfinding signage at trailheads. 2.4.6. Clearly identify what types of users are allowed on each trail. 23

PRECEDENT SIGNAGE PRECEDENT SIGNAGE Existing County Trail Signage Arlington, VA Regional Trail Wayfinding Signage Miami Valley, OH 24

Strategic Direction 2 TRAILS 2.5. Better coordinate planning for and management of onand off-street trails. 25

Strategic Direction 3 NATURAL AND CULTURAL RESOURCES What We ve Learned Residents expressed high unmet need for natural areas High priority put on nature programs Potomac riverfront is difficult to access Four Mile Run lacks cohesive identity Appetite for more tree canopy, native plantings Connection with school curriculums inconsistent Natural resources should not be compromised for built facilities Supporters of natural resources don t know how to get involved Trees not currently allowed along trails analysis/site evaluation public survey/meetings stakeholder/staff interviews 26

Strategic Direction 3 NATURAL AND CULTURAL RESOURCES Protect, restore, expand, and enhance natural and cultural resources, and increase resource-based activities. 27

Strategic Direction 3 NATURAL AND CULTURAL RESOURCES 3.1. Protect and expand riparian corridors along County waterways and tributaries. 3.1.1. Address the protection and expansion of natural resources in Four Mile Run planning and site master plans for parks along Four Mile Run. 3.1.2. Coordinate the protection and expansion of natural resources with the provision of new hiking trails. 3.1.3. Collaborate with the National Park Service to develop a master plan for Roaches Run and Gravelly Point. 28

Strategic Direction 3 NATURAL AND CULTURAL RESOURCES 3.1. Protect and expand riparian corridors along County waterways and tributaries. (continued) 3.1.4. Work with Arlington Public Schools to identify, preserve, and develop enhancement and management plans for natural and cultural resources in site planning for schools. 3.1.5. Develop an agreement with Arlington Public Schools to increase shared resources for management of natural resources on school property. 3.1.6. Consider daylighting streams in public spaces that are currently part of the underground stormwater system. 3.1.7. Pursue easements to protect natural areas and heritage resources. 29

Strategic Direction 3 NATURAL AND CULTURAL RESOURCES 3.2. Integrate natural resources and natural resource interpretation into the design of public spaces. 3.2.1. Promote the planting and maintenance of canopy trees on public and private land. 3.2.2. Continue a robust invasives management program. 3.2.3. Evaluate opportunities to enhance stormwater management features with natural resources. 3.2.4. Add interpretive signage within public spaces that highlight the natural resources within those spaces and the benefits those resources provide. 3.2.5. Expand and promote official recognition programs for important natural resources, such as the Notable/Significant Tree program. 3.2.6. Increase the diversity of habitats for critical species. 30

Strategic Direction 3 NATURAL AND CULTURAL RESOURCES 3.3. Update the Natural Resources Management Plan. 3.4. Update the Urban Forest Master Plan. 31

Strategic Direction 3 NATURAL AND CULTURAL RESOURCES 3.5. Foster, develop, and promote nature-based education and recreation programming across ages and skill levels. 3.5.1. Enhance and expand nature-based interpretive opportunities for children, starting at pre-school age. 3.5.2. Foster additional integration of nature-based education provided by nature centers into public school curriculums. 3.5.3. Provide outdoor leadership training to better connect teens and young adults to nature. 32

Strategic Direction 3 NATURAL AND CULTURAL RESOURCES 3.6. Promote conservation stewardship volunteerism that allows individuals and organizations to leave a positive legacy in the park system. 3.6.1. Continue to identify opportunities for conservation stewardship activities, such as recycling at large events, removing garbage from waterways or parks, planting trees or native plants, or removing invasive plants. 3.6.2. Continue to collaborate with community groups, service clubs, and businesses on conservation stewardship events. 3.6.3. Revise background check requirements and volunteer waivers to reduce volunteers liability and encourage latent volunteerism. 33

Strategic Direction 3 NATURAL AND CULTURAL RESOURCES 3.7. Capitalize on existing cultural resources in public spaces, and evaluate the potential of protecting additional cultural resources. 3.7.1. Inventory cultural resources in public spaces to identify facilities that may be eligible for local landmark or national register designation. 3.7.2. Identify critical cultural resources that may need protection and have potential educational and interpretive components. 3.7.3. Establish cultural resource design guidelines for the treatment of cultural resources in public spaces, and implement a design review process that is consistent with cultural resource design guidelines. 34

Strategic Direction 3 NATURAL AND CULTURAL RESOURCES 3.7. Capitalize on existing cultural resources in public spaces, and evaluate the potential of protecting additional cultural resources. (continued) 3.7.4. Establish an interpretive and education program plan for individual cultural facilities. 3.7.5. Develop and use objective criteria to evaluate whether potential cultural resources should be added to the public space system. 3.7.6. Focus on interpretation of the Federal Arlington, Historic Arlington, and Global Arlington themes as described in the Public Art Master Plan. 35

Strategic Direction 3 NATURAL AND CULTURAL RESOURCES 3.8. Additional action(s) on art, cultural, and historic resources (TBD) 36

LEVEL OF SERVICE PREVIEW 37

5-MINUTE WALK TO TRAILS DRAFT DRAFT 38

5-MINUTE BIKE TO TRAILS DRAFT DRAFT 39

5-MINUTE TRANSIT TRIP TO TRAILS DRAFT DRAFT 40

5-MINUTE DRIVE TO TRAILS DRAFT DRAFT 41

5-MINUTE ACCESS TO TRAILS OVERLAY DRAFT DRAFT 42

ADVISORY COMMITTEE AND PUBLIC MEETING TIMELINE JUL-AUG 16 definitions, strategic direction prioritization TBD present draft formatted plan document options for classification + LOS standards 2 POP-UP EVENTS strategic directions, actions, action steps,+ implementation strategy (responsibilities, partnerships, funding, timeframes, etc.) physical representation of actions, applied LOS standards 4 PUBLIC MEETING SERIES 3 LOS 4 VISION / STRAT. DIR. ACTION STEPS 5 ACTION STEPS 6 ACTION STEPS 7 ACTION STEPS 5 ACTION STEPS 6 ACTION STEPS 7 8 LOS / PHYS. VISION DRAFT PLAN 9 FINAL PLAN FOCUS GROUP MEETINGS aspirational / inspirational vision statement + strategic directions draft formatted plan document FALL 16 present full set of plan recommendations PUBLIC MEETING SERIES 3 WE ARE HERE 43