4MRV Policy Framework Comments from Shirlington Submitted February 6, 2018

Similar documents
ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of April 21, 2018 SUPPLEMENTAL REPORT

County Board Meeting October 20, Request to Advertise Draft Area Plan

FOUR MILE RUN VALLEY WORKING GROUP AND CHARGE

Presentation at 4MRV Working Group. Jeffrey Zeeman Arlington Commission for the Arts

FOUR MILE RUN VALLEY WORKING GROUP AND CHARGE Adopted April 16, 2016 Amended July 19, 2016

Long Range Planning Committee (LRPC) Meeting July 30, :00 PM

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of September 22, 2018

Community Visioning Workshop Prep

VISION AND PRINCIPLES

Arlington, Virginia is a worldclass

Arlington Joint Facilities Advisory Commission Buck Subcommittee. February 22, 2017

4MRV Working Group: Guiding Principles

2.7 ac park. TOTAL 5,403 DU 1,297,900 sf 1,105,450 sf 3.87 ac 5,563 DU 1,121,200 sf 1,105,450 sf 3.87 ac

December 1, 2014 (revised) Preliminary Report -- Thomas Jefferson Site Evaluation

ARLINGTON COUNTY, VIRGINIA

BENJAMIN BANNEKER PARK FRAMEWORK PLAN (PLAN ADOPTION)

Courthouse Square Implementation Comment/Response Matrix

PINE CURVE REZONING. BACKGROUND Purchased as two parcels in 2001 and 2002

Working Group Meeting

Dyersville Downtown Plan. Open House October 24, 2017

February 27, 2018 City Council Presentation The Crown Jewel Park in the City of Fairfax

W&OD PARK MASTER PLAN. The City s Greenest Street. DRAFT W&OD Trail Master Plan v4.docx Page 1

POPS Advisory Committee Meeting May 31, 2018

PINE CURVE REZONING. Property does not meet criteria for open space preservation and is not a candidate for a park

Courthouse Square Planning & Urban Design Study Working Group Meeting #11 September 2, 2014

Future Proposed Development

ARLINGTON COUNTY, VIRGINIA

At first Work Session on October 22, At second Work Session on November 19, At third Work Session on December 3, 2015

TO: FROM: SUBJECT: Background

July 14, 2016 Parks Operations Bldg. Working Group Meeting #2

Arlington County Long Range Planning Committee Meeting

Table of Contents. Elm Avenue Improvement Plan City of Waco, Texas. Introduction 1. Existing Context 1 Figure 1 2.

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of June 16, 2018

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT

Envision Front Royal Workshop 1 of 2

In surveys, Dallas residents say what they want to change most

DOMINION BOULEVARD CORRIDOR STUDY AND ECONOMIC DEVELOPMENT STRATEGIC PLAN A MODEL FOR CHESAPEAKE S FUTURE

Welcome. Walk Around. Talk to Us. Write Down Your Comments

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT-2

ARLINGTON COUNTY, VIRGINIA

1 Welcome! UBC Okanagan Master Plan Update - Open House

Arlington County Retail Plan

Long Branch-Wayne Local Park Renovation Project

St. Kevin s Area Planning Collaborative

Robbinsdale LRT Station. CDI Development Guidelines. August Overview

participant feedback summary

2035 General Plan Update and Belmont Village Specific Plan. Joint Study Session with the City Council and Planning Commission April 12, 2016

PUBLIC SPACES MASTER PLAN UPDATE (POPS) Joint Facilities Advisory Commission (JFAC) November 28, 2018

26/Old Dominion Task Force

Review of Opportunity Area C Draft Comprehensive Plan and Draft BOS Follow-On Motions. Special Working Group Meeting March 4, 2015

The Auburn Plan Designing the Future of Auburn February 28, 2005

12 th Street Connector Alignment Study VISIONING PUBLIC WORKSHOP - JUNE 25, :00PM TO 8:00PM

Official Plan Review: Draft Built Form Policies

CHAPTER 12 IMPLEMENTATION

July 27, 2016 Parks Operations Bldg. Working Group Meeting #3

Laird in Focus Community Information Session

TO: Denver Planning Board FROM: Analiese Hock, Senior City Planner DATE: March 13, 2018 RE:

WELCOME TO THE NEW WILTON PARK

FOUR MILE RUN VALLEY AREA PLAN JUNE 21, 2018 REVIEW DRAFT 1

Public Workshop. November 8, 2014 Key Elementary School

CHAPTER 3 VISION, GOALS, & PLANNING PRINCIPLES. City of Greensburg Comprehensive Plan. Introduction. Vision Statement. Growth Management Goals.

Somers Point Master Plan

Workshop #3 June 13, 2016

PLANNING IN ARLINGTON. Briefing to Katie Cristol

TOWN OF BETHLEHEM MEETING SUMMARY LOCAL WATERFRONT REVITALIZATION PROGRAM UPDATE

Status Report: MD 355 Project

Town Center (part of the Comprehensive Plan)

SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building. Recommendation: Purpose:

Status Update (2006 vs. Now) Citizen s Advisory Committee February Plan for Prosperity

Remi Mendoza City Planning Academy March 13, 2017

University of Saskatchewan CAMPUS MASTER PLAN. Senate Meeting Preliminary Presentation. April 21, 2018 DIALOG ECS DA WATT

Attachment 1 TOWN OF NEW TECUMSETH. Manual for the Preparation of an Urban Design Report

CITY OF UNION CITY MINUTES GENERAL PLAN ADVISORY COMMITTEE

Building Great Neighbourhoods. Strathcona

McLean Main Street Public Forum Exchange of Ideas

Welcome to the Oakridge Centre Open House

City Plan Commission Briefing #2

DRAFT PLAN PRESENTATION

V. Vision and Guiding Principles

Mark-up of the effect of the proposed Bronte Village Growth Area OPA No.18 on the text of section 24, Bronte Village, of the Livable Oakville Plan

Tacoma Mall Neighborhood Subarea Plan & EIS. Planning Commission February15, 2017

PLANNING ADVISORY BOARD AGENDA OCTOBER

WELCOME. Welcome to this public exhibition about the future of the Aylesham Shopping Centre.

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004

NORTH CLAYMONT AREA MASTER PLAN COMMUNITY WORKSHOP #1 FEBRUARY 3, 2016

IMAGINE CLEARWATER. Community Workshop 3. November 2016

Former Temple Cowley Pools, Oxford TEMPLE COWLEY LIBRARY * ELEVATION SHOWN IS INDICATIVE AND SUBJECT TO FINAL DESIGN AND AGREEMENT.

S A C R A M E N T O C O U N T Y JACKSON HIGHWAY & GRANT LINE EAST VISIONING STUDY

INDEPENDENCE BOULEVARD AREA PLAN

THE 355/270 CORRIDOR:

SOUTHEAST SPORTS COMPLEX MASTER PLAN

Introduction. Chapter 1. Purpose of the Comprehensive Plan Plan Organization Planning Process & Community Input 1-1

COMMUNITY DESIGN. GOAL: Create livable and attractive communities. Intent

The transportation system in a community is an

Re: Alameda Point Update Review and Comment on SunCal s September 19, 2008 Development Concept

Questions for Carlsbad City Council Members and Candidates (July 1, 2016)

Master Plan Implementation Committee Meeting

Peoria Avenue BRT Land Use Framework

Rio/29 Small Area Plan. Design Plan & Implementation Framework Open House - January 25, 2018

THE GEORGE WASHINGTON UNIVERSITY MOUNT VERNON CAMPUS

Transcription:

4MRV Policy Framework Comments from Shirlington Submitted February 6, 2018 Dear Richard, Scott and 4MRV Team, Thank you for circulating the draft 4MRV Policy Framework in advance of the Feb. 6th meeting. We ll review it with our community over the next 2 months and convey the feedback we receive. In the meantime, the Shirlington Representatives and Alternates to the 4MRV Working Group have the following comments and specific additions or corrections for this draft. We'll bring copies of this tonight and submit this on the website. Overall We welcome the County's draft Policy Framework and commend Staff for its responsiveness to many community suggestions and requests. We support the Jennie Dean Park Concept (pp. 25-6) and appreciate that Phase 1 and 2 are presented. The phasing makes sense to us. The design meets many of our community's needs and expectations, and provides recreation, improved open, green space and a lovely playground space near new restrooms. It also enhances tree canopy, visual access to the stream, and RPA protection. We enthusiastically welcome the improvements for Shirlington Park, the realistic presentation of Shirlington Dog Park limitations and needs, and the suggestions for Allie S. Freed Park. All of this will improve the connectivity and provide more equitable resources in Arlington's park system along Four Mile Run stream from East Fall Church to the Potomac. Thank you for all the work that went into this. Omissions from Policy Framework 1. Community Center Space and Facilities On November 21, 2016, the three neighborhood civic association presidents wrote to you, the County Board and the Working Group:" our neighborhoods and civic associations urgently need programs and a community center that works with and is a part of the community it serves, to meet the needs we all identify." This space should be walkable from our communities. This Policy Framework indicates the likely redevelopment of the County Parks & Recreation building at 3700 S Four Mile Run Drive. If this building were built up as 3-4 floors, per current County policy, it will surely be possible to provide one floor for community classes, meetings, career training, and similar uses. As we have pointed out numerous times, Nauck has no new community center in the Town Square plan and limited space at Drew Elementary School. The Shirlington community has occasional access to a single, overbooked room at the public library. We would like the Policy Framework and final report to include a specific, clear mention of this. The only further reference to an undefined community facility is on the Future Land Use Map on page 41. Please strengthen the oblique references to community facilities and insert a clear statement

about this need or explain why not. (And no, we don t want to hear that this is suddenly a County-wide process in which South Arlington once again comes too late to the party.) 2. 4MRV Electric Power Distribution Poles and Transformers This Policy Framework does not yet address the need to reconfigure aging, drooping wooden distribution poles and transformers, if not the power transmission towers in 4MRV project area. This has been part of earlier streetscape improvements work below Shirlington Road. In relation to this, we call to your attention the section on "Infrastructure Actions - Undergrounding of Dominion Virginia Power Transmission Lines, Four Mile Run Restoration Master Plan, March 2006, p. 96. Early in the Working Group deliberations, we asked to hear from Dominion Power but this never happened. Let's be clear: only the County working with the utility company can improve the visual blight of distribution poles and transformers along South Four Mile Run Drive Nelson, Oakland and Oxford Streets. The report lacks any mention of this reality. It's awful. How can we possibly rehabilitate this area without tackling this electric power infrastructure? 3. Commitment to Signature Theater Production Center Signature Theater is a vital part of the economic base of the Village at Shirlington and surrounding area, bringing high value patrons to restaurants, shops and services and building our brand through its marketing efforts. The Signature Theater Production Center now located in the Old Signature Theater building on S. Four Mile Run Drive is essential to the theater, which cannot operate without a close-by facility to store and produce sets. If the County proposes to end the lease for this building (per Figure 31, p. 43), even 15-20 years from now, and take the building down to increase park space, that may make long-term sense. A pre-condition, however, should be that the County makes a concrete commitment to ensure that Signature has access to an affordable, equivalent and acceptable space for its production center in the 4MRV project area. Since Signature already plans to raise the funds to renovate the current production center, it would be better to sort this out sooner rather than later. 4. Renovation of Shirlington Road Bridge This infrastructure project is critical to improving safety and the gateway to 4MRV. At the 4MRV Visioning Workshop, attendees spent considerable time on Shirlington Road Bridge. These ideas are not referenced in this Framework. The transportation consultant included a proposal to improve vehicle traffic flow and pedestrian safety by straightening out Shirlington Road south of the bridge. Such a plan would require shifting the bridge a bit to the west. We recognize that this would require using the southeast corner of Jenny Dean Park to accommodate the bridge. We would like to leave room for further discussion of this option with the County transportation staff. Straightening Shirlington Road as part of the bridge repair project might have many benefits. Please adjust the Framework language so as not to preclude such an improvement in the alignment of Shirlington Road.

5. Parking Overall, this Parking Map (Figure 33, p. 45) is confusing because it omits existing parking, especially existing parallel parking. This Map omits the surface parking lot near WETA production studio that you plan to retain in Jennie Dean Park (shown on p. 25). We have written you separately to explain why it is unrealistic to suggest the Village of Shirlington private parking garage agreements approved by CPHD can be renegotiated to accommodate 4MRV patrons (see our email to Staff of Feb. 3rd). Given this, the suggestion should not be included in a formal planning document. Below please find below Page-by-Page Comments. Respectfully submitted, Edie Wilson, Working Group Member for Shirlington Eleanor McCann, Alternate for Shirlington Page-by-Page Comments P. 6 - Setting the Context for this effort - Nauck Town Square is an urban planning concept relevant to the 4MRV plan. The reference here is helpful since the Nauck Town Square is referenced in other parts of the document, e.g. on p. 19. To complement it, however, we suggest you add a page 6A about the key complementary parks system and stream access concept- the Four Mile Run Restoration Master Plan of 2006. This provides important context for the 4MRV parks plan, which is the "missing link" between the stream sections to the east below Shirlington Road to the Potomac and above Columbia Pike to the west. There are many relevant principles and accomplishments of the Alexandria/Arlington joint effort over the past 20 years that are manifested in this Policy Framework. p. 7 Can a legend be added to Figure 5, Study Area Circulation Map? What are the purple roads meant to show? p. 11 - Do you need to note that the M-1 section on Laporte Property is now Countyowned and subject to zoning reclassification to park? Confusing. p. 12 - Insert "theatrical production uses" into second bullet under 4MRV Today section - please be explicit.

p. 20 or elsewhere - Please add a reference to food-related businesses in the Valley, ranging from AFAC to catering to the Shirlington restaurants. Let s remember that culinary training and/or food preparation are desired activities of the local economy. p. 24 - We applaud the reference to Personal Safety issues in the park, as per community requests. Shifting the diamond fields closer to Nelson will enhance their safety, especially at night when adult softball is played. p. 25 - Please be sure to show an additional, formal entrance to Jennie Dean Park from Nelson Street next to the end of the pedestrian bridge. This entrance from the Village of Shirlington is already much used and needs to be recognized. This is described in the Shirlington community s park concept paper of September 2016. p. 25 The text in the gray box below the figure is confusing. This text says that Phase I will include the existing athletic courts, but the drawing for Phase I on p. 24 does NOT include the athletic courts. Phase 2 is when the athletic courts will be restored. Please be clearer. p. 26 - Let's be sure that stream overlook construction is not dependent on public art funds availability and pushed off into the far future. Public art would be welcome, but overlooks are possible without it. Adjust language accordingly. We are very pleased with the three proposed stream overlooks in Shirlington Park, but these overlooks are very hard to see in Figure 17. In the gray text box, what does secondary contact recreation mean? p. 27 - Good summary of dog park needs. p. 28 - Before this is final, please substitute an up-to-date photo showing Laporte site with grass. Date the photograph. p. 31 - Suggest that you reference the 20-year investment in Four Mile Run Stream Restoration efforts here, especially since the stream photos seem to be from that project. p. 32 -- 3.4.d - First mention of "potential trail underpasses" at South Walter Reed Drive. Discuss. p. 36 - Designation of Major Gateways - Given that 200,000+ visits are made to the Shirlington Dog Park each year and that more people will now come to Jennie Dean Park, we would suggest designating the pedestrian bridge on the Shirlington side as the Minor (Major?) Gateway that it is. At the southern edge of Shirlington Road bridge please add another Major Gateway, which should show how to get to Nauck Town Square and to the Village of Shirlington, among other places.

p. 39 We welcome 2.1.c with regard to technical assistance to existing businesses about stormwater compliance, etc. p. 43 - We keep asking for community center space in the Master Plan. Per the discussion above, add language to clarify these community needs. Please amend the legend "future site for enhanced arts and/or recreation facilities/amenities" to read "...enhanced arts, community center, and/or recreation facilities/amenities." This will then align with the legend on p. 41 that reads "community facility/open space." p. 45 - Parking Map - see comments above p. 49 - Please add a page 49A with Map and photos of electric power distribution poles and transformers and location of transmission towers and how this can be improved. We will provide you with recent photos.