STAFF SUMMARY FOR S17-02 SPECIAL USE PERMIT APPLICATION

Similar documents
STAFF SUMMARY FOR S17-02 SPECIAL USE PERMIT APPLICATION

BROOKHILL NEIGHBORHOOD MODEL ZONING MAP AMENDMENT PREFACE TO APPLICATION

PLANNING COMMISSION. Agenda Item # 3.

4.1.3 LAND USE CATEGORIES

Urban Planning and Land Use

VILLAGE OF CLEMMONS PLANNING BOARD DRAFT STAFF REPORT

Asbury Chapel Subdivision Sketch Plan

Executive Summary. NY 7 / NY 2 Corridor

CHAPTER 3 VISION, GOALS, & PLANNING PRINCIPLES. City of Greensburg Comprehensive Plan. Introduction. Vision Statement. Growth Management Goals.

CHAPTER 7: Transportation, Mobility and Circulation

Baumgarten MPUD. Exhibit 3 Evaluation Criteria

REVIEW AND EVALUATION OF REGIONAL LAND USE

12 January 12, 2011 Public Hearing APPLICANT: TAILWIND DEVELOPMENT GROUP,LLC PROPERTY OWNER: CITY OF VIRGINIA BEACH

Application Number: SD Project Name: Walton Farms Preliminary Subdivision (acting as Master Plan)

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

Planning & Zoning Commission Staff Report

VILLAGE OF CLEMMONS PLANNING BOARD DRAFT STAFF REPORT. Single Family Residential, Townhomes

Behnke Ranch Property, Pasco County: Master Plan Development Approach

Definitions. Average Daily Traffic Demand (ADT): The actual number or projected number of cars that pass a point in a 24-hour period.

14 October 10, 2012 Public Hearing APPLICANT: MPB, INC

PART 1: PROJECT SUMMARY. Proposed Land Use: 120 single-family lots. The application is Attachment A. The site plan is Attachment B.

Hockessin Community Redevelopment Plan

PORT WHITBY COMMUNITY

Plan-It Greenville (2009) Comprehensive Plan 5-Year Update

KEIZER STATION PLAN INTRODUCTION

Executive Summary. The Mebane CLP is not a regulatory document, but is intended to guide land development decisions. The plan includes:

PART 1: PROJECT SUMMARY. The application is Attachment A. The site plan is Attachment B.

8 February 9, 2011 Public Hearing APPLICANT: 7-ELEVEN, INC.

Staff Report and Recommendation

2 January 13, 2010 Public Hearing APPLICANT: AUTOBELL CAR WASH, INC

4 January 11, 2012 Public Hearing APPLICANT:

2040 LUP is a part of the Comprehensive Plan and carries the same legal authority. Economic Challenges

Ivywild On The Creek PRELIMINARY CREEK DISTRICT MASTER PLAN

11 May 9, 2012 Public Hearing APPLICANT: KROGER LIMITED PARTNERSHIP I

NOTICE OF PUBLIC HEARING

ROAD CLOSURE AND LAND USE AMENDMENT SILVER SPRINGS (WARD 1) NORTHEAST OF NOSEHILL DRIVE NW AND SILVER SPRINGS ROAD NW BYLAWS 2C2018 AND 29D2018

A BLUEPRINT FOR BROCKTON A CITY-WIDE COMPREHENSIVE PLAN

Silverdale Regional Center

ARTICLE 6: Special and Planned Development Districts

Transportation Land Use Integration & Regional Planning. Don Kostelec, AICP Senior Planner, Louis Berger Group February 1, 2010

Prepared for the Citizens of Forsyth County by the City-County Planning Board

ARTICLE 13 STREETS General

CHAPTER 1. Ms. Guajardo s Class - Central Elementary CH 1 1

ARLINGTON COUNTY, VIRGINIA

Implementation Guide Comprehensive Plan City of Allen

Vision Statement for the Town of Flower Mound Master Plan The Town of Flower Mound Master Plan furthers the established community based vision to:

Rezoning Petition Pre-Hearing Staff Analysis July 16, 2018

Request Conditional Use Permit (Automobile Service Station) Staff Recommendation Approval. Staff Planner Bill Landfair

CHAPTER 7: VISION AND ACTION STATEMENTS. Noble 2025 Vision Statement

REQUEST Current Zoning: O-15(CD) (office) Proposed Zoning: TOD-M(CD) (transit oriented development mixed-use, conditional)

Secrest Short Cut and Monroe Expressway Small Area Plan AUGUST 29, 2018

ALBEMARLE COUNTY CODE CHAPTER 18 ZONING SECTION 20A NEIGHBORHOOD MODEL - NMD

S C O P E O F W O R K A P R I L

Silver Line CPAM UPDATE. Transportation and Land Use Committee October 14, 2016

MAIN STREET ECONOMIC DEVELOPMENT STRATEGY

Transportation. Strategies for Action

178 Carruthers Properties Inc.

DOMINION BOULEVARD CORRIDOR STUDY AND ECONOMIC DEVELOPMENT STRATEGIC PLAN A MODEL FOR CHESAPEAKE S FUTURE

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC

SPRINGHILL LAKE TRANSIT VILLAGE

COUNTY OF ALBEMARLE PLANNING STAFF REPORT SUMMARY

SHEFFIELD PARK Paulding County, GA DRI #588

Ten Mile Creek Planning Area

REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE TO PLANNED UNIT DEVELOPMENT AUGUST 18, 2016

I. Introduction. Prior Approvals

ARTICLE 13 STREETS General

Joint Public Hearing. Preliminary Subregion 5 Master Plan and Proposed Sectional Map Amendment

Living in Albemarle County s Urban Places

S A C R A M E N T O C O U N T Y JACKSON HIGHWAY & GRANT LINE EAST VISIONING STUDY

This Review Is Divided Into Two Phases:

12 February 9, 2011 Public Hearing APPLICANT: WILDLIFE RESPONSE, INC.

McDonald s Restaurant - Purcellville Town of Purcellville Special Use Permit Statement of Justification July 24, 2014

DRAFT City of Titusville 2040 Comprehensive Plan Future Land Use, Housing, and Transportation Elements April 16, 2018

, C-MS I June 3, 2016 $1500 pd chk #216918

E. RURAL COMMERCIAL/INDUSTRIAL PARK MODEL

AWH REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE TO PLANNED UNIT DEVELOPMENT

Town Center (part of the Comprehensive Plan)

Rezoning Petition Post-Hearing Staff Analysis July 31, 2018

Proposed Comprehensive Plan Strategies DRAFT for discussion June 28, 2017

STATEMENT OF JUSTIFICATION CLARKSBURG PREMIUM OUTLETS AT CABIN BRANCH NORTH DISTRICT, PHASE

A Healthy Future Walkability Through Community Design. Fit Families North Carolina October 18, 2004

EXISTING COMPREHENSIVE PLAN

Downtown Huntersville in 2030

1 Introduction. 4 Environmental Integrity. 7 Community Facilities

Guiding Principles, Objectives, Strategies and Policies

Citizen Comment Staff Response Staff Recommended Revision Planning Committee

I. DESCRIPTION OF PROPOSED ACTION... 1 A. General Description... 1 B. Historical Resume and Project Status... 2 C. Cost Estimates...

MEMORANDUM. DATE: March 15, Chairman and Members Community Redevelopment Agency. Leif J. Ahnell, C.P.A., C.G.F.O. Executive Director

Chapter 3: Land Use and Local Planning

Former Rockcliffe Airbase Community Design Plan Guiding Design Vision and Principles December 4, 2013

Welcome. Walk Around. Talk to Us. Write Down Your Comments

NEW CASTLE COUNTY S ZONING DISTRICTS

2035 General Plan Update and Belmont Village Specific Plan. Joint Study Session with the City Council and Planning Commission April 12, 2016

Atlanta BeltLine. Subareas 9 & 10. Master Plan Updates. March 26, Washington Park Jamboree 1

Public input has been an important part of the plan development process.

CASE NUMBER: 16SN0565 (AMENDED) APPLICANT: C.A.H. Investments, LLC

The transportation system in a community is an

Preliminary Plan Framework: Vision and Goals

REQUEST FOR QUALIFICATIONS

Proposed Walkability Ordinance for City of Knoxville (6/16/17)

Transcription:

APPLICATION SUMMARY Case Number: S17-02 Request: STAFF SUMMARY FOR S17-02 SPECIAL USE PERMIT APPLICATION SUP application in order to develop a convenience food store. Applicant: Property Owner(s): Cindee Wolf of Design Solutions Yosef, Inc. Location: Acreage: 7900 block of Market Street 1.78 acres PID(s): Comp Plan Place Type: R03600-003-042-005 Community Mixed Use Existing Land Use: Proposed Land Use: Undeveloped Convenience food store (with gas sales) Current Zoning: O&I SURROUNDING AREA LAND USE North Liberty Baptist Church, The East Carolina Bank O&I East General Commercial Uses (Retail, Office) B-2 South Amberleigh Shores Apartments ZONING West Single-Family Residential (Brickstone Estates) R-15 MF-M (City of Wilmington) S17-02 Staff Summary Page 1 of 10

ZONING HISTORY July 6, 1971 Initially zoned R-15 (Area 5) February 21, 2011 Rezoned to O&I (Z-909) COMMUNITY SERVICES Water/Sewer Fire Protection Schools Recreation The development will connect to CFPUA water and sewer services. New Hanover County Fire Services, New Hanover County Northern Fire District, New Hanover County Station Ogden Blair Elementary, Eaton Elementary, Holly Shelter Middle, and Laney High schools Ogden Park CONSERVATION, HISTORIC, & ARCHAEOLOGICAL RESOURCES Conservation No known conservation resources Historic No known historic resources Archaeological No known archaeological resources S17-02 Staff Summary Page 2 of 10

PROPOSED SITE PLAN TRANSPORTATION Access is provided to the subject property by Bump Along Road, a private road, from Market Street (BUS 17), and Raintree Road (SR 2146). The site plan currently limits the access from Raintree Road to an entrance only. As shown, all traffic must exit on Bump Along Road/Market Street. The development will also install a sidewalk to Raintree Road. The NC State Transportation Improvement Program includes a project (U-4902D) that will install a median and pedestrian improvements along the adjacent portion of Market Street. This project will require right-of-way dedication from the subject property and construction is expected to begin in late 2018. The NHC/City of Wilmington Greenway Plan recommends that a greenway be installed along Market Street. A Traffic Impact Analysis (TIA) for the project has been completed and is currently under review by the MPO and NCDOT. Below is information taken from the analysis. The TIA can be found online at the County s Development Activity Page: http://planningdevelopment.nhcgov.com/development-activity/ Trip Generation LAND USE INTENSITY AM PEAK PM PEAK Gas Station with Convenience Mart and Car Wash (946) 16 Vehicle Fueling Positions 189 222 S17-02 Staff Summary Page 3 of 10

The proposed development will generate 2,445 trips during the course of a 24-hour period. The TIA expects, if a two-way connection to Raintree Road is provided, that 5% of the trips generated by the proposed development will utilize that road for access. This equates to 9 trips in the AM peak, 11 trips in the PM peak, and 122 trips over the course of a 24- hour period. Level of Service The Level of Service results include two alternatives for the proposed development. Alternative 1 (Table A) includes a two-way connection to Raintree Road. Alternative 2 (Table B) illustrates the proposed development with the access to Raintree Road. Alternative 1 includes a connection to Raintree Road. S17-02 Staff Summary Page 4 of 10

Proposed Improvements Alternative 2 does not include a connection to Raintree Road. The TIA recommends that a southbound right turn land of 175 feet of storage with 50 feet of full lane width deceleration and appropriate taper to the intersection of Market Street and Bump Along Road. It also recommends that the signalization at the U-turn at Market Street be evaluated after the development is built. ENVIRONMENTAL The property does not contain any Special Flood Hazard Areas or Natural Heritage Areas. The property does contain wetlands regulated by the US Army Corps of Engineers. These wetlands will be filled in accordance with the US Army Corps of Engineers standards. The wetlands have the characteristics of swamp forest under the Conservation Overlay District, however it is not of a sufficient size for conservation spaced to be required. The property is within the Pages Creek (SA;HQW) watershed. Soils on the property consist of Murville Fine Sand, Kureb Sand, and Johnston soils. S17-02 Staff Summary Page 5 of 10

2016 COMPREHENSIVE LAND USE PLAN The New Hanover County Future Land Use Map provides a general representation of the vision for New Hanover County s future land use, as designated by place types describing the character and function of the different types of development that make up the community. Specific goals of the comprehensive plan are designated to be promoted in each place type, and other goals may be relevant for particular properties. Future Land Use Map Place Type Place Type Description Consistency Analysis Community Mixed Use Focuses on small-scale, compact, mixed use development patterns that serve all modes of travel and act as an attractor for county residents and visitors. Types of appropriate uses include office, retail, mixed use, recreational, commercial, institutional, and multi-family and single-family residential. A convenience store with fueling station is an appropriate use for this place type, especially given its location along Market St. Its provision of sidewalk access for nearby residents also supports the multi-modal goals of this place type. Relevant Goals of the Comprehensive Plan Goal I: Support business success Desired Outcome: A vibrant economy for New Hanover County based on business success Consistency Analysis: One of the implementation guidelines for this goal includes developing strategies for encouraging business that provide community level services for nearby residents. The proposed use provides these types of services and is designed to provide access for the adjacent residential neighborhood. S17-02 Staff Summary Page 6 of 10

Goal III: Promote fiscally responsible growth Desired Outcome: Growth patterns that achieve efficient provisions of services and equitable distribution of costs between the public and private sectors Consistency Analysis: The proposed use is infill development along a major highway corridor with existing infrastructure. Goal IV: Use public infrastructure improvements to leverage private investments Desired Outcome: Coordinated efforts of public and private investment to maximize improvements Consistency Analysis: The proposed site plan is designed to maintain and improve the existing connection between Raintree Rd. and Bump Along Rd., which will enhance the ability of nearby residents to access Market St. and support emergency responders. The connectivity is limited to a one-way drive in response to resident concerns voiced at the pre-application community meeting according to the application; however, limiting the drive to one-way travel reduces the usability of this connection, both for emergency responders and for nearby residents. Goal V: Revitalize commercial corridors and blighted areas through infill and redevelopment Desired Outcome: Strong existing neighborhoods and corridors where the highest and best uses are promoted in an effort to increase economic revitalization Consistency Analysis: The proposed use is infill development along a major highway corridor. Goal VIII: Integrate multimodal transportation into mixed land uses that encourage safe, walkable communities Desired Outcome: A community with a mixture of land uses that allows for individuals to perform daily tasks without the use of an automobile. A community where individuals can safely walk, bike, and access transit. Consistency Analysis: The proposed site plan incorporates a pedestrian link to the nearby residential neighborhood and to the future pedestrian improvements planned along Market Street. It also provides an additional easement for those future pedestrian improvements along Market St. Finally, it also shows other bicycle infrastructure such as bicycle parking facilities. Goal XVI: Increase public safety by reducing crime through the built environment Desired Outcome: New development patterns that focus on increased public safety Consistency Analysis: The applicant has included a pedestrian pathway between the site and the nearby residential neighborhood, which is beneficial for multi-modal access and encouraging a walkable community, also an implementation strategy for this goal. In order to reduce the potential for crime, however, lighting and other safety features, which are not required to be shown on special use permit application site plans, become important. There is no information included in the application regarding these types of features. S17-02 Staff Summary Page 7 of 10

Goal XVIII: Increase physical activity and promote healthy active lifestyles Desired Outcome: A built environment that encourages active lifestyles and increased health through walking and biking. Consistency Analysis: As mentioned above, the proposed site plan incorporates a pedestrian link to the nearby residential neighborhood but does not provide an easement for a multi-use path along Market St., as recommended in the Greenway Plan. Goal XIX: Increase access to affordable and convenient healthy foods Desired Outcome: Increased community health Consistency Analysis: The role of convenience stores in providing access to affordable, convenient healthy foods is mixed. Their close proximity improves access to foods, but these foods are often more expensive and less likely to be healthy than those that can be found at grocery stores, farmers markets, etc. Goal XXI: Ensure NHC remains in attainment for air quality, in support of clean air and improved health outcomes in support of continued growth Desired Outcome: New Hanover County to remain in attainment for air quality to protect public health and retain and attract development and industries Consistency Analysis: One of the implementation guidelines for this goal is supporting and enhancing access between neighborhoods and neighborhood-based commercial developments. The proposed pedestrian linkage will support this recommendation. A two-way connecting drive would assist in reducing miles travelled; this goal is not adequately addressed by the one-way connection. Staff Analysis of Comprehensive Plan Consistency In general, the proposed convenience store and fueling station is consistent with the goals of the 2016 Comprehensive Plan, as it will provide an appropriate commercial service to nearby residents and travelers along Market St. and a pedestrian access for nearby residents. However, the oneway drive does not maximize the benefits of connectivity that are promoted in the comprehensive plan. COMMUNITY MEETING NOTES A community meeting was held on Tuesday, August 30, 2017. The applicant has provided a summary of the meeting in the application. Modifications were made to the proposed site plan presented during the meeting. These changes included reducing the scope of the proposal, and modifying the connection to Raintree Road. S17-02 Staff Summary Page 8 of 10

STAFF PRELIMINARY CONCLUSIONS AND FINDINGS OF FACT: Staff has conducted an analysis of the proposed use and the information provided as part of the application package and has created preliminary findings of fact for each of the conclusions required to be reached to approve the special use permit request. These preliminary findings of fact and conclusions are based solely on the information provided to date, prior to any information or testimony in support or opposition to the request that may be presented at the upcoming public hearing at the Planning Board meeting. Finding 1: The Board must find that the use will not materially endanger the public health or safety where proposed and developed according to the plan as submitted and approved. A. Water and wastewater services must be provided and designed to comply with the Cape Fear Public Utilities Authority standards. B. The subject property is located in the New Hanover County North Fire Service District. C. The main access to the site will be provided by Market Street, an arterial street. D. A Traffic Impact Analysis was completed for the proposed development. The TIA found that with the recommended improvements, the area s street network will operate from an A to D Level of Service. E. The subject site does not host any known conservation, cultural, historic, or archaeological resources. F. The existing wetlands on the subject site must comply with the standards and regulations of the US Army Corps of Engineers. Staff Suggestion: Evidence in the record at this time supports a finding that the use will not materially endanger the public health or safety where proposed. In addition, staff s suggested condition regarding providing a two-way vehicular connection to Raintree Road will provide better safety to the area s residents by reducing emergency service response time and traffic on Market Street. Finding 2: The Board must find that the use meets all required conditions and specifications of the Zoning Ordinance. A. Convenience Food Stores are allowed by Special Use Permit in the O&I zoning district. B. The site design complies with the standards of the Zoning Ordinance. Staff Suggestion: Evidence in the record at this time supports a finding that the use meets all of the required conditions and specifications of the Zoning Ordinance. Finding 3: The Board must find that the use will not substantially injure the value of adjoining or abutting property or that the use is a public necessity. A. The location of the proposed development is classified as Community Mixed Use in the 2016 Comprehensive Plan. B. The surrounding land uses include residential, institutional, and commercial uses. C. No evidence has been submitted that this project will decrease the property values of adjacent or nearby properties. S17-02 Staff Summary Page 9 of 10

Staff Suggestion: The evidence in the record at this time supports a finding that the use will not substantially injure the value of adjoining or abutting property. Finding 4: The Board must find that the location and character of the use if developed according to the plan as submitted and approved will be in harmony with the area in which it is to be located and in general conformity with the plan of development for New Hanover County. A. The 2016 Comprehensive Plan classifies the area proposed for the development as Community Mixed Use, and the proposal aligns with the intent of the Community Mixed Use land use classification. Additionally, the proposal supports other policies of the 2016 Comprehensive Plan, including providing appropriate commercial services to nearby residents and interconnectivity to surrounding areas. B. The proposed development will provide for alternative forms of transportation in compliance with the Wilmington/NHC Comprehensive Greenway Plan. Staff Suggestion: Evidence in the record at this time supports a finding that the use is general conformity with the plan of development for New Hanover County. Staff Suggested Conditions 1. The improvements required as part of the approved Traffic Impact Analysis must be completed prior to issuance of a Certificate of Occupancy. 2. A two-way vehicular connection must be made to Raintree Road and extend to Bump Along Road. This vehicular travelway must comply with the County s construction standards for private roads and must be included within a 30 foot access easement that is dedicated for public use. 3. The portion of Bump Along Road adjoining the subject property must be dedicated for public use, either by dedicating an easement or right-of-way. 4. A 20 foot wide easement shall be dedicated to the County along Market Street for the purposes of installing a future multi-use path or sidewalk in accordance with the Wilmington/NHC Comprehensive Greenway Plan. 5. The development must include bicycle parking facilities consisting of at minimum four bicycle parking spaces. S17-02 Staff Summary Page 10 of 10