Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates).

Similar documents
Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in May 2010 construction rates)

GYPSUM PARKWAY CORRIDOR ENHANCEMENT Gypsum, Colorado. Schematic Design January 2015

GPCID Mall Boulevard & Gwinnett Place Drive Complete Street: Sectional View of Concepts

GREENING THE BOULEVARD Master Plan Concepts for Venice Boulevard between Lincoln and Sawtelle

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS CONTRACT NO CONFLUENCE BIKE/PED RAMPS-SOUTH PLATTE GREENWAY STATEMENT OF QUANTITIES

JOB CREATION PROJECTS

FDOT D4 Complete Streets

MEMORANDUM & CITY COMMISSION BRIEFING Orlando Avenue Landscape Plans Consent Agenda Item

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM

Conceptual Design. Main Street Enhancement and Extension Project. Bothell, Washington. June 11, 2009

The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape..

WHEREAS, the CCSD has agreed to reimburse the City for the cost of the sidewalk, trail, and the bioretention area

CAMPUS PLANNING COMMITTEE STAFF REPORT SAMARITAN SPORTS MEDICINE INSTITUTE AT OSU 10/21/2013

GUIDELINES FOR PERMEABLE SIDEWALK-LANDSCAPING PERMIT

ORDINANCE NO

VEHICULAR AND PEDESTRIAN CIRCULATION

University Park Subdivision Street Assessment Report

russell+mills studios

Butchers Hill. Greening Feasibility FINAL REPORT MAY 2009 N PORT ST N WOLFE ST S MADEIRA ST. Submitted To: Submitted By:

Construction Engineering & Inspection

Design Guidelines and Standards for Sight Triangles. Sight Triangle MANUAL

Fifth and Detroit Street Design May 2017 Capital Improvements Committee. DOWNTOWN Street Design

Main Street Reconstruction From Ninth Line to Stouffer Street. Town of Whitchurch-Stouffville. Public Information Centre

3 Focusing the Vision Following the second workshop, the Project

Garfield Elementary School Feasibility Study for New Library Building Project Number A C

ARLINGTON COUNTY, VIRGINIA

Nuts and Bolts (or Gravel and Asphalt) of the Main Street Project

PROJECTS UNDER CONSTRUCTION

Fall 2017 Construction Update

PARKLET PROPOSAL PACKAGE & PROCESS

COMPLETE GREEN STREET CHECKLIST

CHAPTER 8. Mrs. Zimman s Class - Central Elementary

STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS

CITY OF LATHROP. Department of Public Works. DESIGN & CONSTRUCTION Standard Details

3.13. Development Guidelines

City of Cedar Rapids Public Works Tentative Bid Schedule Issued December 4, 2017 *Subject to Change*

DESIGN CRITERIA PACKAGE

2016 REVISIONS COMMENT FORM RULES AND REGULATIONS FOR CONSTRUCTION IN THE PUBLIC WAY COMMENT PERIOD: JUNE 1 TO JUNE 30, 2015

CONFORMED AGREEMENT INCORPORATED REVISIONS PER AMENDMENT DATED: APRIL 2, 2013 FOR REFERENCE

Corridor Identity. Section 9. Introduction. Corridor Guiding Principles

CARVER COUNTY DIVISION OF PUBLIC WORKS LANDSCAPE POLICY. Adopted by the Carver County Board of Commissioners March 3, 2015

ATTACHMENT A. SILVERDALE DESIGN STANDARDS Amendments to the Waaga Way Town Center Chapter

23 EA , , , , , , , LF , , ,596.

3.0 master plan concept

AGENDA ACTION ITEMS INFORMATION ITEMS

Pine Avenue Improvement Project

Roads Plan

PRELIMINARY PLAT DESIGN REQUIREMENTS Updated 4/8/2016

Maury County Projects

Cottage Grove Road Reconstruction. City of Madison Engineering

Municipality of Anchorage, Alaska Parks & Recreation Department

Millar Park. Master Plan. Prepared for CITY OF UNIVERSITY CITY Department of Public Works & Parks 6801 Delmar Avenue University City, Missouri 63130

Lilburn, Georgia A Pedestrian Master Plan Report

Construction Engineering & Inspection Services Transit Bus Stop Infrastructure for the Broward County Transit Division (BCT)

Spreadsheet Report Page 1. WREDP Infrastructure Wickenburg, AZ SD Estimate Rev

Chapter 14 Streetscape Improvements

ROCKTON DOWNTOWN STREETSCAPE MASTER PLAN. Plan Commission Presentation April 10, 2018 Teska Associates Christopher Burke Engineering

Letter of Credit Itemized Cost Estimate For: 100% Site Development Costs

This page left intentionally blank.

City of Aurora Planning Department DESIGN STANDARDS FOR MOTOR VEHICLE FUEL DISPENSING STATION. August 3, 1998

KASPER. City of Georgetown, Texas PUD Planned Unit Development. December 30, 2015 Revised January 27, 2016

Carson Street Streetscape Improvements. Request for Proposals

PROJECT SITE The Proposed Project includes the Allen and Pike Street malls between Delancey and South Streets (see Figure 2C-1).

DRAFT. CITY OF ESCONDIDO 11th Avenue Park WORKSHOP SUMMARY December 17, 2008

Mary Hills Nature Area. Roadway Lighting. The Minneapolis Clinic of Neurology Courage Kenny Rehabilitation Institute

BEMIDJI CITY COUNCIL Work Session Agenda Monday July 9, 2012

TAC/CAC, TPO Project Update February 2016

Technical Bullet Series on Clay Brick Pavers

Design Guidelines for Residential Subdivisions

Corridor Investment Projects (FY FY2012)

Property Owners Association. Annual Meeting Notice July 26, :00pm - 7:00pm Park City Marriott 1895 Sidewinder Drive Park City, Utah

BEST PRACTICES FOR PROJECT NOMINATIONS TA Set-Aside Program

County of El Dorado Standard Plans

Transportation Alternatives Program (TAP) Experience

FREEWAY/TOURIST DISTRICT

Hidden Pointe Landscape Master Plan. June, archi terra

Chapter 6. Green Streets

Index to Projects by Project Name

North Hutchinson Island 7.55 Acres Vacant Land Approved for 30 Townhome Units

Memorandum CITY OF DALLAS. Riverfront Boulevard Design From Continental Avenue to Cadiz Street

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

Town of Yucca Valley Capital Improvement Projects Report July 24, 2014

STAFF REPORT TO COUNCIL PLANNING AND DEVELOPMENT

IOWA HIGHWAY 57 / WEST 1 ST STREET STUDY PUBLIC INFORMATIONAL MEETING APRIL 22, 2014

Public input has been an important part of the plan development process.

Design Considerations

GROUND LEVEL ENLARGEMENT / STREETSCAPE AT PIER AVENUE STRAND & PIER HOTEL HERMOSA BEACH HARDSCAPE MATERIAL KEY MAP PIER AVENUE

NEWPORT NEWS/WILLIAMSBURG INTERNATIONAL AIRPORT DESIGN AND SUSTAINABILTY GUIDELINES

Shell Beach Road Streetscape Frequently asked Questions

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

STANDARD DETAILS QUICK REFERENCE

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

SFMTA PHELAN LOOP AND PUBLIC PLAZA PHELAN OCEAN AVENUE

Below the trestle lie artifacts of past industry along the Cobbossee Stream. South end of the trestle, at the proposed trailhead area.

Grafton Street < N September 2, 2015

LOCATION AND DESIGN DIVISION

CHURCH STREET MAIN STREET CHURCH STREET

February 17, Sara Ullman Planner I. Sincerley,

CRA Five Year Capital Improvement Plan. September 2, 2015

STREETSCAPE IMPROVEMENTS - RECOMMENDATIONS

Transcription:

Pelican Bay Community Improvement Plan Traffic,JI Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates). D1 -A: Provide consistent signing, marking and use of RPM's for roadways throughout the community. no Proposed Improvement: Install reflective pavement markings (RPM's) in the center line skip striping of Gulf Park Drive and replace the missing RPM's in Pelican Bay Boulevard (estimated 235 RPM's). Opinion of Probable Cost: $ 800 Alternative solution: This is a roadway maintenance item. Phasing: This work should be done at one time. Sequencing: This work requires maintenance from time to time to replace RPM's that break away from the pavement. We suggest that the center line skip striping be done at the same time that the entire community is reviewed for missing blue fire hydrant RPM's. Whenever pavement resurfacing occurs new pavement striping, markings and RPM's are to be included in the work. D1 -B: Install yellow RPM's on the asphalt at the base of the curbing of all the median bull noses throughout the community for better visual identification of turning movements and lane demarcation at night (estimated 2,178 RPM's). C rt3 ov (T) Proposed Improvement: Install yellow RPM's only on the asphalt at the base of curb lines at all median nosings do not paint curb line or asphalt yellow. Opinion of Probable Cost: $ 7,300 Alternative solution: This is a roadway maintenance item. Phasing: This work should be done at one time. Sequencing: This work requires maintenance from time to time to replace RPM's that break away from the pavement. We suggest that this work be done with the center line skip striping and while the entire community is reviewed for missing blue fire hydrant RPM's. Whenever pavement resurfacing occurs new pavement striping, markings and RPM's are to be included in the work. D1 -C: Relocate to the north and re-construct the deceleration lane and realigned curb cut to access the North Tram Station parking lot from north bound Pelican Bay Boulevard traffic. Proposed Improvement: Replace the original curb line in Pelican Bay Boulevard with a new curb line and drive access that is in alignment with the new parking lot drive way access, keeps the crosswalk in its current location and provides for landscape removal for improved sight line distance (reference Crosswalk Sheet #1 1). Opinion of Probable Cost: $ 164,500 05/18/2010

Alternative solutions: n 1.1.11n rt5 ae ro Close the current vehicular median turn lane and return it to landscape while maintaining the existing crosswalk location. Opinion of Probable Cost: $ 182,000 Maintain the current vehicular median turn lane but remove landscape for better lines of sight. Opinion of Probable Cost: $ 5,700 a) E cu 2> 0 E ro>' ro a_ Phasing: This is a one time project and based on the Owners chosen solution should be done all at once. Sequencing: These projects may also be done within other specific area improvement projects for mid-block crosswalks and the North Tram Station improvements including street lighting and landscape improvements in the median. D1 -D: Install consistently finished, signed and marked existing and proposed crosswalks in the community (9 intersections; reference Intersection Crosswalk Layout plans; refer to D1 -E for mid-block crosswalks). Proposed Improvement: Install monolithic concrete base and 12" header curb each side of cross walk to receive mud set clay brick crosswalks in a herringbone field pattern and a soldier course border between header curbs and valley gutters including all associated signing and ADA compatible connections. Opinion of Probable Cost: $ 817,000 Alternative solutions: Same as proposed improvement but with color concrete pavers in lieu of clay brick. Opinion of Probable Cost: $ 742,500 Install thermoplastic paint in a high visibility piano key striping pattern for all existing and proposed crosswalk locations in the community. Opinion of Probable Cost: $ 289,500 Phasing: These projects can be phased however we suggest that little phasing or time passes between beginning and completing the work. We suggest that a reasonable phasing would be to improve the crosswalks south of Gulf Park Drive in one year and improve the balance of the crosswalks north of Gulf Park Drive in the next year. Sequencing: These projects may also be done within other specific area improvement projects or should be considered to be part of the pathway, signage and ADA ramping improvements. D1 -E: Install mid-block crosswalks in Pelican Bay Boulevard at Community Amenity Destination points (5 locations; reference Mid-block Crosswalk Location plan). 05/18/2010

Proposed Improvement: Install mud set clay brick crosswalks on a monolithic base with 12" header bands to match D1-D above and include a 32" split face cobble stone band edge inside the header band at both sides of the cross walk as an upgrade to these five crosswalk locations including all associated signing and ADA compatible connections. Opinion of Probable Cost: $ 263,000 Alternative solutions: Same as proposed improvement, but do not include the cobble stone band edge with the clay brick pavers. Opinion of Probable Cost: $ 220,000 Same as proposed improvement, but install precast colored concrete pavers in lieu of clay brick as noted above. Opinion of Probable Cost: 247,500 Same as alternative solution #2, but do not include the cobble stone band edge with the colored concrete pavers. Opinion of Probable Cost: $ 204,500 Install only Thermoplastic paint in a high visibility piano key striping pattern. Opinion of Probable Cost: $ 115,300 a) E 2> 0 E >1 CD co av Phasing: These projects can be phased however we suggest that little phasing or time passes between beginning and completing the work. We suggest that a reasonable phasing would be to improve the mid-block crosswalks that may be done in part of area wide improvements such as the North Tram Station or the St. Raphael beach access lighting project. Sequencing: These projects may also be done within other specific area improvement projects or should be considered to be part of the pathway, signage and ADA ramping improvements. D1 -F: Install fields of clay brick pavement in the major community intersection areas. Patterns should be artful and aesthetically pleasing, serve as announcement of entry and primary intersections within the community and assist on the ground-plane by expressing the expected turning movements around adjacent street medians (reference Intersection Treatment Alternatives this section) Proposed Improvement: Install sand set clay brick pavers in the field areas between the crosswalks in the street intersections of Pelican Bay Boulevard and Ridgewood Drive, Pelican Bay Boulevard and Oakmont Parkway/Extension and Pelican Bay Boulevard and Gulf Park Drive. Opinion of Probable Cost: $ 536,000 Alternative solutions: 1. Install sand set colored concrete pavers in lieu of clay brick pavers in conjunction with colored concrete paver crosswalks in the intersection field areas noted above. Opinion of Probable Cost: $ 496,500 05/18/2010

11.1.1.1.1 2. Install stamped concrete pavement and exposed aggregate colored concrete in the intersection field areas with clay brick paver crosswalks. Opinion of Probable Cost: $ 549,500 co a_ C E." C a) E a) 2> E to ca C... TC) a. Phasing: This work can be phased by whole intersection field areas. Sequencing: This work should be considered to be complete with the crosswalk improvements in these intersections. D1 -G: Install fields of clay brick pavement across the three roadway entries into Pelican Bay from US 41 at Pelican Bay Boulevard north and south as well as Gulf Park Drive (reference pages 19, 20 and 21 under the Project Improvement Plan section C). Proposed Improvement: Install 12" header curb between the valley gutters each side of the pavement area to receive sand set clay brick pavement in a herringbone field pattern and a soldier course border between header curbs and valley gutters for a length of up to 150 feet. Opinion of Probable Cost: $ 463,000 Alternative solutions: 1. Same as proposed improvement but with colored concrete pavers in lieu of clay brick pavers. Opinion of Probable Cost: $ 429,000 Phasing: These projects can be phased by individual location however we suggest that consideration of the installation of an intersection field area noted in Dl-F above would also include the installation of the corresponding US-41 entry drive area improvement in D1-G too. Sequencing: These projects may also be done within other Community entry specific area improvement projects for landscape, lighting and signage. D1 -H: Install fields of clay brick pavement across the roadway entries in to the single family neighborhoods where intersection improvements noted in Dl-F above are not suggested (2 locations, Gulf Park Drive and Ridgewood Drive/ Gulf Park Drive and Green Tree Drive). Proposed Improvement: Install 12" header curb between the valley gutters each side of the pavement area to receive sand set clay brick pavement in a herringbone field pattern and a soldier course border between header curbs and valley gutters for a length of up to 50 feet behind any cross walk improvement. Opinion of Probable Cost: $ 52,600 Alternative solutions: 1. Same as proposed improvement but with colored concrete pavers in lieu of clay brick pavers. Opinion of Probable Cost: $ 48,900

Phasing: These projects can be phased by individual location however we suggest that consideration of the installation of an intersection field area noted in Dl-F above would also include the installation of the corresponding US-41 entry drive area improvement in D1-G too. Sequencing: These projects may also be done within other residential area entry specific area improvement projects for landscape, lighting and signage. Future maintenance and improvement guidelines: The addition of a four foot bike lane in accordance with FDOT policy as delivered through its Plans and Preparation Manual and through the Collier County MPO Policies and Resolutions within the existing asphalt cross section of Pelican Bay Boulevard and Gulf Park Drive is recommended to be implemented at the next resurfacing of these roadways. This remarking and restriping is to occur at the time of the next resurfacing of each street and provide for two ten foot automobile travel lanes and one four foot bicycle lane in each direction unless otherwise deemed unjustified through the variance process. Although not a County law, Collier County highly recommends incorporation of bike lanes where feasible in new construction or resurfacing of roadways. Transportation engineering design will be required to provide the documentation necessary for this improvement. Maintain un-obstructive landscape and elevated median grades in favor of pedestrian and driver sight lines at the edges of the rights of way and within the medians of the community. Continue to work with the Collier County Transportation Division on multi-modal and pathway master plans at the exterior edges of the Pelican Bay Community so as to budget and plan for Community Landscape, Perimeter Wall and connective pathway improvements in the future. Continue to work with the Collier County Sherriff Department in street and community policing and reporting of community incidents. Continue to work with the Collier County Transportation Department within the Neighborhood Traffic Management Plans for additional traffic calming techniques beyond the addition of the bike lane noted above. 05/18/2010

,VilsonMiller - March 29, 2010 Location Striping Only Concrete Pavers Clay Brick Paving Iltern Type Option 1 Option 2 Option 3 01 - Pelican Bay Blvd. @ Ridgewood Drive 3 Direction $19,276 $69,591 $77,755 01a - Add paver field (1) $158,116 (1) $189,286 02 - Pelican Bay Blvd. @ Myra J. Daniels Blvd. 2 Direction $15,019 $41,360 $45,373 03 - Pelican Bay Blvd. @ Crayton Road 2 Direction $15,036 $47,118 $52,320 04 - Pelican Bay Blvd. @ Glenview Place Mid-Block $19,213 $35,666 $38,283 04a - Add cobble bands (2) $5,960 (2) $5,960 05 - Pelican Bay Blvd. @ The Commons Mid-Block $19,309 $33,101 $35,479 05a - Add cobble bands (2) $6,110 (2) $6,110 06 - Pelican Bay Blvd. @ Gulf Park Drive 4 Direction $92,506 $158,011 $169,257 06a - Add paver field (1) $154,396 (1) $184,580 07 - Gulf Park Drive @ Ridgewood Drive 2 Direction $16,859 $47,688 $52,923 08 - Gulf Park Drive @ Green Tree Drive 2 Direction $19,149 $49,964 $55,157 09 - Pelican Bay Blvd. @ Sandpiper Parking Mid-Block $23,983 $36,291 $38,658 09a - Add cobble bands (2) $4,800 (2) $4,800 10 - Pelican Bay Blvd. @ Beachwalk Pathway Mid-Block $23,220 $36,417 $38,779 10a - Add cobble bands (2) $5,100 (2) $5,100 11 - Pelican Bay Blvd. @ North Tram Station Mid-Block $3,591 $17,042 $19,450 iia - Add cobble bands (2) $11,213 (2) $11,213 12 - Pelican Bay Blvd. @ North Pointe Drive 2 Direction $14,863 $48,161 $53,561 13 - Pelican Bay Blvd. @ Hammock Oak Drive 2 Direction $15,057 $46,613 $51,724 14 - Pelican Bay Blvd. @ Oakmont Parkway 3 Direction $16,535 $67,072 $75,284 (Subtotal: 115% Contingency:!Design / Permit Fee Estimate: (Grand Total: $313,616 $734,095 $804,002 $47,042 I $110,114 I $43,279 $101,305 $120,600-1 $110,952 I $403,937 I $945,514 I I $1,035,555( * Price Sources: Historic Project File Cost Data, RSMeans Site Work and Landscape Data 2010, FDOT Statewide Item Average Unit Cost 2009. "" Prices are a comparison of finishes only and do not include design or permitting fees. Additional cost beyond crosswalk improvements to include field area between crosswalks in special pavement. Additional cost to include 3.0' wide split-face cobble paver either side of mid-block crosswalks. (3) Additional Item 11 costs to improve median: Close Median +/- $126,648.00 Re-Align Median +/- $125,130.00

01 - Pelican Bay Blvd. @ Ridgewood Drive Option 1 - Striping Only $19,276 Iltern Demolition - Clearing and Grubbing Demolition - Curb Demolition - Sidewalk Demolition - Thermoplastic Striping (Remove) Sitework - Concrete - ADA Compliant Ramp Assembly Sitework - Concrete - Sidewalk (5.0') Sitework - Concrete - Type 'A' Curb Sitework - Regulatory Signage - Decorative Post Mount Sitework - Roadway - Retro-reflective pavement markers Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width Sitework - Thermoplastic Striping, STD, White, Solid - 24" Width Landscape - Shrubs, Grasses, Groundcovers, Mulch Landscape - Irrigation Iltern Demolition - Asphalt to 4" Thick (Includes limerock base to 8") Demolition - Clearing and Grubbing Demolition - Curb Demolition - Sidewalk Sitework - Concrete - ADA Compliant Ramp Assembly Sitework - Concrete - Brick Pavers Sitework - Concrete - Sidewalk (5.0') Sitework - Concrete - Slab (Up to 8" thick reinforced) Sitework - Concrete - Type 'A' Curb Sitework - Regulatory Signage - Decorative Post Mount Sitework - Roadway - 8" Limerock Base Sitework - Roadway - Retro-reflective pavement markers Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width Sitework - Thermoplastic Striping, STD, White, Solid - 24" Width Landscape - Irrigation Landscape - Shrubs, Grasses, Groundcovers, Mulch Quantity Unit Unit Cost Subtotall 250 SF $0.49 $122.50 10 LF $6.00 $60.00 2 SY $12.00 $24.00 480 LF $2.08 $998.40 4 EA $545.00 $2,180.00 28 SY $32.00 $896.00 10 LF $10.50 $105.00 10 EA $1,150.00 $11,500.00 20 EA $3.34 $66.80 860 LF $2.01 $1,728.60 36 LF $4.06 $146.16 230 SF $5.50 $1,265.00 230 SF $0.80 $184.00 Option 2 - Concrete Pavers $69,591 304 SY $8.00 $2,432.00 250 SF $0.49 $122.50 10 LF $6.00 $60.00 2 SY $12.00 $24.00 4 EA $545.00 $2,180.00 2,177 SF $5.50 $11,973.50 28 SY $32.00 $896.00 2,729 SF $12.80 $34,931.20 10 LF $10.50 $105.00 10 EA $1,150.00 $11,500.00 304 SY $6.50 $1,976.00 20 EA $3.34 $66.80 860 LF $2.01 $1,728.60 36 LF $4.06 $146.16 230 SF $0.80 $184.00 230 SF $5.50 $1,265.00 Option 3 - Clay Brick Paving $77,755 Demolition - Asphalt to 4" Thick (Includes limerock base to 8") 304 SY $8.00 $2,432.00 Demolition - Clearing and Grubbing 250 SF $0.49 $122.50 Demolition - Curb 10 LF $6.00 $60.00 Demolition - Sidewalk 2 SY $12.00 $24.00 Sitework - Concrete - ADA Compliant Ramp Assembly 4 EA $545.00 $2,180.00 Sitework - Clay - Brick Pavers 2,177 SF $9.25 $20,137.25 Sitework - Concrete - Sidewalk (5.0') 28 SY $32.00 $896.00 Sitework - Concrete - Slab (Up to 8" thick reinforced) 2,729 SF $12.80 $34,931.20 Sitework - Concrete - Type 'A' Curb 10 LF $10.50 $105.00 Sitework - Roadway - 8" Limerock Base 304 SY $6.50 $1,976.00 Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 860 LF $2.01 $1,728.60 Landscape - Irrigation 230 SF $0.80 $184.00 Landscape - Shrubs, Grasses, Groundcovers, Mulch 230 SF $5.50 $1,265.00

02 - Pelican Bay Blvd. @ Myra J. Daniels Blvd. Option 1 - Striping Only $15,019 Demolition - Thermoplastic Striping (Remove) 196 LF $2.08 $407.68 Sitework - Concrete - ADA Compliant Ramp Assembly 4 EA $545.00 $2,180.00 Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 430 LF $2.01 $864.30 Sitework - Thermoplastic Striping, STD, White, Solid - 24" Width 0 LF $4.06 $0.00 Option 2 - Concrete Pavers $41,360 Iltern Demolition - Asphalt to 4" Thick (Includes limerock base to 8") 304 SY $8.00 $2,432.00 Sitework - Concrete - ADA Compliant Ramp Assembly 4 EA $545.00 $2,180.00 Sitework - Concrete - Brick Pavers 1,070 SF $5.50 $5,885.00 Sitework - Concrete - Slab (Up to 8" thick reinforced) 1,383 SF $12.80 $17,702.40 Sitework - Roadway - 8" Limerock Base 154 SY $6.50 $1,001.00 Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 295 LF $2.01 $592.95 Option 3 - Clay Brick Paving $45,373 Iltern Demolition - Asphalt to 4" Thick (Includes limerock base to 8") 304 SY $8.00 $2,432.00 Sitework - Concrete - ADA Compliant Ramp Assembly 4 EA $545.00 $2,180.00 Sitework - Clay - Brick Pavers 1,070 SF $9.25 $9,897.50 Sitework - Concrete - Slab (Up to 8" thick reinforced) 1,383 SF $12.80 $17,702.40 Sitework - Roadway - 8" Limerock Base 154 SY $6.50 $1,001.00 Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 295 LF $2.01 $592.95

03 - Pelican Bay Blvd. @ Crayton Road Option 1 - Striping Only $1 5,036 Demolition - Thermoplastic Striping (Remove) 280 LF $2.08 $582.40 Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 550 LF $2.01 $1,105.50 Option 2 - Concrete Pavers $47,118 Demolition - Asphalt to 4" Thick (Includes limerock base to 8") 197 SY $8.00 $1,576.00 Sitework - Concrete - Brick Pavers 1,387 SF $5.50 $7,628.50 Sitework - Concrete - Slab (Up to 8" thick reinforced) 1,765 SF $12.80 $22,592.00 Sitework - Roadway - 8" Limerock Base 197 SY $6.50 $1,280.50 Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 345 LF $2.01 $693.45 Option 3 - Clay Brick Paving $52,320 Demolition - Asphalt to 4" Thick (Includes limerock base to 8") 197 SY $8.00 $1,576.00 Sitework - Clay - Brick Pavers 1,387 SF $9.25 $12,829.75 Sitework - Concrete - Slab (Up to 8" thick reinforced) 1,765 SF $12.80 $22,592.00 Sitework - Roadway - 8" Limerock Base 197 SY $6.50 $1,280.50 Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 345 LF $2.01 $693.45

04 - Pelican Bay Blvd. @ Glenview Place Option 1 - Striping Only $19,213 Iltern Demolition - Clearing and Grubbing 685 SF $0.49 $335.65 Demolition - Curb 36 LF $6.00 $216.00 Demolition - Thermoplastic Striping (Remove) 20 LF $2.08 $41.60 Sitework - Concrete - Sidewalk (5.0') 27 SY $32.00 $864.00 Sitework - Concrete - Type 'A' Curb 40 LF $10.50 $420.00 Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 260 LF $2.01 $522.60 Sitework - Thermoplastic Striping, STD, White, Solid - 24" Width 62 LF $4.06 $251.72 Landscape - Shrubs, Grasses, Groundcovers, Mulch 550 SF $5.50 $3,025.00 Landscape - Irrigation 550 SF $0.80 $440.00 Landscape - Topsoil (6" Depth) 11 CY $40.00 $440.00 Option 2 - Concrete Pavers $35,666 Iltern Demolition - Clearing and Grubbing 685 SF $0.49 $335.65 Demolition - Curb 36 LF $6.00 $216.00 Demolition - Asphalt to 4" Thick (Includes limerock base to 8") 100 SY $8.00 $800.00 Sitework - Concrete - Brick Pavers 698 SF $5.50 $3,839.00 Sitework - Concrete - Slab (Up to 8" thick reinforced) 895 SF $12.80 $11,456.00 Sitework - Concrete - Sidewalk (5.0') 27 SY $32.00 $864.00 Sitework - Concrete - Type 'A' Curb 40 LF $10.50 $420.00 Sitework - Roadway - 8" Limerock Base 100 SY $6.50 $650.00 Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 135 LF $2.01 $271.35 Sitework - Thermoplastic Striping, STD, White, Solid - 24" Width 62 LF $4.06 $251.72 Landscape - Shrubs, Grasses, Groundcovers, Mulch 550 SF $5.50 $3,025.00 Landscape - Irrigation 550 SF $0.80 $440.00 Landscape - Topsoil (6" Depth) 11 CY $40.00 $440.00 Option 3 - Clay Brick Paving $38,283 Iltern Demolition - Clearing and Grubbing 685 SF $0.49 $335.65 Demolition - Curb 36 LF $6.00 $216.00 Demolition - Asphalt to 4" Thick (Includes limerock base to 8") 100 SY $8.00 $800.00 Sitework - Clay - Brick Pavers 698 SF $9.25 $6,456.50 Sitework - Concrete - Slab (Up to 8" thick reinforced) 895 SF $12.80 $11,456.00 Sitework - Concrete - Sidewalk (5.0') 27 SY $32.00 $864.00 Sitework - Concrete - Type 'A' Curb 40 LF $10.50 $420.00 Sitework - Roadway - 8" Limerock Base 100 SY $6.50 $650.00 Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 135 LF $2.01 $271.35 Sitework - Thermoplastic Striping, STD, White, Solid - 24" Width 62 LF $4.06 $251.72 Landscape - Shrubs, Grasses, Groundcovers, Mulch 550 SF $5.50 $3,025.00 Landscape - Irrigation 550 SF $0.80 $440.00 Landscape - Topsoil (6" Depth) 11 CY $40.00 $440.00

05 - Pelican Bay Blvd. @ The Commons Option 1 - Striping Only $19,309 Quantity Unit Unit Cost Subtotall Demolition - Clearing and Grubbing 685 SF $0.49 $335.65 Demolition - Curb 36 LF $6.00 $216.00 Demolition - Thermoplastic Striping (Remove) 20 LF $2.08 $41.60 Sitework - Concrete - Sidewalk (5.0') 30 SY $32.00 $960.00 Sitework - Concrete - Type 'A' Curb 40 LF $10.50 $420.00 Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 260 LF $2.01 $522.60 Sitework - Thermoplastic Striping, STD, White, Solid - 24" Width 62 LF $4.06 $251.72 Landscape - Shrubs, Grasses, Groundcovers, Mulch 550 SF $5.50 $3,025.00 Landscape - Irrigation 550 SF $0.80 $440.00 Landscape - Topsoil (6" Depth) 11 CY $40.00 $440.00 Option 2 - Concrete Pavers $33,101 Demolition - Clearing and Grubbing 685 SF $0.49 $335.65 Demolition - Curb 36 LF $6.00 $216.00 Demolition - Asphalt to 4" Thick (Includes limerock base to 8") 90 SY $8.00 $720.00 Sitework - Concrete - ADA Compliant Ramp Assembly 0 EA $545.00 $0.00 Sitework - Concrete - Brick Pavers 634 SF $5.50 $3,487.00 Sitework - Concrete - Slab (Up to 8" thick reinforced) 811 SF $12.80 $10,380.80 Sitework - Concrete - Sidewalk (5.0') 30 SY $32.00 $960.00 Sitework - Concrete - Type 'A' Curb 40 LF $10.50 $420.00 Sitework - Roadway - 8" Limerock Base 90 SY $6.50 $585.00 Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 136 LF $2.01 $273.36 Sitework - Thermoplastic Striping, STD, White, Solid - 24" Width 62 LF $4.06 $251.72 Landscape - Shrubs, Grasses, Groundcovers, Mulch 550 SF $5.50 $3,025.00 Landscape - Irrigation 550 SF $0.80 $440.00 Landscape - Topsoil (6" Depth) 11 CY $40.00 $440.00 Option 3 - Clay Brick Paving $35,479 Demolition - Clearing and Grubbing 685 SF $0.49 Demolition - Curb 36 LF $6.00 Demolition - Asphalt to 4" Thick (Includes limerock base to 8") 90 SY $8.00 Sitework - Concrete - ADA Compliant Ramp Assembly 0 EA $545.00 Sitework - Clay - Brick Pavers 634 SF $9.25 Sitework - Concrete - Slab (Up to 8" thick reinforced) 811 SF $12.80 Sitework - Concrete - Sidewalk (5.0') 30 SY $32.00 Sitework - Concrete - Type 'A' Curb 40 LF $10.50 Sitework - Regulatory Signage - Decorative Post Mount 10 EA $1,150.00 Sitework - Roadway - 8" Limerock Base 90 SY $6.50 Sitework - Roadway - Retro-reflective pavement markers 20 EA $3.34 Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 136 LF $2.01 Sitework - Thermoplastic Striping, STD, White, Solid - 24" Width 62 LF $4.06 Landscape - Shrubs, Grasses, Groundcovers, Mulch 550 SF $5.50 Landscape - Irrigation 550 SF $0.80 Landscape - Topsoil (6" Depth) 11 CY $40.00 $335.65 $216.00 $720.00 $0.00 $5,864.50 $10,380.80 $960.00 $420.00 $11,500.00 $585.00 $66.80 $273.36 $251.72 $3,025.00 $440.00 $440.00

06 - Pelican Bay Blvd. @ Gulf Park Drive Option 1 - Striping Only $92,506!Item Demolition - Clearing and Grubbing 13,620 SF $0.49 $6,673.80 Demolition - Curb 160 LF $6.00 $960.00 Demolition - Sidewalk 30 SY $12.00 $360.00 Sitework - Concrete - ADA Compliant Ramp Assembly 4 EA $545.00 $2,180.00 Sitework - Concrete - Sidewalk (5.0') 8 SY $32.00 $256.00 Sitework - Concrete - Type 'A' Curb 140 LF $10.50 $1,470.00 Sitework - Roadway - 8" Limerock Base 84 SY $6.50 $546.00 Sitework - Roadway - Asphalt (2") 1 TN $200.00 $200.00 Sitework - Roadway - Retro-reflective pavement markers 60 EA $3.34 $200.40 Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 940 LF $2.01 $1,889.40 Landscape - Trees 15 EA $300.00 $4,500.00 Landscape - Shrubs, Grasses, Groundcovers, Mulch 9,780 SF $5.50 $53,790.00 Landscape - Sod 3,840 SF $0.35 $1,344.00 Landscape - Topsoil (6" Depth) 181 CY $40.00 $7,240.00 Landscape - Irrigation 13,620 SF $0.80 $10,896.00 Option 2 - Concrete Pavers $158,011 Iltern Quantity Unit Unit Cost Subtotall Demolition - Asphalt 319 SY $8.00 $2,552.00 Demolition - Clearing and Grubbing 13,620 SF $0.49 $6,673.80 Demolition - Curb 160 LF $6.00 $960.00 Demolition - Sidewalk 30 SY $12.00 $360.00 Sitework - Concrete - ADA Compliant Ramp Assembly 4 EA $545.00 $2,180.00 Sitework - Concrete - Brick Pavers 2,999 SF $5.50 $16,494.50 Sitework - Concrete - Ribbon Curb 560 LF $15.00 $8,400.00 Sitework - Concrete - Sidewalk (5.0') 8 SY $32.00 $256.00 Sitework - Concrete - Slab (Up to 8" thick reinforced) 2,871 SF $12.80 $36,748.80 Sitework - Concrete - Type 'A' Curb 140 LF $10.50 $1,470.00 Sitework - Roadway - 8" Limerock Base 403 SY $6.50 $2,619.50 Sitework - Roadway - Asphalt 1 TN $200.00 $200.00 Sitework - Roadway - Retro-reflective pavement markers 60 EA $3.34 $200.40 Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 560 LF $2.01 $1,125.60 Landscape - Trees 15 EA $300.00 $4,500.00 Landscape - Shrubs, Grasses, Groundcovers, Mulch 9,780 SF $5.50 $53,790.00 Landscape - Sod 3,840 SF $0.35 $1,344.00 Landscape - Topsoil (6" Depth) 181 CY $40.00 $7,240.00 Landscape - Irrigation 13,620 SF $0.80 $10,896.00 Option 3 - Clay Brick Paving $169,257 Demolition - Asphalt 319 SY $8.00 $2,552.00 Demolition - Clearing and Grubbing 13,620 SF $0.49 $6,673.80 Demolition - Curb 160 LF $6.00 $960.00 Demolition - Sidewalk 30 SY $12.00 $360.00 Sitework - Concrete - ADA Compliant Ramp Assembly 4 EA $545.00 $2,180.00 Sitework - Clay - Brick Pavers 2,999 SF $9.25 $27,740.75 Sitework - Concrete - Ribbon Curb 560 LF $15.00 $8,400.00 Sitework - Concrete - Sidewalk (5.0') 8 SY $32.00 $256.00 Sitework - Concrete - Slab (Up to 8" thick reinforced) 2,871 SF $12.80 $36,748.80 Sitework - Concrete - Type 'A' Curb 140 LF $10.50 $1,470.00 Sitework - Roadway - 8" Limerock Base 403 SY $6.50 $2,619.50 Sitework - Roadway - Asphalt 1 TN $200.00 $200.00 Sitework - Roadway - Retro-reflective pavement markers 60 EA $3.34 $200.40 Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 560 LF $2.01 $1,125.60 Landscape - Trees 15 EA $300.00 $4,500.00 Landscape - Shrubs, Grasses, Groundcovers, Mulch 9,780 SF $5.50 $53,790.00 Landscape - Sod 3,840 SF $0.35 $1,344.00 Landscape - Topsoil (6" Depth) 181 CY $40.00 $7,240.00 Landscape - Irrigation 13,620 SF $0.80 $10,896.00

07 - Gulf Park Drive @ Ridgewood Drive Option 1 - Striping Only $16,859 Demolition - Clearing and Grubbing 225 SF $0.49 $110.25 Demolition - Curb 35 LF $6.00 $210.00 Demolition - Asphalt to 4" Thick (Includes limerock base to 8") 10 SY $8.00 $80.00 Sitework - Concrete - Sidewalk (5.0') 4 SY $32.00 $128.00 Sitework - Concrete - Type 'A' Curb 26 LF $10.50 $273.00 Sitework - Roadway - Asphalt 1 TN $200.00 $200.00 Sitework - Roadway - 8" Limerock Base 20 SY $6.50 $130.00 Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 540 LF $2.01 $1,085.40 Landscape - Shrubs, Grasses, Groundcovers, Mulch 180 SF $5.50 $990.00 Landscape - Irrigation 180 SF $0.80 $144.00 Landscape - Topsoil (6" Depth) 4 CY $40.00 $160.00 Option 2 - Concrete Pavers $47,688 Quantity Unit Unit Cost Subtotal Demolition - Clearing and Grubbing 225 SF $0.49 $110.25 Demolition - Curb 35 LF $6.00 $210.00 Demolition - Asphalt to 4" Thick (Includes limerock base to 8") 10 SY $8.00 $80.00 Sitework - Concrete - Brick Pavers 1,396 SF $5.50 $7,678.00 Sitework - Concrete - Slab (Up to 8" thick reinforced) 1,772 SF $12.80 $22,681.60 Sitework - Concrete - Sidewalk (5.0') 4 SY $32.00 $128.00 Sitework - Concrete - Type 'A' Curb 26 LF $10.50 $273.00 Sitework - Roadway - Asphalt 1 TN $200.00 $200.00 Sitework - Roadway - 8" Limerock Base 208 SY $6.50 $1,352.00 Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 166 LF $2.01 $333.66 Landscape - Shrubs, Grasses, Groundcovers, Mulch 180 SF $5.50 $990.00 Landscape - Irrigation 180 SF $0.80 $144.00 Landscape - Topsoil (6" Depth) 4 CY $40.00 $160.00 Option 3 - Clay Brick Paving $52,923 Demolition - Clearing and Grubbing 225 SF $0.49 $110.25 Demolition - Curb 35 LF $6.00 $210.00 Demolition - Asphalt to 4" Thick (Includes limerock base to 8") 10 SY $8.00 $80.00 Sitework - Clay - Brick Pavers 1,396 SF $9.25 $12,913.00 Sitework - Concrete - Slab (Up to 8" thick reinforced) 1,772 SF $12.80 $22,681.60 Sitework - Concrete - Sidewalk (5.0') 4 SY $32.00 $128.00 Sitework - Concrete - Type 'A' Curb 26 LF $10.50 $273.00 Sitework - Roadway - Asphalt 1 TN $200.00 $200.00 Sitework - Roadway - 8" Limerock Base 208 SY $6.50 $1,352.00 Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 166 LF $2.01 $333.66 Landscape - Shrubs, Grasses, Groundcovers, Mulch 180 SF $5.50 $990.00 Landscape - Irrigation 180 SF $0.80 $144.00 Landscape - Topsoil (6" Depth) 4 CY $40.00 $160.00

08 - Gulf Park Drive @ Green Tree Drive Option 1 - Striping Only $19,149 Iltern Quantity Unit Unit Cost Subtotal Demolition - Clearing and Grubbing 380 SF $0.49 $186.20 Demolition - Curb 55 LF $6.00 $330.00 Demolition - Asphalt to 4" Thick (Includes limerock base to 8") 163 SY $8.00 $1,304.00 Sitework - Concrete - Sidewalk (5.0') 12 SY $32.00 $384.00 Sitework - Concrete - Type 'A' Curb 35 LF $10.50 $367.50 Sitework - Roadway - Asphalt 1 TN $200.00 $200.00 Sitework - Roadway - 8" Limerock Base 18 SY $6.50 $117.00 Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 550 LF $2.01 $1,105.50 Landscape - Shrubs, Grasses, Groundcovers, Mulch 255 SF $5.50 $1,402.50 Landscape - Irrigation 255 SF $0.80 $204.00 Landscape - Topsoil (6" Depth) 5 CY $40.00 $200.00 Option 2 - Concrete Pavers $49,964 Demolition - Clearing and Grubbing 380 SF $0.49 $186.20 Demolition - Curb 55 LF $6.00 $330.00 Demolition - Asphalt to 4" Thick (Includes limerock base to 8") 150 SY $8.00 $1,200.00 Sitework - Concrete - Brick Pavers 1,385 SF $5.50 $7,617.50 Sitework - Concrete - Slab (Up to 8" thick reinforced) 1,755 SF $12.80 $22,464.00 Sitework - Concrete - Sidewalk (5.0') 12 SY $32.00 $384.00 Sitework - Concrete - Type 'A' Curb 35 LF $10.50 $367.50 Sitework - Roadway - Asphalt 1 TN $200.00 $200.00 Sitework - Roadway - 8" Limerock Base 213 SY $6.50 $1,384.50 Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 336 LF $2.01 $675.36 Landscape - Shrubs, Grasses, Groundcovers, Mulch 255 SF $5.50 $1,402.50 Landscape - Irrigation 255 SF $0.80 $204.00 Landscape - Topsoil (6" Depth) 5 CY $40.00 $200.00 Option 3 - Clay Brick Paving $55,157 Iltern Demolition - Clearing and Grubbing 380 SF $0.49 $186.20 Demolition - Curb 55 LF $6.00 $330.00 Demolition - Asphalt to 4" Thick (Includes limerock base to 8") 150 SY $8.00 $1,200.00 Sitework - Clay - Brick Pavers 1,385 SF $9.25 $12,811.25 Sitework - Concrete - Slab (Up to 8" thick reinforced) 1,755 SF $12.80 $22,464.00 Sitework - Concrete - Sidewalk (5.0') 12 SY $32.00 $384.00 Sitework - Concrete - Type 'A' Curb 35 LF $10.50 $367.50 Sitework - Roadway - Asphalt 1 TN $200.00 $200.00 Sitework - Roadway - 8" Limerock Base 213 SY $6.50 $1,384.50 Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 336 LF $2.01 $675.36 Landscape - Shrubs, Grasses, Groundcovers, Mulch 255 SF $5.50 $1,402.50 Landscape - Irrigation 255 SF $0.80 $204.00 Landscape - Topsoil (6" Depth) 5 CY $40.00 $200.00

09 - Pelican Bay Blvd. @ Sandpiper Parking Option 1 - Striping Only $23,983!Item Quantity Unit Unit Cost Subtotall Demolition - Clearing and Grubbing 1,075 SF $0.49 $526.75 Demolition - Curb 50 LF $6.00 $300.00 Sitework - Concrete - Sidewalk (5.0') 14 SY $32.00 $448.00 Sitework - Concrete - Type 'A' Curb 72 LF $10.50 $756.00 Sitework - Roadway - Asphalt 3 TN $200.00 $600.00 Sitework - Roadway - 8" Limerock Base 305 SY $6.50 $1,982.50 Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 260 LF $2.01 $522.60 Sitework - Thermoplastic Striping, STD, White, Solid - 24" Width 48 LF $4.06 $194.88 Landscape - Shrubs, Grasses, Groundcovers, Mulch 850 SF $5.50 $4,675.00 Landscape - Irrigation 850 SF $0.80 $680.00 Landscape - Topsoil (6" Depth) 16 CY $40.00 $640.00 Option 2 - Concrete Pavers $36,291 Demolition - Clearing and Grubbing 1,075 SF $0.49 $526.75 Demolition - Curb 50 LF $6.00 $300.00 Demolition - Asphalt to 4" Thick (Includes limerock base to 8") 90 SY $8.00 $720.00 Sitework - Concrete - Brick Pavers 631 SF $5.50 $3,470.50 Sitework - Concrete - Slab (Up to 8" thick reinforced) 806 SF $12.80 $10,316.80 Sitework - Concrete - Sidewalk (5.0') 14 SY $32.00 $448.00 Sitework - Concrete - Type 'A' Curb 72 LF $10.50 $756.00 Sitework - Roadway - 8" Limerock Base 90 SY $6.50 $585.00 Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 160 LF $2.01 $321.60 Sitework - Thermoplastic Striping, STD, White, Solid - 24" Width 48 LF $4.06 $194.88 Landscape - Shrubs, Grasses, Groundcovers, Mulch 850 SF $5.50 $4,675.00 Landscape - Irrigation 850 SF $0.80 $680.00 Landscape - Topsoil (6" Depth) 16 CY $40.00 $640.00 Option 3 - Clay Brick Paving $38,658 Demolition - Clearing and Grubbing 1,075 SF $0.49 $526.75 Demolition - Curb 50 LF $6.00 $300.00 Demolition - Asphalt to 4" Thick (Includes limerock base to 8") 90 SY $8.00 $720.00 Sitework - Clay - Brick Pavers 631 SF $9.25 $5,836.75 Sitework - Concrete - Slab (Up to 8" thick reinforced) 806 SF $12.80 $10,316.80 Sitework - Concrete - Sidewalk (5.0') 14 SY $32.00 $448.00 Sitework - Concrete - Type 'A' Curb 72 LF $10.50 $756.00 Sitework - Roadway - 8" Limerock Base 90 SY $6.50 $585.00 Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 160 LF $2.01 $321.60 Sitework - Thermoplastic Striping, STD, White, Solid - 24" Width 48 LF $4.06 $194.88 Landscape - Shrubs, Grasses, Groundcovers, Mulch 850 SF $5.50 $4,675.00 Landscape - Irrigation 850 SF $0.80 $680.00 Landscape - Topsoil (6" Depth) 16 CY $40.00 $640.00

10 - Pelican Bay Blvd. @ Beachwalk Pathway Option 1 - Striping Only $23,220 Demolition - Clearing and Grubbing 1,433 SF $0.49 $702.17 Demolition - Curb 30 LF $6.00 $180.00 Sitework - Concrete - Sidewalk (5.0') 30 SY $32.00 $960.00 Sitework - Concrete - Type 'A' Curb 70 LF $10.50 $735.00 Sitework - Roadway - Asphalt 3 TN $200.00 $600.00 Sitework - Roadway - 8" Limerock Base 38 SY $6.50 $247.00 Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 260 LF $2.01 $522.60 Sitework - Thermoplastic Striping, STD, White, Solid - 24" Width 50 LF $4.06 $203.00 Landscape - Shrubs, Grasses, Groundcovers, Mulch 910 SF $5.50 $5,005.00 Landscape - Irrigation 910 SF $0.80 $728.00 Landscape - Topsoil (6" Depth) 17 CY $40.00 $680.00 Option 2 - Concrete Pavers $36,417 Demolition - Clearing and Grubbing 1,433 SF $0.49 $702.17 Demolition - Curb 30 LF $6.00 $180.00 Sitework - Concrete - Brick Pavers 630 SF $5.50 $3,465.00 Sitework - Concrete - Slab (Up to 8" thick reinforced) 797 SF $12.80 $10,201.60 Sitework - Concrete - Sidewalk (5.0') 30 SY $32.00 $960.00 Sitework - Concrete - Type 'A' Curb 70 LF $10.50 $735.00 Sitework - Roadway - 8" Limerock Base 89 SY $6.50 $578.50 Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 160 LF $2.01 $321.60 Sitework - Thermoplastic Striping, STD, White, Solid - 24" Width 50 LF $4.06 $203.00 Landscape - Shrubs, Grasses, Groundcovers, Mulch 910 SF $5.50 $5,005.00 Landscape - Irrigation 910 SF $0.80 $728.00 Landscape - Topsoil (6" Depth) 17 CY $40.00 $680.00 Option 3 - Clay Brick Paving $38,779 Demolition - Clearing and Grubbing 1,433 SF $0.49 $702.17 Demolition - Curb 30 LF $6.00 $180.00 Sitework - Clay - Brick Pavers 630 SF $9.25 $5,827.50 Sitework - Concrete - Slab (Up to 8" thick reinforced) 797 SF $12.80 $10,201.60 Sitework - Concrete - Sidewalk (5.0') 30 SY $32.00 $960.00 Sitework - Concrete - Type 'A' Curb 70 LF $10.50 $735.00 Sitework - Roadway - 8" Limerock Base 89 SY $6.50 $578.50 Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 160 LF $2.01 $321.60 Sitework - Thermoplastic Striping, STD, White, Solid - 24" Width 50 LF $4.06 $203.00 Landscape - Shrubs, Grasses, Groundcovers, Mulch 910 SF $5.50 $5,005.00 Landscape - Irrigation 910 SF $0.80 $728.00 Landscape - Topsoil (6" Depth) 17 CY $40.00 $680.00

11 - Pelican Bay Blvd. @ North Tram Station with No Median Adjustments Option 1 - Striping On y $3,591 Demolition - Signage 1 LS $1,200.00 Demolition - Thermoplastic Striping (Remove) 592 LF $2.08 Sitework - Concrete - ADA Compliant Ramp Assembly 0 EA $545.00 Sitework - Regulatory Signage - Decorative Post Mount 0 EA $1,150.00 Sitework - Roadway - Retro-reflective pavement markers 0 EA $3.34 Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 480 LF $2.01 Sitework - Thermoplastic Striping, STD, White, Solid - 24" Width 48 LF $4.06 Option 2 - Concrete Pavers $17,042 Quantity Unit Unit Cost Subtotall $1,200.00 $1,231.36 $0.00 $0.00 $0.00 $964.80 $194.88 Quantity Unit Unit Cost Subtotall Demolition - Asphalt to 4" Thick (Includes limerock base to 8") 90 SY $8.00 $720.00 Demolition - Signage 1 LS $1,200.00 $1,200.00 Sitework - Concrete - ADA Compliant Ramp Assembly 0 EA $545.00 $0.00 Sitework - Concrete - Brick Pavers 642 SF $5.50 $3,531.00 Sitework - Concrete - Slab (Up to 8" thick reinforced) 819 SF $12.80 $10,483.20 Sitework - Regulatory Signage - Decorative Post Mount 0 EA $1,150.00 $0.00 Sitework - Roadway - 8" Limerock Base 91 SY $6.50 $591.50 Sitework - Roadway - Retro-reflective pavement markers 0 EA $3.34 $0.00 Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 160 LF $2.01 $321.60 Sitework - Thermoplastic Striping, STD, White, Solid - 24" Width 48 LF $4.06 $194.88 Option 3 - Clay Brick Paving $19,450 Demolition - Asphalt to 4" Thick (Includes limerock base to 8") 90 SY $8.00 $720.00 Demolition - Signage 1 LS $1,200.00 $1,200.00 Sitework - Concrete - ADA Compliant Ramp Assembly 0 EA $545.00 $0.00 Sitework - Clay - Brick Pavers 642 SF $9.25 $5,938.50 Sitework - Concrete - Slab (Up to 8" thick reinforced) 819 SF $12.80 $10,483.20 Sitework - Regulatory Signage - Decorative Post Mount 0 EA $1,150.00 $0.00 Sitework - Roadway - 8" Limerock Base 91 SY $6.50 $591.50 Sitework - Roadway - Retro-reflective pavement markers 0 EA $3.34 $0.00 Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 160 LF $2.01 $321.60 Sitework - Thermoplastic Striping, STD, White, Solid - 24" Width 48 LF $4.06 $194.88

11 a - Pelican Bay Blvd. @ North Tram Station with Filled, Continuous Landscape Median Option 1 - Striping Only $139,239 Demolition - Asphalt to 4" Thick (Includes limerock base to 8") 630 SY $8.00 $5,040.00 Demolition - Clearing and Grubbing 7,820 SF $0.49 $3,831.80 Demolition - Tree Removal (Includes stump) 3 EA $550.00 $1,650.00 Demolition - Palm Removal (Includes stump) 20 EA $200.00 $4,000.00 Demolition - Curb 870 LF $6.00 $5,220.00 Demolition - Sidewalk 10 SY $12.00 $120.00 Demolition - Signage 1 LS $1,200.00 $1,200.00 Demolition - Thermoplastic Striping (Remove) 160 LF $2.08 $332.80 Sitework - Concrete - Sidewalk (5.0') 10 SY $32.00 $320.00 Sitework - Concrete - Type 'A' Curb 1,035 LF $10.50 $10,867.50 Sitework - Roadway - 8" Limerock Base 82 SY $6.50 $533.00 Sitework - Roadway - Asphalt 7 TN $200.00 $1,400.00 Sitework - Roadway - Retro-reflective pavement markers 40 EA $3.34 $133.60 Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 260 LF $2.01 $522.60 Sitework - Thermoplastic Striping, STD, White, Solid - 24" Width 72 LF $4.06 $292.32 Landscape - Shrubs, Grasses, Groundcovers, Mulch 12,950 SF $5.50 $71,225.00 Landscape - Irrigation 12,950 SF $0.80 $10,360.00 Landscape - Topsoil (6" Depth) 240 CY $40.00 $9,600.00 Option 2 - Concrete Pavers $152,297 Demolition - Asphalt to 4" Thick (Includes limerock base to 8") 690 SY $8.00 $5,520.00 Demolition - Clearing and Grubbing 7,820 SF $0.49 $3,831.80 Demolition - Tree Removal (Includes stump) 3 EA $550.00 $1,650.00 Demolition - Palm Removal (Includes stump) 20 EA $200.00 $4,000.00 Demolition - Curb 870 LF $6.00 $5,220.00 Demolition - Sidewalk 10 SY $12.00 $120.00 Demolition - Signage 1 LS $1,200.00 $1,200.00 Sitework - Concrete - Brick Pavers 620 SF $5.50 $3,410.00 Sitework - Concrete - Sidewalk (5.0') 10 SY $32.00 $320.00 Sitework - Concrete - Slab (Up to 8" thick reinforced) 790 SF $12.80 $10,112.00 Sitework - Concrete - Type 'A' Curb 1,035 LF $10.50 $10,867.50 Sitework - Roadway - 8" Limerock Base 142 SY $6.50 $923.00 Sitework - Roadway - Asphalt 3 TN $200.00 $600.00 Sitework - Roadway - Retro-reflective pavement markers 40 EA $3.34 $133.60 Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 160 LF $2.01 $321.60 Sitework - Thermoplastic Striping, STD, White, Solid - 24" Width 72 LF $4.06 $292.32 Landscape - Shrubs, Grasses, Groundcovers, Mulch 12,950 SF $5.50 $71,225.00 Landscape - Irrigation 12,950 SF $0.80 $10,360.00 Landscape - Topsoil (6" Depth) 240 CY $40.00 $9,600.00 Option 3 - Clay Brick Paving $154,622 Demolition - Asphalt to 4" Thick (Includes limerock base to 8") 690 SY $8.00 Demolition - Clearing and Grubbing 7,820 SF $0.49 Demolition - Tree Removal (Includes stump) 3 EA $550.00 Demolition - Palm Removal (Includes stump) 20 EA $200.00 Demolition - Curb 870 LF $6.00 Demolition - Sidewalk 10 SY $12.00 Demolition - Signage 1 LS $1,200.00 Sitework - Concrete - ADA Compliant Ramp Assembly 2 EA $545.00 Sitework - Clay - Brick Pavers 620 SF $9.25 Sitework - Concrete - Sidewalk (5.0') 10 SY $32.00 Sitework - Concrete - Slab (Up to 8" thick reinforced) 790 SF $12.80 Sitework - Concrete - Type 'A' Curb 1,035 LF $10.50 Sitework - Regulatory Signage - Decorative Post Mount 10 EA $1,150.00 Sitework - Roadway - 8" Limerock Base 142 SY $6.50 Sitework - Roadway - Asphalt 3 TN $200.00 Sitework - Roadway - Retro-reflective pavement markers 40 EA $3.34 Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 160 LF $2.01 Sitework - Thermoplastic Striping, STD, White, Solid - 24" Width 72 LF $4.06 Landscape - Shrubs, Grasses, Groundcovers, Mulch 12,950 SF $5.50 Landscape - Irrigation 12,950 SF $0.80 Landscape - Topsoil (6" Depth) 240 CY $40.00 $5,520.00 $3,831.80 $1,650.00 $4,000.00 $5,220.00 $120.00 $1,200.00 $1,090.00 $5,735.00 $320.00 $10,112.00 $10,867.50 $11,500.00 $923.00 $600.00 $133.60 $321.60 $292.32 $71,225.00 $10,360.00 $9,600.00

11 a - Pelican Bay Blvd. @ North Tram Station with Filled, Continuous Landscape Median WilsonMiller - March 26, 2010 Option 3 - Clay Brick Paving $154,622 Demolition - Asphalt to 4" Thick (Includes limerock base to 8") 690 SY $8.00 $5,520.00 Demolition - Clearing and Grubbing 7,820 SF $0.49 $3,831.80 Demolition - Tree Removal (Includes stump) 3 EA $550.00 $1,650.00 Demolition - Palm Removal (Includes stump) 20 EA $200.00 $4,000.00 Demolition - Curb 870 LF $6.00 $5,220.00 Demolition - Sidewalk 10 SY $12.00 $120.00 Demolition - Signage 1 LS $1,200.00 $1,200.00 Sitework - Clay - Brick Pavers 620 SF $9.25 $5,735.00 Sitework - Concrete - Sidewalk (5.0') 10 SY $32.00 $320.00 Sitework - Concrete - Slab (Up to 8" thick reinforced) 790 SF $12.80 $10,112.00 Sitework - Concrete - Type 'A' Curb 1,035 LF $10.50 $10,867.50 Sitework - Roadway - 8" Limerock Base 142 SY $6.50 $923.00 Sitework - Roadway - Asphalt 3 TN $200.00 $600.00 Sitework - Roadway - Retro-reflective pavement markers 40 EA $3.34 $133.60 Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 160 LF $2.01 $321.60 Sitework - Thermoplastic Striping, STD, White, Solid - 24" Width 72 LF $4.06 $292.32 Landscape - Shrubs, Grasses, Groundcovers, Mulch 12,950 SF $5.50 $71,225.00 Landscape - Irrigation 12,950 SF $0.80 $10,360.00 Landscape - Topsoil (6" Depth) 240 CY $40.00 $9,600.00 (TOTAL: I $154,622 I 115% CONTINGENCY: I $23,193( Design / Permit Fee Estimates $22,000 Engineering / Survey/ Geotechnical Landscape Architecture Permitting!GRAND TOTAL: Quantity Unit Unit Cost LS $11,500.00 LS $3,000.00 LS $7,500.00 Subtotal' $11,500.00 $3,000.00 $7,500.00 I $199,815 I

llb - Pelican Bay Blvd. @ North Tram Station with New Turn Lane Relocated Option 1 - Striping Only $123,670 Demolition - Asphalt to 4" Thick (Includes limerock base to 8") 630 SY $8.00 $5,040.00 Demolition - Clearing and Grubbing 7,820 SF $0.49 $3,831.80 Demolition - Tree Removal (Includes stump) 3 EA $550.00 $1,650.00 Demolition - Palm Removal (Includes stump) 20 EA $200.00 $4,000.00 Demolition - Curb 870 LF $6.00 $5,220.00 Demolition - Sidewalk 10 SY $12.00 $120.00 Demolition - Signage 1 LS $1,200.00 $1,200.00 Demolition - Thermoplastic Striping (Remove) 160 LF $2.08 $332.80 Sitework - Concrete - Sidewalk (5.0') 10 SY $32.00 $320.00 Sitework - Concrete - Type 'A' Curb 964 LF $10.50 $10,122.00 Sitework - Roadway - 8" Limerock Base 416 SY $6.50 $2,704.00 Sitework - Roadway - Asphalt 34 TN $200.00 $6,800.00 Sitework - Roadway - Retro-reflective pavement markers 40 EA $3.34 $133.60 Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 260 LF $2.01 $522.60 Sitework - Thermoplastic Striping, STD, White, Solid - 24" Width 72 LF $4.06 $292.32 Landscape - Shrubs, Grasses, Groundcovers, Mulch 9,770 SF $5.50 $53,735.00 Landscape - Irrigation 9,770 SF $0.80 $7,816.00 Landscape - Topsoil (6" Depth) 181 CY $40.00 $7,240.00 Option 2 - Concrete Pavers $137,494 Demolition - Asphalt to 4" Thick (Includes limerock base to 8") 690 SY $8.00 $5,520.00 Demolition - Clearing and Grubbing 7,820 SF $0.49 $3,831.80 Demolition - Tree Removal (Includes stump) 3 EA $550.00 $1,650.00 Demolition - Palm Removal (Includes stump) 20 EA $200.00 $4,000.00 Demolition - Curb 870 LF $6.00 $5,220.00 Demolition - Sidewalk 10 SY $12.00 $120.00 Demolition - Signage 1 LS $1,200.00 $1,200.00 Sitework - Concrete - Brick Pavers 620 SF $5.50 $3,410.00 Sitework - Concrete - Sidewalk (5.0') 10 SY $32.00 $320.00 Sitework - Concrete - Slab (Up to 8" thick reinforced) 790 SF $12.80 $10,112.00 Sitework - Concrete - Type 'A' Curb 964 LF $10.50 $10,122.00 Sitework - Roadway - 8" Limerock Base 440 SY $6.50 $2,860.00 Sitework - Roadway - Asphalt 35 TN $200.00 $7,000.00 Sitework - Roadway - Retro-reflective pavement markers 40 EA $3.34 $133.60 Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 160 LF $2.01 $321.60 Sitework - Thermoplastic Striping, STD, White, Solid - 24" Width 72 LF $4.06 $292.32 Landscape - Shrubs, Grasses, Groundcovers, Mulch 9,770 SF $5.50 $53,735.00 Landscape - Irrigation 9,770 SF $0.80 $7,816.00 Landscape - Topsoil (6" Depth) 181 CY $40.00 $7,240.00 Option 3 - Clay Brick Paving $139,819 Quantity Unit Unit Cost Subtotal! Demolition - Asphalt to 4" Thick (Includes limerock base to 8") 690 SY $8.00 Demolition - Clearing and Grubbing 7,820 SF $0.49 Demolition - Tree Removal (Includes stump) 3 EA $550.00 Demolition - Palm Removal (Includes stump) 20 EA $200.00 Demolition - Curb 870 LF $6.00 Demolition - Sidewalk 10 SY $12.00 Demolition - Signage 1 LS $1,200.00 Sitework - Concrete - ADA Compliant Ramp Assembly 2 EA $545.00 Sitework - Clay - Brick Pavers 620 SF $9.25 Sitework - Concrete - Sidewalk (5.0') 10 SY $32.00 Sitework - Concrete - Slab (Up to 8" thick reinforced) 790 SF $12.80 Sitework - Concrete - Type 'A' Curb 964 LF $10.50 Sitework - Regulatory Signage - Decorative Post Mount 10 EA $1,150.00 Sitework - Roadway - 8" Limerock Base 440 SY $6.50 Sitework - Roadway - Asphalt 35 TN $200.00 Sitework - Roadway - Retro-reflective pavement markers 40 EA $3.34 Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 160 LF $2.01 Sitework - Thermoplastic Striping, STD, White, Solid - 24" Width 72 LF $4.06 Landscape - Shrubs, Grasses, Groundcovers, Mulch 9,770 SF $5.50 Landscape - Irrigation 9,770 SF $0.80 Landscape - Topsoil (6" Depth) 181 CY $40.00 $5,520.00 $3,831.80 $1,650.00 $4,000.00 $5,220.00 $120.00 $1,200.00 $1,090.00 $5,735.00 $320.00 $10,112.00 $10,122.00 $11,500.00 $2,860.00 $7,000.00 $133.60 $321.60 $292.32 $53,735.00 $7,816.00 $7,240.00

llb - Pelican Bay Blvd. @ North Tram Station with New Turn Lane Relocated WilsonMiller - March 26, 2010 Option 3 - Clay Brick Paving $139,819 (TOTAL: Demolition - Asphalt to 4" Thick (Includes limerock base to 8") 690 SY $8.00 $5,520.00 Demolition - Clearing and Grubbing 7,820 SF $0.49 $3,831.80 Demolition - Tree Removal (Includes stump) 3 EA $550.00 $1,650.00 Demolition - Palm Removal (Includes stump) 20 EA $200.00 $4,000.00 Demolition - Curb 870 LF $6.00 $5,220.00 Demolition - Sidewalk 10 SY $12.00 $120.00 Demolition - Signage 1 LS $1,200.00 $1,200.00 Sitework - Clay - Brick Pavers 620 SF $9.25 $5,735.00 Sitework - Concrete - Sidewalk (5.0') 10 SY $32.00 $320.00 Sitework - Concrete - Slab (Up to 8" thick reinforced) 790 SF $12.80 $10,112.00 Sitework - Concrete - Type 'A' Curb 964 LF $10.50 $10,122.00 Sitework - Roadway - 8" Limerock Base 440 SY $6.50 $2,860.00 Sitework - Roadway - Asphalt 35 TN $200.00 $7,000.00 Sitework - Roadway - Retro-reflective pavement markers 40 EA $3.34 $133.60 Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 160 LF $2.01 $321.60 Sitework - Thermoplastic Striping, STD, White, Solid - 24" Width 72 LF $4.06 $292.32 Landscape - Shrubs, Grasses, Groundcovers, Mulch 9,770 SF $5.50 $53,735.00 Landscape - Irrigation 9,770 SF $0.80 $7,816.00 Landscape - Topsoil (6" Depth) 181 CY $40.00 $7,240.00 115% CONTINGENCY: I I $139,819 I $20,973( Design / Permit Fee Estimates $22,000 Item Engineering / Survey/ Geotechnical Landscape Architecture Permitting (GRAND TOTAL: Quantity Unit Unit Cost LS $11,500.00 LS $3,000.00 LS $7,500.00 Subtotal' $11,500.00 $3,000.00 $7,500.00 I $182,792 I