March 13, Government Center Station. Project Briefing

Similar documents
Construction Contract A47CN01: Wollaston Station Improvements and Quincy Center Garage Demolition. June 2017

PLACEMAKING & MOBILITY WORKSHOP. January 27, 2016

Welcome. to the 95th Street Terminal Improvement Project Public Hearing

MassDOT Highway ACEC State Markets Conference April 4, Jonathan Gulliver, Highway Administrator

PLAN ELEMENTS WORKSHOP. April 5, 2016

Institutional Master Plan The Arnold Arboretum of Harvard University

Expo Line Transit Project. Project Status Update Meeting West End Corridor Segment C

Washington Union Station s 2nd Century DEVELOPMENT PLAN

Denver Union Station Redevelopment Public Presentation on Transit Architecture July 16, 2009 SOM

Subject: Expo Light Rail - Revision of the Terminus Station North Entrance Design

Southeast Extension to RidgeGate Parkway Scoping Booklet

KENDALL SQUARE INITIATIVE. Planned Unit Development Special Permit Application - SoMa September 8, 2015

What s Up Next In The Seattle Squeeze. PSRC Transportation Policy Board April 11

WALTER RAND TRANSPORTATION CENTER

4.13 Security and System Safety

Stakeholders Advisory Working Groups (SAWGs) Smart Growth and TOD Land Use (#11) SAWG Meeting

KENDALL SQUARE INITIATIVE. Planned Unit Development Special Permit Application - SoMa September 8, 2015

The University District envisions, in its neighborhood

Preliminary Assessment of Transportation Issues Related to Proposed Casino at Gateway South

Meeting Display Boards for Public Hearing on the Wilson Transfer Station Project held Tuesday, February 18, 2014.

Pre-Application Questionnaire

Welcome! MILLENNIUM LINE BROADWAY EXTENSION. Over the next 30 years, Metro Vancouver will welcome 1 million new residents and 600,000 new jobs.

Chapter 9 Route window W18 Slough station. Transport for London

UNIVERSITY OF WISCONSIN-PLATTEVILLE REQUEST FOR ARCHITECTURE & ENGINEERING PRE-PLANNING & DESIGN SERVICES. for. Williams Fieldhouse - Phase I

Bus Rapid Transit Environmental Assessment and Section 4(f) Evaluation Summary

Atlanta BeltLine Corridor Environmental Study. Scoping Meeting August 2008

Midtown Corridor Alternatives Analysis. Appendix A - Initially Considered Alternatives Screening

Life Safety - Means of Egress/Exits NFPA 101

CHAPTER 7: Transportation, Mobility and Circulation

Multi-Board Task Force on East Midtown Rezoning. Resolution on Special Permits Sought by Green 317 Madison, LLC for One Vanderbilt

Shift Rapid Transit Public Participation Meeting May 3, 2017

Victoria Bridge Municipal Class EA Civic Works Committee

Call to Artists Public Art for Los Angeles Metro Stations

Redevelopment of Ajax Plaza Area Public Open House Meeting February 19, 2015 Questions and Answers

Honorable Mayor and Members of the City Council. Submitted by: Eric Angstadt, Director, Planning and Development

Taming the Bus: Strategies for Urbanizing Suburban Transit. Seth Riseman, Utile, Inc. Architecture + Planning

Urban Design Manual PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction. Station Study Areas

Introduction. Community Outreach Approach. Sacramento Valley Station Master Plan. Online Questionnaire Summary of Feedback.

DENVER INTERNATIONAL AIRPORT. Photo provided courtesy of Denver International Airport

Key Themes and Responses May 2016

D2 Subway Project Development. Stakeholder Committee October 24, 2018

Though functionally a part of the Ocean Avenue Neighborhood Commercial

Eglinton West/Allen Road Station Potential South Side Entrance Options. Online Consultation April 2 nd to April 16 th

Accessibility Improvement Study

DESIGN OF FOOTBRIDGES

Clairtrell Area Context Plan

C O N V E r G E N C E O F T I M E

Reinventing Kendall Square for the 21st Century

Appendix G. Central Area. Boston Proper and Circumferential Mobility Problems and Proposed Solutions. Existing Co n d i t i o n s

The Ambassador Bridge/ Gateway Project

Phase I Redevelopment Plan. First Community Meeting

Link Union Station (Link US) Project Open House September 26, 2018

COMMUNITY OPEN HOUSE. March 28, 2012

A Study on the People Evacuation Safety for the. Underground MRT Station

Multimodal Station Planning Working Session Rebuilding a Better I-84 in Hartford. August 10, 2017

Inner Sunset Streetscape Improvement Project. Operations and Customer Service Committee July 11, 2017

South 200 th Link Extension Open House April 3, 2013

Coxwell Station Easier Access

YOUR FUTURE RIDE. Lynnwood. 200th St SW. Lynnwood. Transit Center. 52nd Ave W. 220th St SW. Transit Center. 236th St SW. 244th St SW.

Union Station Master Plan Task 2 Briefing

Town Center (part of the Comprehensive Plan)

Major changes to parks and/or facilities within parks require Park Board approval.

Branch Capital Projects Feasibility Study

Silver Line Gateway. Extension of Silver Line Bus Rapid Transit (BRT) to Chelsea and East Boston. Public Informational Meeting Chelsea, MA

UNION STUDIO Greater Kennedy Plaza!

A Napier City Council Facility/Service. Rodney Green Centennial Event Centre. Evacuation Scheme

Vision Plan Kickoff Meeting Summary Report

Mix of Uses Guide for Transit-Oriented Development MIX OF USES

Evacuation Hazards in Crowded Subway Stations

St. Clair Avenue West Area Transportation Master Plan

Urban Design Brief. 875 Wellington Road. Proposed One-Storey Fast Food Restaurant and Two-Storey Restaurant. Wellington Harlech Centre Inc.

L E A R N LEARN. Is there additional information or existing conditions that should be considered as part of the planning process?

Preliminary Fire/Life Safety Assessment Task No (Submittal No. PH b14

FIRE SAFETY INSPECTION REPORT

Executive Summary. NY 7 / NY 2 Corridor

FIRE SAFETY INSPECTION REPORT

Proposed Major Institution Master Plan Street Vacation. March 19, 2009

Newark Liberty International Airport Terminal A Redevelopment Program

PLAN REVIEW SUBMITTAL GUIDE

PLAN: Mattapan Preserve. Enhance. Grow.

APPENDIX D: Visual and Aesthetic Conditions for NCCU Station Refinement. Durham-Orange Light Rail Transit Project

West Broadway Transit Study Initial Screening of Alternatives Memo

History: a Grand Urban Boulevard

A L F O N S O A R C H I T E C T S

2008 APWA Public Works Congress

Executive Review Panel Report on Arson Incident

Relief Line Project Assessment

Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA

BANK OF AMERICA Charles River Plaza, Boston, MA

Ashland BRT Environmental Assessment: logos of CTA, CDOT, Chicago Department of Housing and Economic Development

Downtown Brampton Capital Project

112th Avenue Light Rail Options Concept Design Report JUNE 2010 PREPARED FOR PREPARED BY TBG PGH

Pine Hills Bus Transit Center Community Design Workshop. Presentation April 21, 2018

7/14/2016 CITY HALL ADA ENHANCEMENT/REMODEL ACTION PLAN 1978 Construction

CITY OF BOCA RATON GOVERNMENTAL CAMPUS Master Plan Progress August 22, 2017

ARROYO PROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET

OPTIONS QUESTIONNAIRE

1 Metrolinx overview. Mission We connect our communities. Vision Getting you there better, faster and easier

Chapter 10 Route window W17 Middlegreen Road, St Mary s Road and Trenches bridges. Transport for London

Monroe Street Reconstruction. Public Preconstruction Meeting February 21, 2018

Transcription:

March 13, 2013 Government Center Station Green Reconstruction Line / Blue Project Line Option for Green Construction Line / Blue Staging Line Project Briefing February 12, 2010

Project Purpose Accessibility Last Key Station Modernized, Customer-Friendly Station New Station Entrance and Lobbies Redundant Elevators Upgrade to Current Code Requirements Complete Electrical System Replacement New Station Platforms Improved Lighting New Fare Gates Station Entrance that ties into City Hall Plaza

Project Schedule 2009 BRA Conceptual Design Approval 2012 Final Design 2013 Begin Construction and Station Closure * 24 month Station Closure & Subway By-pass * 2015 Anticipated Re-Opening

Stakeholder and Public Outreach CITY OF BOSTON Boston Redevelopment Authority Property Management Commission for Person with Disabilities Boston Landmarks Commission Public Works Dept. Boston Transportation Dept. Boston Water and Sewer Commission Public Improvements Commission Mayor s Office Parks and Recreation Dept. Street Lighting OTHERS Public Information Meeting Dec. 2012 General Services Admin Federal Transit Admin Mass DOT Mass Historical Commission Area Business Groups Project Abutters Private Utilities Architectural Access Board Massport MBTA System-wide Accessibility Green Line and Blue Line Operations Security Safety Signals Communications Engineering & Maintenance Real Estate Management Environmental Design & Construction Advertising Track Electrical Systems and Maintenance Traction Power Quality Control PLANNED East Boston Public Info Meeting Revere Public Info Meeting Lynn Public Info Meeting Winthrop Public Info

Existing Station Headhouse

Proposed Station Entrance

Existing City Hall Plaza

Proposed City Hall Plaza

Project Site Existing Cambridge Street Station Entrance City Hall Plaza JFK Federal Building Boston City Hall

Proposed Site Plan Cambridge Street Proposed Entrance City Hall Accessible Routes Project Limits Emergency Egress - Only Headhouse JFK ```

Existing City Hall Plaza

Proposed City Hall Plaza

Headhouse Plan Six Entrances with Automatic Sliding Doors Fare Collection Redundant Elevators Accessible Restroom Glass Element with Stairs and Escalators

Headhouse/Station Cross Section Surface Green Line Brattle Loop To Green Line Elevs. Green Line to Haymarket

Existing Headhouse Entry

Proposed Headhouse Entry

Existing Interior Entry Lobby

Proposed Interior Entry Lobby

Interior Paid Lobby

Proposed Head House - Interior Redundant Elevators Solid Stair Risers Perforated for Safety and Visibility

Proposed Head House - Interior

Green Line Station Plan SCOPE OF WORK Raise Entire Station Floor 8-inches Install Redundant Elevators Replace all Escalators Replace All Stairs Replace Electrical Systems Reconstruct Stairs Construct New Elevators to Blue Line Completely Reconstruct Entire Platform Surface Demolish and Reconstruct All Stairs Construct Elevators to Surface Construct Area of Rescue Assistance Enclosure Construct New Stairs to Surface Replace Electrical Substation Replace Escalators

Green Line Station Track Clearance Improvements Existing Platform: About 3-feet Wide Proposed Platform: About 10-feet Wide with Tactile Warnings

Station Arrival

Blue Line Station Plan Construct Area of Rescue Assistance and Stairs for Emergency-Only Egress Reconstruct Entire Platform Surface Rebuild Stairs Replace Escalator & Vendor Space Construct Redundant Elevators to Green Line Completely Demolish and Rebuild Stairs in New Location

Blue Line Emergency Egress Blue Line Emergency only Egress (looking towards Tremont St) Blue Line Emergency only Egress (from Cambridge Street)

Blue Line Emergency Egress Headhouse at Cambridge Street Level Blue Line Mezzanine Level Area of Rescue Assistance at Blue Line Station Level

Construction Phasing Criteria: Maintain Public and Worker Safety Minimize Customer Inconvenience Minimize Operational Disruptions Minimize Risks of Construction Delays Maximize Quality of Workmanship Value Engineering Recommendation: Station Closure and Trains Run Through

Construction Phasing Station Closure and Allow Trains to Run Through Advantages: - Safer Operations & Construction - Simpler Trip Planning - Reduced Project Schedule - Accessibility Provided 2-years Earlier - Cost Savings of at least $20 Million Disadvantages: - Longer walk for some users - Additional transfer time

Mitigation: Customer Rerouting & Busing

Customer Transfers Riders who usually transfer here Options: Haymarket Via Haymarket (recommended) Connect via Orange Line Increased service at Haymarket: 1 1 Via Downtown Crossing (off-peak) Connect via Orange Line Red Line Connection or Walk via Winter St Concourse Park State 2 Downtown Crossing

Customer Diversion: Government Center Entries/Exits If you usually enter or exit here: shuttle Haymarket Green Line Options: Walk from Park or Haymarket Shuttle bus from Haymarket Bowdoin Blue Line Options: Walk from State or Bowdoin Extended Bowdoin hours Shuttle bus from State or Bowdoin Government Center State Park 4 - Minute Walk

Proposed Station Headhouse THANK YOU