EXHIBIT A 2019 FINANCING: PROJECT AUTHORIZATIONS

Similar documents
Lawrence s GIS Coordinator created a map with various geographic centers identified. These centers included: Mean Center of Urban Growth Area

Spring 2018 Construction Update

Index to Projects by Project Name

Planning Districts INTRODUCTION

Special Revenue Funds

Fall 2017 Construction Update

Municipality of Anchorage. Community Council Survey Capital Projects Needs Ranking Survey (ALPHABETICAL) Airport Heights

Index to Projects by Project Name

COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY

Plan Policies. Introduction

Olde Towne Vision Plan

CITY OF BOYNTON BEACH SE 1 ST STREET COMPLETE STREETS IMPROVEMENTS

MPRD s Keith Mione (Community) Park Midlothian Road Entrance Traffic Signals

Abbott Loop. Community Council Survey Capital Projects Needs Ranking Survey. Comm Council Priority Rank. Rank # ABBOTT LOOP COMMUNITY PARK

Monthly Permits Issued for January, 2018

Prince William Street Project (Grant Avenue to Wellington Road)

2017 General Obligation Bond

Play areas overlooking climbing hill. School & playgrounds overlooking pond bottom ballfields. Project experience while at Loris and Associates, Inc.

RESOLUTION NO. PC

Const. ROADS - Description

Town of Yucca Valley Capital Improvement Projects Report July 24, 2014

Monthly Permits Issued for January, 2016

The Vision. Photo provided by The Minervini Group. 46 Vision, Objectives & Strategies

C h a p t e r 4 - L a n d U s e, T r a n s p o r t a t i o n N e t w o r k & S o c i o e c o n o m i c C h a r a c t e r i s t i c s

ROAD PAVING VARIOUS LOCATIONS LANE KM

DEPARTMENT SUMMARY. Departmental Relationship to City Council Goals: Support and Promote the Local Economy

Location. Served. Category. Units Start Year. Previous Appropriations

CITY OF TULSA PUBLIC FACILITIES & INFRASTRUCTURE

CITY OF SIMI VALLEY MEMORANDUM

5-Year Street Reconstruction Plan ( )

Engineering Department

City of Kearney Capital Improvement Update October 1, TH STREET AND 17TH AVENUE IMPROVEMENTS

Title 11 Streets and Sidewalks

Capital Projects Update March 2017

Long Branch-Wayne Local Park Renovation Project

Monthly Permits Issued for December, 2017

Public Works Project Delivery Report

Awarded Small Works Projects

REBUILD GUTTER AND ROLLED CURB TO MATCH EXISTING DETAIL. (TYPICAL) REPAIR EXISTING BENCH FINISH. RETURN TO EXISTING LOCATIONS.

School District of Milton 5- Year Capital Maintenance and Improvement Plan

Chapter Landscaping and Screening

DRAFT ROOSEVELT ROAD. District Recommendations. Figure 5.23 The Roosevelt Road Corridor

8 October 14, 2015 Public Hearing

PROJECTS UNDER CONSTRUCTION

Report or technical documentations of the target areas in Siauliai

Proposed Walkability Ordinance for City of Knoxville (6/16/17)

City of Hartford Capital Improvement Plan 2009/ /2019. Part II: Project Descriptions. Eddie A. Perez, Mayor

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14

FY Capital Improvement Program Arroyo Projects - Lower Arroyo Summary

CAMPUS PLANNING COMMITTEE STAFF REPORT SAMARITAN SPORTS MEDICINE INSTITUTE AT OSU 10/21/2013

[Leveraging & Improving Neighborhood Connections] Area A Riverfront

Town of Cornelius Bond Update August, 2017

Memorandum CITY OF DALLAS. Riverfront Boulevard Design From Continental Avenue to Cadiz Street

Project will Replace: Utilities Curb Pavement Lighting. City of Madison

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

TABLE OF CONTENTS INTRODUCTION PLAN CONCEPT... 3

City of Gainesville Parks, Recreation and Cultural Affairs Infrastructure Sales Tax City Commission Approved Project List

OPPORTUNITIES AND CONSTRAINTS - OXBOW PARK ENTRANCE AND PUT-IN

#8) T-1409 CENTENNIAL & LAMB TENTATIVE MAP

Draft TISCORNIA ESTATE SPECIFIC PLAN/EIR

Roads Plan

Project Output Indicators for Federal Gas Tax Investments

Illustration of Eastlake Farmer s Cooperative Grain Elevator. Chapter 5: implementation 5-1

PRELIMINARY PLAT DESIGN REQUIREMENTS Updated 4/8/2016

CITY OF KITCHENER CONDITIONS REQUIRED FOR ISSUANCE OF SITE PLAN APPROVAL

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

ARTICLE 375. PD 375.

Coco Palms Community Development District. Engineer s Report Infrastructure Improvements

Capital Improvement Plan

29 Bella Fontaine Park

Capital Improvements Program FY18-FY22 Bryan City Council Workshop. May 16, 2017

7.5 Impacts on the Section 4(f) Properties

City of New Bedford STAFF REPORT

LITTLE ELM CAPTIAL IMPROVEMENT BOND STREET PRESENTATION

LAND USE AMENDMENT DOWNTOWN COMMERCIAL CORE (WARD 7) MACLEOD TRAIL SE AND 5 AVENUE SE BYLAW 254D2017

Highway 15 Project - Hutchinson

HOT SPRINGS COMPREHENSIVE PLAN OUTLINE

Pedestrian and Bike Bridge LOGO

DEPARTMENT OF PUBLIC WORKS & UTILITIES

East Whiteland Township Current Land Development Projects

Table of Contents. Elm Avenue Improvement Plan City of Waco, Texas. Introduction 1. Existing Context 1 Figure 1 2.

OFFICIAL CONTROLS IMPLEMENTATION LEGAL REQUIREMENTS

PUBLIC SERVICES ELEMENT GOALS / POLICIES / MEASURES

INFRASTRUCTURE EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities

The Auburn Plan Designing the Future of Auburn February 28, 2005

An Integrated Green Infrastructure Plan to Address Combined Sewer Overflow, Stormwater and Nutrient Reductions in Lancaster City, PA

Proposed Capital Improvement Program and Capital Budget FY & FY

EXHIBIT A. Tax Increment Reinvestment Zone No. 1 (Town Center) First Amended Project Plan 1

TIFT COUNTY SCHOOLS E-SPLOST HISTORY

2016 WORKSHOP LVR Field Trip

Edenfield Avenue Green Street Demonstration Project Neighborhood Meeting

Needs/Requests Related to UCSF Expansion Into Dogpatch. Neighborhood List UCSF Response and Community Discussion

leel NG CITY COUNCIL AGENDA REPORT Honorable Mayor and City Council Members

STAFF REPORT TO COUNCIL PLANNING AND DEVELOPMENT

Pedestrian Bridge at Vermijo Avenue. Kathleen Krager June 13, 2016

KASPER. City of Georgetown, Texas PUD Planned Unit Development. December 30, 2015 Revised January 27, 2016

CRA Five Year Capital Improvement Plan. September 2, 2015

Municipality of Anchorage, Alaska Parks & Recreation Department

8 ARTICLE EIGHT LANDSCAPING AND SCREENING

Transcription:

EXHIBIT A 2019 FINANCING: PROJECT AUTHORIZATIONS Projects with Prior City Commission Authorization (No Changes) Downtown Canopy PW17B4CIP Prior Authorizing Ordinance: Ordinance No. 9428 Estimated Total Project Cost: $350,000 General Obligation Bond Authorization Amount: $350,000 plus capitalized interest on any Statutory Authority: Charter Ordinance No. 28 Project Description: Improvement to the City s storm sewer system located in the alley between Vermont Street and Massachusetts Street, from 8th Street to 9th Street, by removing the existing canopy and replacing the underground storm water collection piping and associated inlets, and repairing and replacing the associated sidewalk improvements. East 9 th Street Improvements PW17E66CIP Prior Authorizing Resolution: Resolution No. 7220 Estimated Total Project Cost: $2,500,000 General Obligation Bond Authorization Amount: $2,500,000 plus capitalized interest on any Statutory Authority: K.S.A. 12-685 et seq.; Charter Ordinance No. 46 Project Description: Reconstruction of 9th Street from Massachusetts Street to Delaware Street, including design, engineering, and construction of concrete pavement, storm sewer, sidewalks, onstreet parking, pedestrian lighting, related landscaping, and any necessary improvements related thereto. Humane Society CM1701CIP Prior Authorizing Ordinance: Ordinance No. 9516 Estimated Total Project Cost: $2,500,000 General Obligation Bond Authorization Amount: $2,500,000 plus capitalized interest on any Statutory Authority: Article 12, Section 5 of the Constitution of the State of Kansas Project Description: General obligation debt of the City will be issued to make a grant to the Lawrence Humane Society, Inc., in the amount not to exceed $2,500,000 for use in connection with A-1

the acquisition, construction and equipping of a facility to be located in the City and owned and occupied by the Humane Society in order to better provide the City with animal control and services related thereto. One Stop Shop PS1701CIP Prior Authorizing Resolution: Resolution No. 7264 Estimated Total Project Cost: $1,101,000 General Obligation Bond Authorization Amount: $180,000 plus capitalized interest on any Project Description: Acquisition, design, alteration. repair, reconstruction, remodel, renovation, replacement or making additions to, furnishing and equipping of and making any necessary and related improvements to Municipal Court and Planning and Development Services facilities to be located at 1 Riverfront Plaza, top floor of west side, within the City. Parks & Recreation Facilities Projects (2018): Indoor Aquatics Center Pool Painting PR1821CIP; Community Building Renovation PR1822CIP; South Park Playground (ADA Compliance) PR1823CIP; East Lawrence Recreation Center PR1820CIP; Holcom Park Recreation Center PR1907CIP; Union Pacific Depot Renovation PR1909CIP Prior Authorizing Resolution: Resolution No. 7241 Estimated Total Project Cost: $600,000 General Obligation Bond Authorization Amount: $600,000 plus capitalized interest on any Project Description: The design, alteration, repair, reconstruction, remodel, renovation, replacement or making additions to, furnishing and equipping of the following public buildings and facilities within the City: Lawrence Indoor Aquatic Center - 4706 Overland Drive; Community Building - 115 W 11 th Street; South Park Playground - 1141 Massachusetts Street; East Lawrence Recreation Center - 1245 E. 15th Street; Holcom Park Recreation Center - 2700 W. 27th Street; and Union Pacific Depot - 402 N. 2nd Street. Public Building projects (2018): Arts Center Boilers and Roof PW18B6CIP; City Hall Fire Alarm Panel and General Maintenance PW18B5CIP A-2

Prior Authorizing Resolution: Resolution No. 7247 Estimated Total Project Cost: $320,000 General Obligation Bond Authorization Amount: $320,000 plus capitalized interest on any Project Description: Repair and replacement of: Existing roof and boilers at the Arts Center located at 940 New Hampshire Street; and Fire alarms, halon system, access control system and carpets in City Hall located at 6 East 6 th Street. Street Projects (2018): 23 rd Street from Louisiana to Massachusetts PW18E10CIP; Louisiana Street from 12 TH Street to 13 TH Street PW18E8CIP Prior Authorizing Resolution: Resolution No. 7246 Estimated Total Project Cost: $1,950,000 General Obligation Bond Authorization Amount: $950,000 plus capitalized interest on any Statutory Authority: K.S.A. 12-685 et seq.; Charter Ordinance No. 46 Project Description: Street construction, curbing, guttering, paving, sidewalk and pedestrian path construction, drainage improvements, pavement marking, signing, and all related design, engineering and inspection work, at the following locations: 23 rd Street from Louisiana to Massachusetts Street; Louisiana Street from 12 th Street to 13 th Street. Projects with Prior City Commission Authorization (Changes Requested) Fire Medical Pavement Replacement PW19B7CIP [Increased Authorization; Amended Project Description] Prior Authorizing Resolution: Resolution No. 7273 Estimated Total Project Cost: $3,000,000 General Obligation Bond Authorization Amount: $3,000,000 plus capitalized interest on any Project Description: The repair, reconstruction and replacement of the pavement located at the following Fire Stations and making any necessary and related improvements thereto. A-3

Fire Station No. 2 2128 Harper Street Fire Station. No. 3 3708 West 6 th Street Fire Station No. 4 2121 Wakarusa Drive Fire Station No. 5 1911 Stewart Avenue Fire Training Center 1941 Haskell Avenue Summary of Changes: Resolution No. 7273 gave authorization to make improvements to Fire Station No. 5 in an amount not to exceed $368,820.18 plus issuance costs and interest. This was completed ahead of the other projects because other work is occurring in the area that would help minimize costs. The increased authorization is to incorporate the remainder of the locations included in the project scope. Fire Station No. 1/Senior Center FM1702CIP [Increased Authorization] Prior Authorizing Resolution: Resolution No. 7192 Estimated Total Project Cost: $7,100,000 General Obligation Bond Authorization Amount: $7,100,000 plus capitalized interest on any Project Description: Design, repair, renovate and reconstruct Fire Station No. 1 of the City, including various interior and exterior improvements necessary to address the operational needs of the City s fire and medical departments, renovations necessary for ADA compliance and other related and appurtenant improvements. Summary of Changes: Resolution No. 7192 gave authorization to make improvements to Fire Station No. 1/Senior Resource Center in an amount not to exceed $6,287,000 plus issuance costs and interest. The increased authorization figure aligns with current project estimates. Fire Training Tower FM1703CIP [Increased Authorization] Prior Authorizing Resolution: Resolution No. 7243 Estimated Total Project Cost: $1,200,000 General Obligation Bond Authorization Amount: $1,097,680 plus capitalized interest on any Project Description: Replacement of existing Fire Training Tower located at 1941 Haskell Avenue and design and construction of a new Fire Training Tower. Summary of Changes: Resolution No. 7243 gave authorization to make improvements to the Fire Training Tower in an amount not to exceed $700,000 plus issuance costs and interest. The increased authorization aligns with current project estimates that were increased due to significant site plan improvements that were required to be completed as part of the project. A-4

Police Facility [Increased Authorization; Amended Project Description] Phase 1 PD1803CIP Two Percent for Art at Police Facility CM 1902 Prior Authorizing Resolution: Resolution No. 7222 Estimated Total Project Cost: $18,840,000 General Obligation Bond Authorization Amount: $18,840,000 plus capitalized interest on any Project Description: The design, planning, construction, equipping and furnishing a new police department facility located at 5100 Overland Drive. Project shall include an amount up to $340,000 to fund public art located at the facility. Summary of Changes: Resolution No. 7222 gave authorization to design and construct a new police facility in an amount not to exceed $18,500,000 plus issuance costs and interest. The increased authorization is to include funds for public art that was included in the CIP but not in the initial authorization. Sidewalk, Bike, Pedestrian Improvements, ADA Ramps CI09 [Amended Project Description] Prior Authorizing Resolution: Resolution No. 7254 Estimated Total Project Cost: $500,000 General Obligation Bond Authorization Amount: $500,000 plus capitalized interest on any Statutory Authority: K.S.A. 12-685 et seq., Charter Ordinance No. 46 Project Description: Street construction, curbing, guttering, paving, sidewalk and pedestrian path construction, drainage improvements, pavement marking, signing, and all related design, engineering and inspection work, at the following locations: East side of Michigan Street, 2nd Street to 3rd Street; South side of West 27th Street, Crestline Drive to Chipperfield Road; South side of Harvard Road. Iowa Street to Hilltop Drive; Bike Boulevard on 21st Street from Iowa Street to Naismith Drive; Bike Boulevard on 21st Street from Naismith Drive to Massachusetts Street; Bike Boulevard on Lawrence Avenue, from Harvard Road to Bob Billings Parkway; Bike Boulevard on Naismith Drive from 19 th Street to 21 st Street; and Bike Boulevard on 13 th Street from Massachusetts Street to Haskell Avenue. Summary of Changes: Resolution No. 7254 gave authorization to make improvements to a number of locations across the City in an amount not to exceed $500,000 plus issuance costs and interest. The last two locations were added for flexibility as the bike boulevard design is moving through public process. A-5

Traffic Calming PW17E8CIP [Increased Authorization; Amended Project Description] Prior Authorizing Resolution: Resolution No. 7256 and 7205 Estimated Total Project Cost: $600,000 General Obligation Bond Authorization Amount: $600,000 plus capitalized interest on any Statutory Authority: K.S.A. 12-685 et seq.; Charter Ordinance No. 46 Project Description: Street construction, curbing, guttering, paving, sidewalk and pedestrian path construction, drainage improvements, pavement marking, signing, and all related design, engineering and inspection work, at the following locations: W. 17 th Street and Indiana traffic calming devices including traffic circles; W. 18 th Street and Indiana traffic calming devices including traffic circles; W. 17 th Street and Illinois traffic calming devices including traffic circles; W. 18 th Street and Illinois traffic calming devices including traffic circles; Ousdahl Road from 26 th Street to 23 rd Street speed humps and cushions; Trail Road from Kasold to Folks Road speed humps and cushions; Missouri Street, 8th Street to 9th Street; Arkansas Street, 8th Street to 9th Street; Lincoln Street, 3rd Street to 7th Street; East 13th Street, Massachusetts Street to Haskell Avenue; and West 24th Street, Crossgate Drive to Kasold Drive. Summary of Changes: Resolution No. 7256 gave authorization to make improvements to Missouri Street, Arkansas Street, Lincoln Street, East 13 th Street, and West 24 th Street in an amount not to exceed $200,000 plus issuance costs and interest. Resolution No. 7205 gave authorization to make improvements to West 17 th Street, West 18 th Street, Ousdahl Road, and Trail Road in an amount not to exceed $400,000 plus issuance costs and interest. This combines these two resolutions into a singular resolution. New Projects Requesting City Commission Authorization 19 th Street Reconstruction Harper to O Connell PW17e3cip Estimated Total Project Cost: $3,625,000 General Obligation Bond Authorization Amount: $1,775,000 plus capitalized interest on any Project Description: Reconstruction of 19 th Street from Harper to O Connell Street, including but not limited to construction, curbing, guttering, paving, sidewalk and pedestrian path construction, drainage improvements, pavement marking, signing, and all related design, engineering and inspection work, and all necessary and related improvements. A-6

ITC Exterior Repairs and HVAC PW19B4CIP Estimated Total Project Cost: $750,000 General Obligation Bond Authorization Amount: $750,000 plus capitalized interest on any Project Description: Design, alteration, repair, reconstruction, remodel, renovation, replacement or making additions to, furnishing and equipping the City s Investigations and Training Center (ITC) located at 4820 Bob Billings Parkway, including exterior repairs and HVAC replacement, and associated engineering, design, inspection, removal, replacement, and construction costs related thereto. Parks and Recreation Facilities Projects (2019): Indoor Aquatics Center Roof Resurfacing PR1902CIP; Arboretum Bathroom Upgrade PR1901CIP; Arboretum Parking Lot Repair PR1924CIP; Burcham Park/Upgrade Shelter and Playground PR1901CIP; Lawrence Loop Trail Downtown Section PR2121CIP; Oak Hill Cemetery Mausoleum (Historic Structure) PR1906CIP; Parking Lots and Roads Parks & Rec, 2019 PR1921CIP. Estimated Total Project Cost: $2,110,000 General Obligation Bond Authorization Amount: $1,410,000 plus capitalized interest on any Project Description: Projects include the design, alteration, repair, reconstruction, remodel, renovation, replacement or making additions to, furnishing and equipping of the following public parks and recreation areas and facilities, including any appurtenances related thereto, and associated engineering, design, inspection, removal, replacement, and construction costs: Lawrence Arboretum - 4711 W 27 th Street bathroom upgrades and parking lot repairs Burcham Park - South Powerhouse Road shelter upgrades and playground construction Downtown Section of the Lawrence Loop Trail from Hobbs Park to Burcham Park Oak Hill Cemetery - 1605 Oak Hill Avenue improvements to mausoleum structure Repair and replacement of parking lots and roads at various City parks and recreation facilities Indoor Aquatics Center - 4706 Overland Drive roof resurfacing Public Parking Improvements Elevator Rehab New Hampshire Garage PW20B4CIP; Parking Garage Repairs, 2019 PW19B5CIP; A-7

Santa Fe Depot Repair PW19E3CIP. Estimated Total Project Cost: $1,000,000 General Obligation Bond Authorization Amount: $800,000 plus capitalized interest on any Project Description: Projects include the design, alteration, repair, reconstruction, remodel, renovation, replacement or making additions to the following public parking facilities within the City, including any appurtenances related thereto, any necessary land acquisitions, and associated engineering, design, inspection, removal, replacement, and construction costs: New Hampshire Parking Garage - 927 New Hampshire Street elevator rehabilitation and parking garage repairs Santa Fe Depot 413 E. 7 th Street parking lot improvements Riverbank Stabilization PW17E9CIP Estimated Total Project Cost: $1,000,000 General Obligation Bond Authorization Amount: $1,000,000 plus capitalized interest on any Project Description: Repair, renovate and reconstruct portions of the Kansas River riverbank located at 502 South Powerhouse Road and all related design, engineering and inspection work. Street Maintenance 2019 PW17SM1CIP Estimated Total Project Cost: $3,190,000 General Obligation Bond Authorization Amount: $821,000 plus capitalized interest on any Project Description: Street construction, rehabilitation, reconstruction, curbing, guttering, paving, sidewalk and pedestrian path construction, drainage improvements, pavement marking, signing, and all related design, engineering and inspection work, at the following locations: Lawrence Avenue Clinton Parkway to West 31 st Street East 19 th Street Massachusetts Street to Haskell Avenue A-8